City of Cheyenne, Wyoming; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 57804-57805 [2015-24375]
Download as PDF
57804
Federal Register / Vol. 80, No. 186 / Friday, September 25, 2015 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, AND ‘‘MOTIONS TO
INTERVENE’’, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24376 Filed 9–24–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:58 Sep 24, 2015
Jkt 235001
Dated: September 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2015–24371 Filed 9–24–15; 8:45 am]
Combined Notice of Filings #2
September 21, 2015.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–2678–000.
Applicants: NorthWestern
Corporation.
Description: Initial rate filing: Rate
Schedule FERC No. 38–SD—
Agreements with Western Area Power
Administration to be effective
9/22/2015.
Filed Date: 9/21/15.
Accession Number: 20150921–5097.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER15–2679–000.
Applicants: Latigo Wind Park, LLC.
Description: Baseline eTariff Filing:
Latigo Wind Park, LLC MBR Tariff to be
effective 11/15/2015.
Filed Date: 9/21/15.
Accession Number: 20150921–5133.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: ER15–2680–000.
Applicants: Sandstone Solar LLC.
Description: Baseline eTariff Filing:
Sandstone Solar LLC MBR Tariff to be
effective 11/1/2015.
Filed Date: 9/21/15.
Accession Number: 20150921–5161.
Comments Due: 5 p.m. ET 10/13/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD15–33–000]
City of Cheyenne, Wyoming; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On August 26, 2015, the City of
Cheyenne, Wyoming, by and through its
Board of Public Utilities, filed a notice
of intent to construct a qualifying
conduit hydropower facility, pursuant
to section 30 of the Federal Power Act
(FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Sherard
Hydroelectric Generation Facility would
have an installed capacity of 950
kilowatts (kW), and would be located
along an existing 48-inch-diameter raw
water pipeline within the city’s water
treatment plant. The project would be
located near the City of Cheyenne,
Wyoming.
Applicant Contact: Tim Wilson,
Director, 2416 Snyder Ave., Cheyenne,
WY 82001, Phone No. (307) 637–6460.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
two-level powerhouse approximately 36
feet by 36 feet adjacent to the existing
water treatment plant building; (2) an
approximately 800-foot-long, up to 48inch-diameter penstock teeing off the
existing 48-inch-diameter raw water
pipeline; (3) one impulse turbine/
generator unit with an installed capacity
of 950 kilowatt (kW); (4) a short
discharge returning water to the existing
48-inch-diameter raw water pipeline;
and (5) appurtenant facilities.
The proposed project would have a
total installed capacity of 950 kW.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
E:\FR\FM\25SEN1.SGM
25SEN1
Federal Register / Vol. 80, No. 186 / Friday, September 25, 2015 / Notices
57805
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Satisfies
(Y/N)
Statutory provision
Description
FPA 30(a)(3)(A), as amended by HREA .....
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation
of electricity.
The facility is constructed, operated, or maintained for the generation of electric power
and uses for such generation only the hydroelectric potential of a non-federally
owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .......................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
FPA 30(a)(3)(C)(i), as amended by HREA ..
mstockstill on DSK4VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by HREA
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
1 18
19:58 Sep 24, 2015
Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24375 Filed 9–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5069–011]
Cascade Clean Energy, Inc.; Kingdom
Energy Products; Notice of Transfer of
Exemption
1. By letter filed August 19, 2015,
Neva Van Hook, d/b/a Kingdom Energy
CFR 385.2001–2005 (2015).
VerDate Sep<11>2014
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the Web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD15–33) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Jkt 235001
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Y
Y
Y
Y
Products (KEP) informed the
Commission that the exemption from
licensing for the Sygitowicz Creek
Power Project, FERC No. 5069,
originally issued July 14, 1982,1 has
been transferred to Kingdom Energy
Products. The project is located on the
Sygitowicz Creek, Whatcom County,
Washington. The transfer of an
exemption does not require Commission
approval.
2. Kingdom Energy Products is now
the exemptee of the Sygitowicz Creek
Power Project, FERC No. 5069. All
correspondence should be forwarded to:
Mr. Alan Van Hook, Kingdom Energy
Products, Box 557, Klawock, AK 99925.
Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–24383 Filed 9–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications. Order No. 607 (64 FR
51222, September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
1 20 FERC ¶ 62,051, Order Granting Exemption
From Licensing of a Small Hydroelectric Project of
5 Megawatts or Less (1982).
E:\FR\FM\25SEN1.SGM
25SEN1
Agencies
[Federal Register Volume 80, Number 186 (Friday, September 25, 2015)]
[Notices]
[Pages 57804-57805]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24375]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD15-33-000]
City of Cheyenne, Wyoming; Notice of Preliminary Determination of
a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On August 26, 2015, the City of Cheyenne, Wyoming, by and through
its Board of Public Utilities, filed a notice of intent to construct a
qualifying conduit hydropower facility, pursuant to section 30 of the
Federal Power Act (FPA), as amended by section 4 of the Hydropower
Regulatory Efficiency Act of 2013 (HREA). The proposed Sherard
Hydroelectric Generation Facility would have an installed capacity of
950 kilowatts (kW), and would be located along an existing 48-inch-
diameter raw water pipeline within the city's water treatment plant.
The project would be located near the City of Cheyenne, Wyoming.
Applicant Contact: Tim Wilson, Director, 2416 Snyder Ave.,
Cheyenne, WY 82001, Phone No. (307) 637-6460.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A proposed two-level powerhouse
approximately 36 feet by 36 feet adjacent to the existing water
treatment plant building; (2) an approximately 800-foot-long, up to 48-
inch-diameter penstock teeing off the existing 48-inch-diameter raw
water pipeline; (3) one impulse turbine/generator unit with an
installed capacity of 950 kilowatt (kW); (4) a short discharge
returning water to the existing 48-inch-diameter raw water pipeline;
and (5) appurtenant facilities.
The proposed project would have a total installed capacity of 950
kW.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
[[Page 57805]]
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies
Statutory provision Description (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended The conduit the facility Y
by HREA. uses is a tunnel, canal,
pipeline, aqueduct, flume,
ditch, or similar manmade
water conveyance that is
operated for the
distribution of water for
agricultural, municipal, or
industrial consumption and
not primarily for the
generation of electricity.
FPA 30(a)(3)(C)(i), as The facility is constructed, Y
amended by HREA. operated, or maintained for
the generation of electric
power and uses for such
generation only the
hydroelectric potential of
a non-federally owned
conduit.
FPA 30(a)(3)(C)(ii), as The facility has an Y
amended by HREA. installed capacity that
does not exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as On or before August 9, 2013, Y
amended by HREA. the facility is not
licensed, or exempted from
the licensing requirements
of Part I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility, which is
not required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the Web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (i.e., CD15-33) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call
(202) 502-8659.
Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24375 Filed 9-24-15; 8:45 am]
BILLING CODE 6717-01-P