Exelon Generation Company, LLC; Clinton Power Station, Unit No. 1, 23085-23087 [2019-10549]
Download as PDF
Federal Register / Vol. 84, No. 98 / Tuesday, May 21, 2019 / Notices
Dated at Rockville, Maryland, on May 15,
2019.
For the Nuclear Regulatory Commission.
Andrew J. Pretzello,
Deputy Director, Division of Fuel Cycle Safety,
Safeguards, and Environmental Review,
Office of Nuclear Material Safety and
Safeguards.
[FR Doc. 2019–10488 Filed 5–20–19; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2019–0001]
Sunshine Act Meetings
Weeks of May 20, 27,
June 3, 10, 17, 24, 2019.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
MATTERS TO BE CONSIDERED:
TIME AND DATE:
Week of May 20, 2019
There are no meetings scheduled for
the week of May 20, 2019.
Week of May 27, 2019—Tentative
Thursday, May 30, 2019
9:00 a.m.
Briefing on Nuclear Regulatory
Research Program (Public Meeting)
(Contact: Nicholas DiFrancesco:
301–415–1115).
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
Week of June 3, 2019—Tentative
There are no meetings scheduled for
the week of June 3, 2019.
There are no meetings scheduled for
the week of June 10, 2019.
Week of June 17, 2019—Tentative
10:00 a.m.
Briefing on Human Capital and Equal
Employment Opportunity (Public
Meeting) (Contact: Jason Lising:
301–287–0569)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
Thursday, June 20, 2019
jbell on DSK3GLQ082PROD with NOTICES
For more information or to verify the
status of meetings, contact Denise
McGovern at 301–415–0681 or via email
at Denise.McGovern@nrc.gov. The
schedule for Commission meetings is
subject to change on short notice.
The NRC Commission Meeting
Schedule can be found on the internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
braille, large print), please notify
Kimberly Meyer-Chambers, NRC
Disability Program Manager, at 301–
287–0739, by videophone at 240–428–
3217, or by email at Kimberly.MeyerChambers@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Nuclear
Regulatory Commission, Office of the
Secretary, Washington, DC 20555 (301–
415–1969), or by email at
Wendy.Moore@nrc.gov.
Dated at Rockville, Maryland, this 17th day
of May, 2019.
For the Nuclear Regulatory Commission.
Denise L. McGovern,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2019–10699 Filed 5–17–19; 4:15 pm]
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–461; NRC–2019–0123]
Tuesday, June 18, 2019
Exelon Generation Company, LLC;
Clinton Power Station, Unit No. 1
Nuclear Regulatory
Commission.
ACTION: Environmental assessment and
finding of no significant impact;
issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is considering the
issuance of an amendment to Facility
Operating License No. NPF–62, issued
to Exelon Generation Company, LLC
(the licensee), for operation of the
Clinton Power Station, Unit No 1 (CPS),
located in DeWitt County, Illinois. The
SUMMARY:
10:00 a.m.
Briefing on Results of the Agency
Action Review Meeting (Public
Meeting) (Contact: Andrea Mayer:
301–415–1081)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
17:50 May 20, 2019
CONTACT PERSON FOR MORE INFORMATION:
BILLING CODE 7590–01–P
Week of June 10, 2019—Tentative
VerDate Sep<11>2014
Week of June 24, 2019—Tentative
There are no meetings scheduled for
the week of June 24, 2019.
Jkt 247001
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
23085
proposed action would amend the
expiration of Facility Operating License
No. NPF–62 from September 29, 2026,
to April 17, 2027. From September 29,
1986, to April 17, 1987, CPS was limited
to 5 percent of rated power while
operators conducted low-power testing
before being issued a full-power
operating license on April 17, 1987. The
action to amend the expiration date of
the license from September 29, 2026, to
April 17, 2027, would result in the
license expiring 40 years from the date
of the issuance of the full-power
operating license, as is permitted by the
NRC’s regulations.
