Army Department – Federal Register Recent Federal Regulation Documents
Results 1 - 50 of 1,347
Notice of Intent To Prepare a Draft Supplemental Environmental Impact Statement/Subsequent Environmental Impact Report XIV [XIV] for the 2016 American River Watershed Common Features Project, Sacramento, CA
The U.S. Army Corps of Engineers (USACE) published a document in the Federal Register of October 7, 2022, concerning the intent to prepare a draft Supplemental Environmental Impact Statement (SEIS)/ Subsequent Environmental Impact Report (SEIR) to the 2016 American River Watershed Common Features (ARCF) General Reevaluation Report (GRR), Final Environmental Impact Statement/Environmental Impact Report (FEIS/FEIR). The document contained an incorrect date.
Notice of Solicitation of Applications for Stakeholder Representative Members of the Missouri River Recovery Implementation Committee
The Commander of the Northwestern Division of the U.S. Army Corps of Engineers (Corps) is soliciting applications to fill vacant stakeholder representative member positions on the Missouri River Recovery Implementation Committee (MRRIC). Members are sought to fill vacancies on a committee to represent various categories of interests within the Missouri River basin. The MRRIC was formed to advise the Corps on a study of the Missouri River and its tributaries and to provide guidance to the Corps with respect to the Missouri River recovery and mitigation activities currently underway. The Corps established the MRRIC as required by the U.S. Congress through the Water Resources Development Act of 2007 (WRDA), Section 5018.
Proposals by Non-Federal Interests, for Feasibility Studies, Proposed Modifications to Authorized Water Resources Development Projects and Feasibility Studies, and Proposed Modifications for an Environmental Infrastructure Program for Inclusion in the Annual Report to Congress on Future Water Resources Development
The Water Resources Reform and Development Act (WRRDA) 2014, as amended, requires the Secretary of the Army annually submit to the Congress a report (Annual Report) that identifies feasibility reports, proposed feasibility studies submitted by non-Federal interests, proposed modifications to authorized water resources development projects or feasibility studies, and proposed modifications to environmental infrastructure program authorities that meet certain criteria. The Annual Report is to be based, in part, upon requests for proposals submitted by non-Federal interests.
National Wetland Plant List
The National Wetland Plant List (NWPL) provides plant species indicator status ratings, which are used in determining whether the hydrophytic vegetation factor is met when conducting wetland delineations under the Clean Water Act and wetland determinations under the Wetland Conservation Provisions of the Food Security Act. Other applications of the NWPL include wetland restoration, establishment, and enhancement projects. To update the NWPL, U.S. Army Corps of Engineers (USACE), as part of an interagency effort with the U.S. Environmental Protection Agency (EPA), the U.S. Fish and Wildlife Service (FWS) and the U.S. Department of Agriculture Natural Resources Conservation Service (NRCS), is announcing the availability of the draft changes to the 2020 NWPL and its web address to solicit public comments. The public will now have the opportunity to comment on the proposed changes to wetland indicator status ratings for five plant species in select regions and the addition of 22 new plant species to the NWPL.
Federal Interagency Steering Committee on Multimedia Environmental Modeling
The annual public meeting of the Federal Interagency Steering Committee on Multimedia Environmental Modeling (ISCMEM) will convene to discuss some of the latest developments in environmental modeling applications, tools and frameworks, as well as new operational initiatives for FY 2015 among the participating agencies. The meeting this year will emphasize environmental modeling challenges in the Chesapeake Bay Watershed and receiving waters.
Army Educational Advisory Committee
Pursuant to the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (5 U.S.C. Sec. 552b, as amended), and 41 CFR 102-3.150, the following meeting notice is announced: Name of Committee: U.S. Army War College Subcommittee of the Army Education Advisory Committee. Dates of Meeting: November 15, 2011. Place of Meeting: U.S. Army War College, 122 Forbes Avenue, Carlisle, PA, Command Conference Room, Root Hall, Carlisle Barracks, Pennsylvania 17013. Time of Meeting: 8:30 a.m.-12:30 p.m. Proposed Agenda: Receive various information briefings and updates and dialogue with the Commandant on issues and matters related to the continued growth and development of the United States Army War College.
Withdrawal of the Notice of Intent To Prepare a Programmatic Environmental Impact Statement for the Stationing and Operation of Joint High Speed Vessels
On February 5, 2010, the Department of the Army announced in the Federal Register (75 FR 6003) its intention to prepare a Programmatic Environmental Impact Statement (PEIS) for the stationing and operation of up to 12 Joint High Speed Vessels (JHSVs). In May 2011, the Army's JHSVs were transferred to the U.S. Navy; therefore, the Army is withdrawing the notice of intent.
