Combined Notice of Filings #2, 58726-58727 [2015-24736]
Download as PDF
58726
Federal Register / Vol. 80, No. 189 / Wednesday, September 30, 2015 / Notices
draft-eis. On August 28, 2015, DOE
announced public hearings in October
2015 to receive comments on the Draft
EIS in the Federal Register (80 FR
52268). On August 31, 2015, DOE
received an amendment to the July 1,
2013, Northern Pass Transmission Line
Project Presidential permit amended
application. The August 31, 2015
amendment and related exhibits are
available on the Northern Pass EIS Web
site at https://www.northernpasseis.us/
library/documents/.
The August 31, 2015 application
amendment changed the proposed
transmission line route by adding three
miles of buried transmission line
adjacent to a road not previously
analyzed, added two new transition
stations (one in Bridgewater and one in
Bethlehem; both would transition the
transmission line between aboveground
and buried) of approximately one acre
each, and increased the amount of
proposed buried transmission line from
approximately 8 miles to approximately
60 miles. In addition, the amendment
proposed a minor shift (less than 100
feet) in the international border crossing
location, changed the project size from
1,200 MW to 1,000 MW with a potential
transfer capability of 1,090 MW and
included other design changes (e.g.,
change in converter technology and type
of cable).
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 13, 2015.
Issued in Washington, DC, on September
24, 2015.
Meghan Conklin,
Deputy Assistant Secretary, National
Electricity Delivery Division, Office of
Electricity Delivery and Energy Reliability,
U.S. Department of Energy.
Dated: September 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24772 Filed 9–29–15; 8:45 am]
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. ER15–2541–000]
Federal Energy Regulatory
Commission
[Docket No. NJ15–18–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Oncor Electric Delivery Company LLC;
Notice of Filing
Take notice that on September 22,
2015, Oncor Electric Delivery Company
LLC submitted its tariff filing: Oncor
TFO Tariff Rate Changes, to be effective
9/15/2015.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
18:27 Sep 29, 2015
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
BILLING CODE 6450–01–P
VerDate Sep<11>2014
[FR Doc. 2015–24740 Filed 9–29–15; 8:45 am]
Jkt 235001
Burgess Capital LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Burgess
Capital LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 14,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24738 Filed 9–29–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
September 24, 2015.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–2707–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
USBR SGIA ? Green Springs Rev 1 to be
effective 9/15/2015.
E:\FR\FM\30SEN1.SGM
30SEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 189 / Wednesday, September 30, 2015 / Notices
Filed Date: 9/24/15.
Accession Number: 20150924–5112.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2708–000.
Applicants: Hardin Hilltop Wind,
LLC.
Description: § 205(d) Rate Filing:
Hardin Hilltop and Greene Wind
Transmission and Interconnection
Agreement to be effective 11/23/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5119.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2709–000.
Applicants: Hardin Hilltop Wind,
LLC.
Description: § 205(d) Rate Filing:
Hardin Hilltop and Hardin Wind
Transmission and Interconnection
Agreement to be effective 11/23/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5125.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2710–000.
Applicants: Hardin Hilltop Wind,
LLC.
Description: § 205(d) Rate Filing:
Hardin Hilltop and Poverty Ridge
Transmission and Interconnection
Agreement to be effective 11/23/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5126.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2711–000.
Applicants: Hardin Hilltop Wind,
LLC.
Description: § 205(d) Rate Filing:
Hardin Hilltop and Sutton Wind
Transmission and Interconnection
Agreement to be effective 11/23/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5127.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2712–000.
Applicants: Hardin Hilltop Wind,
LLC.
Description: § 205(d) Rate Filing:
Hardin Hilltop and Wind Family
Transmission and Interconnection
Agreement to be effective 11/23/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5129.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2713–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing:
FPL–FPUC-Preliminary Engineering
Design, Permitting and Procurement of
Material to be effective 9/2/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5130.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–2714–000.
Applicants: Hardin Hilltop Wind,
LLC.
