Army Department – Federal Register Recent Federal Regulation Documents
Results 451 - 500 of 1,462
Deauthorization of Water Resources Projects
The U.S. Army Corps of Engineers published a document in the Federal Register of July 2, 2009, listing water resources projects deauthorized on March 29, 2009. The document incorrectly included the Baltimore Harbor and Channels, MD & VA (50-ft Deepening) project.
Notice of Availability for the Final Environmental Impact Statement for the Matagorda Ship Channel Improvement Project, Calhoun County and Matagorda County, TX
The U.S. Army Corps of Engineers, Galveston District, announces the release of the Final Environmental Impact Statement (FEIS) and the public comment period for the Calhoun Port Authority's (CPA) proposed Matagorda Ship Channel (MSC) Improvement Project.
Intent To Prepare a Draft and Final Supplemental Environmental Impact Statement for Reaches 1B, 1C and 1D on the Herbert Hoover Dike Major Rehabilitation Project, Martin and Palm Beach Counties
The purpose of the project is to reconstruct and rehabilitate Reaches 1B, 1C and 1D of the Herbert Hoover Dike to prevent catastrophic failure of the system to retain the waters of Lake Okeechobee. On July 8 2005, the Jacksonville District, U.S. Army Corps of Engineers (Corps) issued a Final Supplemental Environmental Impact Statement (FSEIS) for the Major Rehabilitation actions proposed for Herbert Hoover Dike (HHD), Reach One. Herbert Hoover Dike is the levee that completely surrounds Lake Okeechobee. On September 23, 2005, a Record of Decision was signed adopting the preferred alternative as the Selected Plan for Reach One.
Record of Decision (ROD) for Military Training Activities at Makua Military Reservation (MMR), Hawaii
Senior Commander, US Army Hawaii, has reviewed the Final Environmental Impact Statement (EIS) for Military Training Activities at MMR and has made the decision to proceed with a variation of Alternative 2 to recommence live-fire training at MMR. Alternative 2 in the Final EIS analyzes up to 50 combined-arms live-fire exercises (CALFEX) and 200 convoy live-fire exercises (LFX). The variation of Alternative 2 allows up to 32 CALFEXs and 150 convoy LFXs, and allows squad- and platoon-level LFXs that lead up to the company-level CALFEX. This decision also reconfirms that the Army will not use MMR for live- fire training at night until all relevant fire suppression measures are met and approved in accordance with the U.S. Fish and Wildlife Service 2007 and 2008 Biological Opinions. The Army has decided not to use the following weapon systems at MMR in order to further protect the environmental and cultural resources of the valley: Tracer ammunition; Javelin and inert, tube-launched, optically tracked, wire-guided (TOW) missiles; anti-tank (AT-4) and 2.75-inch rockets; the shoulder-launched multipurpose assault weapon (SMAW); and illumination munitions. This decision also eliminates the use of Ka'ena Point and C-Ridge for training, due to the risk of wildfire and the potential impacts to threatened and endangered species. This Alternative 2 variation represents a proper balance for meeting the training requirements of the units of the 25th Infantry Division (ID), U.S. Army Reserve, Hawaii Army National Guard, and other users of the range at MMR, while ensuring the Army meets its responsibilities to preserve the land and resources at MMR, and continues to be a good neighbor to the community along the Wai'anae coast.
Restricted Areas at Cape Canaveral Air Force Station, Patrick AFB, FL
The U.S. Army Corps of Engineers (Corps) is amending its restricted area regulations to enlarge an existing restricted area in the Banana River and to establish a new restricted area in the Atlantic Ocean for the Cape Canaveral Air Force Station (CCAFS), located on Patrick Air Force Base (AFB), Florida. We are also removing an existing restricted area in the Banana River at CCAFS. CCAFS Command, located at Patrick AFB, Florida, is responding to Department of Defense (DoD) security assessments which have identified a need for CCAFS to have the capability to secure their shoreline. The enhancement of these capabilities is necessary to counter postulated threats to CCAFS.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for a Proposed: Supercritical Pulverized Coal/Biomass Steam Power Electric Generation Facility in Non-Tidal Wetlands in Surry County, VA
The Corps will prepare an Environmental Impact Statement to evaluate project alternatives and the public interest review factors for the proposed supercritical pulverized coal/biomass steam power electric generation facility.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to add a system of records to its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Proposed Suspension and Modification of Nationwide Permit 21
The U.S. Army Corps of Engineers (Corps) is proposing to take two actions concerning Nationwide Permit (NWP) 21, which authorizes discharges of dredged or fill material into waters of the United States for surface coal mining activities. First, the Corps proposes to modify NWP 21 to prohibit its use to authorize discharges of dredged or fill material into waters of the United States for surface coal mining activities in the Appalachian region of the following states: Kentucky, Ohio, Pennsylvania, Tennessee, Virginia, and West Virginia until it expires on March 18, 2012. The proposed modification would enhance environmental protection of aquatic resources by requiring surface coal mining projects in the affected region to obtain individual permit coverage under the Clean Water Act (CWA), which includes increased public and agency involvement in the permit review process, including an opportunity for public comment on individual projects. The application of NWP 21 to surface coal mining activities in the rest of the United States would not be affected by this proposed modification.
