Army Department – Federal Register Recent Federal Regulation Documents
Results 251 - 300 of 1,347
Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses
The U.S. Army Corps of Engineers (USACE) is proposing an interim Continuing Contracts clause for use on specifically authorized Civil Works projects only. This proposal is in response to a recurring statutory provision that requires a change to the clause USACE had previously used.
Notice of Availability of Final Environmental Impact Statement for the Proposed Construction of the Western Wake Regional Wastewater Management Facilities; Which Includes Regional Wastewater Pumping, Conveyance, Treatment, and Discharge Facilities To Serve the Towns of Apex, Cary, Holly Springs and Morrisville, as Well as the Wake County Portion of Research Triangle Park (RTP South) in North Carolina
The comment period for the Final Environmental Impact Statement for the proposed construction of the Western Wake Regional Wastewater Management Facilities, in Wake and Chatham Counties, NC published in the Federal Register on Friday, December 18, 2009 (74 FR 67180), required comments be submitted 33 days (January 19, 2010) following publication in the Federal Register. The comment period has been extended to 54 days (February 9, 2010). This is because the initial Web version of the Final Environmental Impact Statement had problems with the Web links. The web version was corrected on December 28, 2009.
Proposed Collection; Comment Request
In compliance with section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, the Department of the Army proposes to extend a public information collection and seeks public comment on the provisions thereof. Comments are invited on: Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; the accuracy of the agency's estimate of the burden of the proposed information collection; ways to enhance the quality, utility, and clarity of the information to be collected; and ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology.
Final Environmental Impact Statement (FEIS) for Development and Implementation of Range-Wide Mission and Major Capabilities at White Sands Missile Range (WSMR), NM
The Department of the Army announces the availability of an FEIS that analyzes environmental and socioeconomic impacts resulting from expanding testing and training capabilities at WSMR. The FEIS analyzes the impacts of land use changes that provide for expanded off- road maneuver and facilities to support new testing and training requirements associated with increased Brigade Combat Team (BCT) modernization (formerly known as Future Combat Systems) testing (preferred alternative) and the stationing of a Heavy Brigade Combat Team (HBCT) (or comparable unit) of approximately 3,800 Soldiers. On June 2, 2009, the Secretary of the Army announced a decision not to station an HBCT at WSMR in 2013; however, it was decided to retain the analysis in this FEIS to support implementation of potential future stationing decisions.
Submission for OMB Review; Comment Request
The Department of Defense has submitted to OMB for clearance, the following proposal for collection of information under the provisions of the Paperwork Reduction Act (44 U.S.C. Chapter 35).
Chief of Engineers Environmental Advisory Board
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning an Anti-Relapse Treatment and Prophylaxis for Malaria
Announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 61/261,872 entitled ``* * * as an Anti-Relapse Treatment and Prophylaxis for Malaria,'' filed November 17, 2009. The United States Government, as represented by the Secretary of the Army, has rights to this invention.
Army Science Board Plenary Meeting
Pursuant to the Federal Advisory Committee Act (FACA) of 1972 (5 U. S. C., Appendix, as amended), the Sunshine in the Government Act of 1976 (U. S. C. 552b, as amended) and 41 Code of the Federal Regulations (CFR 102-3. 140 through 160, the Department of the Army announces the following committee meeting:
Restricted Areas and Danger Zones at Eglin Air Force Base, FL
The U.S. Army Corps of Engineers (Corps) is proposing to revise several existing danger zone and restricted area regulations and to establish four new restricted areas within the Eglin Air Force Base (AFB) facilities and along the Eglin AFB facility shoreline in Florida. The Eglin AFB and Eglin Reservation span over 724 square miles with over 150 miles of waterway boundary. This amendment to the existing regulation is necessary to update their water boundary security plan to provide adequate protection to Eglin personnel and resources.
