Army Department – Federal Register Recent Federal Regulation Documents
Results 651 - 700 of 1,462
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Folsom South of U.S. Highway 50 Specific Plan Project, in Sacramento County, CA, Corps Permit Application Number SPK-2007-02159
The South Folsom Property Owners Group proposes to implement a large-scale, mixed-use, mixed-density master planned community with residential, commercial, office, public/quasi-public uses, open space, and parks. The proposed project consists of approximately 1,464 acres of residential development, 523 acres of mixed-use and commercial development, 109 acres of parks, and 1,053 acres of open space. The majority of the 1,053 acres of open space would be located in the western portion of the project site. This area includes Alder Creek, numerous cultural resources sites, and the highest concentration of oak woodland habitat within the project site. The proposed Folsom South of 50 Specific Plan includes development of up to 10,045 mixed-density residential homes and approximately 7.4 million square feet of retail and office uses within an area south of Highway 50 that would be annexed to the City of Folsom. The proposed project would provide five elementary schools, one joint middle school/ high school, and a campus for the Sacramento County Day School. It is anticipated that construction would begin in 2010. The initiation and duration of construction would depend on market conditions and receipt of environmental permits and clearances; full build-out would likely be completed within 20 years from construction commencement. The project site is approximately 3,502 acres and contains 82.89 acres of waters of the United States. The proposed project would directly affect approximately 21.28 acres of waters of the United States, including vernal pools and other wetlands. These acreages do not include indirect impacts from the proposed action or impacts anticipated to result from off-site infrastructure that may be determined to be required as part of the U.S. Army Corps of Engineers' (USACE) Environmental Impact Statement (EIS) process. The EIS will be prepared as a joint document with the City of Folsom. The City is the local agency responsible for preparing an Environmental Impact Report in compliance with the California Environmental Quality Act (CEQA).
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning “Continuous Disreefing Apparatus for Parachute”
In accordance with 37 CFR Part 404.6, announcement is made of the availability for licensing of US Patent No. US 7,416,158 entitled ``Continuous Disreefing Apparatus for Parachute'' issued August 26, 2008. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Notice of Intent To Prepare an Environmental Impact Statement (EIS) for the Intake Diversion Dam Modification, Lower Yellowstone Project, Montana
Pursuant to section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, and the Council on Environmental Quality's (CEQ) regulations for implementing the procedural provisions of NEPA, the Bureau of Reclamation (Reclamation) and the U.S. Army, Corps of Engineers (Corps) propose to jointly prepare an EIS that analyzes and discloses effects associated with modifications to Intake Diversion Dam. The proposed Federal action is to modify Intake Diversion Dam and canal headworks, features of Reclamation's Lower Yellowstone Project, to improve passage and reduce entrainment for endangered pallid sturgeon and other native fish in the lower Yellowstone River. Reclamation and the Corps will serve as joint lead Federal agencies in the preparation of the Intake Diversion Dam Modification EIS. Reclamation will act as administrative lead for NEPA compliance activities during preparation of the EIS. Reclamation and the Corps will each consider and approve a Record of Decision regarding actions and decisions for which the respective agencies are responsible.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is deleting a system of records in its existing inventory of record systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is deleting two systems of records in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning Ratchet Hook Tourniquet
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 61/090,042 entitled ``Ratchet Hook Tourniquet,'' filed August 19, 2008. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Intent To Prepare a Draft Environmental Impact Statement for Shoreline Protection for Flagler County, FL
The Jacksonville District, U.S. Army Corps (Corps) of Engineers intends to prepare a Draft Environmental Impact Statement (EIS) for protection of 18-Miles of coastal shoreline in Flagler County, FL. The project is a cooperative effort between the U.S. Army Corps of Engineers (lead Federal agency) and City of Flagler Beach (non-Federal sponsor and cooperating agency).
