Nuclear Regulatory Commission May 2019 – Federal Register Recent Federal Regulation Documents
Results 1 - 50 of 56
Tennessee Valley Authority; Clinch River Nuclear Site
The U.S. Nuclear Regulatory Commission (NRC) is giving notice once each week for four consecutive weeks for an application from Tennessee Valley Authority (TVA), for an early site permit (ESP) for the Clinch River Nuclear Site located in Oak Ridge, Tennessee.
Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station
The U.S. Nuclear Regulatory Commission (NRC) has issued a partial exemption in response to a February 8, 2019, request from Entergy Nuclear Operations, Inc. (the licensee or Entergy). The issuance of the exemption would grant Entergy a partial exemption from regulations that require the retention of records for certain systems, structures, and components associated with the Pilgrim Nuclear Power Station (Pilgrim) until the termination of the Pilgrim operating license.
List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM 100 Multipurpose Canister Cask System, Certificate of Compliance No. 1014, Amendment Nos. 12 and 13; Corrections
The U.S. Nuclear Regulatory Commission (NRC) published two direct final rules in the Federal Register, on December 12, 2018, and February 26, 2019, which amended its spent fuel storage regulations by revising the Holtec International HI-STORM 100 Multipurpose Canister Cask System listing within the ``List of approved spent fuel storage casks'' to include Amendment Nos. 12 and 13 to Certificate of Compliance No. 1014 respectively. Amendment No. 12 became effective on February 25, 2019, and Amendment No. 13 became effective on May 13, 2019. The technical specifications for the HI-STORM Multipurpose Canister Cask 100 System, Amendment Nos. 12 and 13 contained a typographical error. The purpose of this action is to correct the error.
Guidance for Changes, Tests, and Experiments
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 of regulatory guide (RG) 1.187, ``Guidance for Implementation of 10 CFR 50.59, `Changes, Tests, and Experiments.' '' Concurrently the NRC is issuing for public comment DG-1356, which is proposed Revision 2 of RG 1.187.
Processing Fitness-for-Duty Drug and Alcohol Cases
The U.S. Nuclear Regulatory Commission (NRC) is issuing a revision to its Enforcement Policy (the Policy). The NRC is revising Section 4.1, ``Considerations in Determining Enforcement Actions Involving Individuals,'' of the Policy to indicate that the NRC typically will not consider Fitness-for-Duty (FFD) Drug and Alcohol (D&A) related violations for enforcement unless the licensee's FFD program has apparent deficiencies.
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Power Operated Relief Valve Noise Mitigation
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 159 for Unit 3 and No. 157 for Unit 4 to Combined Licenses (COLs), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (collectively SNC); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Plant License Renewal
Tennessee Valley Authority; Clinch River Nuclear Site
The U.S. Nuclear Regulatory Commission (NRC) is giving notice once each week for four consecutive weeks for an application from Tennessee Valley Authority (TVA), for an early site permit (ESP) for the Clinch River Nuclear Site located in Oak Ridge, Tennessee.
Draft Approaches for Addressing Training and Experience Requirements for Radiopharmaceuticals Requiring a Written Directive
On May 2, 2019, the U.S. Nuclear Regulatory Commission (NRC) requested comments on draft approaches regarding the training and experience (T&E) requirements for radiopharmaceuticals requiring a written directive. The public comment period was originally scheduled to close on June 3, 2019. The NRC is extending the comment period to July 3, 2019, to allow more time for stakeholders and members of the public to submit their comments.
Advanced Power Reactor 1400 (APR1400) Design Certification
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its regulations to certify the Advanced Power Reactor 1400 (APR1400) standard design. Applicants or licensees intending to construct and operate an APR1400 standard design may do so by referencing this design certification (DC) rule. The applicant for the certification of the APR1400 standard design is Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KEPCO/KHNP).
Advanced Power Reactor 1400 (APR1400) Design Certification
The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations to certify the Advanced Power Reactor 1400 (APR1400) standard design. Applicants or licensees intending to construct and operate an APR1400 standard design may do so by referencing this design certification (DC) rule. The applicant for the certification of the APR1400 standard design is Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KEPCO/KHNP).
Exelon Generation Company, LLC; Clinton Power Station, Unit No. 1
The U.S. Nuclear Regulatory Commission (NRC) is considering the issuance of an amendment to Facility Operating License No. NPF-62, issued to Exelon Generation Company, LLC (the licensee), for operation of the Clinton Power Station, Unit No 1 (CPS), located in DeWitt County, Illinois. The proposed action would amend the expiration of Facility Operating License No. NPF-62 from September 29, 2026, to April 17, 2027. From September 29, 1986, to April 17, 1987, CPS was limited to 5 percent of rated power while operators conducted low-power testing before being issued a full-power operating license on April 17, 1987. The action to amend the expiration date of the license from September 29, 2026, to April 17, 2027, would result in the license expiring 40 years from the date of the issuance of the full-power operating license, as is permitted by the NRC's regulations.