The environmental assessment
(EA) and finding of no significant
impact (FONSI) referenced in this
document is available on May 21, 2019.
DATES:
Please refer to Docket ID
NRC–2019–0123 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2019–0123. Address
questions about NRC docket IDs to
Jennifer Borges; telephone: 301–287–
9127; email: Jennifer.Borges@nrc.gov.
For technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced (if it is
available in ADAMS) is provided the
first time that it is mentioned in this
document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
ADDRESSES:
Joel
S. Wiebe, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–6606; email:
Joel.Wiebe@nrc.gov.
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
E:\FR\FM\21MYN1.SGM
21MYN1
23086
Federal Register / Vol. 84, No. 98 / Tuesday, May 21, 2019 / Notices
I. Introduction
The NRC is considering the issuance
of an amendment to Facility Operating
License No. NPF–62, issued to Exelon
Generation Company, LLC (the
licensee), for operation of the Clinton
Power Station, Unit No. 1 (CPS), located
in DeWitt County, Illinois. The licensee
requested the amendment by letter
dated September 17, 2018 (ADAMS
Accession No. ML18260A307). If
approved, the amendment would revise
the expiration date of the license such
that it would expire 40 years from the
date of the issuance of the full-power
operating license, as is permitted by title
10 of the Code of Federal Regulations
(10 CFR) 50.51. In accordance with 10
CFR 51.21, the NRC prepared the
following EA that analyzes the
environmental impacts of the proposed
licensing action. Based on the results of
this EA, and in accordance with 10 CFR
51.31(a), the NRC has determined not to
prepare an environmental impact
statement for the proposed licensing
action and is issuing a FONSI.
II. Environmental Assessment
jbell on DSK3GLQ082PROD with NOTICES
Description of the Proposed Action
The proposed action would revise the
expiration date of the license such that
it would expire 40 years from the date
of the issuance of the full-power
operating license, as is permitted by 10
CFR 50.51. Specifically, the proposed
action would revise the expiration date
of the Facility Operating License No.
NPF–62 from September 29, 2026, to
April 17, 2027, which is 40 years from
the issuance of the full-power operating
license on April 17, 1987.
The proposed action is also described
in the licensee’s application dated
September 17, 2018.
Need for the Proposed Action
On September 29, 1986, the NRC
issued a low-power testing license (No.
NPF–55) that authorized the licensee to
operate CPS at up to 5 percent of rated
power. On April 17, 1987, the NRC
issued a full-power operating license
(No. NPF–62) that authorized the
licensee to operate CPS at up to 100
percent of rated power, with an
expiration date 40 years from the date
of the issuance of the low-power
license.
The proposed action would allow the
licensee to recapture the approximately
6.5 month period of low-power
operation and extend the license
expiration date to April 17, 2027. This
action is consistent with NRC policy
established in the Staff Requirements
Memorandum (SRM) for SECY–98–296,
‘‘Staff Requirements—SECY–98–296—
VerDate Sep<11>2014
17:50 May 20, 2019
Jkt 247001
Agency Policy Regarding Licensee
Recapture of Low-Power Testing or
Shutdown Time for Nuclear Power
Plants,’’ dated March 30, 1999 (available
at www.nrc.gov/reading-rm/doccollections/commission/srm/1998/1998296srm.pdf). SECY–98–296, ‘‘Agency
Policy Regarding Licensee Recapture of
Low-Power Testing or Shutdown Time
for Nuclear Power Plants,’’ dated
December 21, 1998, is available at
www.nrc.gov/reading-rm/doccollections/commission/secys/1998/
secy1998-296/1998-296scy.pdf.
Environmental Impacts of the Proposed
Action
The proposed action would amend
the CPS license such that it would
expire 40 years from the date of the
issuance of the facility’s full-power
operating license.
NUREG–0854, ‘‘Final Environmental
Statement Related to the Operation of
Clinton Power Station, Unit No.1,’’
dated May 1982 (ADAMS Accession No.