Notice of Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report (DEIS/DEIR) for a Permit Application for a Proposed Aggregate Terminal Project on Pier D in the Port of Long Beach, Los Angeles County, CA
The U.S. Army Corps of Engineers (Corps) is considering a permit application from Eagle Rock Aggregates, Inc., a division of Polaris Minerals Corporation, to develop an aggregate receiving and storage terminal on privately held land within the Port of Long Beach (Port). The Proposed Action would be subject to the Corps permitting authority under Section 10 of the River and Harbors Act and include the following in-water and land-based elements: dredging, wharf improvements, installation of truck scales and conveyor system for aggregate. The primary Federal concerns are the dredging and wharf improvements within waters of the United States and the potential impacts to the natural and human environment. Therefore, in accordance with the National Environmental Policy Act (NEPA), the Corps is requiring the preparation of an Environmental Impact Statement (EIS) prior to consideration of any permit action. The Corps may ultimately make a determination to permit or deny the Proposed Action, or permit or deny alternatives to the Proposed Action. Pursuant to the California Environmental Quality Act (CEQA), the Port will serve as the lead agency for the preparation of an Environmental Impact Report (EIR) for its consideration of development approvals within its jurisdiction. The Corps and the Port have agreed to jointly prepare a DEIS/DEIR in order to optimize efficiency and avoid duplication. The DEIS/DEIR is intended to be sufficient in scope to address the Federal, state, and local requirements and environmental issues concerning the proposed activities and permit approvals.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Excelsior Estates Project in Sacramento County, CA, Corps Permit Application Number SPK-2004-00790
The U.S. Army Corps of Engineers, Sacramento District, (Corps) received a complete Department of the Army permit application from Tsakopoulos Investments (applicant) to fill 39.81 acres of waters of the United States to construct the proposed Excelsior Estates Project in Sacramento County, CA, in June 2010. The Corps, as the lead agency responsible for compliance with the National Environmental Policy Act (NEPA), determined that the proposed project may result in significant impacts to the environment, and that the preparation of an Environmental Impact Statement (EIS) is required. The applicant proposes to construct a mixed-use community including residential, commercial, office, schools, parks and open space land uses. The residential component of the proposed community would include approximately 4,400 single- and multi-family units, varying in density. The proposed project would also involve 57 acres of commercial and office uses, as well as two elementary schools and a combined middle school and high school on 102 acres. A proposed community park would be constructed on 20 acres and three neighborhood parks would be constructed on 31 acres. The proposed project would also involve the preservation of 123 acres on the eastern portion of the site, containing Morrison Creek and adjacent wetlands. The applicant also proposes to construct approximately 30 acres of drainageways and greenbelts. Finally, the proposed project would involve the construction of on-site and off-site infrastructure, consisting of roads and utility lines, including road extensions along Keifer Boulevard, Excelsior Road and the Jackson Highway. The project site is approximately 862 acres and contains 39.81 acres of waters of the U.S. In addition, the site also contains 13.61 acres of isolated, intrastate waters that are not subject to Corps jurisdiction, which may contain suitable habitat for Federally listed threatened and/or endangered species. The proposed project would involve the discharge of fill material into approximately 28.77 acres of waters of the United States, and the preservation of 11.04 acres of waters of the U.S. The proposed project would also involve the placement of fill material into 13.61 acres of isolated waters. The proposed project may also have indirect impacts on other waters of the U.S.
Notice of Availability for Exclusive, Non-Exclusive, or Partially-Exclusive Licensing of an Invention Concerning Method for Estimating Core Body Temperature From Heart Rate
Announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 61/572,677, entitled ``Method for Estimating Core Body Temperature from Heart Rate,'' filed on July 8, 2011. The United States Government, as represented by the Secretary of the Army, has rights to this invention.
Notice of Availability for Exclusive, Non-Exclusive, or Partially-Exclusive Licensing of an Invention Concerning a Device and Method for Inducing Brain Injury in Animal Test Subjects
Announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 61/521,446, entitled ``A Device and Method for Inducing Brain Injury in Animal Test Subjects,'' filed on August 9, 2011. The United States Government, as represented by the Secretary of the Army, has rights to this invention.
