Steve Patton; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene, 57803-57804 [2015-24376]
Download as PDF
Federal Register / Vol. 80, No. 186 / Friday, September 25, 2015 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24370 Filed 9–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2203–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Alabama Power Company; Notice of
Authorization for Continued Project
Operation
On August 16, 2013, Alabama Power
Company, licensee for the Holt
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Holt Hydroelectric Project is
located on the Black Warrior River, in
Tuscaloosa County, Alabama.
The license for Project No. 2203 was
issued for a period ending August 31,
2015. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR.16.21(b),
VerDate Sep<11>2014
19:58 Sep 24, 2015
Jkt 235001
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2203
is issued to the licensee for a period
effective September 1, 2015 through
August 31, 2016 or until the issuance of
a new license for the project or other
disposition under the FPA, whichever
comes first.
If issuance of a new license (or other
disposition) does not take place on or
before August 31, 2016, notice is hereby
given that, pursuant to 18 CFR 16.18(c),
an annual license under section 15(a)(1)
of the FPA is renewed automatically
without further order or notice by the
Commission, unless the Commission
orders otherwise. If the project is not
subject to section 15 of the FPA, notice
is hereby given that the licensee,
Alabama Power Company, is authorized
to continue operation of the Holt
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24382 Filed 9–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI15–4–000]
Steve Patton; Notice of Declaration of
Intention and Soliciting Comments,
Protests, and Motions To Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI15–4–000.
c. Date Filed: May 11, 2015.
d. Applicant: Steve Patton.
e. Name of Project: Patton Colorado
Hydropower Project.
f. Location: The proposed Patton
Colorado Hydropower Project will be
located on Columbine Creek (feeder to
South Fork of Rio Grande) in the town
of Southfork, Mineral County, Colorado.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C
817(b) (2012).
h. Applicant Contact: Steve Patton,
2418 Hawthorne, Amarillo, TX 79109;
telephone: (806) 355–2418, fax: (806)
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
57803
463–2418, email address: itsme_ss@
suddenlink.net.
i. FERC Contact: Any questions on
this notice should be addressed to
Jennifer Polardino, (202) 502–6437, or
email address: Jennifer.Polardino@
ferc.gov.
j. Deadline for filing comments,
protests, and motions to intervene is: 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
protests, and motions to intervene using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The first page of any filing should
include docket number DI15–04–000.
k. Description of Project: The
proposed run-of-river Patton Colorado
Hydropower Project would consist of:
(1) Diverting water from Columbine
Creek through either a 10-inch-diameter
pipe or two 6-inch diameter pipes, by
220-foot-long, leading to a gravitation
water vortex type generating unit; (2) a
generating unit rated between 2 to 10
kilowatt (kW) with a rated head of 8
feet; and (3) appurtenant facilities.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the project would
affect the interests of interstate or
foreign commerce. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy public
lands or reservations of the United
States; (3) would utilize surplus water
or water power from a government dam;
or (4) would be located on a nonnavigable stream over which Congress
has Commerce Clause jurisdiction and
would be constructed or enlarged after
1935.
l. Locations of the Application: This
filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
E:\FR\FM\25SEN1.SGM
25SEN1
57804
Federal Register / Vol. 80, No. 186 / Friday, September 25, 2015 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, AND ‘‘MOTIONS TO
INTERVENE’’, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24376 Filed 9–24–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:58 Sep 24, 2015
Jkt 235001
Dated: September 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2015–24371 Filed 9–24–15; 8:45 am]
Combined Notice of Filings #2
September 21, 2015.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–2678–000.
Applicants: NorthWestern
Corporation.
Description: Initial rate filing: Rate
Schedule FERC No. 38–SD—
Agreements with Western Area Power
Administration to be effective
9/22/2015.
Filed Date: 9/21/15.
Accession Number: 20150921–5097.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER15–2679–000.
Applicants: Latigo Wind Park, LLC.
Description: Baseline eTariff Filing:
Latigo Wind Park, LLC MBR Tariff to be
effective 11/15/2015.
Filed Date: 9/21/15.
Accession Number: 20150921–5133.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER15–2680–000.
