Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, this notice announces that FRA is forwarding the Information Collection Request (ICR) summarized below to the Office of Management and Budget (OMB) for review and comment. The ICR describes the information collection and its expected burden. On July 5, 2023, FRA published a notice providing a 60-day period for public comment on the ICR.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, this notice announces that FRA is forwarding the Information Collection Request (ICR) summarized below to the Office of Management and Budget (OMB) for review and comment. The ICR describes the information collection and its expected burden. On November 14, 2022, FRA published a notice providing a 60-day period for public comment on the ICR.
Safety Advisory 2023-04; High-Impact Wheels Causing Damage to Rails and Track Structures
This Safety Advisory recommends railroads utilize Wheel Impact Load Detectors (WILD) to properly identify and replace high-impact railcar wheels that could cause significant damage to rails and supporting track structures. FRA's preliminary investigation of a recent train derailment in Gothenburg, Nebraska, indicates that high- impact wheels damaged the rail the train was operating over and caused the derailment. Current industry practices for using WILDs to identify and replace high-impact wheels could help prevent such incidents in the future.
Trinity Railway Express and the Silver Line's Joint Request for Approval To Conduct Positive Train Control Field Testing
This document provides the public with notice that on August 29, 2023, Trinity Railway Express (TRE) submitted a request together with the Silver Line (SLVR) to field test trains on TRE's positive train control (PTC)-equipped territory, which is equipped with the Interoperable Electronic Train Management System (I-ETMS). FRA is publishing this notice and inviting public comment on TRE and SLVR's joint request to test I-ETMS.
TEXRail and the Silver Line's Joint Request for Approval To Conduct Positive Train Control Field Testing
This document provides the public with notice that on August 30, 2023, TEXRail submitted a request together with the Silver Line (SLVR) to field test trains on TEXRail's positive train control (PTC)- equipped territory, which is equipped with the Interoperable Electronic Train Management System (I-ETMS). FRA is publishing this notice and inviting public comment on TEXRail and SLVR's joint request to test I- ETMS.
Norfolk Southern Railway's Request To Operate During a Temporary Outage of Its Positive Train Control System
This document provides the public with notice that, on August 28, 2023, Norfolk Southern Railway (NS) submitted a request for amendment (RFA) to its FRA-certified positive train control (PTC) system. On August 28, 2023, NS experienced a system-wide outage of its PTC back office, temporarily impacting the operations of NS and its tenant railroads. NS is seeking FRA's authorization under FRA's PTC regulations to continue operations, with certain restrictions, while NS's PTC system is temporarily disabled.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) summarized below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
North County Transit District Request for Approval To Begin Field Testing on Its Positive Train Control Network Comment Extension Notice
On July 25, 2023, North County Transit District (NCTD) submitted a request to field test its new Crash Energy Management (CEM) Bi-Level cab cars that have been equipped with NCTD's Interoperable Electronic Train Management System (I-ETMS) technology as part of its positive train control (PTC) system. FRA published a notice inviting public comment on NCTD's request to test its PTC system, with the initial comment period closing on August 30, 2023. This document provides the public with notice that FRA is extending the comment period on NCTD's test request from August 30, 2023, to October 10, 2023.
Certification of Signal Employees
On May 31, 2023, FRA published an NPRM proposing to require railroads to develop written programs for certifying signal employees and to submit those written certification programs to FRA for approval prior to implementation. On July 5, 2023, FRA published a notice extending the comment period by 30 days. By this notice, FRA is extending the NPRM's comment period by an additional 15 days.
Certification of Dispatchers
On May 31, 2023, FRA published an NPRM proposing to require railroads to develop written programs for certifying dispatchers and to submit those written certification programs to FRA for approval prior to implementation. On July 5, 2023, FRA published a notice extending the comment period by 30 days. By this notice, FRA is extending the NPRM's comment period by an additional 15 days.