Draft Programmatic Environmental Impact Statement (EIS) for Modernization of Training Infrastructure at Pōhakuloa Training Area (PTA), Hawai`i
The United States Army Pacific and United States Army Garrison, Hawai`i propose to modernize training ranges, training support infrastructure (e.g., roads and utilities), and training support facilities in the cantonment area at PTA to meet the training requirements of military units in Hawai`i. This modernization would improve the quality of training, make more efficient use of facilities at PTA and reduce a current shortfall in collective (group) live-fire training capabilities for units stationed in Hawai`i. The shortfall has been created by ranges that do not meet current Army design standards or are otherwise not resourced to train platoon and company-sized units when they deploy with their battalions and brigades to PTA to conduct semiannual training. In addition, much of the training support facilities and training support infrastructure at PTA are old, are operating beyond their useful life and do not meet current DoD design standards as defined in the Military Standard 3007 Unified Facilities Criteria and Unified Facilities Guide Specifications. The Army provides a list of modernization projects that could be built in the reasonably foreseeable future within the Draft Programmatic EIS. The modernization list also includes requirements from the U.S. Marine Corps (another major user of PTA), with these projects being evaluated in the cumulative impacts section of the Draft Programmatic EIS. These projects are essential to support modernization of PTA, and to ensure that the Army and other users of PTA continue to have ready access to sustainable training ranges, training support infrastructure (e.g., roads and utilities), and training support facilities in the cantonment area. The Draft Programmatic EIS specifically addresses the requirement for an Infantry Platoon Battle Area (IPBA) at PTA that would include an Infantry Platoon Battle Course (IPBC), Live-fire Shoothouse, and Military Operations on Urban Terrain (MOUT) facility. Other projects on the modernization list are not fully mature because they are still in the planning process and are not yet ready for decision. The Army plans to tier from this Draft Programmatic EIS to address those projects at a time when design alternatives are ready for decision. The IPBA is the only modernization project ready for decision presently.
Privacy Act of 1974; System of Records
The Department of the Army is deleting a system of records notice from its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Atlantic Ocean off Wallops Island and Chincoteague Inlet, Virginia; Danger Zone
The Corps of Engineers is proposing to amend an existing permanent danger zone in the waters of the Atlantic Ocean off Wallops Island and Chincoteague Inlet, Virginia. The National Aeronautics and Space Administration, Goddard Space Flight Center, Wallops Flight Facility conducts rocket-launching operations. The proposed amendment is necessary to protect the public from hazards associated with the rocket-launching operations. The proposed amendment would increase the danger zone to a 30 nautical mile sector.
Archers Creek, Ribbon Creek, and Broad River; U.S. Marine Corps Recruit Depot, Parris Island, SC; Danger Zone
The U.S. Army Corps of Engineers (Corps) is amending its regulations by modifying two existing danger zones that are located adjacent to the rifle range and pistol range at the U.S. Marine Corps Recruit Depot Parris Island in Beaufort County, South Carolina. The amendments include reformatting the regulations for clarity, modifying the boundaries of both danger zones, and modifying the hours of range operations from 6:30 a.m. to 5 p.m. to 6 a.m. to 5 p.m. Monday through Friday. These amendments will enhance the ability of the U.S. Marine Corps to provide for the safe operation of the existing rifle and pistol ranges.
Privacy Act of 1974; System of Records; Correction
On October 5, 2011 (76 FR 61680-61682), DoD published a notice announcing its intent to add a new Privacy Act System of Records. The Contesting Records category was inadvertently omitted. This notice corrects that error.
Privacy Act of 1974; System of Records
The Department of the Army proposes to add a system of records to its inventory of record systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended.
Board of Visitors, United States Military Academy (USMA)
Under the provisions of the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Government in the Sunshine Act of 1976 (5 U.S.C. 552b, as amended), and 41 CFR 102-3.150, the Department of Defense announces that the following Federal advisory committee meeting will take place: 1. Name of Committee: United States Military Academy Board of Visitors. 2. Date: Thursday, October 27, 2011. 3. Time: 12:30 p.m.3 p.m. Members of the public wishing to attend the meeting will need to show photo identification in order to gain access to the meeting location. All participants are subject to security screening. 4. Location: Jefferson Hall Library, Haig Room. West Point, NY. 5. Purpose of the Meeting: This is the 2011 Annual Meeting of the USMA Board of Visitors (BoV). Members of the Board will be provided updates on Academy issues. 6. Agenda: The Academy leadership will provide the Board updates on the following: the Academic program, Honor and Respect Programs and the Annual Report writing process. 7. Public's Accessibility to the Meeting: Pursuant to 5 U.S.C. 552b and 41 CFR 102-3.140 through 102-3.165, and the availability of space, this meeting is open to the public. Seating is on a first-come basis. 8. Committee's Designated Federal Officer or Point of Contact: Ms. Joy A. Pasquazi, (845) 938-5078, Joy.Pasquazi@us.army.mil.
Final Legislative Environmental Impact Statement (LEIS) for the Limestone Hills Training Area Land Withdrawal, Montana Army National Guard (MTARNG)
This announces the availability of the Final LEIS prepared by NGB (lead agency) and the Bureau of Land Management (BLM) of the Department of Interior (DOI) (cooperating agency). The LEIS analyzed the proposed withdrawal of 18,644 acres of federal land within the Limestone Hills Training Area (LHTA) from BLM administration. The LEIS proposes that Congress authorize BLM to transfer administrative responsibility of all federal land within the LHTA to the Army for military training use by the MTARNG. No new facilities are proposed in this LEIS. The LEIS is the detailed statement required by the National Environmental Policy Act to be included in a recommendation or report on a legislative proposal to Congress.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Haile Gold Mine in Lancaster County, SC
The U.S. Army Corps of Engineers, Charleston District intends to prepare a Draft Environmental Impact Statement (DEIS) to assess the potential social, economic and environmental effects of the proposed construction and operation of a gold mine in order to extract and process gold from the Haile ore body in wetlands and streams associated with Haile Gold Mine Creek, by Haile Gold Mine, Inc. (Haile) in the vicinity of Kershaw, in Lancaster County, South Carolina. The DEIS will assess potential effects of a range of alternatives.
