Environmental Protection Agency April 2018 – Federal Register Recent Federal Regulation Documents
Results 1 - 50 of 117
Strengthening Transparency in Regulatory Science
This document proposes a regulation intended to strengthen the transparency of EPA regulatory science. The proposed regulation provides that when EPA develops regulations, including regulations for which the public is likely to bear the cost of compliance, with regard to those scientific studies that are pivotal to the action being taken, EPA should ensure that the data underlying those are publicly available in a manner sufficient for independent validation. In this notice, EPA solicits comment on this proposal and how it can best be promulgated and implemented in light of existing law and prior Federal policies that already require increasing public access to data and influential scientific information used to inform federal regulation.
Agency Information Collection Activities; Proposed Renewal of an Existing Collection (EPA ICR No. 0155.13); Comment Request
In compliance with the Paperwork Reduction Act (PRA), this document announces that EPA is planning to submit an Information Collection Request (ICR) to the Office of Management and Budget (OMB). The ICR, entitled: ``Certification of Pesticide Applicators Renewal'' and identified by EPA ICR No. 0155.13 and OMB Control No. 2070-0029, represents the renewal of an existing ICR that is scheduled to expire on November 30, 2018. Before submitting the ICR to OMB for review and approval, EPA is soliciting comments on specific aspects of the proposed information collection that is summarized in this document. The ICR and accompanying material are available in the docket for public review and comment.
TSCA Alternative Testing Methods Draft Strategic Plan; Extension of Comment Period
EPA issued a Draft Strategic Plan to Promote the Development and Implementation of Alternative Test Methods under section 4(h) of the Toxic Substances Control Act (TSCA). This document extends the comment period for the draft document from April 26, 2018 to May 11, 2018. A commenter requested additional time to submit written comments. EPA is therefore extending the comment period in order to give all interested persons additional time to comment.
Proposed Information Collection Request; Comment Request; Mobile Air Conditioner Retrofitting Program (Renewal)
The Environmental Protection Agency is planning to submit an information collection request (ICR), ``Mobile Air Conditioner Retrofitting Program (Renewal)'' (EPA ICR No. 1774.07, OMB Control No. 2060-0350) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. EPA is announcing its intent to renew this ICR with no substantive changes. This is a proposed extension of the ICR, which is currently approved through July 31, 2018. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
Planning for Natural Disaster Debris and Related Guidance
The U.S. Environmental Protection Agency (EPA) is making available for public comment three draft documents: Planning for Natural Disaster Debris; Pre-incident All-hazards Waste Management Plan Guidelines: Four-step Waste Management Planning Process; and All- hazards Waste Management Decision Diagram. The Planning for Natural Disaster Debris guidance is intended to assist communities in planning for debris management before a natural disaster occurs (also referred to as ``pre-incident debris management planning''). This guidance revises EPA's existing guidance document on planning for natural disaster debris that was published in 2008 under the same name. The other two documents describe, respectively, the pre-incident waste management planning process for all hazards and the waste management decision-making process during an all-hazards incident. Pre-incident planning can significantly aid decision-making during a response and enhance a community's resiliency. Pre-incident planning can also help communities recover faster, spend less money on cleanup and debris/ waste management, and use fewer resources to rebuild and recover.