FirstEnergy Nuclear Operating Company; Beaver Valley Power Station, Unit No. 1, Davis-Besse Nuclear Power Station, Unit No. 1
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of FirstEnergy Nuclear Operating Company, et al., dated May 8, 2019, to withdraw its application dated May 18, 2017, as supplemented by letter dated August 23, 2018, for proposed amendments to Renewed Facility Operating License No. DPR-66 for the Beaver Valley Power Station, Unit No. 1 (BVPS-1), and to Renewed Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS). The proposed amendments would have modified the BVPS-1 and DBNPS Renewed Facility Operating Licenses to reflect that FirstEnergy Solutions Corp. is providing the $400 million support agreement instead of FirstEnergy Corp.
Maine Yankee Atomic Power Company; Maine Yankee Independent Spent Fuel Storage Installation
The U.S. Nuclear Regulatory Commission (NRC) is issuing an environmental assessment (EA) and a finding of no significant impact (FONSI) for its review and approval of the decommissioning funding plans submitted by Maine Yankee Atomic Power Company (MYAPC) on January 8, 2013, and December 16, 2015, for the independent spent fuel storage installation (ISFSI) at Maine Yankee in Wiscasset, Maine.
Luminant Generation Company, LLC; Comanche Peak Independent Spent Fuel Storage Installation
The U.S. Nuclear Regulatory Commission (NRC) is issuing an environmental assessment (EA) and a finding of no significant impact (FONSI) for its review and approval of the decommissioning funding plans submitted by Luminant Generation Company, LLC (Luminant Power) on March 28, 2013, and March 31, 2015, for the independent spent fuel storage installation (ISFSI) at Comanche Peak in Glen Rose, Texas.
LaCrosse Solutions, LLC; La Crosse Boiling Water Reactor, Vernon County, Wisconsin
The U.S. Nuclear Regulatory Commission (NRC) is considering an amendment to Possession Only License DPR-45 to add a license condition that reflects the NRC's approval of the license termination plan (LTP) for the La Crosse Boiling Water Reactor (LACBWR) and provides criteria for when prior NRC approval is needed to make changes to the LTP. The NRC has prepared a final environmental assessment (EA) and finding of no significant impact (FONSI) for this licensing action.
Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Pursuant to the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued, from April 23, 2019, to May 6, 2019. The last biweekly notice was published on May 7, 2019.
Arizona Public Service Company; Palo Verde Independent Spent Fuel Storage Installation
The U.S. Nuclear Regulatory Commission (NRC) is issuing an environmental assessment (EA) and a finding of no significant impact (FONSI) for its review and approval of the decommissioning funding plans submitted by Arizona Public Service Company (APS) on December 14, 2012, and March 31, 2015, for the independent spent fuel storage installation (ISFSI) at Palo Verde in Wintersburg, Arizona.
Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation
The U.S. Nuclear Regulatory Commission (NRC) is issuing an environmental assessment (EA) and a finding of no significant impact (FONSI) for its review and approval of the decommissioning funding plans submitted by Pacific Gas and Electric Company (PG&E) on December 17, 2012, and December 17, 2015, for the independent spent fuel storage installation (ISFSI) at Humboldt Bay in Eureka, California.
Vogtle Electric Generating Plant, Units 3 and 4
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment and exemption to Combined Licenses (NPF-91 and NPF-92), issued to Southern Nuclear Operating Company, Inc. (SNC), Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (collectively, SNC), for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia.
Final Interim Staff Guidance DC/COL-ISG-03: Probabilistic Risk Assessment Information To Support Design Certification and Combined License Applications
The U.S. Nuclear Regulatory Commission (NRC) is withdrawing its Final Interim Staff Guidance (ISG) DC/COL-ISG-03, ``Probabilistic Risk Assessment Information to Support Design Certification and Combined License Applications.'' This ISG served to supplement the guidance provided to the staff in Section 19.0, ``Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors,'' of NUREG- 0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' concerning the review of probabilistic risk assessment information and severe accident assessment submitted to support design certification (DC) and combined license (COL) applications. The NRC staff issues ISG to facilitate timely implementation of current staff guidance and to facilitate activities associated with review of applications for DC and COLs by the Office of New Reactors. The NRC staff incorporated the approved DC/ COL-ISG into Revision 3 to Section 19.0 of NUREG-0800 dated December 2015. With the issuance of Revision 3 to Section 19.0 of NUREG-0800, the staff has determined that DC/COL-ISG-03 is no longer necessary and should be withdrawn.