Privacy Act of 1974; System of Records
The Department of the Army is deleting a system of records notice from its existing inventory of record systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Notice of Availability of the Record of Decision for the Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) and the Final General Conformity Determination for the Newhall Ranch Resource Management and Development Plan, Santa Clarita, CA
The U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) has made a Final General Conformity Determination (GCD) and executed a Record of Decision (ROD) for the Final Environmental Impact Statement/Environmental Impact Report (EIS/ EIR) and a Section 404 Permit under the Clean Water Act for the Newhall Ranch Resource Management and Development Plan, Santa Clarita, California. This Notice serves as the Public Notice/Notice of Availability for the Final EIS/EIR ROD and the Final GCD. The Record of Decision for the Final EIS/EIR was signed on 31 August 2011. In June 2010, the Corps, in coordination with the California Department of Fish and Game (CDFG), completed and published a joint Final EIS/EIR and Draft GCD, pursuant to National Environmental Policy Act (NEPA) and section 176(c) of the Clean Air Act. The identified least environmentally damaging practicable alternative (LEDPA) in the ROD includes permanent impacts to 47.9 acres of waters of the United States, including 5.1 acres of wetlands, associated with discharges of fill material for bank protection to protect land development projects along water courses (including buried soil cement, buried gunite, grouted riprap, ungrouted riprap, and gunite lining); drainage facilities such as storm drains or outlets and partially lined open channels; grade control structures; bridges and drainage crossings; building pads; and water quality control facilities (sedimentation control, flood control, debris, and water quality basins). The LEDPA also includes temporary impacts to 35.3 acres of waters of the United States, including 11.8 acres of wetlands, associated with the construction of bank protection to protect land development projects along water courses (including buried soil cement, buried gunite, grouted riprap, ungrouted riprap, and gunite lining); utility crossings; activities associated with construction of a Water Reclamation Plant adjacent to the Santa Clara River and required bank protection; water quality control facilities (sedimentation control, flood debris, and water quality basins); regular and ongoing maintenance of all flood, drainage, and water quality protection structures and facilities on the RMDP site (such activities would include periodic inspection of structures and monitoring of vegetation growth and sediment buildup to ensure that the integrity of the structures is maintained and that planned conveyance capacity is present, routine repairs and maintenance of bridges and bank protection, and emergency maintenance activities); and temporary haul routes for grading equipment and geotechnical survey activities. As a Federal agency, the Corps prepared the Final GCD in compliance with Section 176(c) of the Clean Air Act and for the issuance of a Corps Section 404 Permit for the discharges of fill material into waters of the United States. Direct and indirect air emissions for all pollutants related to the Federal action are not below specified de minimis Federal thresholds (40 CFR 93.153(b)). On 31 August 2011, the Corps completed its environmental review and finalized the GCD, executed the ROD, and issued a provisional Section 404 Standard Individual Permit for the LEDPA. The Corps considered and responded to all comments received in finalizing the EIS/EIR, Final GCD, ROD, and issuing the provisional permit. The public can request copies of the Final General Conformity Determination document or the ROD from the Corps at the address listed below. In addition, copies of the Final General Conformity Determination document are available for review during the next 30 days at the following libraries: County of Los Angeles Newhall Branch, Castaic Branch, Sylmar Branch, Valencia Branch, and the County of Ventura Fillmore Branch.
Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report for Proposed Marine Terminal Development at Pier S and Back Channel Navigational Safety Improvements in the Port of Long Beach, Los Angeles County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Long Beach, has completed a Draft Environmental Impact Statement/Environmental Impact Report (DEIS/DEIR) for the Pier S Marine Terminal and Back Channel Improvement Project, encompassing approximately 210 acres of land and water. The development of Pier S and Back Channel improvements would result in an approximately 160-acre marine container terminal, and would include the following elements: Property acquisition; dredging, wharf construction, other waterside improvements, and container cranes; container yard and associated structures; terminal buildings and other structures; truck gates, associated structures, and roadwork; intermodal rail yard, structures, and dual rail lead; and utility and oil facility relocation. Construction duration is estimated at 22 months. The Port of Long Beach requires authorization pursuant to Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act, and Section 103 of the Marine Protection, Research, and Sanctuaries Act, to implement various regulated activities in and over waters of the U.S. associated with developing Pier S. Pursuant to the California Environmental Quality Act (CEQA), the Port will serve as Lead Agency for the preparation of an Environmental Impact Report (EIR) for its consideration of development approvals within its jurisdiction. The Corps and the Port have agreed to jointly prepare a DEIS/DEIR in order to optimize efficiency and avoid duplication. The DEIS/DEIR is intended to be sufficient in scope to address federal, state, and local requirements and environmental issues concerning the proposed activities and permit approvals.
Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1
The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim change to the MFTURP No. 1. The interim change updates Section A.II.D.6 to align the safety requirements for transportation protective service (TPS) carriers with the Department of Transportation's (DOT) Federal Motor Carrier Safety Administration (FMCSA) scoring system.
Notice of Availability of a Draft Environmental Impact Statement in Cooperation With the North Carolina Department of Transportation for Improvements to the US 17 and Market Street (US 17 Business) Corridor in Northern New Hanover and Southern Pender Counties, NC
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Division is issuing this notice to advise the public that a State of North Carolina funded Draft Environmental Impact Statement (DEIS) has been prepared describing proposed improvements to the transportation system starting at Military Cutoff Road in New Hanover County to north of Hampstead along US 17, Pender County, NC (TIP Projects U-4751 and R-3300).
Notice of Intent To Prepare a Draft Environmental Impact Statement for the Puyallup River General Investigation Study, Pierce County, WA
The Seattle District, U.S. Army Corps of Engineers (USACE) will prepare a Draft Environmental Impact Statement (DEIS) pursuant to Section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, for a proposed flood-risk management project in the Puyallup River Basin including the Puyallup River downstream of Electron Dam to Commencement Bay, the Carbon River and the White River downstream of Mud Mountain Dam. This study was requested by Pierce County (the local sponsor), Washington, because of the potential for significant flooding within the Puyallup River Basin. A DEIS is being prepared because of the potential for impacts on environmental resources, particularly salmonid habitat, and the intense public interest already demonstrated in addressing the flooding problems of the Puyallup, Carbon and White Rivers. The Puyallup River General Investigation (GI) DEIS for the Puyallup River Basin is being conducted under the authority of Section 209 of the Flood Control Act of 1962, Public Law 87-874. That section authorized a comprehensive study of Puget Sound, Washington, and adjacent waters including tributaries, in the interest of flood control, navigation, and other water uses and related land resources.
Privacy Act of 1974; System of Records; Correction
On September 6, 2011 (76 FR 55057-55059), DoD published a notice announcing its intent to add a Privacy Act System of Records. The system identifier was incorrectly written. This notice corrects that error.
Intent to Prepare an Environmental Impact Statement (EIS) for a Permit Application for Widening of Bayou Casotte and Lower Sound Channels of the Pascagoula Harbor Channel, in the Port of Pascagoula, Jackson County, Mississippi
The U.S. Army Corps of Engineers (Corps) Mobile District Regulatory Division announces its intent to prepare an EIS to assess the potential environmental impacts associated with widening the existing Pascagoula Lower Sound/Bayou Casotte Federal Channel segment of Pascagoula Harbor (the Project). The proposed Project is a 100-foot- widening of the Lower Sound and Bayou Casotte Legs of the Pascagoula Harbor Channel, as well as limited widening of the northern portion of the Horn Island Pass Channel to facilitate the transition between the two channel segments. The Corps is considering the Jackson County Port Authority/Port of Pascagoula (Port) application for a Department of the Army permit under Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act of 1899, and Section 103 of the Marine Protection, Research, and Sanctuaries Act. A joint public notice for the Section 10 permit (SAM-2011-00389-PAH) was issued by the Corps on April 15, 2011.
Draft Environmental Impact Statement for a Proposed Highway Between Bush, LA and I-12 in St. Tammany Parish, LA
The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise the public that a Draft Environmental Impact Statement (DEIS) has been completed and is available for review and comment.
Privacy Act of 1974; System of Records
The Department of the Army proposes to add a system of records to its inventory of record systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army proposes to add a system of records to its inventory of record systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended.
Intent to Prepare a Draft Environmental Impact Statement for the Proposed Cordova Hills Project in Sacramento County, CA, Corps Permit Application Number SPK-2004-00116
In 2008, the Cordova Hills Ownership Group (applicant) submitted a Department of the Army permit application for the proposed Cordova Hills project. On June 18, 2008, the U.S. Army Corps of Engineers, Sacramento District (Corps) determined that the proposed project may result in significant impacts to the environment, and that the preparation of an Environmental Impact Statement (EIS) is necessary. A revised permit application was submitted by the applicant on March 15, 2011. The applicant proposes to implement a large-scale, mixed-use, mixed-density master planned community with an integrated university, neighborhood and regional commercial and residential uses and associated infrastructure. The proposed project consists of approximately: 1,000 acres of residential uses ranging from one dwelling unit per acre to 40 dwelling units per acres; 1,380,000 square feet of retail and commercial uses; 240 acres of private university campus; 635 acres of recreation areas, parks, natural avoided areas and open space corridors; 538 acres for on-site wetland and habitat avoidance, and; 18 miles of off-street/multi-use trails. The project site is approximately 2,688 acres and contains 89.106 acres of waters of the United States. The proposed project would involve the discharge of fill material into approximately 39.630 acres of waters of the United States, including vernal pools, seasonal wetlands, seeps, intermittent drainages, and stock ponds. The proposed project may also have have indirect impacts on other waters of the U.S.