Missouri River Recovery Implementation Committee; Meeting
In accordance with Section 5018 (b) of the Water Resources Act of 2007, announcement is made of the following committee meeting: Name of Committee: Missouri River Recovery Implementation Committee. Date: September 29-October 1, 2008. Time: 1 p.m. to 6 p.m. (September 29, 2008). 8:30 a.m. to 6 p.m. (September 30, 2008). 8:30 a.m. to 6 p.m. (October 1, 2008). Place: Sheraton Clayton Plaza Hotel, 7730 Bonhomme Avenue, Clayton, MO 63105.
Availability of Final Supplemental Environmental Impact Statement for Atlantic Coast of Maryland Shoreline Protection Project-General Reevaluation Study: Borrow Sources for 2010-2044, Ocean City, MD
In accordance with the requirements of the National Environmental Policy Act (NEPA), the Baltimore District, U.S. Army Corps of Engineers (USACE), has prepared a Final Supplemental Environmental Impact Statement (SEIS) for the Atlantic Coast of Maryland Shoreline Protection Project (Atlantic Coast Project). The SEIS evaluated new borrow sources to provide sand for routine periodic beach nourishment of Ocean City, MD, for the years 2010-2044. Existing borrow sources in state waters are anticipated to be exhausted after about 2010. Between 6,800,000 and 15,000,000 cubic yards of sand would be needed through 2044, depending on future storm frequency and intensity. Three offshore shoals in Federal waters are proposed as sand sources: Weaver, Isle of Wight, and ``A.'' Sand may also be dredged from Shoal ``B,'' also known as Bass Grounds or First Lump, in the future, but only if its value as a fishing ground declines substantially. Guidelines to minimize long-term impacts to the offshore shoals were formulated in coordination with resource agency personnel and academic experts. Dredging would be conducted in accordance with these guidelines. Specific dredging plans would be developed in coordination with resource agencies prior to each beach nourishment cycle.
Board on Coastal Engineering Research
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Board on Coastal Engineering Research. Date of Meeting: September 23-25, 2008. Place: Pavilion Ballroom, Hilton Portland and Executive Tower, 921 SW 6th Avenue, Portland, OR 97204. Time: 8 a.m. to 5 p.m. (September 23, 2008); 8 a.m. to 5:30 p.m. (September 24, 2008); 8 a.m. to 5 p.m. (September 25, 2008).
Department of Defense Historical Advisory Committee; Meeting
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Department of the Army Historical Advisory Committee. Date: October 23, 2008. Time: 9 a.m. to 4:30 p.m. Place: U.S. Army Center of Military History, Collins Hall, Building 35, 103 Third Avenue, Fort McNair, DC 20319-5058. Proposed Agenda: Review and discussion of the status of historical activities in the United States Army.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Public Scoping Meetings for Update of the Water Control Manual for the Alabama-Coosa-Tallapoosa River Basin in Alabama and Georgia
The U.S. Army Corps of Engineers (Corps), Mobile District, issued a Notice of Intent (NOI) in the Federal Register (72 FR 63561), published on November 9, 2007, describing the preparation of a Draft Environmental Impact Statement (EIS), as required by the National Environmental Policy Act (NEPA), to address the proposed update of the Water Control Manual (WCM) for the Alabama-Coosa-Tallapoosa (ACT) River Basin. The Corps will hold four public scoping meetings during the month of September as part of its review and update of the WCM for the ACT River Basin. The public is invited to attend the scoping meetings which will provide information on the WCM update process and afford the opportunity to receive input from the public about their issues and concerns regarding that process. All four public meetings will be held using an open house format, allowing time for participants to review specific information and to provide comments to the resource staff attending the meeting.