Notice of Intent To Prepare an Environmental Impact Statement/Environmental Impact Report for the West Sacramento Project, California, General Reevaluation Report
The action being taken is the preparation of an environmental impact statement/environmental impact report (EIS/EIR) for the West Sacramento Project, California, General Reevaluation Report (GRR). The GRR will re-evaluate the currently authorized plan as well as develop and evaluate opportunities to reduce flood risk, increase recreation, and restore the ecosystem along the Sacramento River in and around the City of West Sacramento.
Intent To Grant an Exclusive License of a U.S. Government-Owned Patent
In accordance with 35 U.S.C. 209(e) and 37 CFR 404.7 (a)(I)(i), announcement is made of the intent to grant an exclusive, royalty-bearing, revocable license to U.S. Patent No. 6,579,233 entitled ``System and Method for Evaluating Task Effectiveness Based on Sleep Patterns,'' issued June 17, 2003 to Fatigue Science, Inc. with its principal place of business at 700 Bishop Street, Suite 2000, Honolulu, HI 96813.
Inland Waterways Users Board
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting.
Publication of Revision and Consolidation of Military Freight Traffic Rules Publications (MFTRP) 1C-R (Motor), 10 (Rail), 30 (Barge), 6A (Pipeline), 4A (Tank Truck), Military Standard Tender Instruction Publication (MSTIP) 364D, SpotBid Business Rules, and SDDC Military Class Rate Publication No. 100A to a Consolidation of Procurement Requirements for the Purchase of Commercial Transportation Services Into the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1
The notice published in the Federal Register on June 9, 2009 (74 FR 27294), indicated a July 9, 2009 effective date. The effective date for this publication will not be July 9, 2009. The effective date will be determined and published at a later date. All publications listed above will remain in effect until further notice.
Notice of Intent To Terminate the Draft Environmental Impact Statement (EIS) for the Potable Water Supply for Washington Parish Reservoir Project
The Vicksburg District, Corps of Engineers, is issuing this notice to advise the public that the Draft Environmental Impact Statement (EIS) process for the proposed Potable Water Supply Project for Washington Parish, Louisiana, is terminated. The original Notice of Intent for this EIS process was published in the Federal Register on March 28, 2008 (73 FR 16653).
United States Navy Danger Zone, Naval Air Station North Island, San Diego, CA
The U.S. Army Corps of Engineers is proposing to establish a new danger zone in the waters adjacent to the existing small arms range (SAR) on Naval Air Station North Island (NASNI) located in San Diego, California. The proposed regulation would prohibit any activity by the public within the danger zone. The new danger zone is necessary to bring the existing SAR into compliance with the Naval Facilities Engineering Command MIL-HDBK 10-27/3B by preventing any SAR ricochet rounds from posing a hazard to passing water traffic.
Notice of Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report for a Permit Application for the Proposed Berths 302-306 Container Terminal Improvements Project at the Port of Los Angeles, in Los Angeles County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Corps) in conjunction with the City of Los Angeles Harbor Department (LAHD) is examining the feasibility of waterside terminal and transportation improvements at Berths 302-306 in the Port of Los Angeles. The Corps is considering the LAHD's application for a Department of the Army permit under section 10 of the River and Harbor Act and potentially section 404 of the Clean Water Act to construct wharf/docking facilities, perform dredging, construct container loading apparatus (i.e., cranes), and other ancillary improvements within 100 feet land side of the waters' edge associated with the Berths 302-306 [American President Lines (APL)] Container Terminal Project (proposed project). Dredging up to 75,000 cubic yards (cy) may be required for the proposed project, and any proposed offshore disposal at the LA-2 disposal site would also trigger review under section 103 of the Marine Protection, Research, and Sanctuaries Act (MPRSA).