ML19079A225), concluded that CPS
will most likely operate with only
minimal environmental impact. The
proposed action would not affect the
design or operation of the plant, and
would not involve any modifications to
the plant or any increase in the licensed
power for the plant. Similarly, the
proposed action would not significantly
increase the probability or consequences
of accidents or change the types of
effluents released offsite. Because the
proposed approximately 6.5 month
extension of operation represents only a
small fraction of the 40 year operating
life considered in NUREG–0854, there
would be no significant increase in the
amount of any effluent released or waste
generated, and no significant increase in
occupational or public radiation
exposure. The nominal additional
quantities of effluents and waste
generated during the proposed
approximately 6.5 month period of
extension would be in accordance with
current operating requirements and
regulatory limits. Therefore, the NRC
concludes that there would be no
significant radiological or
nonradiological environmental impacts
associated with the proposed action.
Environmental Impacts of the
Alternatives to the Proposed Action
As an alternative to the proposed
action, the NRC considered denial of the
license amendment request (i.e., the
‘‘no-action’’ alternative). Denial of the
license amendment request would result
in no change in current environmental
impacts. Accordingly, the
environmental impacts of the proposed
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
action and the no-action alternative
would be similar.
Alternative Use of Resources
There are no unresolved conflicts
concerning alternative uses of available
resources under the proposed action.
Agencies or Persons Consulted
No additional agencies or persons
were consulted regarding the
environmental impact of the proposed
action. However, in accordance with 10
CFR 50.91, the licensee provided copies
of its application to the State of Illinois,
and the NRC staff will consult with this
State prior to issuance of the
amendment.
III. Finding of No Significant Impact
The licensee has requested an
amendment to revise the expiration date
of the CPS license such that it would
expire 40 years from the date of the
issuance of the full-power operating
license, as is permitted by 10 CFR 50.51.
Specifically, the proposed action would
revise the expiration date of Facility
Operating License No. NPF–62 from
September 29, 2026, to April 17, 2027,
which is 40 years from the issuance of
the full-power operating license on
April 17, 1987.
The proposed action is in accordance
with the licensee’s application dated
September 17, 2018.
The NRC is considering issuing the
requested amendment. The proposed
action would not significantly affect
plant safety, would not have a
significant adverse effect on the
probability of an accident occurring,
and would not have any significant
radiological or nonradiological impacts.
The reason the human environment
would not be significantly affected is
that the proposed action would not
involve any construction or
modification of the facility. Consistent
with 10 CFR 51.21, the NRC conducted
the EA for the proposed action, and this
FONSI incorporates by reference the EA
in Section II of this notice. Therefore,
the NRC concludes that the proposed
action will not have a significant effect
on the quality of the human
environment. Accordingly, the NRC has
determined not to prepare an
environmental impact statement for the
proposed action.
As required by 10 CFR 51.32(a)(5), the
related environmental document which
provides the latest description of
environmental conditions at CPS is
NUREG–0854.
This FONSI and other related
environmental documents may be
examined, and/or copied for a fee, at the
NRC’s Public Document Room (PDR),
E:\FR\FM\21MYN1.SGM
21MYN1
Federal Register / Vol. 84, No. 98 / Tuesday, May 21, 2019 / Notices
located at One White Flint North, 11555
Rockville Pike, Rockville, Maryland
20852. Publicly-available records are
also accessible electronically from the
ADAMS Public Electronic Reading
Room on the internet at the NRC’s
website: https://www.nrc.gov/readingrm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC’s PDR
reference staff by telephone at 1–800–
397–4209 or 301–415–4737, or by email
to pdr.resource@nrc.gov.
Dated at Rockville, Maryland, this 16th day
of May 2019.
For the Nuclear Regulatory Commission.
