Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 58728 Federal Register / Vol. 80, No. 189 / Wednesday, September 30, 2015 / Notices Filed Date: 9/24/15. Accession Number: 20150924–5060. Comments Due: 5 p.m. ET 10/15/15. Docket Numbers: ER15–1494–000. Applicants: Convergent Energy and Power Inc. Description: Report Filing: MarketBased Rate Tariff Refund Report to be effective N/A. Filed Date: 9/24/15. Accession Number: 20150924–5077. Comments Due: 5 p.m. ET 10/15/15. Docket Numbers: ER15–2695–000. Applicants: Crosswind Transmission, LLC. Description: § 205(d) Rate Filing: Crosswind and Eagle View Transmission and Interconnection Agreement to be effective 11/22/2015. Filed Date: 9/23/15. Accession Number: 20150923–5160. Comments Due: 5 p.m. ET 10/14/15. Docket Numbers: ER15–2696–000. Applicants: Crosswind Transmission, LLC. Description: § 205(d) Rate Filing: Crosswind and Elk Lake Transmission and Interconnection Agreement to be effective 11/22/2015. Filed Date: 9/23/15. Accession Number: 20150923–5162. Comments Due: 5 p.m. ET 10/14/15. Docket Numbers: ER15–2697–000. Applicants: Crosswind Transmission, LLC. Description: § 205(d) Rate Filing: Crosswind and Green Prairie Transmission and Interconnection Agreement to be effective 11/22/2015. Filed Date: 9/23/15. Accession Number: 20150923–5163. Comments Due: 5 p.m. ET 10/14/15. Docket Numbers: ER15–2698–000. Applicants: Crosswind Transmission, LLC. Description: § 205(d) Rate Filing: Crosswind and Highland Transmission and Interconnection Agreement to be effective 11/22/2015. Filed Date: 9/23/15. Accession Number: 20150923–5164. Comments Due: 5 p.m. ET 10/14/15. Docket Numbers: ER15–2699–000. Applicants: Crosswind Transmission, LLC. Description: § 205(d) Rate Filing: Crosswind and Palo Alto Transmission and Interconnection Agreement to be effective 11/22/2015. Filed Date: 9/23/15. Accession Number: 20150923–5166. Comments Due: 5 p.m. ET 10/14/15. Docket Numbers: ER15–2700–000. Applicants: Crosswind Transmission, LLC. Description: § 205(d) Rate Filing: Crosswind and Silver Lake VerDate Sep<11>2014 18:27 Sep 29, 2015 Jkt 235001 Transmission and Interconnection Agreement to be effective 11/22/2015. Filed Date: 9/23/15. Accession Number: 20150923–5167. Comments Due: 5 p.m. ET 10/14/15. Docket Numbers: ER15–2701–000. Applicants: Crosswind Transmission, LLC. Description: § 205(d) Rate Filing: Crosswind and Sunrise View Transmission and Interconnection Agreement to be effective 11/22/2015. Filed Date: 9/23/15. Accession Number: 20150923–5168. Comments Due: 5 p.m. ET 10/14/15. Docket Numbers: ER15–2702–000. Applicants: Crosswind Transmission, LLC. Description: § 205(d) Rate Filing: Crosswind and Virgin Lake Transmission and Interconnection Agreement to be effective 11/22/2015. Filed Date: 9/23/15. Accession Number: 20150923–5169. Comments Due: 5 p.m. ET 10/14/15. Docket Numbers: ER15–2703–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended CLGIA and Distribution Service Agreement Tulare Solar Center 1 Project to be effective 9/25/2015. Filed Date: 9/24/15. Accession Number: 20150924–5000. Comments Due: 5 p.m. ET 10/15/15. Docket Numbers: ER15–2704–000. Applicants: National Gas & Electric, LLC. Description: Baseline eTariff Filing: Application for MBR to be effective 9/25/2015. Filed Date: 9/24/15. Accession Number: 20150924–5065. Comments Due: 5 p.m. ET 10/15/15. Docket Numbers: ER15–2705–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Revisions To Address Seams Transmission Projects to be effective 12/1/2015. Filed Date: 9/24/15. Accession Number: 20150924–5073. Comments Due: 5 p.m. ET 10/15/15. Docket Numbers: ER15–2706–000. Applicants: Hardin Hilltop Wind, LLC. Description: Baseline eTariff Filing: Hardin Hilltop and Cy-Hawk Transmission and Interconnection Agreement to be effective 11/23/2015. Filed Date: 9/24/15. Accession Number: 20150924–5101. Comments Due: 5 p.m. ET 10/15/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. PO 00000 Frm 00027 Fmt 4703 Sfmt 9990 Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 24, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–24735 Filed 9–29–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6942–003] Joseph Weinert, Holly Parrish and Kevin Bezner, Notice of Transfer of Exemption 1. By letter filed September 15, 2015, Joseph Weinert informed the Commission that the exemption from licensing for the Lower Bear Creek Power Plant Project, FERC No. 6942, originally issued May 9, 1983,1 has been transferred to Holly Parrish and Kevin Bezner. The project is located on the Little Bear Creek in Placer County, California. The transfer of an exemption does not require Commission approval. 2. Holly Parrish and Kevin Bezner are now the exemptees of the Lower Bear Creek Power Plant Project, FERC No. 6942. All correspondence should be forwarded to: Holly Parrish and Kevin Bezner, 4239 Fairway View Drive, Loomis, CA 95650. Dated: September 24, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–24741 Filed 9–29–15; 8:45 am] BILLING CODE 6717–01–P 1 23 FERC ¶ 62,182, Notice of Exemption From Licensing (1982). E:\FR\FM\30SEN1.SGM 30SEN1

Agencies

[Federal Register Volume 80, Number 189 (Wednesday, September 30, 2015)]
[Notices]
[Page 58728]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24741]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 6942-003]


Joseph Weinert, Holly Parrish and Kevin Bezner, Notice of 
Transfer of Exemption

    1. By letter filed September 15, 2015, Joseph Weinert informed the 
Commission that the exemption from licensing for the Lower Bear Creek 
Power Plant Project, FERC No. 6942, originally issued May 9, 1983,\1\ 
has been transferred to Holly Parrish and Kevin Bezner. The project is 
located on the Little Bear Creek in Placer County, California. The 
transfer of an exemption does not require Commission approval.
---------------------------------------------------------------------------

    \1\ 23 FERC ] 62,182, Notice of Exemption From Licensing (1982).
---------------------------------------------------------------------------

    2. Holly Parrish and Kevin Bezner are now the exemptees of the 
Lower Bear Creek Power Plant Project, FERC No. 6942. All correspondence 
should be forwarded to: Holly Parrish and Kevin Bezner, 4239 Fairway 
View Drive, Loomis, CA 95650.

    Dated: September 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24741 Filed 9-29-15; 8:45 am]