Proposed Issuance of NPDES General Permit for Hydroelectric Facilities Within the State of Idaho (IDG360000)
The Director, Office of Water and Watersheds, Environmental Protection Agency (EPA) Region 10, is proposing to issue a National Pollutant Discharge Elimination System (NPDES) General Permits for Hydroelectric Facilities discharging to waters within the State of Idaho (Permit No. IDG360000). As proposed, the hydroelectric general permit would protect surface waters from discharges of oil, grease and alterations to pH from facility and equipment outfalls and minimize the impacts of the cooling water intake structures to fish and aquatic organisms.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; National Volatile Organic Compound Emission Standards for Architectural Coatings (Renewal)
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR)National Volatile Organic Compound Emission Standards for Architectural Coatings, EPA ICR Number 1750.08, OMB Control Number 2060-0393to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through April 30, 2018. Public comments were previously requested via the Federal Register (82 FR 48076) on October 16, 2017, during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
Availability of a Programmatic Environmental Assessment (PEA) and Finding of No Significant Impact (FONSI)
Pursuant to the National Environmental Policy Act (NEPA), the Council on Environmental Quality's NEPA regulations, and EPA's regulations for implementing NEPA, EPA has prepared a Programmatic Environmental Assessment (PEA) to analyze the potential environmental impacts related to the issuance of credit assistance under the Water Infrastructure Finance and Innovation Act (WIFIA) program. The PEA evaluates the potential adverse and beneficial environmental impacts of water infrastructure projects eligible for WIFIA credit assistance in compliance with NEPA. Projects receiving WIFIA credit assistance must also comply with applicable federal laws and regulations and Executive Orders (E.O.) and other state and local environmental reviews. Based on the environmental impact analysis in the PEA, EPA has made a preliminary determination that no significant environmental impacts are anticipated from the issuance of WIFIA credit assistance. This notice initiates the 30-day review period and invites comments from Federal, State, and local agencies, Indian tribes, and the public regarding EPA's preliminary determination.
Approval and Promulgation of Air Quality Implementation Plans; South Dakota; Revisions to the Permitting Rules
The Environmental Protection Agency (EPA) is proposing to approve State Implementation Plan (SIP) revisions submitted by the State of South Dakota on October 4, 2017, related to South Dakota's Air Pollution Control Program. The October 4, 2017 submittal updates certain dates of incorporation by reference and reorganizes and revises certain rules. In this rulemaking, we are proposing action on all portions of the October 4, 2017 submittal, except for those portions of the submittal which do not belong in the SIP. This action is being taken under section 110 of the Clean Air Act (CAA).
Approval and Promulgation of Implementation Plans; Texas; Control of Air Pollution From Visible Emissions and Particulate Matter
Pursuant to the Federal Clean Air Act (CAA), the Environmental Protection Agency (EPA) is approving revisions to the Texas State Implementation Plan (SIP) submitted by the State of Texas to EPA on August 23, 2017, that pertain to particulate matter standards and outdoor burning regulations. This rulemaking action is being taken under Section 110 of the CAA.
Approval and Promulgation of Implementation Plans; Texas; Control of Air Pollution From Visible Emissions and Particulate Matter
Pursuant to the Federal Clean Air Act, the Environmental Protection Agency (EPA) is proposing to approve revisions to the Texas State Implementation Plan (SIP) submitted by the State of Texas to the EPA on August 23, 2017, that pertain to regulations to control air pollution from visible emissions and particulate matter.
Approval and Promulgation of Air Quality Implementation Plans; State of Montana; Revisions to PSD Permitting Rules
The Environmental Protection Agency (EPA) is proposing to fully approve the State Implementation Plan (SIP) revision submitted by the State of Montana on October 14, 2016. Montana's October 14, 2016 submittal revises their prevention of significant deterioration (PSD) regulations. This action is being taken under section 110 of the Clean Air Act (CAA) (Act).
New York: Incorporation by Reference of State Hazardous Waste Management Program
The Solid Waste Disposal Act, as amended, commonly referred to as the Resource Conservation and Recovery Act (RCRA), allows the Environmental Protection Agency (EPA) to authorize States to operate their hazardous waste management programs in lieu of the Federal program. EPA uses the regulations entitled ``Approved State Hazardous Waste Management Programs'' to provide notice of the authorization status of State programs and to incorporate by reference those provisions of the State regulations that will be subject to EPA's inspection and enforcement. This rule does not incorporate by reference the New York hazardous waste statutes. The rule codifies in the regulations the prior approval of New York's hazardous waste management program and incorporates by reference authorized provisions of the State's regulations.
