Joseph Weinert, Holly Parrish and Kevin Bezner, Notice of Transfer of Exemption, 58728 [2015-24741]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
58728
Federal Register / Vol. 80, No. 189 / Wednesday, September 30, 2015 / Notices
Filed Date: 9/24/15.
Accession Number: 20150924–5060.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–1494–000.
Applicants: Convergent Energy and
Power Inc.
Description: Report Filing: MarketBased Rate Tariff Refund Report to be
effective N/A.
Filed Date: 9/24/15.
Accession Number: 20150924–5077.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2695–000.
Applicants: Crosswind Transmission,
LLC.
Description: § 205(d) Rate Filing:
Crosswind and Eagle View
Transmission and Interconnection
Agreement to be effective 11/22/2015.
Filed Date: 9/23/15.
Accession Number: 20150923–5160.
Comments Due: 5 p.m. ET 10/14/15.
Docket Numbers: ER15–2696–000.
Applicants: Crosswind Transmission,
LLC.
Description: § 205(d) Rate Filing:
Crosswind and Elk Lake Transmission
and Interconnection Agreement to be
effective 11/22/2015.
Filed Date: 9/23/15.
Accession Number: 20150923–5162.
Comments Due: 5 p.m. ET 10/14/15.
Docket Numbers: ER15–2697–000.
Applicants: Crosswind Transmission,
LLC.
Description: § 205(d) Rate Filing:
Crosswind and Green Prairie
Transmission and Interconnection
Agreement to be effective 11/22/2015.
Filed Date: 9/23/15.
Accession Number: 20150923–5163.
Comments Due: 5 p.m. ET 10/14/15.
Docket Numbers: ER15–2698–000.
Applicants: Crosswind Transmission,
LLC.
Description: § 205(d) Rate Filing:
Crosswind and Highland Transmission
and Interconnection Agreement to be
effective 11/22/2015.
Filed Date: 9/23/15.
Accession Number: 20150923–5164.
Comments Due: 5 p.m. ET 10/14/15.
Docket Numbers: ER15–2699–000.
Applicants: Crosswind Transmission,
LLC.
Description: § 205(d) Rate Filing:
Crosswind and Palo Alto Transmission
and Interconnection Agreement to be
effective 11/22/2015.
Filed Date: 9/23/15.
Accession Number: 20150923–5166.
Comments Due: 5 p.m. ET 10/14/15.
Docket Numbers: ER15–2700–000.
Applicants: Crosswind Transmission,
LLC.
Description: § 205(d) Rate Filing:
Crosswind and Silver Lake
VerDate Sep<11>2014
18:27 Sep 29, 2015
Jkt 235001
Transmission and Interconnection
Agreement to be effective 11/22/2015.
Filed Date: 9/23/15.
Accession Number: 20150923–5167.
Comments Due: 5 p.m. ET 10/14/15.
Docket Numbers: ER15–2701–000.
Applicants: Crosswind Transmission,
LLC.
Description: § 205(d) Rate Filing:
Crosswind and Sunrise View
Transmission and Interconnection
Agreement to be effective 11/22/2015.
Filed Date: 9/23/15.
Accession Number: 20150923–5168.
Comments Due: 5 p.m. ET 10/14/15.
Docket Numbers: ER15–2702–000.
Applicants: Crosswind Transmission,
LLC.
Description: § 205(d) Rate Filing:
Crosswind and Virgin Lake
Transmission and Interconnection
Agreement to be effective 11/22/2015.
Filed Date: 9/23/15.
Accession Number: 20150923–5169.
Comments Due: 5 p.m. ET 10/14/15.
Docket Numbers: ER15–2703–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended CLGIA and Distribution
Service Agreement Tulare Solar Center
1 Project to be effective 9/25/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5000.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2704–000.
Applicants: National Gas & Electric,
LLC.
Description: Baseline eTariff Filing:
Application for MBR to be effective
9/25/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5065.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2705–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions To Address Seams
Transmission Projects to be effective
12/1/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5073.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2706–000.
Applicants: Hardin Hilltop Wind,
LLC.
Description: Baseline eTariff Filing:
Hardin Hilltop and Cy-Hawk
Transmission and Interconnection
Agreement to be effective 11/23/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5101.
Comments Due: 5 p.m. ET 10/15/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
PO 00000
Frm 00027
Fmt 4703
Sfmt 9990
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24735 Filed 9–29–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6942–003]
Joseph Weinert, Holly Parrish and
Kevin Bezner, Notice of Transfer of
Exemption
1. By letter filed September 15, 2015,
Joseph Weinert informed the
Commission that the exemption from
licensing for the Lower Bear Creek
Power Plant Project, FERC No. 6942,
originally issued May 9, 1983,1 has been
transferred to Holly Parrish and Kevin
Bezner. The project is located on the
Little Bear Creek in Placer County,
California. The transfer of an exemption
does not require Commission approval.
2. Holly Parrish and Kevin Bezner are
now the exemptees of the Lower Bear
Creek Power Plant Project, FERC No.
6942. All correspondence should be
forwarded to: Holly Parrish and Kevin
Bezner, 4239 Fairway View Drive,
Loomis, CA 95650.
Dated: September 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24741 Filed 9–29–15; 8:45 am]
BILLING CODE 6717–01–P
1 23 FERC ¶ 62,182, Notice of Exemption From
Licensing (1982).
E:\FR\FM\30SEN1.SGM
30SEN1
Agencies
[Federal Register Volume 80, Number 189 (Wednesday, September 30, 2015)]
[Notices]
[Page 58728]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24741]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6942-003]
Joseph Weinert, Holly Parrish and Kevin Bezner, Notice of
Transfer of Exemption
1. By letter filed September 15, 2015, Joseph Weinert informed the
Commission that the exemption from licensing for the Lower Bear Creek
Power Plant Project, FERC No. 6942, originally issued May 9, 1983,\1\
has been transferred to Holly Parrish and Kevin Bezner. The project is
located on the Little Bear Creek in Placer County, California. The
transfer of an exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ 23 FERC ] 62,182, Notice of Exemption From Licensing (1982).
---------------------------------------------------------------------------
2. Holly Parrish and Kevin Bezner are now the exemptees of the
Lower Bear Creek Power Plant Project, FERC No. 6942. All correspondence
should be forwarded to: Holly Parrish and Kevin Bezner, 4239 Fairway
View Drive, Loomis, CA 95650.
Dated: September 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24741 Filed 9-29-15; 8:45 am]
BILLING CODE 6717-01-P