Final Interim Staff Guidance DC/COL-ISG-03: Probabilistic Risk Assessment Information To Support Design Certification and Combined License Applications, 22523 [2019-10319]

Download as PDF Federal Register / Vol. 84, No. 96 / Friday, May 17, 2019 / Notices • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. FOR FURTHER INFORMATION CONTACT: Mr. George Wunder, Office of the New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001; telephone 301–415–1494 or email at George.Wunder@nrc.gov. SUPPLEMENTARY INFORMATION: On November 3, 2009, as noticed in the Federal Register (74 FR 58323), the staff issued its Final Interim Staff Guidance, DC/COL–ISG–10, ‘‘Review of Evaluation to Address Adverse Flow Effects in Equipment Other than Reactor Internals’’ (ADAMS Accession No. ML092890285). This document is being withdrawn because on March 6, 2017, the staff issued Revision 4 to Sections 3.9.2 and 3.9.5 of NUREG–0800 (ADAMS Accession No. ML16133A418), incorporating the guidance of DC/COL– ISG–10 and, therefore, superseding it. Therefore, as of the date of this notice, DC/COL–ISG–10 is withdrawn. Dated at Rockville, Maryland, this 14th day of May 2019. For the Nuclear Regulatory Commission. Jennivine K. Rankin, Acting Chief, Licensing Branch 3, Division of Licensing, Siting, and Environmental Analysis, Office of New Reactors. [FR Doc. 2019–10316 Filed 5–16–19; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2008–0089] Final Interim Staff Guidance DC/COL– ISG–03: Probabilistic Risk Assessment Information To Support Design Certification and Combined License Applications Nuclear Regulatory Commission. ACTION: Interim staff guidance; withdrawal. jbell on DSK3GLQ082PROD with NOTICES AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is withdrawing its Final Interim Staff Guidance (ISG) DC/ COL–ISG–03, ‘‘Probabilistic Risk Assessment Information to Support Design Certification and Combined SUMMARY: VerDate Sep<11>2014 17:05 May 16, 2019 Jkt 247001 License Applications.’’ This ISG served to supplement the guidance provided to the staff in Section 19.0, ‘‘Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors,’’ of NUREG–0800, ‘‘Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,’’ concerning the review of probabilistic risk assessment information and severe accident assessment submitted to support design certification (DC) and combined license (COL) applications. The NRC staff issues ISG to facilitate timely implementation of current staff guidance and to facilitate activities associated with review of applications for DC and COLs by the Office of New Reactors. The NRC staff incorporated the approved DC/COL–ISG into Revision 3 to Section 19.0 of NUREG–0800 dated December 2015. With the issuance of Revision 3 to Section 19.0 of NUREG–0800, the staff has determined that DC/COL–ISG–03 is no longer necessary and should be withdrawn. DATES: The date of the withdrawal of Final Interim Staff Guidance DC/COL– ISG–03 is May 17, 2019. ADDRESSES: Please refer to Docket ID: NRC–2008–0089 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2008–0089. Address questions about Docket IDs in Regulations.gov to Jennifer Borges; telephone: 301–287–9221; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. FOR FURTHER INFORMATION CONTACT: Mr. George Wunder, Office of the New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC, 20555– 0001; telephone 301–415–1494 or email at George.Wunder@nrc.gov. SUPPLEMENTARY INFORMATION: On June 11, 2008, as noticed in the Federal PO 00000 Frm 00094 Fmt 4703 Sfmt 4703 22523 Register (73 FR 34347), the staff issued Final Interim Staff Guidance (ISG) DC/ COL–ISG–03, ‘‘Probabilistic Risk Assessment Information to Support Design Certification and Combined License Applications’’ (ADAMS Accession No. ML081430047). This document is being withdrawn because on January 21, 2016, the staff issued Revision 3 to Section 19.0 of NUREG– 0800 incorporating the guidance of DC/ COL–ISG–03 (ADAMS Accession No. ML15085A093) and, therefore, superseding it. Therefore, as of the date of this notice, DC/COL–ISG–03 is withdrawn. Dated at Rockville, Maryland, this 14th day of May 2019. For the Nuclear Regulatory Commission. Jennivine K. Rankin, Acting Branch Chief, Licensing Branch 3, Division of Licensing, Siting, and Environmental Analysis, Office of New Reactors. [FR Doc. 2019–10319 Filed 5–16–19; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 52–047; NRC–2016–0119] Tennessee Valley Authority; Clinch River Nuclear Site Nuclear Regulatory Commission. ACTION: Early site permit application; receipt. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is giving notice once each week for four consecutive weeks for an application from Tennessee Valley Authority (TVA), for an early site permit (ESP) for the Clinch River Nuclear Site located in Oak Ridge, Tennessee. SUMMARY: The ESP application was received on May 12, 2016 and supplemented with Revision 2 on January 18, 2019. ADDRESSES: Please refer to Docket ID NRC–2016–0119 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2016–0119. Address questions about NRC docket IDs in Regulations.gov to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individuals listed DATES: E:\FR\FM\17MYN1.SGM 17MYN1