Request for Comments on the Notice of Intent To Prepare a Draft Environmental Impact Statement for the Skagit River General Investigation Study (Previously Advertised as the Skagit River Flood Damage Reduction Study), Skagit County, WA
The Corps of Engineers is extending the comment period for the Notice of Intent (NOI) to prepare a Draft Environmental Impact Statement for the Skagit River General Investigation Study (previously advertised as the Skagit River Flood Damage Reduction Study), Skagit County, Washington. This extension will provide interested persons with additional time to prepare comments on the NOI.
Availability of the Proposed Report of the Chief of Engineers and the Final Joint Environmental Impact Statement/Environmental Impact Report Within the City of San Clemente Extending 3,412 ft (1,040 m) From Linda Lane to T Street
This announces the availability of the Proposed Report of the Chief of Engineers and the Final Joint Environmental Impact Statement/ Environmental Impact Report (FEIS/R) which analyzes the potential environmental effects associated with the proposed action and alternatives for providing shoreline protection to approximately 3,412 feet ([ft], 1,040 meters [m]) of the San Clemente shoreline from coastal storms. Maintaining the beach is needed to prevent the beach erosion that results from winter storms and to prevent damage to adjacent commuter and national defense rail line that runs along the beach through the City. In addition, the loss of sand at the beach would have an impact on City beachfront structures and beach recreation, which contributes to the local economy, and would reduce the ecological functioning of the sand beach/littoral zone.
Notice of Intent To Prepare a Joint Supplemental Environmental Impact Statement and Environmental Impact Report for the Folsom Dam Modification Project, Approach Channel.
The action being taken is the preparation of a joint supplemental environmental impact statement/environmental impact report (EIS/EIR) for the Folsom Dam Modification, Approach Channel Project. The EIS/EIR will be prepared in accordance with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The U.S. Army Corps of Engineers (USACE) will serve as lead agency for compliance with NEPA, and the State of California Central Valley Flood Protection Board (CVFPB) will serve as lead agency for compliance with CEQA. The Folsom Dam Modification Project, Approach Channel will evaluate alternatives, including a locally preferred plan, for providing dam safety and flood damage reduction at Folsom Dam located downstream from the confluence of the North and South Forks of the American River near the city of Folsom, California.
Notice of Availability of the Record of Decision on the Final Programmatic Environmental Impact Statement for the Mechanical and Artificial Creation and Maintenance of Emergent Sandbar Habitat in the Riverine Segments of the Upper Missouri River, Missouri River Basin, United States
The District Commander of the Omaha District U.S. Army Corps of Engineers (Corps) has reviewed the ``Final Programmatic Environmental Impact Statement (PEIS) for the Mechanical and Artificial Creation and Maintenance of Emergent Sandbar Habitat (ESH) on the Riverine Segments of the Upper Missouri River'' and has made the decision to proceed with the implementation of an Adaptive Management Implementation Process (AMIP) (preferred alternative) with a construction ceiling of acres associated with Alternative 3.5. Specific details of the decision are captured in the Record of Decision (ROD) for this action. The ROD explains that the Corps will create and maintain ESH acres in the Fort Peck, Garrison, Fort Randall and Gavins Point River Segments, and the Lewis and Clark Lake Segment for the benefit of the Interior Population of the least tern (least tern) and the northern Great Plains piping plover (piping plover). The maximum potential acres of ESH to be created is approximately 4,370 acres total, with the following estimated maximum acres by reach: Fort Peck River, 565. Garrison River, 1,327. Fort Randall River, 212. Lewis & Clark Lake, 354. Gavins Point River, 1,913. The AMIP alternative best supports the needs of the birds while providing flexibility in program implementation that will help minimize environmental impacts as well as costs.
Intent To Prepare a Draft Supplemental Environmental Impact Statement for the Larose to Golden Meadow Hurricane Protection Project, Post-Authorization Change Study, in Lafourche Parish, LA
The U.S. Army Corps of Engineers (USACE) intends to prepare a supplemental environmental impact statement (SEIS) for the Larose to Golden Meadow Hurricane Protection Project, Post-Authorization Change (PAC) Study. This project was originally authorized in 1965. Construction began in 1972 and is still underway. The PAC Study was initiated to identify and evaluate modifications needed to ensure that completion of project features, designed and constructed before development of the post-Katrina Hurricane and Storm Damage Risk Reduction System (HSDRRS) Design Guidelines, are in compliance with these new guidelines. The subject SEIS will supplement the original environmental impact statement (EIS) prepared for the project as authorized in 1965. The Statement of Findings for the original EIS was signed on April 4, 1975. An SEIS was subsequently prepared to address proposed modifications to the authorized plan. The Record of Decision for this first SEIS was signed on May 20, 1985.