Intent To Prepare an Environmental Impact Statement for Whittier Harbor Navigation Improvements Feasibility Study
The U.S. Army Corps of Engineers (USACE) announces its intention to prepare an Environmental Impact Statement (EIS) to study the feasibility of expanding the existing moorage capacity for vessels at Whittier, AK. This study will be performed through partnership of USACE and the City of Whittier. The existing moorage at Whittier is at maximum capacity, resulting in overcrowded and unsafe conditions for harbor users. Additionally, the City will be unable to meet the growing moorage demands of commercial, charter, recreation, and subsistence
Deauthorization of Water Resources Projects
The Corps of Engineers is publishing the list of water resources projects deauthorized under the provisions of section 1001(b)(2) of the Water Resources Development Act of 1986, Public Law 99-662, as amended, (33 U.S.C 579a(b)(2)), and lists of projects removed from the deauthorization list due to obligations of funds, or deauthorized earlier.
Notice of Availability of the Final Environmental Impact Statement (FEIS) for the Maneuver Center of Excellence (MCOE) Actions at Fort Benning, GA
The Department of the Army announces the availability of the MCOE FEIS, which evaluates the potential environmental and socioeconomic impacts associated with the MCOE activities at Fort Benning. The FEIS covers the construction, operation, facilities maintenance, personnel increases, and training activities associated with the proposed MCOE actions, as well as increased training throughput due to Grow the Army missions at Fort Benning.
Notice of Solicitation of Applications for Stakeholder Representative Members of the Missouri River Recovery Implementation Committee
The Commander of the Northwestern Division of the U.S. Army Corps of Engineers (Corps) is soliciting applications to fill vacant stakeholder representative member positions on the Missouri River Recovery Implementation Committee (MRRIC). Members are sought to fill vacancies on a committee to represent various categories of interests within the Missouri River basin. The MRRIC was formed to advise the Corps on a study of the Missouri River and its tributaries and to provide guidance to the Corps with respect to the Missouri River recovery and mitigation activities currently underway. The Corps established the MRRIC as required by the U.S. Congress through the Water Resources Development Act of 2007 (WRDA), section 5018.
Board of Visitors, United States Military Academy (USMA)
Under the provisions of the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Government in the Sunshine Act of 1976 (5 U.S.C. 552b, as amended), and 41 CFR 102-3.150, the Department of Defense announces that the following Federal advisory committee meeting will take place:
Intent To Prepare an Environmental Impact Statement on an Application for a Department of the Army Permit Under Section 404 of the Clean Water Act by The Sabine Mining Company for the Construction, Operation, and Reclamation of the South Hallsville No. 1 Lignite Mine-Rusk Permit Area, Rusk, Panola, and Harrison Counties, TX
The U.S. Army Corps of Engineers, Fort Worth District (USACE) has received an application for a Department of the Army permit under Section 404 of the Clean Water Act (CWA) from The Sabine Mining Company (SMC) to construct, operate, and reclaim the South Hallsville No. 1 Lignite MineRusk Permit Area. In accordance with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321 et seq.), the USACE has determined that issuance of such a permit may have a significant impact on the quality of the human environment and, therefore, requires the preparation of an Environmental Impact Statement (EIS).
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Revised Great Salt Lake Minerals Corporation's Solar Evaporation Pond Expansion Project Within the Great Salt Lake, Box Elder County, UT
In accordance with the National Environmental Policy Act (NEPA), the U.S. Army Corps of EngineersSacramento District (Corps) will prepare an Environmental Impact Statement (EIS) for Corps authorization actions for the proposed Revised Great Salt Lake Minerals Corporation Solar Evaporation Ponds Expansion project. The basic project purpose is potassium sulfate extraction/mining. The overall project purpose is to increase production/output of organically certified potassium sulfate to help meet the increasing demand for this type of fertilize. The applicant believes there is a need to increase production of potassium sulfate in order to maintain its market share over the next 50 years.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Elverta Specific Plan Project, in Sacramento County, CA, Corps Permit File Number SPK-2004-323
The U.S. Army Corps of Engineers, Sacramento District (Corps), will prepare an Environmental Impact Statement (EIS) for the Elverta Specific Plan project, a proposed master planned community in Sacramento County, CA. The Elverta Owners Group has applied for Department of Army permits to fill approximately 39 acres of waters of the United States, including wetlands, to construct this project.