New York: Incorporation by Reference of State Hazardous Waste Management Program
The Environmental Protection Agency (EPA) proposes to revise the codification of New York's authorized hazardous waste program which is set forth in the regulations entitled ``Approved State Hazardous Waste Management Programs''. EPA will incorporate by reference into the Code of Federal Regulations (CFR) those provisions of the State regulations that are authorized and that EPA will enforce under the Solid Waste Disposal Act, as amended and commonly referred to as the Resource Conservation and Recovery Act (RCRA).
Protection of Stratospheric Ozone: Notification of Guidance and a Stakeholder Meeting Concerning the Significant New Alternatives Policy (SNAP) Program
The U.S. Environmental Protection Agency (EPA) is providing this document to dispel confusion and provide regulatory certainty for stakeholders affected by EPA's Significant New Alternatives Policy program final rule issued on July 20, 2015, and the decision of the Court of Appeals for the District of Columbia Circuit in the case of Mexichem Fluor, Inc. v. EPA. The 2015 Rule changed the listings for certain hydrofluorocarbons in various end-uses in the aerosols, refrigeration and air conditioning, and foam blowing sectors. It also changed the listings for certain hydrochlorofluorocarbons being phased out of production under the Montreal Protocol on Substances that Deplete the Ozone Layer and section 605 of the Clean Air Act. The court vacated the 2015 Rule ``to the extent it requires manufacturers to replace HFCs with a substitute substance'' and remanded the rule to EPA for further proceedings. This document provides guidance to stakeholders that, based on the court's partial vacatur, in the near- term EPA will not apply the HFC listings in the 2015 Rule, pending a rulemaking. This document also provides the Agency's plan to begin a notice-and-comment rulemaking process to address the remand of the 2015 Rule. The Agency is also providing notice of a stakeholder meeting as part of the rulemaking process.
Air Plan Approval; Minnesota; Flint Hills Sulfur Dioxide (SO2
The Environmental Protection Agency (EPA) is proposing to approve a revision to the Minnesota sulfur dioxide (SO2) State Implementation Plan (SIP) for the Flint Hills Resources, LLC Pine Bend Refinery (FHR) as submitted on February 8, 2017. The proposed SIP revision pertains to the introduction and removal of certain equipment at the refinery as well as amendments to certain emission limits, resulting in an overall decrease of SO2 emissions from FHR.
Approval and Promulgation of Air Quality Implementation Plans; North Dakota; Regional Haze State Implementation Plan
The Environmental Protection Agency (EPA) is proposing to approve certain portions of a State Implementation Plan (SIP) revision to address regional haze submitted by the Governor of North Dakota on March 3, 2010, along with SIP Supplement No. 1 submitted on July 27, 2010, SIP Amendment No. 1 submitted on July 28, 2011 and SIP Supplement No. 2 submitted on January 2, 2013 (collectively, ``the Regional Haze SIP''). Specifically, the EPA is proposing to approve the nitrogen oxides (NOX) Best Available Retrofit Technology (BART) determination for Coal Creek Station included in SIP Supplement No. 2. Coal Creek Station is owned and operated by Great River Energy (GRE) and is located near Underwood, North Dakota. This Regional Haze SIP was submitted to address the requirements of the Clean Air Act (CAA or ``the Act'') and our rules that require states to develop and implement air quality protection plans to reduce visibility impairment in mandatory Class I areas caused by emissions of air pollutants from numerous sources located over a wide geographic area (also referred to as the ``regional haze program''). States are required to assure reasonable progress toward the national goal of achieving natural visibility conditions in Class I areas. The EPA is taking this action pursuant to section 110 of the CAA.
Approval and Promulgation of Air Quality Implementation Plans; Colorado; Regional Haze State Implementation Plan
The Environmental Protection Agency (EPA) is proposing to approve a State Implementation Plan (SIP) revision submitted by the State of Colorado on May 26, 2017, addressing regional haze. The EPA is proposing to approve source-specific revisions to the nitrogen oxides (NOX) best available retrofit technology (BART) determination for Craig Station Unit 1. This unit is owned in part and operated by Tri-State Generation & Transmission Association, Inc. (Tri- State). We are also proposing to approve revisions to the NOX reasonable progress determination for Tri-State's Nucla Station. The EPA is taking this action pursuant to section 110 of the Clean Air Act (CAA).