Applicants: Sandstone Solar LLC.
Description: Baseline eTariff Filing:
Sandstone Solar LLC MBR Tariff to be
effective 11/1/2015.
Filed Date: 9/21/15.
Accession Number: 20150921–5161.
Comments Due: 5 p.m. ET 10/13/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD15–33–000]
City of Cheyenne, Wyoming; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On August 26, 2015, the City of
Cheyenne, Wyoming, by and through its
Board of Public Utilities, filed a notice
of intent to construct a qualifying
conduit hydropower facility, pursuant
to section 30 of the Federal Power Act
(FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Sherard
Hydroelectric Generation Facility would
have an installed capacity of 950
kilowatts (kW), and would be located
along an existing 48-inch-diameter raw
water pipeline within the city’s water
treatment plant. The project would be
located near the City of Cheyenne,
Wyoming.
Applicant Contact: Tim Wilson,
Director, 2416 Snyder Ave., Cheyenne,
WY 82001, Phone No. (307) 637–6460.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
two-level powerhouse approximately 36
feet by 36 feet adjacent to the existing
water treatment plant building; (2) an
approximately 800-foot-long, up to 48inch-diameter penstock teeing off the
existing 48-inch-diameter raw water
pipeline; (3) one impulse turbine/
generator unit with an installed capacity
of 950 kilowatt (kW); (4) a short
discharge returning water to the existing
48-inch-diameter raw water pipeline;
and (5) appurtenant facilities.
The proposed project would have a
total installed capacity of 950 kW.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
E:\FR\FM\25SEN1.SGM
25SEN1
Agencies
[Federal Register Volume 80, Number 186 (Friday, September 25, 2015)]
[Notices]
[Pages 57803-57804]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24376]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI15-4-000]
Steve Patton; Notice of Declaration of Intention and Soliciting
Comments, Protests, and Motions To Intervene
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No: DI15-4-000.
c. Date Filed: May 11, 2015.
d. Applicant: Steve Patton.
e. Name of Project: Patton Colorado Hydropower Project.
f. Location: The proposed Patton Colorado Hydropower Project will
be located on Columbine Creek (feeder to South Fork of Rio Grande) in
the town of Southfork, Mineral County, Colorado.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16
U.S.C 817(b) (2012).
h. Applicant Contact: Steve Patton, 2418 Hawthorne, Amarillo, TX
79109; telephone: (806) 355-2418, fax: (806) 463-2418, email address:
itsme_ss@suddenlink.net.
i. FERC Contact: Any questions on this notice should be addressed
to Jennifer Polardino, (202) 502-6437, or email address:
Jennifer.Polardino@ferc.gov.
j. Deadline for filing comments, protests, and motions to intervene
is: 30 days from the issuance date of this notice by the Commission.
The Commission strongly encourages electronic filing. Please file
comments, protests, and motions to intervene using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. The first page of any
filing should include docket number DI15-04-000.
k. Description of Project: The proposed run-of-river Patton
Colorado Hydropower Project would consist of: (1) Diverting water from
Columbine Creek through either a 10-inch-diameter pipe or two 6-inch
diameter pipes, by 220-foot-long, leading to a gravitation water vortex
type generating unit; (2) a generating unit rated between 2 to 10
kilowatt (kW) with a rated head of 8 feet; and (3) appurtenant
facilities.
When a Declaration of Intention is filed with the Federal Energy
Regulatory Commission, the Federal Power Act requires the Commission to
investigate and determine if the project would affect the interests of
interstate or foreign commerce. The Commission also determines whether
or not the project: (1) Would be located on a navigable waterway; (2)
would occupy public lands or reservations of the United States; (3)
would utilize surplus water or water power from a government dam; or
(4) would be located on a non-navigable stream over which Congress has
Commerce Clause jurisdiction and would be constructed or enlarged after
1935.
l. Locations of the Application: This filing may be viewed on the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the last three digits in the docket
number field to access the document. You may
[[Page 57804]]
also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: All filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND
``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of the
particular application to which the filing refers. A copy of any Motion
to Intervene must also be served upon each representative of the
Applicant specified in the particular application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24376 Filed 9-24-15; 8:45 am]