The Release of the Final Environmental Impact Statement (FEIS) for the Proposed Construction of the Western Wake Regional Wastewater Management Facilities, Which Includes Regional Wastewater Pumping, Conveyance, Treatment, and Discharge Facilities To Serve the Towns of Apex, Cary, Holly Springs and Morrisville, as Well as the Wake County Portion of Research Triangle Park (RTP South) in North Carolina
The U.S. Army Corps of Engineers (COE), Wilmington District, Regulatory Division has been reviewing the request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act from the Town of Cary, acting as the lead applicant for the Western Wake Regional Wastewater Management Facilities Project Partners (Western Wake Partners), to construct Regional Wastewater Management Facility. The proposed project consists of regional wastewater pumping, conveyance, treatment, and discharge facilities to serve the Towns of Apex, Cary, Holly Springs and Morrisville, as well as the Wake County portion of Research Triangle Park (RTP South), NC.
Extension of the Public Comment Period for the Draft Environmental Impact Statement for the Moffat Collection System Project, City and County of Denver, Adams County, Boulder County, Jefferson County, and Grand County, CO
The U.S. Army Corps of Engineers (Corps) Omaha District is announcing a 32-day extension of the public comment period for the Moffat Collection System Project (Moffat Project) Draft Environmental Impact Statement (Draft EIS). The originally announced comment period ends on January 28, 2010, but has been extended until March 1, 2010. The original Notice of Availability of the Draft EIS was published in the Federal Register on Friday, October 30, 2009 (74 FR 56186).
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the State of Alaska's Proposed Alaska Stand Alone Pipeline (ASAP) Natural Gas Transportation Pipeline
The Alaska District, U.S. Army Corps of Engineers (Corps) intends to prepare a Draft Environmental Impact Statement (DEIS) to identify and analyze the potential impacts associated with the construction of the proposed Alaska Stand Alone Pipeline (ASAP) natural gas transportation pipeline. The Corps is the lead federal agency and the Bureau of Land Management (BLM), National Park Service (NPS) and Environmental Protection Agency (EPA) are participating as cooperating agencies in the DEIS development process. The Environmental Impact Statement (EIS) will be used as a basis for the Corps permit decision and to ensure compliance with the National Environmental Policy Act (NEPA). The Corps will be evaluating a permit application for work under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Because ASAP would require decisions and actions by other federal agencies (such as right-of-way grants and other permits), this DEIS will also fulfill the NEPA responsibilities of those federal agencies.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Proposed Point Thomson Project To Develop the Thomson Sand Reservoir by Extracting Gas Condensate and Oil for the Purpose of Commercial Production as Proposed by the Exxon Mobil Corporation (ExxonMobil)
The Alaska District, U.S. Army Corps of Engineers (Corps) intends to prepare a Draft Environmental Impact Statement (DEIS) to identify and analyze the potential impacts associated with the development of the Thomson Sand Reservoir, including construction and operation of the proposed project. The Corps will be evaluating a permit application for work under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. The Environmental Impact Statement (EIS) will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to add a system of records to its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Record of Decision (ROD) for the Real Property Master Plan and Real Property Exchange at Camp Parks, Dublin, CA
The U.S. Army, with cooperation from the National Aeronautics and Space Administration (NASA), announces the availability of the ROD for the Real Property Master Plan (RPMP) and the Real Property Exchange at Camp Parks. The ROD selects the Accelerated Modernization Alternative, under which the construction of new facilities and ranges included in the RPMP would be partially funded using the value of the land exchange (180 acres of the southern cantonment area) from Federal to private ownership. The remainder of RPMP construction at Camp Parks would be programmed as military construction projects. NASA's in- holding would be sold and proceeds of the sale would be used at its NASA-Ames Research Center, Moffett Field. This decision will speed the replacement of antiquated facilities and infrastructure on Camp Parks.
The Release of the Draft Environmental Impact Statement (DEIS) for the Town of Nags Head Proposed Beach Nourishment Project in Dare County, NC
The U.S. Army Corps of Engineers (COE), Wilmington District, Regulatory Division, has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899, from the Town of Nags Head to dredge up to 4.6 million cubic yards of beach-quality sediment from an offshore borrow source, and deposit the material along approximately 10 miles of ocean shoreline in the Town of Nags Head.