Army Education Advisory Committee Meeting
Pursuant to the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (U.S.C. 552b, as amended) and 41 Code of the Federal Regulations (CFR) 102-3. 140 through 160, the Department of the Army announces the following committee meeting: Name of Committee: Army Education Advisory Committee. Date of Meeting: September 17, 2008. Time of Meeting: 0830-1500, September 17, 2008. Place of Meeting: Cadet Command Headquarters, 55 Pratt Road, Building 56, Commander's Conference Room, Ft Monroe, VA. Interested persons may submit a written statement for consideration by the Army Education Advisory Committee. Individuals submitting a written statement must submit their statement to the Designated Federal Official at the address detailed below, at any point, however, if a written statement is not received at least 10 calendar days prior to the meeting, which is the subject of this notice, then it may not be provided to or considered by the Army Education Advisory Committee. The Designated Federal Official will review all timely submissions with the Army Education Advisory Committee Chairperson, and ensure they are provided to members of the Army Education Advisory Committee before the meeting that is the subject of this notice.
Intent To Grant an Exclusive License of a U.S. Government-Owned Patent
In accordance with 35 U.S.C. 209(e) and 37 CFR 404.7(a)(I)(i), announcement is made of the intent to grant an exclusive, royalty- bearing, revocable license to U.S. Patent No. 6,451,309 entitled ``Prophylactic and Therapeutic Monoclonal Antibodies,'' issued September 17, 2002; and U.S. Patent No. 6,620,412 entitled, ``Prophylactic and Therapeutic Monoclonal Antibodies,'' issued September 16, 2003, which is a continuation of U.S. Patent No. 6,451,309, and foreign rights to BioFactura, Inc., with its principal place of business at 9700 Great Seneca Highway, Rockville, Maryland 20850.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to alter a system of records in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to add a system of records to its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is deleting a system of records in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Intent To Grant an Exclusive License of a U.S. Government-Owned Patent
In accordance with 35 U.S.C. 209(e) and 37 CFR 404.7(a)(I)(i), announcement is made of the intent to grant an exclusive, royalty- bearing, revocable license to U.S. Patent No. 5,983,557, issued November 16, 1999, entitled ``Lethal Mosquito Breeding Container,'' U.S. Patent No. 6,185,861 issued February 13, 2001, entitled ``Lethal Mosquito Breeding Container,'' U.S. Patent No. 6,389,740, issued May 21, 2002, entitled ``Lethal Mosquito Breeding Container,'' and foreign rights to SpringStar, Inc., with its principal place of business at 17669 128th Place NE., Woodinville, WA 98072.
Intent To Prepare a Draft Environmental Impact Statement for the Expansion of an Operating Open Pit Taconite Mine and Expansion of an Operating Taconite Ore Processing Facility Proposed by U.S. Steel-Minnesota Ore Operations Near Keewatin in Itasca County and St. Louis County, MN
U.S. SteelMinnesota Ore Operations (U.S. Steel) has applied to the St. Paul District, Corps of Engineers (Corps) for a Clean Water Act Section 404 permit to discharge fill material into jurisdictional wetlands to facilitate the expansion of an operating open pit taconite mine and expansion of an operating taconite ore processing facility near Keewatin in Itasca County and St. Louis County, MN. Tailings would be discharged into an existing, operating tailings basin. The proposed project is known as the Keetac Expansion Project. Iron ore mining and taconite pellet production have been on-going at the Keetac site since 1967, when the original Phase I taconite processing plant began operation. In 1977, the Phase II expansion added a second grate-kiln pellet line. The Phase I facility was idled in December 1980, leaving the Phase II facility as the only operating pellet production line. U.S. Steel now proposes to increase the capacity at the Keetac facility by restarting the Phase I line and upgrading the mining, concentrating, and agglomerating processes. The restart would involve the installation of energy-efficient technologies in addition to new emission controls. The expansion would increase the project impact area by approximately 1,272 acres to a total of approximately 12,864 acres. The project would continue to operate 24 hours per day; 365 days per year. Taconite pellet production output would increase by 3.6 million tons to a total output of 9.6 million tons per year. The mining process would require the construction of overburden, waste rock, and lean ore stockpiles adjacent to the open pit mine. There is currently adequate ore crushing capacity for the proposed expansion. The existing tailings basin would be expanded slightly in order to reinforce the dikes so that the height of the tailings can be increased. The currently permitted mine could also be used to provide ore for the proposed expanded operation, but this would reduce the life of the mine and therefore an expansion of the mine is proposed to maintain twenty-five years of permitted capacity. The project would require the discharge of fill material into approximately 620 acres of wetlands. While some of the wetlands may be isolated, the majority of the wetlands are abutting or adjacent to an unnamed tributary to Welcome Creek, which is a tributary to O'Brien Creek, which is a tributary to the Swan River, which is a tributary to the Mississippi River, which is a navigable water of the United States. U.S. Steel proposes to utilize approximately 395 acres of wetlands that have been restored and are being monitored adjacent to the existing tailings basin to compensate for the first five years of lost wetland functions and values that would be caused by the proposed project. Those restored wetlands have been identified as being suitable for wetland banking. In addition, U.S. Steel will submit a compensatory wetland mitigation plan to identify compensation for the remainder of the proposed wetland impacts. The discharge of dredged or fill material into waters of the United States requires a permit issued by the Corps under Section 404 of the Clean Water Act. The Final Environmental Impact Statement (FEIS) will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act (NEPA).
