Electric Quarterly Reports; M&R Energy Resources Corp.; Reliable Power, LLC; Susterra Energy, LLC; Notice of Revocation of Market-Based Rate Tariff, 58243 [2015-24534]
Download as PDF
Federal Register / Vol. 80, No. 187 / Monday, September 28, 2015 / Notices
Southeastern Regional Transmission
Planning (SERTP) Process.
The SERTP Process Third Quarter
Meeting
September 24, 2015, 10:00 a.m.–2:00
p.m. (Central Time)
The above-referenced meeting will be
via web conference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
www.southeasternrtp.com.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket Nos. ER13–1927, et al., PJM
Interconnection, L.L.C., et al.
Docket Nos. ER13–1923, et al.,
Midcontinent Independent System
Operator, Inc., et al.
Docket No. EL15–32, North Carolina
Waste Awareness and Reduction
Network, Inc. v. Duke Energy Carolinas
and Duke Energy Progress.
Docket No. ER13–1105, Duke Energy
Carolinas, LLC.
For more information, contact Valerie
Martin, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–6139 or
Valerie.Martin@ferc.gov.
Dated: September 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24536 Filed 9–25–15; 08:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER02–2001–019; ER13–392–
000, ER11–4531–000; ER12–2514–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Electric Quarterly Reports; M&R
Energy Resources Corp.; Reliable
Power, LLC; Susterra Energy, LLC;
Notice of Revocation of Market-Based
Rate Tariff
On August 21, 2015, the Commission
issued an order announcing its intent to
revoke the market-based rate authority
of the public utilities listed in the
caption of that order, which had failed
to file their required Electric Quarterly
Reports.1 The Commission directed
those public utilities to file the required
Electric Quarterly Reports within 15
days of the date of issuance of the order
or face revocation of their authority to
sell power at market-based rates and
1 Electric Quarterly Reports, 152 FERC ¶ 61,141
(2015) (August 21 Order).
VerDate Sep<11>2014
17:19 Sep 25, 2015
Jkt 235001
termination of their electric marketbased rate tariffs.2
The time period for compliance with
the August 21 Order has elapsed. The
above-captioned companies failed to file
their delinquent Electric Quarterly
Reports. The Commission hereby
revokes the market-based rate authority
and terminates the electric market-based
rate tariff of each of the companies who
are named in the caption of this order.
Dated: September 22, 2015
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24534 Filed 9–25–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14707–000]
Empire State Hydro 305, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 26, 2015, Empire State
Hydro 303, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Texaco Dam Hydroelectric Project
(project) to be located on the
Susquehanna River, near the town of
Fishkill, Dutchess County, New York.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) An existing 22-foothigh, 205-foot-long masonry and
concrete dam; (2) an existing intake
structure, which conveys flow to the
existing penstock; (3) an existing
powerhouse approximately 20 feet long
by 20 feet wide; (4) the powerhouse
would house two equally sized
proposed Kaplan turbines having a total
installed capacity of 450 kilowatts; (5) a
proposed 500-foot-long, 12,700-volt
transmission line; and (6) appurtenant
facilities. The proposed project would
have an average annual generation of 1.5
megawatt-hours.
Applicant Contact: Mr. Mark
Boumansour, Gravity Renewables, Inc.,
2 Id.
PO 00000
at Ordering Paragraph A.
Frm 00013
Fmt 4703
Sfmt 4703
58243
1401 Walnut Street, Suite 220, Boulder,
CO 80302; phone: (303) 440–3378.
FERC Contact: Timothy Looney;
phone: (202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14707–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14707) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24540 Filed 9–25–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER00–1–005.
Applicants: Cross-Sound Cable
Company, LLC.
Description: Notice of Non-Material
Change in Status of Cross-Sound Cable
Company, LLC.
Filed Date: 9/21/15.
Accession Number: 20150921–5246.
Comments Due: 5 p.m. ET 10/13/15.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 80, Number 187 (Monday, September 28, 2015)]
[Notices]
[Page 58243]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24534]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER02-2001-019; ER13-392-000, ER11-4531-000; ER12-2514-000]
Electric Quarterly Reports; M&R Energy Resources Corp.; Reliable
Power, LLC; Susterra Energy, LLC; Notice of Revocation of Market-Based
Rate Tariff
On August 21, 2015, the Commission issued an order announcing its
intent to revoke the market-based rate authority of the public
utilities listed in the caption of that order, which had failed to file
their required Electric Quarterly Reports.\1\ The Commission directed
those public utilities to file the required Electric Quarterly Reports
within 15 days of the date of issuance of the order or face revocation
of their authority to sell power at market-based rates and termination
of their electric market-based rate tariffs.\2\
---------------------------------------------------------------------------
\1\ Electric Quarterly Reports, 152 FERC ] 61,141 (2015) (August
21 Order).
\2\ Id. at Ordering Paragraph A.
---------------------------------------------------------------------------
The time period for compliance with the August 21 Order has
elapsed. The above-captioned companies failed to file their delinquent
Electric Quarterly Reports. The Commission hereby revokes the market-
based rate authority and terminates the electric market-based rate
tariff of each of the companies who are named in the caption of this
order.
Dated: September 22, 2015
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24534 Filed 9-25-15; 8:45 am]
BILLING CODE 6717-01-P