Western Hemisphere Institute for Security Cooperation Board of Visitors; Meeting
The location for the Western Hemisphere Institute for Security Cooperation Board of Visitors meeting scheduled for June 18, 2009 that was published in the Federal Register on Tuesday, June 2, 2009 (74 FR 26378) has changed. The meeting will now be held at the Rayburn House Office Building, HR 2212, Washington, DC.
Army Science Board Plenary Meeting
Pursuant to the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (U.S.C. 552b, as amended) and 41 Code of the Federal Regulations (CFR 102-3.140 through 160), the Department of the Army announces the following committee meeting:
Publication of Revision and Consolidation of Military Freight Traffic Rules Publications (MFTRP) 1C-R (Motor), 10 (Rail), 30 (Barge), 6A (Pipeline), 4A (Tank Truck), Military Standard Tender Instruction Publication (MSTIP) 364D, SpotBid Business Rules, and SDDC Military Class Rate Publication No. 100A to a Consolidation of Procurement Requirements for the Purchase of Commercial Transportation Services Into the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1
The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it intends to publish its consolidated procurement requirements of commercial transportation services publication, the MFTURP No. 1, which governs the purchase of surface freight transportation in the Continental United States (CONUS) by DOD using Federal Acquisition Regulation (FAR) exempt transportation service contracts. The purpose for this new procurement procedure is to streamline the transportation requirements to reflect the current needs of the DOD.
Notice of Availability (NOA) of the Final Environmental Impact Statement (EIS) for Military Training Activities at Mãkua Military Reservation (MMR), Hawaii
The Army proposes to recommence conducting live-fire military training exercises at MMR, Oahu, Hawaii, for units assigned to the 25th Infantry Division (25th ID) and for other military components (Marine Corps, Army Reserves, and the Hawaii Army National Guard). Conducting live-fire exercises at the company level and below is critical to maintaining the readiness of all military units assigned or stationed in Hawaii. Training at the company level is particularly important because it is one of the key building blocks upon which the Army's progressive training doctrine depends. The Army has prepared the Final EIS pursuant to section 102(2)(c) of the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality regulations (40 CFR parts 1500-1508) and Environmental Analysis of Army Actions (32 CFR part 651).
Board of Visitors, Defense Language Institute Foreign Language Center
In accordance with Section 10(a) (2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Western Hemisphere Institute for Security Cooperation Board of Visitors; Meeting
This notice sets forth the schedule and summary agenda for the summer meeting of the Board of Visitors (BoV) for the Western Hemisphere Institute for Security Cooperation (WHINSEC). Notice of this meeting is required under the Federal Advisory Committee Act (Pub. L. 92-463). The Board's charter was renewed on February 1, 2008 in compliance with the requirements set forth in Title 10 U.S.C. 2166.
Intent To Prepare a Draft Supplement No. 2 to the Final Environmental Impact Statement for the West Tennessee Tributaries (WTT) General Reevaluation
The draft supplement no. 2 will be prepared in conjunction with a general reevaluation report (GRR) and will supplement the ``Final Supplement to the Final Environmental Impact Statement, West Tennessee Tributaries Project (Obion-Forked Deer River Basin),'' filed with the Environmental Protection Agency on February 25, 1983. A general reevaluation study will be conducted for the entire WTT project area to determine if there is still a federal interest in pursuing a flood risk management project and, if so, recommend a plan of improvement. The GRR and draft supplement no. 2 to the final environmental impact statement (FEIS) will focus on methods that reduce flood risks within the Obion and Forked Deer watersheds by restoring natural floodplain functions and reducing sedimentation that could cause channel blockages.
Intent To Prepare a Draft Environmental Impact Statement for a Feasibility Study of the Trilby Wash Study Area
Analyses of foreseeable environmental impacts from potential actions in the vicinity of Trilby Wash and the McMicken Dam project area located near the Cities of Surprise, Sun City, El Mirage Litchfield Park and Goodyear, Maricopa County, Arizona will commence. No explicit plans have been advanced as yet, so contents of the Draft Environmental Impact Statement (DEIS) remain to be determined during the public scoping process. The Trilby Wash Study area encompasses the Trilby Wash watershed upstream and downstream from the McMicken Dam Project which includes: McMicken Dam, McMicken Dam Outlet Channel and McMicken Dam Outlet Wash, approximately 9 miles, 6 miles, and 4 miles respectively in length. The McMiken Dam Outlet Wash discharges to the Agua Fria River in Maricopa County, Central Arizona.