Chlormequat Chloride; Pesticide Tolerances
This regulation establishes tolerances for residues of chlormequat chloride in or on multiple commodities which are identified and discussed later in this document. Taminco US LLC, a subsidiary of Eastman Chemical Company requested these tolerances under the Federal Food, Drug, and Cosmetic Act (FFDCA).
Proposed Information Collection Request; Comment Request; Contractor Cumulative Claim and Reconciliation (Renewal)
The Environmental Protection Agency is planning to submit an information collection request (ICR), ``Contractor Cumulative Claim and Reconciliation (Renewal)'' (EPA ICR No. 0246.13, OMB Control No. 2030-0016) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. This is a proposed extension of the ICR, which is currently approved through November 30, 2018. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
2018 Safer Choice Partner of the Year Awards Program
EPA is seeking applications for the 2018 Safer Choice Partner of the Year Awards. In 2015, EPA developed the Partner of the Year Awards to recognize Safer Choice stakeholders who have advanced the goals of the Pollution Prevention Act by reducing pollution at its source through safer chemistry. At the 2018 Partner of the Year Awards, Safer Choice will recognize stakeholder organizations from five broad categories: Formulators/Product Manufacturers of both Consumer and Institutional/Industrial products, Purchasers and Distributors, Retailers, Supporters (e.g., non-governmental organizations), and Innovators (e.g., chemical manufacturers). All applications and accompanying materials must be received by Wednesday, June 27, 2018. Award winners will be recognized at a ceremony in the fall of 2018.
Approval and Promulgation of Implementation Plans; Texas; Reasonable Further Progress Plan for the Houston-Galveston-Brazoria Ozone Nonattainment Area
Pursuant to the Federal Clean Air Act (CAA or the Act), the Environmental Protection Agency (EPA) is proposing to approve a revision to the Texas State Implementation Plan (SIP) to meet the Reasonable Further Progress (RFP) requirements for the Houston- Galveston-Brazoria (HGB) moderate 2008 8-hour ozone nonattainment area (HGB area). Specifically, EPA is proposing to approve the RFP demonstration, contingency measures, motor vehicle emissions budgets (MVEBs) and an updated 2011 base year emissions inventory.
Approval and Promulgation of State Plans for Designated Facilities and Pollutants; North Dakota; Control of Emissions From Existing Commercial and Industrial Solid Waste Incineration Units
The Environmental Protection Agency (EPA) is approving a revised state plan (the ``plan'') submitted by the North Dakota Department of Health (the ``Department'') for the regulation of existing commercial and industrial solid waste incineration (CISWI) units within the jurisdiction of the State of North Dakota. The Department submitted the plan to the EPA for approval following the promulgation of federal new source performance standards (NSPS) and emission guidelines (EG) for CISWI units on March 21, 2011, and the subsequent, limited revisions to that final rule published on February 7, 2013, and June 23, 2016. This plan approval final rulemaking action is being taken in accordance with sections 111(d) and 129 of the Clean Air Act (CAA, or the ``Act'').
Notice of Requests for Approval of Alternative Means of Emission Limitation
This action provides public notice and solicits comment on the alternative means of emission limitation (AMEL) requests from ExxonMobil Corporation; Marathon Petroleum Company, LP (for itself and on behalf of its subsidiary, Blanchard Refining, LLC); and Chalmette Refining, LLC, under the Clean Air Act (CAA), to operate flares at several refineries in Texas and Louisiana, as well as the AMEL request from LACC, LLC to operate flares at a chemical plant in Louisiana.