Notice of Funding Opportunity for Special Transportation Circumstances Projects
This notice details the application requirements and procedures for the states of Alaska, South Dakota, and Wyoming to obtain Special Transportation Circumstances (STC) directed grant funding for eligible rail Capital Projects. The funding has been made available for the program by the Consolidated Appropriations Act, 2017; Consolidated Appropriations Act, 2019; Further Consolidated Appropriations Act, 2020; Consolidated Appropriations Act, 2021; Consolidated Appropriations Act, 2022; Consolidated Appropriations Act, 2023; and the Infrastructure Investment and Jobs Act (2022 and 2023 supplemental Appropriations) (together, the Appropriations Acts). The opportunities described in this notice are available under Assistance Listing number 20.325, ``Consolidated Rail Infrastructure and Safety Improvements.'' Alaska, South Dakota, and Wyoming must each submit applications for projects meeting the requirements of this notice to receive directed funding. Should FRA identify additional available funding after the release of this NOFO, FRA may elect to award such additional funding to a project submitted for funding under this NOFO, as permitted by law.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) summarized below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
North County Transit District's Request for Approval To Begin Field Testing on Its Positive Train Control Network
This document provides the public with notice that on July 25, 2023, North County Transit District (NCTD) submitted a request to field test its new Crash Energy Management (CEM) Bi-Level cab cars that have been equipped with NCTD's Interoperable Electronic Train Management System (I-ETMS) technology. FRA is publishing this notice and inviting public comment on NCTD's request to test its positive train control (PTC) system.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) summarized below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
Long Island Rail Road's Request to Amend Its Positive Train Control System
This document provides the public with notice that, on July 20, 2023, the Long Island Rail Road (LIRR) submitted a request for amendment (RFA) to its FRA-certified positive train control (PTC) system in order to establish an Advanced Civil Speed Enforcement System II (ACSES II) Construction Zone (CZ) to support the construction of an extension of the Patchogue Siding and associated signal system changes for LIRR's modification of the current track infrastructure. FRA is publishing this notice and inviting public comment on the railroad's RFA to its PTC system.
Amtrak's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System
This document provides the public with notice that, on July 14, 2023, the National Railroad Passenger Corporation (Amtrak) submitted two requests for amendment (RFA). The first RFA is to Amtrak's FRA-approved Positive Train Control Safety Plan (PTCSP) and its Advanced Civil Speed Enforcement System II (ACSES II), which seeks FRA's approval to introduce modified safety server software to address a known defect and updates to type approval documentation. The second RFA is to Amtrak's FRA-certified positive train control (PTC) system for its ACSES II system, which seeks FRA's approval to install Construction Zone (CZ) transponders to support cutover activities on the Philadelphia to Washington (PW) line. As these RFAs may involve requests for FRA's approval of proposed material modifications to an FRA-certified PTC system, FRA is publishing this notice and inviting public comment on Amtrak's RFAs to its PTCSP and PTC system.
Notice of Final Federal Agency Action on Proposed Rail Transportation Project
This notice announces final environmental action taken by the Federal Railroad Administration (FRA) for the Cajon Pass High-Speed Rail Project. The purpose of this notice is to advise the public of the time limit to file any claims that may challenge this decision and other Federal permits, licenses, and approvals for the project.
Union Pacific Railroad's Request To Amend Its Positive Train Control Safety Plan
This document provides the public with notice that, on July 14, 2023, the Union Pacific Railroad (UP) submitted a request for amendment (RFA) to its FRA-approved Positive Train Control Safety Plan (PTCSP) in order to add information on UP's Arrangement of its Onboard positive train control (PTC) Apparatus, to correct regulatory reference formatting, and to add a PTCSP section reference. As this RFA may involve a request for FRA's approval of proposed material modifications to an FRA-certified PTC system, FRA is publishing this notice and inviting public comment on UP's RFA to its PTCSP.
Railworthiness Directive for Tank Cars Owned by Sumitomo Mitsui Banking Corporation Rail Services, LLC and Equipped With Rubber Linings Owned by Sumitomo Mitsui Banking Corporation Rail Services, LLC; RWD No. 2023-01
On July 19, 2023, FRA issued a Railworthiness Directive (Directive or RWD) to Sumitomo Mitsui Banking Corporation Rail Services, LLC (SMBC). This document announces FRA's issuance of the RWD, RWD No. 2023-01, and its availability on FRA's website.