Information Collection: NRC Form 313, “Application for Materials License” and NRC Forms 313A (RSO), 313A (AMP), 313A (ANP), 313A (AUD), 313A (AUT), and 313A (AUS)”
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``NRC Form 313, `Application for Materials License' and NRC Forms 313A (RSO), 313A (AMP), 313A (ANP), 313A (AUD), 313A (AUT), and 313A (AUS)''.
Final Interim Staff Guidance DC/COL-ISG-10: Review of Evaluation To Address Adverse Flow Effects in Equipment Other Than Reactor Internals
The Nuclear Regulatory Commission (NRC) is withdrawing its Final Interim Staff Guidance (ISG) DC/COL-ISG-10, ``Review of Evaluation to Address Adverse Flow Effects in Equipment Other than Reactor Internals.'' This ISG served to supplement the guidance provided to the staff in Sections 3.9.2, ``Dynamic Testing and Analysis of Systems, Structures, and Components,'' and 3.9.5, ``Reactor Pressure Vessel Internals,'' of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' concerning the review of probabilistic risk assessment information and severe accident assessment submitted to support design certification (DC) and combined license (COL) applications. The NRC staff issues ISG to facilitate timely implementation of current staff guidance and to facilitate activities associated with review of applications for DC and COLs by the Office of New Reactors. The NRC staff incorporated the approved DC/COL-ISG into Revision 4 to Sections 3.9.2 and 3.9.5 of NUREG-0800 dated March 2017. With the issuance of Revision 4 to Sections 3.9.2 and 3.9.5 of NUREG-0800, the staff has determined that DC/COL-ISG-10 is no longer necessary and should be withdrawn.
Final Interim Staff Guidance DI&C-ISG-03: Probabilistic Risk Assessment Information To Support Design Certification and Combined License Applications
The Nuclear Regulatory Commission (NRC) is withdrawing its Final Interim Staff Guidance (ISG) DI&C-ISG-03, ``Interim Staff Guidance on Review of New Reactor Digital Instrumentation and Control Probabilistic Risk Assessment.'' This ISG served to supplement the guidance provided to the staff in Section 19.0, ``Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors,'' of NUREG- 0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' concerning the probabilistic risk assessment associated with review of new reactor digital instrumentation and control to support the review of design certification and combined license (COL) applications. The NRC staff issues ISG to facilitate timely implementation of the current staff guidance and to facilitate activities associated with review of applications for DC and COLs by the Office of New Reactors. The NRC staff incorporated the approved DI&C-ISG-03 into Revision 3 to Section 19.0 of NUREG-0800 dated January 2016. With the issuance of Revision 3 to Section 19.0 of NUREG-0800, the staff has determined that DI&C-ISG- 03 is no longer necessary and should be withdrawn.
Tennessee Valley Authority; Clinch River Nuclear Site
The U.S. Nuclear Regulatory Commission (NRC) is giving notice once each week for four consecutive weeks for an application from Tennessee Valley Authority (TVA), for an early site permit (ESP) for the Clinch River Nuclear Site located in Oak Ridge, Tennessee.
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019
The U.S. Nuclear Regulatory Commission (NRC) is amending the licensing, inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990, as amended (OBRA-90), which requires the NRC to recover approximately 90 percent of its annual budget through fees.
Information Collection: NRC Form 237, “Request for Access Authorization”
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, NRC Form 237, ``Request for Access Authorization.''
Information Collection: NRC Form 277, Request for Visit
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ``NRC Form 277, Request for Visit.''
List of Approved Spent Fuel Storage Casks: NAC International NAC-UMS® Universal Storage System, Certificate of Compliance No. 1015, Amendment No. 7
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its spent fuel storage regulations by revising the NAC International NAC-UMS[supreg] Universal Storage System listing within the ``List of approved spent fuel storage casks'' to include Amendment No. 7 to Certificate of Compliance No. 1015. Amendment No. 7 would revise the surveillance requirements for technical specifications A3.1.6.1 and A3.1.6.2 to ensure that adequate monitoring of the concrete cask heat removal system is performed. Amendment No. 7 would also revise the basis for technical specification A3.1.6 to clarify that the surveillance requirements for technical specification A3.1.6 require a minimum of two outlet air temperature measurements to provide an average outlet temperature.
List of Approved Spent Fuel Storage Casks: NAC International NAC-UMS® Universal Storage System, Certificate of Compliance No. 1015, Amendment No. 7
The U.S. Nuclear Regulatory Commission (NRC) is amending its spent fuel storage regulations by revising the NAC International NAC- UMS[supreg] Universal Storage System listing within the ``List of approved spent fuel storage casks'' to include Amendment No. 7 to Certificate of Compliance No. 1015. Amendment No. 7 revises the surveillance requirements for technical specifications A3.1.6.1 and A3.1.6.2 to ensure that adequate monitoring of the concrete cask heat removal system is performed. Amendment No. 7 also revises the basis for technical specification A3.1.6 to clarify that the surveillance requirements for technical specification A3.1.6 require a minimum of two outlet air temperature measurements to provide an average outlet temperature.