National Emission Standards for Hazardous Air Pollutants for Asbestos: Request for Approval of an Alternative Work Practice for Asbestos Cement Pipe Replacement
This action provides public notice and solicits comment on an alternative work practice (AWP) request under the Clean Air Act, to use new technology and work practices developed for removal and replacement of asbestos cement (A/C) pipe. In this action, the Environmental Protection Agency (EPA) is soliciting comment on all aspects of this request for an AWP that, in order to be approved, should be at least environmentally equivalent to the existing work practices in the National Emission Standards for Hazardous Air Pollutants for Asbestos (Asbestos NESHAP), which applies to the removal and replacement of A/C pipe.
Approval of State Plans for Designated Facilities and Pollutants; Missouri; Hospital, Medical, and Infectious Waste Incineration (HMIWI) Units
The Environmental Protection Agency (EPA) is approving revisions to the Missouri state plan for designated facilities and pollutants developed under sections 111(d) and 129 of the Clean Air Act (CAA) that were requested by Missouri Department of Natural Resources (MDNR) in two separate submissions made on August 8, 2011 and on July 3, 2014. This final action will amend the state regulations referenced in the state's 111(d) plan applicable to existing Hospital, Medical, Infectious Waste Incinerators (HMIWI) operating in the state of Missouri. The state rule revisions we are approving with this action update HMIWI regulatory requirements for emission limits for waste management plans, training, compliance and performance testing, monitoring, and reporting and recordkeeping to be consistent with updates to Federal rules. These regulatory revisions we are approving into Missouri's state plan do not impact air quality. EPA's approval of this revision is being performed in accordance with the requirements of CAA section 111(d) as further described in the Technical Support Document that is included in this docket.
User Fees for the Administration of the Toxic Substances Control Act (TSCA)
EPA is extending the comment period for 30 days and is providing notice that EPA has added a supplemental analysis, titled ``Supplemental Analysis of Alternative Small Business Size Standard Definitions and their Effect on TSCA User Fee Collection'', to the rulemaking docket for the proposed rule that published in the Federal Register on February 26, 2018. The supplemental analysis provides additional estimates for the impact of setting the small business definition based on an employee-based threshold.
State of North Dakota Underground Injection Control Program; Class VI Primacy Approval
The Environmental Protection Agency (EPA) is hereby approving an application from the state of North Dakota under the Safe Drinking Water Act (SDWA) to implement an underground injection control (UIC) program for Class VI injection wells located within the state, except within Indian lands.
Air Plan Approval; AK; Interstate Transport Requirements for the 2010 Nitrogen Dioxide and Sulfur Dioxide National Ambient Air Quality Standards
The Environmental Protection Agency (EPA) is proposing to approve the State Implementation Plan (SIP) submittal from the Alaska Department of Environmental Conservation (Alaska DEC) demonstrating that the SIP meets certain interstate transport requirements of the Clean Air Act (CAA) for the National Ambient Air Quality Standards (NAAQS) promulgated in 2010 for nitrogen dioxide (NO2) and sulfur dioxide (SO2). The EPA proposes to determine that Alaska's SIP contains adequate provisions to ensure that air emissions in Alaska do not significantly contribute to nonattainment or interfere with the maintenance of the 2010 NO2 and SO2 NAAQS in any other state.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Shipbuilding and Ship Repair Facilities-Surface Coating (Renewal)
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR)NESHAP for Shipbuilding and Ship Repair FacilitiesSurface Coating, EPA ICR Number 1712.10, OMB Control Number 2060-0330, to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through April 30, 2018. Public comments were requested previously, via the Federal Register, on June 29, 2017 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Marine Tank Vessel Loading Operations (Renewal)
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR)NESHAP for Marine Tank Vessel Loading Operations (Renewal), EPA ICR Number 1679.10, OMB Control Number 2060-0289to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through April 30, 2018. Public comments were previously requested via the Federal Register on June 29, 2017 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An Agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NSPS for Calciners and Dryers in Mineral Industries (Renewal)
The Environmental Protection Agency has submitted an information collection request (ICR)NSPS for Calciners and Dryers in Mineral Industries (Renewal), EPA ICR Number 0746.10, OMB Control Number 2060-0251to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through April 30, 2018. Public comments were previously requested via the Federal Register on June 29, 2017 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Bacillus subtilis
This regulation establishes an exemption from the requirement of a tolerance for residues of Bacillus subtilis strain FMCH002 in or on all food commodities when used in accordance with label directions and good agricultural practices. FMC Corporation submitted a petition to EPA under the Federal Food, Drug, and Cosmetic Act (FFDCA), requesting the exemption from a requirement of a tolerance. This regulation eliminates the need to establish a maximum permissible level for residues of Bacillus subtilis strain FMCH002 under FFDCA.