Joel S. Wiebe,
Senior Project Manager, Plant Licensing
Branch III, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2019–10549 Filed 5–20–19; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
FOR FURTHER INFORMATION CONTACT:
[Docket Nos. 50–334, 50–346; NRC–2017–
0169]
FirstEnergy Nuclear Operating
Company; Beaver Valley Power
Station, Unit No. 1, Davis-Besse
Nuclear Power Station, Unit No. 1
Nuclear Regulatory
Commission.
ACTION: License amendment application;
withdrawal by applicant.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has granted the
request of FirstEnergy Nuclear
Operating Company, et al., dated May 8,
2019, to withdraw its application dated
May 18, 2017, as supplemented by letter
dated August 23, 2018, for proposed
amendments to Renewed Facility
Operating License No. DPR–66 for the
Beaver Valley Power Station, Unit No. 1
(BVPS–1), and to Renewed Facility
Operating License No. NPF–3 for the
Davis-Besse Nuclear Power Station, Unit
No. 1 (DBNPS). The proposed
amendments would have modified the
BVPS–1 and DBNPS Renewed Facility
Operating Licenses to reflect that
FirstEnergy Solutions Corp. is providing
the $400 million support agreement
instead of FirstEnergy Corp.
DATES: May 21, 2019.
ADDRESSES: Please refer to Docket ID
NRC–2017–0169 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
jbell on DSK3GLQ082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:50 May 20, 2019
Jkt 247001
information related to this document
using any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2017–0169. Address
questions about NRC docket IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions, contact the individual(s)
listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced (if it is
available in ADAMS) is provided the
first time that it is mentioned in this
document.
Bhalchandra K. Vaidya, Office of
Nuclear Reactor Regulation, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–3308, email:
Bhalchandra.Vaidya@nrc.gov.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
SUPPLEMENTARY INFORMATION: The NRC
has granted the request of FirstEnergy
Nuclear Operating Company (FENOC)
(the licensee) dated May 8, 2019
(ADAMS Accession No. ML19128A076),
to withdraw its May 18, 2017,
application, as supplemented by letter
dated August 23, 2018 (ADAMS
Accession Nos. ML17138A381 and
ML18235A194, respectively), for
proposed amendment to Renewed
Facility Operating License No. DPR–66
for the BVPS–1, and to Renewed
Facility Operating License No. NPF–3
for DBNPS. The proposed amendment
would have modified the BVPS–1 and
DBNPS Renewed Facility Operating
Licenses to reflect that FirstEnergy
Solutions Corp. is providing the $400
million support agreement instead of
FirstEnergy Corp.
FENOC’s May 18, 2017, request was
noticed in the Federal Register on
August 1, 2017 (82 FR 35840).
Dated at Rockville, Maryland, this 16th day
of May 2019.
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
23087
For the Nuclear Regulatory Commission.
Bhalchandra K. Vaidya,
Project Manager, Plant Licensing Branch III,
Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2019–10545 Filed 5–20–19; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 72–74; NRC–2018–0259]
Luminant Generation Company, LLC;
Comanche Peak Independent Spent
Fuel Storage Installation
Nuclear Regulatory
Commission.
ACTION: Environmental assessment and
finding of no significant impact;
issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing an
environmental assessment (EA) and a
finding of no significant impact (FONSI)
for its review and approval of the
decommissioning funding plans
submitted by Luminant Generation
Company, LLC (Luminant Power) on
March 28, 2013, and March 31, 2015, for
the independent spent fuel storage
installation (ISFSI) at Comanche Peak in
Glen Rose, Texas.
DATES: The EA and FONSI referenced in
this document are available on May 21,
2019.
ADDRESSES: Please refer to Docket ID
NRC–2018–0259 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0259. Address
questions about Docket IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. For the convenience of the
SUMMARY:
E:\FR\FM\21MYN1.SGM
21MYN1
Agencies
[Federal Register Volume 84, Number 98 (Tuesday, May 21, 2019)]
[Notices]
[Pages 23085-23087]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-10549]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-461; NRC-2019-0123]
Exelon Generation Company, LLC; Clinton Power Station, Unit No. 1
AGENCY: Nuclear Regulatory Commission.