Measurement Standards Used at U.S. Nuclear Power Plants
The U.S. Nuclear Regulatory Commission (NRC) has received a petition for rulemaking from Michael Taylor, dated December 3, 2018, as amended on January 24, 2019. The petitioner requests that the NRC amend its regulations to revise the measurement standards used at U.S. nuclear power plants. The petition was docketed by the NRC on March 4, 2019, and has been assigned Docket No. PRM-50-118. The NRC is examining the issues raised in PRM-50-118 to determine whether they should be considered in rulemaking. The NRC is requesting public comment on this petition.
Information Collection: Generic Clearance for the Collection of Qualitative Feedback on Agency Service Delivery
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ``Generic Clearance for the Collection of Qualitative Feedback on Agency Service Delivery.''
Information Collection: Billing Instructions for NRC Cost Type Contract/Orders
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``Billing Instructions for NRC Cost Type Contract/Orders.''
Information Collection: Criteria and Procedures for Determining Eligibility for Access to or Control Over Special Nuclear Material
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ``Criteria and Procedures for Determining Eligibility for Access to or Control Over Special Nuclear Material.''
Information Collection: Rules of General Applicability to Domestic Licensing of Byproduct Material
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ``10 CFR part 30, Rules of General Applicability to Domestic Licensing of Byproduct Material.''
Atomic Safety and Licensing Board; in the Matter of Powertech USA, Inc.; Dewey-Burdock in Situ Uranium Recovery Facility
The U.S. Nuclear Regulatory Commission (NRC) is issuing an Order to set a schedule for an evidentiary hearing in the Powertech USA, Inc., Dewey-Burdock In Situ Uranium Recovery Facility proceeding. The Order for Granting NRC Staff Motion and Scheduling Evidentiary Hearing became effective on April 29, 2019.
Advisory Committee on the Medical Uses of Isotopes: Meeting Notice
The U.S. Nuclear Regulatory Commission (NRC) will convene a teleconference meeting of the Advisory Committee on the Medical Uses of Isotopes (ACMUI) on June 10, 2019, to discuss: (1) The revisions to the ACMUI bylaws and (2) the draft report of the ACMUI Regulatory Guide 8.39 Subcommittee. This report will include the subcommittee's comments and recommendations on Phase 1 of the revisions to Regulatory Guide 8.39, ``Release of Patients Administered Radioactive Material.'' A phased approach is being conducted by the NRC staff to comprehensively update Regulatory Guide 8.39. Phase 1 of the revision provides licensees with more detailed instructions to patients before and after they have been administered radioactive material than what is currently provided in Regulatory Guide 8.39. Meeting information, including a copy of the agenda and handouts, will be available at https:// www.nrc.gov/reading-rm/doc-collections/acmui/meetings/2019.ht ml. The agenda and handouts may also be obtained by contacting Ms. Kellee Jamerson using the information below.
Program-Specific Guidance About Commercial Radiopharmacy Licenses
The U.S. Nuclear Regulatory Commission (NRC) has issued Revision 2 to NUREG-1556, Volume 13, ``Consolidated Guidance About Materials Licenses: Program-Specific Guidance About Commercial Radiopharmacy Licenses.'' Volume 13 of NUREG-1556 has been revised to include information on updated regulatory requirements, safety culture, security of radioactive materials, protection of sensitive information, and changes in regulatory policies and practices consistent with current regulations. This volume is intended for use by applicants, licensees, and the NRC staff.
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Pursuant to the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued, from April 9, 2019, to April 22, 2019. The last biweekly notice was published on April 23, 2019.
Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology To Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light Water Reactors
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1353, ``Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light Water Reactors.'' This DG proposes new guidance for designers, applicants, and licensees of non- light water cooled nuclear reactors (non-LWRs) to inform the licensing basis and content of applications submittals to the NRC for licenses, certifications, or approvals. The DG provides guidance on using a technology-inclusive, risk-informed, and performance-based methodology to inform the licensing basis and content of applications for licenses, certifications, and approvals for non-LWRs.
Draft Approaches for Addressing Training and Experience Requirements for Radiopharmaceuticals Requiring a Written Directive
The U.S. Nuclear Regulatory Commission (NRC) would like input on draft approaches the staff has developed that would potentially revise the training and experience (T&E) requirements for radiopharmaceuticals requiring a written directive. The input will be used to determine whether regulatory changes to the NRC's T&E requirements for authorized users (AUs) are warranted and potential advantages, disadvantages, and other considerations associated with each approach.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.