Bacillus Licheniformis
This regulation establishes an exemption from the requirement of a tolerance for residues of Bacillus licheniformis strain FMCH001 in or on all food commodities when used in accordance with label directions and good agricultural practices. FMC Corporation submitted a petition to EPA under the Federal Food, Drug, and Cosmetic Act (FFDCA), requesting the exemption from a requirement of a tolerance. This regulation eliminates the need to establish a maximum permissible level for residues of Bacillus licheniformis strain FMCH001 under FFDCA.
Federal Policy for the Protection of Human Subjects: Proposed Six Month Delay of the General Compliance Date While Allowing the Use of Three Burden-Reducing Provisions During the Delay Period
In a final rule published on January 19, 2017, federal departments and agencies made revisions to the Federal Policy for the Protection of Human Subjects (hereafter the ``2018 Requirements''). The Consumer Product Safety Commission (CPSC) adopted the same regulatory changes in a separate final rule published on September 18, 2017. The 2018 Requirements were scheduled to become effective on January 19, 2018, with a general compliance date of January 19, 2018 (with the exception of the revisions to the cooperative research provision). The departments and agencies listed in this document have also published an interim final rule delaying the effective date and general compliance date for the 2018 Requirements for six months, to cover the time period of January 19, 2018 until July 19, 2018. As per the interim final rule, the effective date of the 2018 Requirements is now July 19, 2018. The departments and agencies listed in this document propose delaying the general compliance date for the 2018 Requirements for an additional six months, for the time period of July 19, 2018 until January 21, 2019. This proposed rule is intended to provide additional time to regulated entities for the preparations necessary to implement the 2018 Requirements. This proposed rule, if finalized, would require regulated entities to continue to comply with the requirements of the current Federal Policy for the Protection of Human Subjects (hereafter the ``pre-2018 Requirements'') until January 21, 2019. This proposal also takes comment on whether to permit institutions to implement, for certain research studies, the following provisions in the 2018 Requirements during the period from July 19, 2018, until January 21, 2019, that the general compliance date is delayed. Those three provisions, intended to reduce burdens on regulated entities, are the 2018 Requirements' definition of ``research,'' which deems certain activities not to be research, the allowance for no annual continuing review of certain categories of research, and the elimination of the requirement that institutional review boards (IRBs) review grant applications related to the research. The way that this option is proposed, regulated entities would be required to comply with all pre- 2018 Requirements during the period that the general compliance date is delayed, except for provisions substituted by the three burden-reducing provisions of the 2018 Requirements. As described in section III, below, this flexibility is proposed only for studies for which an institution makes a choice to transition to comply with the 2018 Requirements, beginning on July 19, 2018. In order to clearly describe this proposed flexibility, including how it would impact institutions choosing to transition research to comply with the 2018 Requirements, this document proposes a redrafted transition provision.