Western Hemisphere Institute for Security Cooperation, Board of Visitors Meeting
This notice sets forth the schedule and summary agenda for the annual meeting of the Board of Visitors (BoV) for the Western Hemisphere Institute for Security Cooperation (WHINSEC). Notice of this meeting is required under the Federal Advisory Committee Act (Pub. L. 92-463). The Board's charter was renewed on February 1, 2008 in compliance with the requirements set forth in Title 10 U.S.C. 2166.
Performance Review Board Membership
Notice is given of the names of members of a Performance Review Board for the Department of the Army.
Notice of Intent To Revise Scope of Draft Environmental Impact Statement for Updating the Water Control Manuals for the Apalachicola-Chattahoochee-Flint River Basin To Account for Federal District Court Ruling
Notice is hereby given that the U.S. Army Corps of Engineers (Corps), Mobile District, intends to revise the scope of the Environmental Impact Statement (EIS) for the Water Control Manuals updates for the Apalachicola-Chattahoochee-Flint (ACF) River Basin in Alabama, Florida, and Georgia, to account for a July 17, 2009 Federal court ruling. On July 17, 2009, Judge Paul A. Magnuson issued a memorandum and order in the case In re Tri-State Water Rights Litigation (M.D. Fla. No. 3:07-md-01),
Restricted Areas at Cape Canaveral Air Force Station, Patrick AFB, FL
The U.S. Army Corps of Engineers (Corps) published a document in the Federal Register on July 23, 2009 (74 FR 36400), revising the restricted areas at Cape Canaveral Air Force Station, Patrick Air Force Base (AFB), Florida. The revision included the establishment of a restricted area within the waters of the Atlantic Ocean offshore of the Cape Canaveral Air Force Station. The regulation included information regarding the boundaries of the new restricted area, including a reference to the offshore (eastern) boundary as being 1.5 miles offshore of the mean high water line. The final rule did not reference the type of mile unit to be used for the boundary line of the restricted area. The intent was to use nautical miles as the unit type. Since the use of nautical miles changes the coordinates for the northeast and southeast corner points of the restricted area, we are also correcting those coordinates. This document corrects the final regulation by revising this section.
Marine Corps Base Hawaii, Kaneohe Bay, Island of Oahu, HI
The U.S. Army Corps of Engineers is amending the regulations at 33 CFR 334.1380 for the existing danger zone in the vicinity of Kaneohe Bay, Hawaii. The amendment reflects the current operational and safety procedures at the Ulupau Crater Weapons Training Range and highlights a change in the hours that weapons firing may occur. The amendment also expands the boundaries of the existing danger zone. These regulations are necessary to protect the public from potentially hazardous conditions which may exist as a result from use of the areas by the United States Marine Corps.
Intent To Prepare an Environmental Impact Statement for the Proposed Construction of Lower Bois d'Arc Creek Reservoir in Fannin County, TX
The U.S. Army Corps of Engineers, Tulsa District (USACE) has received an application for a Department of the Army Permit under Section 404 of the Clean Water Act (CWA) from the North Texas Municipal Water District (NTMWD) to construct Lower Bois d'Arc Creek Reservoir. In accordance with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321 et seq.), the USACE has determined that issuance of such a permit may have a significant impact on the quality of the human environment and, therefore, requires the preparation of an Environmental Impact Statement (EIS).
Record of Decision for Stationing and Training of Increased Aviation Assets Within U.S. Army Alaska
The Department of the Army announces the availability of its Record of Decision (ROD) that documents and summarizes the decision for implementing actions to increase numbers and types of aviation assets and training within U.S. Army Alaska (USARAK). The decision is based on the analysis described in the Final Environmental Impact Statement (FEIS) for Stationing and Training of Increased Aviation Assets within U.S. Army Alaska (August 2009), supporting studies, and comments provided during formal comment and review periods.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning Methods and Composition for Live Bubonic Plague Vaccine Based on Yersinia Pestis * * * Gene Deletion
Announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 61/242,113 entitled ``Methods and Composition for Live Bubonic Plague Vaccine Based On Yersinia Pestis * * * Gene Deletion,'' filed September 14, 2009. The United States Government, as represented by the Secretary of the Army, has rights to this invention.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning Enhanced Substrates for the Protease Activity of Serotype a Botulinum Neurotoxin
Announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 61/252,675 entitled ``Enhanced Substrates for the Protease Activity of Serotype a Botulinum Neurotoxin,'' filed October 18, 2009. The United States Government, as represented by the Secretary of the Army, has rights to this invention.