Notice of Intent To Prepare an Environmental Impact Statement/Environmental Impact Report for the Section 408 Permission for the Southport Sacramento River Early Implementation Project, West Sacramento, CA
Pursuant to the National Environmental Policy Act of 1969, as amended, and the California Environmental Quality Act (CEQA), the U.S. Army Corps of Engineers (USACE) intends to prepare an Environmental Impact Statement/Environmental Impact Report (EIS/EIR) under Section 14 of the Rivers and Harbors Act of 1899 (as amended) (33 U.S.C. 408), and Section 404 of the Clean Water Act (33 U.S.C. 1344), for the proposed Southport Sacramento River Early Implementation Project (EIP), sponsored by the West Sacramento Area Flood Control Agency (WSAFCA). Figures of the project area can be viewed at https:// www.cityofwestsacramento.org/city/flood. WSAFCA is planning the Southport Sacramento River EIP to implement flood-risk reduction measures along the Sacramento River South Levee in the City of West Sacramento, Yolo County, CA. The project reach extends along the right bank of the Sacramento River south of the barge canal, downstream approximately 6.4 miles to the South Cross Levee, protecting the Southport community of West Sacramento. The 3.3-square mile study area encompasses the area of levee improvement along the river corridor and the potential soil borrow sites. In order to implement the project, the sponsor must acquire permission from USACE to alter the Federal project under Section 14 of the Rivers and Harbors Act of 1899 (as amended) (33 U.S.C. 408 or, Section 408). USACE also has authority under Section 404 of the Clean Water Act (33 U.S.C. 1344) over activities involving the discharge of dredged or fill material to waters of the United States, which are known to be in the project area. The project would bring the levee up to standard with Federal and state flood protection criteria, as well as providing opportunities for ecosystem restoration and public recreation. USACE, acting as the federal lead agency under NEPA, and WSAFCA, acting as the state lead agency under the CEQA in coordination with the Central Valley Flood Protection Board, have determined that an EIS/EIR should be prepared to describe alternatives, potential environmental effects, and mitigation measures.
Notice of Availability for Exclusive, Non-Exclusive, or Partially-Exclusive Licensing of an Invention Concerning a Device and Method for Evaluating Manual Dexterity
Announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 61/505,424, entitled ``Device and Method for Evaluating Manual Dexterity,'' filed on July 7, 2011. The United States Government, as represented by the Secretary of the Army, has rights to this invention.
Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report for a Permit Application for the Proposed Salton Sea Species Conservation Habitat Project at the Salton Sea, in Imperial County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the California Natural Resources Agency, has completed a Draft Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) for the Salton Sea Species Conservation Habitat (SCH) Project. The Natural Resources Agency is requesting a permit from the Corps of Engineers to discharge dredged or fill material into the Salton Sea, a water of the United States subject to the Corps jurisdiction under section 404 of the Clean Water Act, including permanent impacts up to 24 acres and temporary impacts up to 1,760 acres for the construction of up to 3,770 acres of shallow ponds and associated infrastructure at the southern end of the Salton Sea in Imperial County, California. Compared to existing conditions, the SCH Project would result in a net increase in the extent of jurisdictional aquatic resources by up to 1,986 acres because the ponds would restore such resources located between elevation -228 feet and -231 feet previously lost by the receding Sea. Draft EIS/EIR Comment Process. In an effort to follow sustainable business practices, the Draft EIS/EIR can be downloaded in electronic format from the Natural Resources AgencyDepartment of Water Resources' Web site: https://www.water.ca.gov/ saltonsea/. A hardcopy of the Draft EIS/EIR and documents referenced in the Draft EIS/EIR can be viewed at the following location: California Department of Fish and Game, 78078 Country Club Drive, Suite 109, Bermuda Dunes, CA 92203. In addition, the hardcopy Draft EIS/EIR can be viewed at the following public locations: Brawley Public Library, 400 Main Street, Brawley, CA 92227; Calipatria Public Library, 225 West Main Street, Calipatria, CA 92233; Imperial Public Library, 200 West 9th Street, Imperial, CA 92251; El Centro Public Library, 375 South 1st Street, El Centro, CA 92243; Imperial County Free Library, 2098 Frontage Road, Salton City, CA 92275; Mecca-North Shore Public Library, 91-260 Avenue 66, Mecca, CA 92254; and Coachella Branch Library, 1538 7th Street, Coachella, CA 92236. The Corps and the Natural Resources Agency invites interested parties to attend one of the jointly held public hearings to provide the agencies with their views and comments on the Draft EIS/EIR. Comments on the content of the Draft EIS/EIR by Federal, State, and local agencies, affected Indian tribes, and other interested organizations and persons are encouraged and will be considered by the Corps and the Natural Resources Agency and become part of the administrative record for the Corps' decision. The public hearings will be held at: 1. CalipatriaSeptember 14, 2011 at 1 P.M. at the Calipatria Inn and Suites, 700 North Sorenson Avenue, Calipatria, CA 92233. 2. BrawleySeptember 14, 2011 at 6 P.M. at Elks Lodge 1420, 161 South Plaza, Brawley, CA 92227. 3. Palm Desert September 15, 2011 at 1 P.M. at the University of California, 75-080 Frank Sinatra Drive, Room B200, Palm Desert, CA 92211. In order for the Corps and the Natural Resources Agency to more accurately process and respond to comments, an online e-form is provided on the Natural Resources AgencyDepartment of Water Resources' Web site https://www.water.ca.gov/saltonsea/ and is the preferred method of receiving comments from interested parties. Alternatively, written comment letters can be provided directly to Ms. Lanika Cervantes or Mr. David Elms at the addresses listed below.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to amend a system of records notice in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for a Study on the Feasibility of Deepening Charleston Harbor
The U.S. Army Corps of Engineers (Corps), Charleston District, intends to prepare a Draft Environmental Impact Statement (DEIS), for the Charleston Harbor Deepening Study (Post-45 study). The purpose of this DEIS and feasibility study is to investigate modification of the existing Charleston Harbor project in the interest of navigation improvements.