Notice of Availability Supplemental Draft Environmental Impact Statement for the White River Minimum Flow Reallocation Study, Arkansas
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers (USACE), Little Rock District, has prepared a Supplemental Draft Environmental Impact Statement (SDEIS) for the proposed implementation of the White River Minimum Flow, Arkansas. This SDEIS is being made available for a 45-day public comment period.
Intent to Prepare an Environmental Impact Statement for the Conveyance of Federal Lands at Lake Texoma to the City of Denison, Grayson County, TX
The purpose of the Environmental Impact Statement (EIS) is to address alternatives and environmental impacts associated with the conveyance of approximately 900 acres of Federal land at Lake Texoma, Oklahoma and Texas, to the city of Denison, TX.
Intent To Grant an Exclusive License of a U.S. Government-Owned Patent
In accordance with 35 U.S.C. 209(e) and 37 CFR 404.7 (a)(I)(i), announcement is made of the intent to grant an exclusive, royalty-bearing, revocable license to U.S. Patent No. 7,094,417, issued August 22, 2006, entitled ``Fish Hatching Method and Apparatus,'' and U.S. Patent Application No. 11/340,757 filed January 27, 2006 entitled, ``Fish Hatching Method and Apparatus,'' and foreign rights to Diapause Research Foundation, with its principal place of business at 1924 Creighton Road, Pensacola, FL 32504.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is deleting a system of records in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Proposed Collection; Comment Request
In compliance with section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, the Department of the Army announces a proposed revision of a public information collection and seeks public comment on the provisions thereof. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed information collection; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology.
Solicitation for Public Sector Nominations To Serve on the Committee on Levee Safety
The U.S. Army Corps of Engineers (USACE) is soliciting nominations from the private sector to serve on the Committee on Levee Safety. The Water Resources Development Act (WRDA) of 2007 requires formation of a sixteen member Committee on Levee Safety (Committee) charged with developing recommendations for a national levee safety program, including a strategic implementation plan. Two representatives of the private sector will be selected to serve on the Committee.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to alter a system of records in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to alter a system of records in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Notice of Availability of the Final Supplemental Programmatic Environmental Impact Statement (SPEIS) for Army Growth and Force Structure Realignment To Support Operations in the Pacific Theater
The Department of the Army announces the availability of the Final SPEIS for the growth and realignment of the U.S. Army to support operations in the Pacific Theater. Pursuant to the National Environmental Policy Act (NEPA), the Department of the Army has prepared a Final SPEIS that evaluates the potential environmental and socioeconomic effects associated with alternatives for implementing the growth and realignment of the Army's forces to support operations in the Pacific Theater. Potential impacts have been analyzed in the Final SPEIS at installations that are capable of supporting operations in the Pacific Theater.
