Combined Notice of Filings, 58244-58245 [2015-24532]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
58244
Federal Register / Vol. 80, No. 187 / Monday, September 28, 2015 / Notices
Docket Numbers: ER12–2068–008;
ER15–1471–001; ER10–2460–008;
ER10–2461–008; ER12–682–009; ER10–
2463–008; ER15–1672–001; ER11–2201–
012; ER10–2464–005; ER13–1139–011;
ER13–1585–005; ER10–2465–004;
ER11–2657–005; ER13–17–006; ER14–
2630–004; ER12–1311–008; ER10–2466–
009; ER11–4029–008; ER12–2205–005;
ER12–2159–004; ER10–1821–009;
ER12–919–003.
Applicants: Blue Sky East, LLC, Blue
Sky West, LLC, Canandaigua Power
Partners, LLC, Canandaigua Power
Partners II, LLC, Erie Wind, LLC,
Evergreen Wind Power, LLC, Evergreen
Wind Power II, LLC, Evergreen Wind
Power III, LLC, First Wind Energy
Marketing, LLC, Imperial Valley Solar 1,
LLC, Longfellow Wind, LLC, Milford
Wind Corridor Phase I, LLC, Milford
Wind Corridor Phase II, LLC, Niagara
Wind Power, LLC, Regulus Solar, LLC,
Stetson Holdings, LLC, Stetson Wind II,
LLC, Vermont Wind, LLC, Meadow
Creek Project Company LLC, Canadian
Hills Wind, LLC, Goshen Phase II LLC,
Rockland Wind Farm LLC.
Description: Supplement to July 27,
2015 Notice of Change in Status of Blue
Sky East, LLC, et. al.
Filed Date: 9/21/15.
Accession Number: 20150921–5220.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER14–1317–004;
ER11–2041–007; ER11–2042–007;
ER10–3193–007; ER10–2964–009;
ER10–2924–007; ER10–2480–006;
ER10–2959–007; ER10–2961–006;
ER10–2934–006; ER12–281–008; ER10–
3099–013; ER13–821–008; ER10–2950–
006; ER14–2500–002; ER14–2498–002;
ER10–2615–007; ER11–2335–008;
ER10–2538–004.
Applicants: Sunshine Gas Producers,
LLC, Innovative Energy Systems, LLC,
Seneca Energy II, LLC, Brooklyn Navy
Yard Cogeneration Partners, L.P.,
Selkirk Cogen Partners, L.P., Kleen
Energy Systems, LLC, Berkshire Power
Company, LLC, Chambers Cogeneration,
Limited Partnership, Edgecombe Genco,
LLC, Logan Generating Company, L.P.,
Northampton Generating Company,
L.P., RC Cape May Holdings, LLC,
Scrubgrass Generating Company, L.P.,
Spruance Genco, LLC, Newark Energy
Center, LLC, EIF Newark, LLC, Plum
Point Energy Associates, LLC, Plum
Point Services Company, LLC, Panoche
Energy Center, LLC.
Description: Notice of Non-Material
Change in Status of Sunshine Gas
Producers, LLC, et. al.
Filed Date: 9/22/15.
Accession Number: 20150922–5063.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER14–1470–004.
VerDate Sep<11>2014
17:19 Sep 25, 2015
Jkt 235001
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: Compliance filing: 2015–
09–21_SA 2645 Compliance AmerenWhite Oak Facilities Service Agreement
to be effective 5/11/2014.
Filed Date: 9/21/15.
Accession Number: 20150921–5209.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER15–2160–001.
Applicants: Crystal Lake Wind II,
LLC.
Description: Compliance filing:
Amendment to Crystal Lake Wind II,
LLC Order No. 784 Compliance Filing to
be effective 7/11/2015.
Filed Date: 9/21/15.
Accession Number: 20150921–5197.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER15–2161–001.
Applicants: Crystal Lake Wind III,
LLC.
Description: Compliance filing:
Amendment to Crystal Lake Wind III,
LLC Order No. 784 Compliance Filing to
be effective 7/11/2015.
Filed Date: 9/21/15.
Accession Number: 20150921–5201.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER15–2681–000.
Applicants: White Oak Energy LLC.
Description: Compliance filing: White
Oak Energy LLC Order No. 784
Revisions to be effective 7/11/2015.
Filed Date: 9/21/15.
Accession Number: 20150921–5191.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER15–2682–000.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Cancellation:
Notice of Termination NCPA IA SA 17
to be effective 10/31/2015.
Filed Date: 9/22/15.