Inland Waterways Users Board
In accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting.
Fort Bliss Army Growth and Force Structure Realignment Draft; Environmental Impact Statement (DEIS)
The Department of the Army announces the availability of a DEIS identifying the potential environmental effects that would result from use of stationing and training capacity, land use changes, and training infrastructure improvements at Fort Bliss (Texas) to support Army growth and force structure realignment.
Availability of the Draft Environmental Impact Statement for the Moffat Collection System Project, City and County of Denver, Adams County, Boulder County, Jefferson County, and Grand County, CO
The U.S. Army Corps of Engineers (Corps) Omaha District has prepared a Draft Environmental Impact Statement (EIS) to analyze the direct, indirect, and cumulative effects of a water supply project called the Moffat Collection System Project (Moffat Project) in the City and County of Denver, Adams County, Boulder County, Jefferson County, and Grand County, CO. The purpose of the Proposed Action is to develop 18,000 acre-feet (AF) per year of new, firm yield to the Moffat Water Treatment Plant (WTP) and raw water customers upstream of the Moffat WTP pursuant to the Board of Water Commissioners' commitment to its customers. Denver Water's need for the proposed Moffat Project is
Notice of Availability of a Draft Environmental Impact Statement (DEIS) for Training Land Acquisition at Fort Polk, LA
The Department of the Army has prepared a DEIS that analyzes environmental and socioeconomic impacts connected with the proposed acquisition (hereinafter to mean including purchase and lease) and use of up to 100,000 additional acres of commercial and private lands for training in the vicinity of Fort Polk, Louisiana. This Proposed Action to acquire additional lands supports the training requirements of the Joint Readiness Training Center (JRTC) and Fort Polk's current and future resident units. The DEIS analyzes three alternatives that are deemed feasible and meet the purpose and need for this Proposed Action.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Patent Application Concerning System and Method for the Deconvolution of Mixed DNA Profiles Using a Proportionately Shared Allele Approach
Announcement is made of the availability for licensing of the invention set forth in U.S. Patent Application Serial No. 12/421,124, entitled ``System and Method for the Deconvolution of Mixed DNA Profiles Using a Proportionately Shared Allele Approach.'' The United States Government, as represented by the Secretary of the Army, has rights to this invention.
Availability for Exclusive, Partially Exclusive, or Non-Exclusive Licensing of U.S. Patent Application No. 12/432,842 Filed April 30, 2009 Entitled: “A Soil Stabilization System, Stabilized Soil Comprising Same, and a Method of Stabilizing Soil”
This announcement serves as notice of the availability of technology for licensing. This invention has non-government co- inventors and this announcement pertains only to the licensing of the federal government's rights, not those of the non-government co- inventors.
Army Science Board Plenary Meeting
Pursuant to the Federal Advisory Committee Act (FACA) of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (U.S.C. 552b, as amended) and 41 Code of the Federal Regulations (CFR 102-3. 140 through 160), the Department of the Army announces the following committee meeting:
Environmental Impact Statement, Permit Under the Clean Water Act, and General Conformity Determination: Port of Los Angeles Channel Deepening Project, Los Angeles, CA
The U.S. Army Corps of Engineers, Los Angeles District, Planning Division and Regulatory Division (Corps) have made a Final General Conformity Determination (GCD) and executed a Record of Decision (ROD) for the Final Supplemental Environmental Impact Statement/Supplemental Environmental Impact Report (SEIS/SEIR) and a ROD for Section 404 Permit under the Clean Water Act for the Port of Los Angeles Channel Deepening Project, Los Angeles, California.