Notice of Availability of the Deepwater Horizon Oil Spill Louisiana Trustee Implementation Group Draft Restoration Plan and Environmental Assessment #4: Nutrient Reduction (Nonpoint Source) and Recreational Use
In accordance with the Oil Pollution Act of 1990 (OPA) and the National Environmental Policy Act (NEPA), the Federal and State natural resource trustee agencies for the Louisiana Trustee Implementation Group (Louisiana TIG) prepared a Draft Restoration Plan and Environmental Assessment #4: Nutrient Reduction (Nonpoint Source) and Recreational Use (Draft RP/EA). The Draft RP/EA describes and proposes restoration project alternatives considered by the Louisiana TIG to improve water quality by reducing nutrients from nonpoint sources and to compensate for recreational use services lost as a result of the Deepwater Horizon oil spill. The Louisiana TIG evaluated these alternatives under criteria set forth in the OPA natural resource damage assessment (NRDA) regulations, and also evaluated the environmental consequences of the restoration alternatives in accordance with NEPA. The proposed projects are consistent with the restoration alternatives selected in the Deepwater Horizon oil spill Final Programmatic Damage Assessment and Restoration Plan/Programmatic Environmental Impact Statement (PDARP/PEIS). The purpose of this notice is to inform the public of the availability of the Draft RP/EA and to seek public comments on the document.
Approval and Promulgation of Implementation Plans; Louisiana; Attainment Demonstration for the St. Bernard Parish 2010 SO2
Pursuant to the Clean Air Act (the Act or CAA), the Environmental Protection Agency (EPA) is proposing to approve a State Implementation Plan (SIP) revision, as supplemented, for the St. Bernard Parish, Louisiana 2010 1-hour sulfur dioxide (SO2) Primary National Air Quality Standard (NAAQS) nonattainment area. EPA is proposing approval of the following CAA SIP elements: The attainment demonstration for the SO2 NAAQS, which includes an Agreed Order on Consent (AOC) for the Rain CII Carbon, LLC. (Rain) facility; the reasonable further progress (RFP) plan; the reasonably available control measures (RACM) and reasonably available control technology (RACT) demonstration; the emission inventories; and the contingency measures. The State has demonstrated that its current Nonattainment New Source Review (NNSR) program covers this NAAQS; therefore, no revision to the SIP is required for the NNSR element.
Air Plan Approval; Kentucky; 2008 Ozone NAAQS Interstate Transport SIP Requirements
The Environmental Protection Agency (EPA) is proposing to approve Kentucky's February 28, 2018, draft State Implementation Plan (SIP) submission pertaining to the ``good neighbor'' provision of the Clean Air Act (CAA or Act) for the 2008 8-hour ozone National Ambient Air Quality Standard (NAAQS) that was submitted by Kentucky for parallel processing. The good neighbor provision requires each state's SIP to address the interstate transport of air pollution in amounts that contribute significantly to nonattainment, or interfere with maintenance, of a NAAQS in any other state. In this action, EPA is proposing to approve Kentucky's draft submission demonstrating that no additional emission reductions are necessary to address the good neighbor provision for the 2008 ozone NAAQS beyond those required by the Cross-State Air Pollution Rule Update (CSAPR Update) federal implementation plan (FIP). Accordingly, EPA is proposing to approve Kentucky's draft submission as partially addressing the requirements of the good neighbor provision for the 2008 ozone NAAQS, and resolving any obligation remaining under the good neighbor provision after promulgation of the CSAPR Update FIP. EPA is proposing this action because it is consistent with the CAA.
Re-Establishment of the Environmental Financial Advisory Board
In accordance with the Federal Advisory Committee Act, notice is hereby given that the U.S. Environmental Protection Agency (EPA) intends to re-establish the Environmental Financial Advisory Board (EFAB) for a two-year period due to an administrative delay in filing the committee's renewal charter. EPA has determined that the EFAB is necessary and in the public interest in connection with the performance of duties imposed on the agency by law. The purpose of EFAB is to provide advice and recommendations to the EPA Administrator on issues associated with environmental financing.
Notification of a Public Meeting of the Chartered Science Advisory Board
The Environmental Protection Agency (EPA) Science Advisory Board (SAB) Staff Office announces a public meeting of the chartered SAB to: (1) Conduct a quality review of a draft SAB report on an Screening Methodologies to Support Risk and Technology Reviews (RTR) for National Emissions Standards for Hazardous Air Pollutants: RTR; (2) discuss information provided by the EPA on planned actions in the 2017 semi-annual regulatory agenda and their supporting science; and (3) receive briefings from the EPA Office of Research and Development, the Office of Water, and the Office of Air.