Accession Number: 20150922–5002.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER15–2683–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Biggs Interruptible Wholesale
Distribution Service and IA (RS 246) to
be effective 11/1/2015.
Filed Date: 9/22/15.
Accession Number: 20150922–5005.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER15–2684–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
NCPA Replacement IA and Related
TFAs Filing (SA 292) to be effective
11/1/2015.
Filed Date: 9/22/15.
Accession Number: 20150922–5006.
Comments Due: 5 p.m. ET 10/13/15.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Docket Numbers: ER15–2685–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised Interconnection Service
Agreement No. 3604 Queue No. W4–
009/X4–005 to be effective 11/4/2014.
Filed Date: 9/22/15.
Accession Number: 20150922–5055.
Comments Due: 5 p.m. ET 10/13/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24530 Filed 9–25–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP15–1277–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: Pro
Forma Operational Balancing
Agreement to be effective 11/1/2015.
Filed Date: 9/17/15.
Accession Number: 20150917–5092.
Comments Due: 5 p.m. ET 9/29/15.
Docket Numbers: RP15–1278–000.
Applicants: Maritimes & Northeast
Pipeline, L.L.C.
Description: § 4(d) Rate Filing: Pro
Forma Operational Balancing
Agreement to be effective 11/1/2015.
Filed Date: 9/17/15.
Accession Number: 20150917–5093.
Comments Due: 5 p.m. ET 9/29/15.
E:\FR\FM\28SEN1.SGM
28SEN1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 187 / Monday, September 28, 2015 / Notices
Docket Numbers: RP15–1279–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: Pro
Forma Operational Balancing
Agreement to be effective 11/1/2015.
Filed Date: 9/17/15.
Accession Number: 20150917–5099.
Comments Due: 5 p.m. ET 9/29/15.
Docket Numbers: RP15–1280–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing: Fuel
Tracker Filing Effective November 2015
to be effective 11/1/2015.
Filed Date: 9/18/15.
Accession Number: 20150918–5066.
Comments Due: 5 p.m. ET 9/30/15.
Docket Numbers: RP15–1281–000.
Applicants: ANR Pipeline Company.
Description: § 4(d) Rate Filing:
Compliance to CP14–514—Sulphur
Springs Revisions to be effective 11/1/
2015.
Filed Date: 9/18/15.
Accession Number: 20150918–5109.
Comments Due: 5 p.m. ET 9/30/15.
Docket Numbers: RP15–1282–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing: GSS
Storage Ratchet and Maximum Storage
Balance Filing to be effective 11/1/2015.
Filed Date: 9/18/15.
Accession Number: 20150918–5115.
Comments Due: 5 p.m. ET 9/30/15.
Docket Numbers: RP15–1283–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Amendment of Formula-Based
Negotiated Rate Agreement Filing
Effective 11/01/2015 to be effective
11/1/2015.
Filed Date: 9/18/15.
Accession Number: 20150918–5116.
Comments Due: 5 p.m. ET 9/30/15.
Docket Numbers: RP15–1284–000.
Applicants: Centra Pipelines
Minnesota Inc.
Description: Petition for Approval of
Settlement submitted by Centra
Pipelines Minnesota Inc. under RP15–
1284.
Filed Date: 9/18/15.
Accession Number: 20150918–5118.
Comments Due: 5 p.m. ET 9/30/15.
Docket Numbers: RP15–1285–000.
Applicants: Enable Mississippi River
Transmission, L.
Description: § 4(d) Rate Filing: 2015
Fuel Adjustment Filing to be effective
11/1/2015.
Filed Date: 9/18/15.
Accession Number: 20150918–5133.
Comments Due: 5 p.m. ET 9/30/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
VerDate Sep<11>2014
17:19 Sep 25, 2015
Jkt 235001
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated September 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24532 Filed 9–25–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14550–001]
New England Hydropower Company,
LLC; Notice of Application Accepted
for Filing With the Commission, Intent
To Waive Scoping, Soliciting Motions
To Intervene and Protests, Ready for
Environmental Analysis, and Soliciting
Comments, Terms and Conditions, and
Recommendations, and Establishing
an Expedited Schedule for Processing
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
from Licensing.
b. Project No.: 14550–001.
c. Date filed: June 26, 2015.
d. Applicant: New England
Hydropower Company, LLC.
e. Name of Project: Hanover Pond
Dam Hydroelectric Project.
f. Location: On the Quinnipiac River,
in the City of Meriden, New Haven
County, Connecticut. The project would
not occupy lands of the United States.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Michael C. Kerr,
New England Hydropower Company,
LLC, P.O. Box 5524, Beverly, MA 01915;
(978) 360–2547.
