Department of the Army, Corps of Engineers – Federal Register Recent Federal Regulation Documents
Results 751 - 800 of 1,276
Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report for the Newhall Ranch Resource Management and Development Plan and Spineflower Conservation Plan, Los Angeles County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the California Department of Fish and Game (CDFG), has completed a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Newhall Ranch Resource Management and Development Plan and Spineflower Conservation Plan. The project proponent and landowner, The Newhall Land and Farming Company, requires a long-term Section 404 permit from the Corps of Engineers for permanent impacts to approximately 93.3 acres of waters of the United States, including, 20.5 acres of wetlands, for the construction of various facilities in waters of the United States associated with the development of a new community composed of a broad range of residential, mixed-use and nonresidential land uses in the 12,000-acre project area located in Santa Clarita, Los Angeles County, California. The Corps considered all comments received in preparing the Final EIS/EIR, which is available for a 30-day review. The Final EIS/ EIR includes a draft general conformity determination (see Section 3.2, Section 4.7 and Appendix D.7), pursuant to Section 176(c) of the Clean Air Act. A general conformity determination is necessary because construction of the proposed project would require Federal action (i.e., issuance of a Corps permit for activities proposed in waters of the U.S.) and not all the Federal action's direct and indirect emissions would be below specified de minimis thresholds (40 CFR 93.153(b)). Pursuant to the general conformity regulations (40 CFR part 93 Subpart B), general conformity determinations do not have to be included in the EIS and can be separately noticed, but the draft general conformity determination for the Federal action associated with the proposed project is being included in the Final EIS/EIR in this case.
Atlantic Ocean Off John F. Kennedy Space Center, FL; Restricted Area
The U.S. Army Corps of Engineers (Corps) is revising its regulations by establishing a new restricted area in the Atlantic Ocean off the coast of the John F. Kennedy Space Center (KSC), Florida. The KSC is the main launch facility for the National Aeronautics and Space Administration (NASA) and they need to have the capability to secure their shoreline at KSC. This amendment to the existing regulations is necessary to enhance KSC's ability to secure their shoreline to counter postulated threats to their facilities and to provide for safe launch operations.
Suspension of Nationwide Permit 21
The U.S. Army Corps of Engineers (Corps) is immediately suspending Nationwide Permit (NWP) 21, which authorizes discharges of dredged or fill material into waters of the United States for surface coal mining activities, in the Appalachian region of Kentucky, Ohio, Pennsylvania, Tennessee, Virginia, and West Virginia. This suspension is an interim measure to protect the aquatic environment while we evaluate modification of NWP 21 or until NWP 21 expires in 2012. While the suspension is in effect, individuals who seek authorization for discharges of dredged or fill material into waters of the United States for surface coal mining projects in the affected region will have to obtain Department of the Army authorization under the Clean Water Act (CWA), through the individual permit process. Individual permits will result in increased public involvement in the permit evaluation process, including an opportunity for public comment on individual projects. NWP 21 activities that have been verified by District Engineers prior to the effective date of this suspension in the affected region continue to be authorized by that NWP until it expires on March 18, 2012, unless the District Engineer takes action to modify, suspend or revoke a particular NWP authorization on a case-by-case basis in accordance with the procedures at 33 CFR 330.5(d). District engineers may not modify previously issued NWP 21 verifications in this region to authorize additional discharges of dredged or fill material into waters of the United States; such discharges must be applied for and evaluated under the individual permit process. This suspension of NWP 21 does not apply to other regions of the United States. The suspension will remain in effect until the Corps takes further action on NWP 21 or until NWP 21 expires on March 18, 2012. The Corps will publish its decision concerning the proposed NWP 21 modification in a future Federal Register notice.
Notice of Availability of a Final General Conformity Determination and Record of Decision for the Pacific L.A. Marine Terminal LLC Crude Oil Terminal Project, Port of Los Angeles, Los Angeles County, CA
In November 2008, the Los Angeles Harbor Department (LAHD) and the U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) published a joint Final Supplemental Environmental Impact Statement and Subsequent Environmental Impact Report (SEIS/SEIR) for the development of a marine oil terminal at Berth 408 on Pier 400 in the Port of Los Angeles, Los Angeles County, California (Project). On February 19, 2010, the Corps published a draft general conformity determination for the Federal action associated with the Project. Comments were received on the draft general conformity determination until March 22, 2010. A general conformity determination was required because Project construction would require Federal action (i.e., issuance of a Corps permit for work and structures in and over navigable waters of the U.S. pursuant to Section 10 of the River and Harbor Act) and not all the Federal action's direct and indirect air emissions would be below specified de minimis thresholds (40 CFR 51.853(b)). On June 1, 2010 and June 3, 2010, the Corps made a final general conformity determination and completed its environmental review and executed the Record of Decision (ROD), respectively, for the Federal action associated with the Project. The Corps considered and responded to all comments received in making the final general conformity determination and executing the ROD.