ACTION: Environmental assessment and finding of no significant impact;
issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering
the issuance of an amendment to Facility Operating License No. NPF-62,
issued to Exelon Generation Company, LLC (the licensee), for operation
of the Clinton Power Station, Unit No 1 (CPS), located in DeWitt
County, Illinois. The proposed action would amend the expiration of
Facility Operating License No. NPF-62 from September 29, 2026, to April
17, 2027. From September 29, 1986, to April 17, 1987, CPS was limited
to 5 percent of rated power while operators conducted low-power testing
before being issued a full-power operating license on April 17, 1987.
The action to amend the expiration date of the license from September
29, 2026, to April 17, 2027, would result in the license expiring 40
years from the date of the issuance of the full-power operating
license, as is permitted by the NRC's regulations.
DATES: The environmental assessment (EA) and finding of no significant
impact (FONSI) referenced in this document is available on May 21,
2019.
ADDRESSES: Please refer to Docket ID NRC-2019-0123 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2019-0123. Address
questions about NRC docket IDs to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced (if it is available in ADAMS) is provided the first
time that it is mentioned in this document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Joel S. Wiebe, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-6606; email: [email protected].
SUPPLEMENTARY INFORMATION:
[[Page 23086]]
I. Introduction
The NRC is considering the issuance of an amendment to Facility
Operating License No. NPF-62, issued to Exelon Generation Company, LLC
(the licensee), for operation of the Clinton Power Station, Unit No. 1
(CPS), located in DeWitt County, Illinois. The licensee requested the
amendment by letter dated September 17, 2018 (ADAMS Accession No.
ML18260A307). If approved, the amendment would revise the expiration
date of the license such that it would expire 40 years from the date of
the issuance of the full-power operating license, as is permitted by
title 10 of the Code of Federal Regulations (10 CFR) 50.51. In
accordance with 10 CFR 51.21, the NRC prepared the following EA that
analyzes the environmental impacts of the proposed licensing action.
Based on the results of this EA, and in accordance with 10 CFR
51.31(a), the NRC has determined not to prepare an environmental impact
statement for the proposed licensing action and is issuing a FONSI.
II. Environmental Assessment
Description of the Proposed Action
The proposed action would revise the expiration date of the license
such that it would expire 40 years from the date of the issuance of the
full-power operating license, as is permitted by 10 CFR 50.51.
Specifically, the proposed action would revise the expiration date of
the Facility Operating License No. NPF-62 from September 29, 2026, to
April 17, 2027, which is 40 years from the issuance of the full-power
operating license on April 17, 1987.
The proposed action is also described in the licensee's application
dated September 17, 2018.
Need for the Proposed Action
On September 29, 1986, the NRC issued a low-power testing license
(No. NPF-55) that authorized the licensee to operate CPS at up to 5
percent of rated power. On April 17, 1987, the NRC issued a full-power
operating license (No. NPF-62) that authorized the licensee to operate
CPS at up to 100 percent of rated power, with an expiration date 40
years from the date of the issuance of the low-power license.
The proposed action would allow the licensee to recapture the
approximately 6.5 month period of low-power operation and extend the
license expiration date to April 17, 2027. This action is consistent
with NRC policy established in the Staff Requirements Memorandum (SRM)
for SECY-98-296, ``Staff Requirements--SECY-98-296--Agency Policy
Regarding Licensee Recapture of Low-Power Testing or Shutdown Time for
Nuclear Power Plants,'' dated March 30, 1999 (available at www.nrc.gov/reading-rm/doc-collections/commission/srm/1998/1998-296srm.pdf). SECY-
98-296, ``Agency Policy Regarding Licensee Recapture of Low-Power
Testing or Shutdown Time for Nuclear Power Plants,'' dated December 21,
1998, is available at www.nrc.gov/reading-rm/doc-collections/commission/secys/1998/secy1998-296/1998-296scy.pdf.