Board on Coastal Engineering Research
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Amended Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Regional Watershed Supply Project, Notice of Additional Public Scoping Meetings and Extension of Scoping Period
The public scoping comment period for the Intent to Prepare an Environmental Impact Statement for the Regional Watershed Supply Project by Million Conservation Resource Group, published in the Federal Register on Friday, March 20, 2009 (74 FR 11920), required comments be submitted by May 19, 2009 following publication in the Federal Register. The comment period has been extended to July 27, 2009. In addition, the COE will be conducting two additional public scoping meetings to describe the Project, preliminary alternatives, the NEPA compliance process, and to solicit input on the issues and alternatives to be evaluated and other related matters.
Rescission of Draft Environmental Impact Statement for Proposed Dam Powerhouse Rehabilitations and Possible Operational Changes at the Wolf Creek, Center Hill, and Dale Hollow Dams, Kentucky and Tennessee
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (Corps), Nashville District published its intention to prepare a Draft Environmental Impact Statement relating to proposed dam powerhouse rehabilitations and possible operational changes at the Wolf Creek, Center Hill, and Dale Hollow Dams in Kentucky and Tennessee. Instead, the Corps has decided to evaluate impacts associated with Center Hill Dam powerhouse rehabilitation with an Environmental Assessment (EA). Separate EAs will also be prepared for powerhouse rehabilitations at Wolf Creek and Dale Hollow Dams in the future. Each of these rehabilitation projects are unconnected stand-alone projects that will occur at different times and in different geographic areas.
Notice of Availability for the Draft Environmental Impact Statement (DEIS) for Development and Implementation of Range-Wide Mission and Major Capabilities at White Sands Missile Range (WSMR), New Mexico
The Department of the Army announces the availability of a DEIS that assesses environmental impacts associated with new mission requirements and new test and training capabilities at WSMR. It analyzes the impacts of land use changes that provide for increased research, development, and testing activities. The impacts of expanded off-road maneuver and facilities needed to support increased Future Combat Systems testing and the stationing and training of a Heavy Brigade Combat Team (HBCT) of approximately 3,800 Soldiers is also analyzed.
Withdrawal of Notice of Intent To Prepare Environmental Impact Statement for St. Charles International Airport
The Department of the Army, Army Corps of Engineers today withdraws its Notice of Intent (67 FR 65342, October 24, 2002) to prepare a Draft Environmental Impact Statement (DEIS) for the St. Charles International Airport Project.
Intent To Prepare a Draft Environmental Impact Statement for a Proposed Flood Risk Management Project on the Red River of the North in Fargo, ND & Moorhead, MN
The St. Paul District Corps of Engineers, in partnership with the City of Fargo, North Dakota and City of Moorhead, Minnesota is conducting a flood risk management feasibility study for the Fargo- Moorhead metropolitan area. The feasibility study will focus on reducing flood risk in the entire Fargo-Moorhead Metropolitan area and surrounding areas. The study will evaluate several alternative measures, including but not limited to; levees and floodwalls, diversion channels, non-structural flood-proofing, relocation of flood- prone structures, and flood storage.
Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report for the Newhall Ranch Resource Management and Development Plan and Spineflower Conservation Plan, Los Angeles County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the California Department of Fish and Game, has completed a Draft Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) for the Newhall Ranch Resource Management and Development Plan and Spineflower Conservation Plan. The project proponent and landowner, The Newhall Land and Farming Company, requires a long-term Section 404 permit from the Corps of Engineers for permanent impacts to approximately 82.3 acres of waters of the United States, including 8.69 acres of wetlands, for the construction of various facilities in waters of the United States associated with the development of a new community composed of a broad range of residential, mixed-use and nonresidential land uses in the 12,000-acre project area located in Santa Clarita, Los Angeles County, California.
Notice of Availability for the Draft Environmental Impact Statement (DEIS) for Stationing and Training of Increased Aviation Assets Within U.S. Army Alaska
The Department of the Army announces the availability of a DEIS for the implementation of the decisions to increase numbers and types of aviation assets and training at Fort Wainwright, Fort Richardson or other military installations in Alaska. The proposed aviation unit, an Aviation Task Force or Combat Aviation Brigade, would potentially consist of up to 62 medium and heavy lift helicopters, 30 combat scout helicopters, 24 attack helicopters, and between 1,200 to 2,850 personnel.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to add a system of records to its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.