Agencies

[Federal Register Volume 84, Number 96 (Friday, May 17, 2019)]
[Notices]
[Page 22523]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-10319]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2008-0089]


Final Interim Staff Guidance DC/COL-ISG-03: Probabilistic Risk 
Assessment Information To Support Design Certification and Combined 
License Applications

AGENCY: Nuclear Regulatory Commission.

ACTION: Interim staff guidance; withdrawal.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is withdrawing 
its Final Interim Staff Guidance (ISG) DC/COL-ISG-03, ``Probabilistic 
Risk Assessment Information to Support Design Certification and 
Combined License Applications.'' This ISG served to supplement the 
guidance provided to the staff in Section 19.0, ``Probabilistic Risk 
Assessment and Severe Accident Evaluation for New Reactors,'' of NUREG-
0800, ``Standard Review Plan for the Review of Safety Analysis Reports 
for Nuclear Power Plants: LWR Edition,'' concerning the review of 
probabilistic risk assessment information and severe accident 
assessment submitted to support design certification (DC) and combined 
license (COL) applications. The NRC staff issues ISG to facilitate 
timely implementation of current staff guidance and to facilitate 
activities associated with review of applications for DC and COLs by 
the Office of New Reactors. The NRC staff incorporated the approved DC/
COL-ISG into Revision 3 to Section 19.0 of NUREG-0800 dated December 
2015. With the issuance of Revision 3 to Section 19.0 of NUREG-0800, 
the staff has determined that DC/COL-ISG-03 is no longer necessary and 
should be withdrawn.

DATES: The date of the withdrawal of Final Interim Staff Guidance DC/
COL-ISG-03 is May 17, 2019.

ADDRESSES: Please refer to Docket ID: NRC-2008-0089 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0089. Address 
questions about Docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9221; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected].

FOR FURTHER INFORMATION CONTACT: Mr. George Wunder, Office of the New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC, 20555-
0001; telephone 301-415-1494 or email at [email protected].

SUPPLEMENTARY INFORMATION: On June 11, 2008, as noticed in the Federal 
Register (73 FR 34347), the staff issued Final Interim Staff Guidance 
(ISG) DC/COL-ISG-03, ``Probabilistic Risk Assessment Information to 
Support Design Certification and Combined License Applications'' (ADAMS 
Accession No. ML081430047). This document is being withdrawn because on 
January 21, 2016, the staff issued Revision 3 to Section 19.0 of NUREG-
0800 incorporating the guidance of DC/COL-ISG-03 (ADAMS Accession No. 
ML15085A093) and, therefore, superseding it. Therefore, as of the date 
of this notice, DC/COL-ISG-03 is withdrawn.

    Dated at Rockville, Maryland, this 14th day of May 2019.

    For the Nuclear Regulatory Commission.
Jennivine K. Rankin,
Acting Branch Chief, Licensing Branch 3, Division of Licensing, Siting, 
and Environmental Analysis, Office of New Reactors.
[FR Doc. 2019-10319 Filed 5-16-19; 8:45 am]
BILLING CODE 7590-01-P