Intent To Grant an Exclusive License of a U.S. Government-Owned Patent
In accordance with 35 U.S.C. 209(e) and 37 CFR 404.7 (a)(I)(i), announcement is made of the intent to grant an exclusive, royalty-bearing, revocable license to U.S. Patent Application 11/ 464,001, filed August 11, 2006, entitled ``Broad Spectrum Antibacterial Compounds'' and foreign rights (PCT/US2006/031550) to Microbiotix, Inc., with its principal place of business at One Innovation Drive, Worchester, Massachusetts, 01605.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to alter a system of records in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to alter a system of records in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is deleting a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to amend a system of records in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Inland Waterways Users Board; Request for Nominations
Section 302 of Public Law 99-662 established the Inland Waterways Users Board. The Board is an independent Federal advisory committee. The Secretary of the Army appoints its 11 members. This notice is to solicit nominations for six (6) appointments or reappointments to two-year terms that will begin after March 1, 2009.
Notice of Availability of the Draft Programmatic Environmental Impact Statement (PEIS) for the Brigade Combat Team Transformation at Fort Irwin, CA
The Fort Irwin National Training Center announces the availability of a Draft PEIS for mission realignment in support of Army Transformation, the Army Campaign Plan, and other Army initiatives. Pursuant to the National Environmental Policy Act (NEPA), the Department of the Army has prepared a PEIS to disclose potential impacts to the natural, physical, and human environment resulting from Army transformation efforts at Fort Irwin. Potential impacts from alternatives that are capable of meeting the Army's training, operations, and quality of life requirements have been analyzed. After reviewing a full range of possible alternative transformation options, the Army has selected Alternative 4 (increase of approximately 5,000 Soldiers and training rotation capacity increased to 12) as the preferred alternative for Army transformation.
Privacy Act of 1974; System of Records
The Department of the Army is amending a system of records notice in its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Corte Madera Creek Flood Control Project, Marin County, CA
The U.S. Army Corps of Engineers (Corps) authorized through the Flood Control Act of 1962, Public Law No. 87-4, 87th Congress, 2nd Session, approved October 23, 1962, and amended by Section 204 of Pub. L. No. 89-789, the Flood Control Act of 1966, and the Water Resources Development Act of 1986, will address channel modification opportunities to Unit 4 of Corte Madera Creek, Marin County, CA. The purpose of the Corte Madera Creek Flood Control Project is to provide flood risk management for Corte Madera Creek, from the upstream end of the existing Unit 3 concrete channel to Sir Francis Drake Boulevard at the border of Ross and San Anselmo. Although Units 1, 2, and 3 channel modifications were completed in 1971, public concerns led to a delay in the planned actions for Unit 4. In 1996, Marin County requested the completion of Unit 4 by the Corps, and damages incurred by the December 2005 flood have also renewed public interest in finding solutions to minimize the risk of future floods. Since 1971, additional technical studies were conducted that provide another opportunity to formulate and review new alternatives in order to complete the project. This is a notice of intent to prepare a joint Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) to consider all reasonable alternatives and to evaluate potential impacts associated with the proposed actions. The U.S. Army Corps of Engineers is the lead agency for this project under the National Environmental Policy Act (NEPA) and Marin County Flood Control and Water Conservation District Zone 9 is the lead agency under the California Environmental Quality Act (CEQA).
Advisory Committee Meeting Notice
Pursuant to the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (U.S.C. 552b, as amended) and 41 Code of the Federal Regulations (CFR 102-3.140 through 160, the Department of the Army announces the following committee meeting: Name of Committee: Distance Learning/Training Technology Subcommittee. Date: July 22-23, 2008. Place: U.S. Army Signal Center at Fort Gordon, GA, LandWarNet eUniversity Facility, Bldg 29610, Fort Gordon, GA 30905. Time: 8:30 a.m. to 4 p.m. (July 22, 2008). 8:30 a.m. to 4 p.m. (July 23, 2008). Proposed Agenda: Starting point of the meeting will be an overview of the LandWarNet eUniversity followed up discussions on the use of technology to enhance the learning environment.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.