Proposed Information Collection Request; Comment Request; National Volatile Organic Compound Emission Standards for Aerosol Coatings
The Environmental Protection Agency (EPA) is planning to submit an information collection request (ICR), ``National Volatile Organic Compound Emission Standards for Aerosol Coatings'' (EPA ICR No. 2289.04, OMB Control No. 2060-0617) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (PRA). Before doing so, the EPA is soliciting public comments on specific aspects of the proposed information collection as described below. This is a proposed extension of the ICR, which is currently approved through October 31, 2018. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
Air Plan Approval; Florida; Update to Materials Incorporated by Reference
The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Florida state implementation plan (SIP). The regulations affected by this update have been previously submitted by Florida and approved by EPA. This update affects the materials that are available for public inspection at the National Archives and Records Administration (NARA) and the EPA Regional Office.
Review of the Primary National Ambient Air Quality Standards for Oxides of Nitrogen
Based on the Environmental Protection Agency's (EPA's) review of the air quality criteria addressing human health effects of oxides of nitrogen and the primary national ambient air quality standards (NAAQS) for oxides of nitrogen, as measured by nitrogen dioxide (NO2), the EPA is retaining the current standards, without revision.
Proposed Prospective Purchaser Agreement for the Manual Transmission of Muncie Site in Muncie, Indiana
In accordance with the Prospective Purchaser Agreement, notice is hereby given of a proposed administrative settlement concerning the Manual Transmission of Muncie Site in Muncie, Indiana with the following Settling Party: Fourteen91 Loft, LLC. The settlement requires the Settling Party to, if necessary, execute and record a Declaration of Restrictive Covenant; provide access to the Site and exercise due care with respect to existing contamination. The settlement includes a covenant not to sue the Settling Parties pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act or the Resource Conservation and Recovery Act with respect to the Existing Contamination. Existing Contamination is defined as any hazardous substances, pollutants, or contaminants or Waste Material present or existing on or under the Property as of the Effective Date of the Settlement Agreement; any hazardous substances, pollutants, or contaminants or Waste Material that migrated from the Property prior to the Effective Date; and any hazardous substances, pollutants, or contaminants or Waste Material presently at the Site that migrates onto, on, under, or from the Property after the Effective Date. For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the EPA, Region 5, Records Center, 77 W Jackson Blvd., 7th Fl., Chicago, Illinois 60604. Commenters may request an opportunity for a public hearing in the affected area, in accordance with Section 7003(d) of RCRA.
Request for Nominations for Mobile Sources Technical Review Subcommittee
The U.S. Environmental Protection Agency (EPA) invites nominations from a diverse range of qualified candidates to be considered for appointment to its Mobile Sources Technical Review Subcommittee (MSTRS). Vacancies are anticipated to be filled by Fall, 2018. Sources in addition to this Federal Register Notice may also be utilized in the solicitation of nominees.
Air Plan Approval; GA; Permitting Revision
The Environmental Protection Agency (EPA) is proposing to approve changes to the Georgia State Implementation Plan (SIP) submitted by the State of Georgia, through the Georgia Environmental Protection Division (GA EPD) of the Department of Natural Resources, on April 11, 2003. EPA is proposing to approve portions of a SIP revision which includes changes to Georgia's rules regarding emissions standards and permitting. This action is being proposed pursuant to the Clean Air Act (CAA or Act) and its implementing regulations.
Tetraconazole; Pesticide Tolerances
This regulation establishes tolerances for residues of tetraconazole in or on multiple commodities which are identified and discussed later in this document. Isagro S.p.A (d/b/a Isagro USA, Inc.) requested these tolerances under the Federal Food, Drug, and Cosmetic Act (FFDCA).
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.