Proposed Agency Information Collection Activities; Comment Request
On July 5, 2023, FRA published a 30-day notice of information collection; request for comment in the Federal Register. FR Doc. 2023- 08413. Due to technical issues as the result of which FRA did not receive two timely-filed comment letters until after the comment period closed, FRA is withdrawing the July 5, 2023, notice of information collection; request for comment and re-issuing the 30-day notice to address the two additional comments. Accordingly, this notice supersedes the July 5, 2023, notice.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) abstracted below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
Railroads' Joint Request to Amend Their Positive Train Control Safety Plans and Positive Train Control Systems
This document provides the public with notice that on June 28, 2023, twenty host railroads submitted a joint request for amendment (RFA) to their FRA-approved Positive Train Control Safety Plans (PTCSP). The RFA proposes an alternative to the definition of ``initial terminal.'' As this joint RFA involves a request for FRA's approval of a proposed material modification to FRA-certified positive train control (PTC) systems, FRA is publishing this notice and inviting public comment on the railroads' joint RFA to their PTCSPs.
Certification of Signal Employees
On May 31, 2023, FRA published an NPRM proposing to require railroads to develop written programs for certifying individuals who work as signal employees on their networks and to submit those written certification programs to FRA for approval prior to implementation. By this notice, FRA is extending the NPRM's comment period by 30 days.
Certification of Dispatchers
On May 31, 2023, FRA published an NPRM proposing to require railroads to develop written programs for certifying individuals who work as dispatchers on their networks and to submit those written certification programs to FRA for approval prior to implementation. By this notice, FRA is extending the NPRM's comment period by 30 days.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, this notice announces that FRA is forwarding the Information Collection Request (ICR) abstracted below to the Office of Management and Budget (OMB) for review and comment. The ICR describes the information collection and its expected burden. On April 21, 2023, FRA published a notice providing a 60-day period for public comment on the ICR.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) abstracted below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
Southeastern Pennsylvania Transportation Authority's Request To Amend Its Positive Train Control System
This document provides the public with notice that, on June 2 and 7, 2023, the Southeastern Pennsylvania Transportation Authority (SEPTA) submitted a request for amendment (RFA) to its FRA-certified positive train control (PTC) system. FRA is publishing this notice and inviting public comment on the railroad's RFA to its PTC system.
Caltrain's Request for Approval To Begin Field Testing on Its Positive Train Control Network
This document provides the public with notice that, on June 14, 2023, Caltrain (PCMZ) submitted a request to field test its Stadler KISS Electric Multiple Units (EMUs) that have been equipped with PCMZ's Interoperable Electronic Train Management System (I-ETMS) technology. FRA is publishing this notice and inviting public comment on PCMZ's request to test its positive train control (PTC) system.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, this notice announces that FRA is forwarding the Information Collection Request (ICR) abstracted below to the Office of Management and Budget (OMB) for review and comment. The ICR describes the information collection and its expected burden. On March 24, 2023, FRA published a notice providing a 60-day period for public comment on the ICR.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, this notice announces that FRA is forwarding the Information Collection Request (ICR) abstracted below to the Office of Management and Budget (OMB) for review and comment. The ICR describes the information collection and its expected burden. On March 24, 2023, FRA published a notice providing a 60-day period for public comment on the ICR.
Safety Advisory 2023-01; Evaluation of Policies and Procedures Related to the Use and Maintenance of Hot Bearing Wayside Detectors (Supplement)
On March 3, 2023, in response to a series of rail accidents suspected of being caused by burnt journal bearings, FRA published Safety Advisory 2023-01 addressing the use and maintenance of hot bearing detectors (HBDs). Since publication of that Safety Advisory, FRA has continued to evaluate railroads' use of HBDs and on May 10, 2023, in New Castle, Pennsylvania, another accident occurred that is suspected of being the result of a burnt journal bearing. Preliminary information related to this most recent accident shows that the train involved passed a HBD which alarmed prior to the accident. Accordingly, FRA is issuing this Notice to supplement Safety Advisory 2023-01 with one additional recommendation. Specifically, this Notice adds a fifth recommendation to Safety Advisory 2023-01 recommending that railroads take action to evaluate the resiliency and accuracy of the overall process used to monitor and measure bearing health.