Description: § 205(d) Rate Filing:
Hardin Hilltop and Zontos Wind
VerDate Sep<11>2014
18:27 Sep 29, 2015
Jkt 235001
Transmission and Interconnection
Agreement to be effective 11/23/2015.
Filed Date: 9/24/15.
Accession Number: 20150924–5131.
Comments Due: 5 p.m. ET 10/15/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
58727
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 13, 2015.
Dated: September 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24739 Filed 9–29–15; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2015–24736 Filed 9–29–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Federal Energy Regulatory
Commission
[Docket No. NJ15–17–000]
Oncor Electric Delivery Company LLC;
Notice of Filing
Take notice that on September 22,
2015, Oncor Electric Delivery Company
LLC submitted its tariff filing: Oncor
Tex-La Tariff Rate Changes, to be
effective 9/15/2015.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG15–131–000.
Applicants: Desert Stateline LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Desert Stateline
LLC.
Filed Date: 9/24/15.
Accession Number: 20150924–5030.
Comments Due: 5 p.m. ET 10/15/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1409–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Report Filing: 2015–09–
24_SA 2769 Refund Report for ATC-City
of Reedsburg CFA to be effective N/A.
Filed Date: 9/24/15.
Accession Number: 20150924–5058.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15–1411–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Report Filing: 2015–09–
24_SA 2770 Refund Report of ATC-City
of Sun Prairie CFA to be effective N/A.
E:\FR\FM\30SEN1.SGM
30SEN1
Agencies
[Federal Register Volume 80, Number 189 (Wednesday, September 30, 2015)]
[Notices]
[Pages 58726-58727]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24736]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
September 24, 2015.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-2707-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: USBR SGIA ? Green Springs
Rev 1 to be effective 9/15/2015.
[[Page 58727]]
Filed Date: 9/24/15.
Accession Number: 20150924-5112.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15-2708-000.
Applicants: Hardin Hilltop Wind, LLC.
Description: Sec. 205(d) Rate Filing: Hardin Hilltop and Greene
Wind Transmission and Interconnection Agreement to be effective 11/23/
2015.
Filed Date: 9/24/15.
Accession Number: 20150924-5119.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15-2709-000.
Applicants: Hardin Hilltop Wind, LLC.
Description: Sec. 205(d) Rate Filing: Hardin Hilltop and Hardin
Wind Transmission and Interconnection Agreement to be effective 11/23/
2015.
Filed Date: 9/24/15.
Accession Number: 20150924-5125.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15-2710-000.
Applicants: Hardin Hilltop Wind, LLC.
Description: Sec. 205(d) Rate Filing: Hardin Hilltop and Poverty
Ridge Transmission and Interconnection Agreement to be effective 11/23/
2015.
Filed Date: 9/24/15.
Accession Number: 20150924-5126.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15-2711-000.
Applicants: Hardin Hilltop Wind, LLC.
Description: Sec. 205(d) Rate Filing: Hardin Hilltop and Sutton
Wind Transmission and Interconnection Agreement to be effective 11/23/
2015.
Filed Date: 9/24/15.
Accession Number: 20150924-5127.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15-2712-000.
Applicants: Hardin Hilltop Wind, LLC.
Description: Sec. 205(d) Rate Filing: Hardin Hilltop and Wind
Family Transmission and Interconnection Agreement to be effective 11/
23/2015.
Filed Date: 9/24/15.
Accession Number: 20150924-5129.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15-2713-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: FPL-FPUC-Preliminary
Engineering Design, Permitting and Procurement of Material to be
effective 9/2/2015.
Filed Date: 9/24/15.
Accession Number: 20150924-5130.
Comments Due: 5 p.m. ET 10/15/15.
Docket Numbers: ER15-2714-000.
Applicants: Hardin Hilltop Wind, LLC.
Description: Sec. 205(d) Rate Filing: Hardin Hilltop and Zontos
Wind Transmission and Interconnection Agreement to be effective 11/23/
2015.
Filed Date: 9/24/15.
Accession Number: 20150924-5131.
Comments Due: 5 p.m. ET 10/15/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24736 Filed 9-29-15; 8:45 am]
BILLING CODE 6717-01-P