i. FERC Contact: Erin Kimsey, (202)
502–8621, or email at erin.kimsey@
ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments, terms
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
58245
and conditions, and recommendations:
Due to the small size and location of
this project and the close coordination
with state and federal agencies during
preparation of the application, the 60day timeframe in 18 CFR 4.34(b) is
shortened. Instead, motions to intervene
and protests, comments, terms and
conditions, and recommendations are
due 30 days from the issuance date of
this notice. All reply comments must be
filed with the Commission within 45
days from the issuance date of this
notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, and
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13806–004.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Waiver of Pre-filing Consultation: In
its application, the New England
Hydropower Company requested that
the Commission waive the requirement
to conduct second stage consultation
pursuant to section 4.38(c) of the
Commission’s regulations. The
applicant provided documentation
indicating that the Connecticut
Department of Energy and
Environmental Protection, National
Marine Fisheries Service, and United
States Fish and Wildlife Service had
agreed to waive second stage
consultation on September 10, 2015,
August 26, 2015, and August 26, 2015,
respectively. Therefore, we are waiving
the requirement to conduct second stage
consultation pursuant to section 4.38(c)
of the regulations and accepting the
application.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 80, Number 187 (Monday, September 28, 2015)]
[Notices]
[Pages 58244-58245]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24532]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP15-1277-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Pro Forma Operational
Balancing Agreement to be effective 11/1/2015.
Filed Date: 9/17/15.
Accession Number: 20150917-5092.
Comments Due: 5 p.m. ET 9/29/15.
Docket Numbers: RP15-1278-000.
Applicants: Maritimes & Northeast Pipeline, L.L.C.
Description: Sec. 4(d) Rate Filing: Pro Forma Operational
Balancing Agreement to be effective 11/1/2015.
Filed Date: 9/17/15.
Accession Number: 20150917-5093.
Comments Due: 5 p.m. ET 9/29/15.
[[Page 58245]]
Docket Numbers: RP15-1279-000.
Applicants: Texas Eastern Transmission, LP.
Description: Sec. 4(d) Rate Filing: Pro Forma Operational
Balancing Agreement to be effective 11/1/2015.
Filed Date: 9/17/15.
Accession Number: 20150917-5099.
Comments Due: 5 p.m. ET 9/29/15.
Docket Numbers: RP15-1280-000.
Applicants: Enable Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Fuel Tracker Filing Effective
November 2015 to be effective 11/1/2015.
Filed Date: 9/18/15.
Accession Number: 20150918-5066.
Comments Due: 5 p.m. ET 9/30/15.
Docket Numbers: RP15-1281-000.
Applicants: ANR Pipeline Company.
Description: Sec. 4(d) Rate Filing: Compliance to CP14-514--
Sulphur Springs Revisions to be effective 11/1/2015.
Filed Date: 9/18/15.
Accession Number: 20150918-5109.
Comments Due: 5 p.m. ET 9/30/15.
Docket Numbers: RP15-1282-000.
Applicants: Equitrans, L.P.
Description: Sec. 4(d) Rate Filing: GSS Storage Ratchet and
Maximum Storage Balance Filing to be effective 11/1/2015.
Filed Date: 9/18/15.
Accession Number: 20150918-5115.
Comments Due: 5 p.m. ET 9/30/15.
Docket Numbers: RP15-1283-000.
Applicants: Equitrans, L.P.
Description: Sec. 4(d) Rate Filing: Amendment of Formula-Based
Negotiated Rate Agreement Filing Effective 11/01/2015 to be effective
11/1/2015.
Filed Date: 9/18/15.
Accession Number: 20150918-5116.
Comments Due: 5 p.m. ET 9/30/15.
Docket Numbers: RP15-1284-000.
Applicants: Centra Pipelines Minnesota Inc.
Description: Petition for Approval of Settlement submitted by
Centra Pipelines Minnesota Inc. under RP15-1284.
Filed Date: 9/18/15.
Accession Number: 20150918-5118.
Comments Due: 5 p.m. ET 9/30/15.
Docket Numbers: RP15-1285-000.
Applicants: Enable Mississippi River Transmission, L.
Description: Sec. 4(d) Rate Filing: 2015 Fuel Adjustment Filing to
be effective 11/1/2015.
Filed Date: 9/18/15.
Accession Number: 20150918-5133.
Comments Due: 5 p.m. ET 9/30/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
may be considered, but intervention is necessary to become a party to
the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated September 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24532 Filed 9-25-15; 8:45 am]
BILLING CODE 6717-01-P