Privacy Act of 1974; System of Records
The Department of the Army is proposing to alter a system of records in its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Board of Visitors, United States Military Academy (USMA)
Under the provisions of the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Government in the Sunshine Act of 1976 (5 U.S.C. 552b, as amended), and 41 CFR 102-3.150, the Department of Defense announces that the following Federal advisory committee meeting will take place:
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Dallas Floodway Project, a Multipurpose Project Containing Levee Remediation, Flood Risk Management, Ecosystem Restoration, Recreation Enhancement, and Other Proposed Projects Along the Trinity River Within and Adjacent to the Existing Dallas Floodway in Dallas County, Dallas TX
The U.S. Army Corps of Engineers (USACE), Fort Worth District, in partnership with the City of Dallas, intends to prepare a Draft Environmental Impact Statement (DEIS), pursuant to Section 102 of the National Environmental Policy Act (NEPA) as implemented by the regulations promulgated by the Council on Environmental Quality (40 Code of Federal Regulations Parts 1500-1508 and USACE Engineering Regulation 200-2-2) to analyze the potential comprehensive environmental consequences resulting from the implementation of proposed levee remediation, flood risk management, ecosystem restoration, recreation enhancement, and other proposed projects in and around the Dallas Floodway, in Dallas, TX.
Board on Coastal Engineering Research
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Department of Defense Historical Advisory Committee; Meeting
In accordance with Section 10(a) (2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning Novel Use and Method of Rapamycin To Treat Toxic Shock
Announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 61/231,348 entitled ``Novel Use and Method of Rapamycin to Treat Toxic Shock,'' filed August 5, 2009. The United States Government, as represented by the Secretary of the Army, has rights to this invention.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning Monoclonal Antibodies Against Glycoprotein of Ebola Sudan Boniface Virus
Announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 61/239,266 entitled ``Monoclonal Antibodies Against Glycoprotein of Ebola Sudan Boniface Virus,'' filed September 2, 2009. The United States Government, as represented by the Secretary of the Army, has rights to this invention.
Notice of Availability of a Novel Fiberglass Technology for Exclusive, Partially Exclusive or Non-Exclusive Licenses
The Department of the Army announces the general availability of exclusive, partially exclusive or non-exclusive licenses relative to a novel fiberglass technology (e-glass; s-glass, etc.) as described in U.S. Patent Application 11/639,221 filed on 12/15/06; entitled ``Nano- Textured Solid Surfaces and Methods for Producing Same''; Jensen and McKnight. Any license shall comply with 35 U.S.C. 209 and 37 CFR part 404.
Intent To Prepare a Draft Programmatic Environmental Impact Statement for the Puget Sound Nearshore Marine Habitat Restoration Project, WA
Pursuant to Section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969, as amended, the U.S. Army Corps of Engineers (Corps), Seattle District, as lead Federal agency, will prepare a draft Programmatic Environmental Impact Statement (PEIS) evaluating a process based restoration project in the marine nearshore zone of Puget Sound,
Proposed Collection; Comment Request
In compliance with Section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, the Department of the Army announces the extension of a proposed public information collection and seeks public comment on the provisions thereof. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed information collection; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology.
Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report and a Draft General Conformity Determination for the San Pedro Waterfront Project, Port of Los Angeles, Los Angeles County, CA
On September 22, 2008, the U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) in coordination with the Los Angeles Harbor Department (LAHD) completed and published the Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Pedro Waterfront Project (Project) in the Port of Los Angeles. The Corps and LAHD considered all comments received in preparing the Final EIS/EIR, which is available for a 30-day review. The Final EIS/ EIR includes a draft general conformity determination (see Section 3.2 and Appendix D.7), pursuant to Section 176(c) of the Clean Air Act. A general conformity determination is necessary because Project construction would require Federal action (i.e., issuance of a Corps permit for activities proposed in and over navigable waters and waters of the U.S.) and not all the Federal action's direct and indirect emissions would be below specified de minimis thresholds (40 CFR 93.153(b)). Pursuant to the general conformity regulations (40 CFR part 93, subpart B), general conformity determinations do not have to be included in the EIS and can be separately noticed, but the draft general conformity determination for the Federal action associated with the Project is being included in the Final EIS/EIR in this case.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.