Surplus Properties
This amended notice provides information regarding the properties that have been determined surplus to the United States needs in accordance with the Defense Base Closure and Realignment Act of 1990, Public Law 101-510, as amended, and the 2005 Base Closure and Realignment Commission Report, as approved, and following screening with Federal agencies and Department of Defense components. This Notice amends the Notice published in the Federal Register on August 7, 2009 (74 FR 39680).
Privacy Act of 1974; System of Records
The Department of the Army proposes to add a system of records to its inventory of record systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to amend a system of records notice in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Board of Visitors, Defense Language Institute Foreign Language Center
Under the provisions of the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Government in the Sunshine Act of 1976 (5 U.S.C. 552b, as amended) and 41 CFR 102-3.150, the Department of Defense announces that the following Federal advisory committee meeting will take place: Name of Committee: Board of Visitors, Defense Language Institute Foreign Language Center. Date: August 3 and 4, 2011. Time of Meeting: Approximately 8 a.m. through 4:30 p.m. Please allow extra time for gate security for both days. Location: Defense Language Institute Foreign Language Center and Presidio of Monterey (DLIFLC & POM), Building 614, Conference Room, Monterey, CA 93944. Purpose of the Meeting: The purpose of the meeting is to provide an overview of the Language, Science & Technology directorate. In addition, the meeting will involve administrative matters. Agenda: SummaryAugust 3Board administrative details and functional areas will be discussed. August 4The Board will be briefed on DLIFLC select mission and functional areas. Public's Accessibility to the Meeting: Pursuant to 5 U.S.C. 552b and 41 CFR 102-3.140 through 102-3.165, and the availability of space, this meeting is open to the public. Seating is on a first-come basis. No member of the public attending open meetings will be allowed to present questions from the floor or speak to any issue under consideration by the Board. Although open to the public, gate access is required no later than five work days prior to the meeting. Contact the Committee's Designated Federal Officer, below, for gate access procedures. Committee's Designated Federal Officer or Point of Contact: Mr. Detlev Kesten, ATFL-APO, Monterey, CA 93944, Detlev.kesten@us.army.mil, (831) 242-6670.
Western Hemisphere Institute for Security Cooperation Board of Visitors; Meeting
This notice replaces the original notice published in the Federal Register on June 10, 2011 (76 FR 34066) and sets forth the schedule and summary agenda for the annual meeting of the Board of Visitors (BoV) for the Western Hemisphere Institute for Security Cooperation (WHINSEC). Notice of this meeting is required under the Federal Advisory Committee Act (Pub. L. 92-463). The Board's charter was renewed on March 18, 2010 in compliance with the requirements set forth in Title 10 U.S.C. 2166. Date: Monday, September 26th, 2011. Time: 4 to 6 p.m. Location: Double Tree Hotel Conference Room, 5351 Sidney Simons Blvd, Columbus, Georgia. Proposed Agenda: Update briefings from the Office of the Secretary of Defense (Policy); Department of State; US Northern Command and US Southern Command meeting on December 3rd, 2010, as well as receive other information appropriate to its interests. Date: Tuesday, September 27th, 2011. Time: 8 a.m. to 4 p.m. Location: WHINSEC, 7161 Richardson Circle, Modular 2D, Fort Benning, Georgia 31905. Proposed Agenda: Topics will include an update briefing from the WHINSEC Commandant; WHINSEC Strategic Communications Plan; BoV engagement and subcommittees; WHINSEC budgeting and personnel challenges; WHINSEC curriculum and feedback
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.