Environmental Impacts of the Proposed Action
The proposed action would amend the CPS license such that it would
expire 40 years from the date of the issuance of the facility's full-
power operating license.
NUREG-0854, ``Final Environmental Statement Related to the
Operation of Clinton Power Station, Unit No.1,'' dated May 1982 (ADAMS
Accession No. ML19079A225), concluded that CPS will most likely operate
with only minimal environmental impact. The proposed action would not
affect the design or operation of the plant, and would not involve any
modifications to the plant or any increase in the licensed power for
the plant. Similarly, the proposed action would not significantly
increase the probability or consequences of accidents or change the
types of effluents released offsite. Because the proposed approximately
6.5 month extension of operation represents only a small fraction of
the 40 year operating life considered in NUREG-0854, there would be no
significant increase in the amount of any effluent released or waste
generated, and no significant increase in occupational or public
radiation exposure. The nominal additional quantities of effluents and
waste generated during the proposed approximately 6.5 month period of
extension would be in accordance with current operating requirements
and regulatory limits. Therefore, the NRC concludes that there would be
no significant radiological or nonradiological environmental impacts
associated with the proposed action.
Environmental Impacts of the Alternatives to the Proposed Action
As an alternative to the proposed action, the NRC considered denial
of the license amendment request (i.e., the ``no-action'' alternative).
Denial of the license amendment request would result in no change in
current environmental impacts. Accordingly, the environmental impacts
of the proposed action and the no-action alternative would be similar.
Alternative Use of Resources
There are no unresolved conflicts concerning alternative uses of
available resources under the proposed action.
Agencies or Persons Consulted
No additional agencies or persons were consulted regarding the
environmental impact of the proposed action. However, in accordance
with 10 CFR 50.91, the licensee provided copies of its application to
the State of Illinois, and the NRC staff will consult with this State
prior to issuance of the amendment.
III. Finding of No Significant Impact
The licensee has requested an amendment to revise the expiration
date of the CPS license such that it would expire 40 years from the
date of the issuance of the full-power operating license, as is
permitted by 10 CFR 50.51. Specifically, the proposed action would
revise the expiration date of Facility Operating License No. NPF-62
from September 29, 2026, to April 17, 2027, which is 40 years from the
issuance of the full-power operating license on April 17, 1987.
The proposed action is in accordance with the licensee's
application dated September 17, 2018.
The NRC is considering issuing the requested amendment. The
proposed action would not significantly affect plant safety, would not
have a significant adverse effect on the probability of an accident
occurring, and would not have any significant radiological or
nonradiological impacts. The reason the human environment would not be
significantly affected is that the proposed action would not involve
any construction or modification of the facility. Consistent with 10
CFR 51.21, the NRC conducted the EA for the proposed action, and this
FONSI incorporates by reference the EA in Section II of this notice.
Therefore, the NRC concludes that the proposed action will not have a
significant effect on the quality of the human environment.
Accordingly, the NRC has determined not to prepare an environmental
impact statement for the proposed action.
As required by 10 CFR 51.32(a)(5), the related environmental
document which provides the latest description of environmental
conditions at CPS is NUREG-0854.
This FONSI and other related environmental documents may be
examined, and/or copied for a fee, at the NRC's Public Document Room
(PDR),
[[Page 23087]]
located at One White Flint North, 11555 Rockville Pike, Rockville,
Maryland 20852. Publicly-available records are also accessible
electronically from the ADAMS Public Electronic Reading Room on the
internet at the NRC's website: https://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems
in accessing the documents located in ADAMS should contact the NRC's
PDR reference staff by telephone at 1-800-397-4209 or 301-415-4737, or
by email to [email protected].
Dated at Rockville, Maryland, this 16th day of May 2019.
For the Nuclear Regulatory Commission.
Joel S. Wiebe,
Senior Project Manager, Plant Licensing Branch III, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2019-10549 Filed 5-20-19; 8:45 am]
BILLING CODE 7590-01-P