Cascade Clean Energy, Inc.; Kingdom Energy Products; Notice of Transfer of Exemption, 57805 [2015-24383]
Download as PDF
Federal Register / Vol. 80, No. 186 / Friday, September 25, 2015 / Notices
57805
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Satisfies
(Y/N)
Statutory provision
Description
FPA 30(a)(3)(A), as amended by HREA .....
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation
of electricity.
The facility is constructed, operated, or maintained for the generation of electric power
and uses for such generation only the hydroelectric potential of a non-federally
owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .......................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
FPA 30(a)(3)(C)(i), as amended by HREA ..
mstockstill on DSK4VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by HREA
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
1 18
19:58 Sep 24, 2015
Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24375 Filed 9–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5069–011]
Cascade Clean Energy, Inc.; Kingdom
Energy Products; Notice of Transfer of
Exemption
1. By letter filed August 19, 2015,
Neva Van Hook, d/b/a Kingdom Energy
CFR 385.2001–2005 (2015).
VerDate Sep<11>2014
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the Web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD15–33) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Jkt 235001
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Y
Y
Y
Y
Products (KEP) informed the
Commission that the exemption from
licensing for the Sygitowicz Creek
Power Project, FERC No. 5069,
originally issued July 14, 1982,1 has
been transferred to Kingdom Energy
Products. The project is located on the
Sygitowicz Creek, Whatcom County,
Washington. The transfer of an
exemption does not require Commission
approval.
2. Kingdom Energy Products is now
the exemptee of the Sygitowicz Creek
Power Project, FERC No. 5069. All
correspondence should be forwarded to:
Mr. Alan Van Hook, Kingdom Energy
Products, Box 557, Klawock, AK 99925.
Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24383 Filed 9–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications. Order No. 607 (64 FR
51222, September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
1 20 FERC ¶ 62,051, Order Granting Exemption
From Licensing of a Small Hydroelectric Project of
5 Megawatts or Less (1982).
E:\FR\FM\25SEN1.SGM
25SEN1
Agencies
[Federal Register Volume 80, Number 186 (Friday, September 25, 2015)]
[Notices]
[Page 57805]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24383]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5069-011]
Cascade Clean Energy, Inc.; Kingdom Energy Products; Notice of
Transfer of Exemption
1. By letter filed August 19, 2015, Neva Van Hook, d/b/a Kingdom
Energy Products (KEP) informed the Commission that the exemption from
licensing for the Sygitowicz Creek Power Project, FERC No. 5069,
originally issued July 14, 1982,\1\ has been transferred to Kingdom
Energy Products. The project is located on the Sygitowicz Creek,
Whatcom County, Washington. The transfer of an exemption does not
require Commission approval.
---------------------------------------------------------------------------
\1\ 20 FERC ] 62,051, Order Granting Exemption From Licensing of
a Small Hydroelectric Project of 5 Megawatts or Less (1982).
---------------------------------------------------------------------------
2. Kingdom Energy Products is now the exemptee of the Sygitowicz
Creek Power Project, FERC No. 5069. All correspondence should be
forwarded to: Mr. Alan Van Hook, Kingdom Energy Products, Box 557,
Klawock, AK 99925.
Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24383 Filed 9-24-15; 8:45 am]
BILLING CODE 6717-01-P