Intent To Prepare an Environmental Impact Statement for Northwest Aggregates' Previously Authorized Replacement of an Existing Barge Loading Facility in East Passage of Puget Sound on the Southeast Shoreline of Maury Island, King County, WA
The U.S. Army Corps of Engineers (Corps) Seattle District is preparing an Environmental Impact Statement (EIS) to analyze the environmental effects of replacing an existing barge loading dock to facilitate resumption of sand and gravel mining operations at Northwest Aggregates' Maury Island facility. The Corps issued a permit to Northwest Aggregates for the dock replacement project on July 2, 2008, under Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. Northwest Aggregates has been enjoined by the U.S. District Court for the Western District of Washington from conducting any further marine construction work under the Corps' permit, until the Corps completes an EIS on the project. A portion of this marine construction work was done prior to the Court's 2009 ruling; the balance remains incomplete at this time. The EIS will analyze the environmental effects of the issuance of the Corps permit, including additional analysis of potential impacts of the project on the marine environment, including endangered species (Chinook salmon, Southern Resident Killer whales, rockfish, eulachon, and other listed species) and forage fish, additional analysis and evaluation of the no action and other alternatives to achieve the project purpose, and additional analysis of cumulative impacts associated with the permit project.
Notice of Intent To Grant Partially Exclusive License of the United States Patent Application No. 12/243,084, Filed October 01, 2008, Entitled: Soluble Salt Produced From a Biopolymer and a Process for Producing the Salt
In accordance with 37 CFR 404.7(a)(1)(i), announcement is made
Notice of Intent To Prepare an Environmental Impact Statement for the Elliott Bay Seawall Project, Seattle, WA
Pursuant to section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, the U.S. Army Corps of Engineers (USACE) will prepare an Environmental Impact Statement (EIS) for a proposed seawall replacement project along the Elliott Bay shoreline in Seattle, WA. The City of Seattle is the non-Federal sponsor for the project.
Board on Coastal Engineering Research
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Notice of Public Scoping Meetings for the Missouri River Authorized Purposes Study, Missouri River Basin, United States
In the April 16, 2010 Federal Register (75 FR 19948), the U.S. Army Corps of Engineers (USACE) Omaha and Kansas City Districts announced in a Notice of Intent (NOI) that it will prepare a comprehensive feasibility-type report with an integrated Environmental Impact Statement (EIS) for the Missouri River Authorized Purposes Study (MRAPS). The NOI did not include specific details of the public scoping meetings. This notice announces the locations, dates, times, and format of the public scoping meetings.
Cancellation of Notice of Intent To Prepare an Environmental Impact Statement for Northwest Aggregates' Previously Authorized Replacement of an Existing Barge Loading Facility in East Passage of Puget Sound on the Southeast Shoreline of Maury Island, King County, WA
The U.S. Army Corps of Engineers (Corps) Seattle District will issue a revised Notice of Intent at a later date. The notice that was previously published in the Federal Register (75 FR 25217) on May 7, 2010 is cancelled.
Danger Zone, Pacific Ocean, Naval Base Coronado, Coronado, California
The U.S. Army Corps of Engineers (Corps) is amending its regulations to establish a naval danger zone in the waters of the Pacific Ocean extending offshore from the small arms range at the Naval Base Coronado (NBC), in Coronado, San Diego County, California. The danger zone will provide an appropriate and enforceable zone in which the Navy may conduct small arms test firing to qualify military personnel.
Intent To Prepare an Environmental Impact Statement for Northwest Aggregates' Previously Authorized Replacement of an Existing Barge Loading Facility in East Passage of Puget Sound on the Southeast Shoreline of Maury Island, King County, WA
The U.S. Army Corps of Engineers (Corps) Seattle District is preparing an Environmental Impact Statement (EIS) to analyze the environmental effects of replacing an existing dock and resuming sand and gravel mining operations. The Corps issued a permit to Northwest Aggregates for the dock replacement project on June 2, 2008, under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Construction of the new dock began in December 2008 and approximately 49% of the construction was completed as of January 2009. The Corps has been directed by the U.S. District Court to complete an EIS on the project. The EIS will include additional analysis of potential impacts of the project on the marine environment, including Chinook salmon, Southern Resident Killer whales, and forage fish, additional analysis and evaluation of the no action and off-site alternatives, and additional analysis of cumulative impacts associated with the permit project.
Notice of Intent To Prepare a Draft Environmental Impact Statement for a Permit Application for the Proposed Gregory Canyon Landfill Project, in San Diego County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Corps) is examining the environmental consequences associated with the proposed construction, operation, and closure of a new Class III landfill in northern San Diego County, in connection with Gregory Canyon, Ltd.'s application for a Department of the Army permit under Section 404 of the Clean Water Act to construct the proposed Gregory Canyon Landfill and associated facilities, which would discharge fill materials into approximately 2 acres of waters of the U.S. (less than 1 acre would be affected by permanent discharges of fill) in the San Luis Rey River to construct a bridge and in Gregory Canyon to construct the landfill liner, stability berm, and ancillary facilities.
Notice of Intent To Prepare a Draft Environmental Impact Statement (EIS) for the Central Palm Beach County Comprehensive Erosion Control Project in Palm Beach County, FL
The U.S. Army Corps of Engineers (Corps), Jacksonville District, intends to prepare a Draft Environmental Impact Statement
Intent To Prepare a Draft Environmental Impact Statement for Improvements to the U.S. 17 and Market Street (U.S. 17 Business) Corridor in Northern New Hanover and Southern Pender Counties, NC
The North Carolina Department of Transportation (NCDOT) has proposed improvements to the transportation system starting at Military Cutoff Road in New Hanover County and extending to a point north of Hampstead along U.S. 17, in Pender County, NC (TIP Projects U-4751 and R-3300). The NCDOT is currently considering alternatives for this project that will require authorization from the U.S. Army Corps of Engineers (USACE) pursuant to Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbor Act). The USACE,Wilmington District, Regulatory Division and the NCDOT intend to prepare a joint environmental impact statement in accordance with regulations implementing the National Environmental Policy Act (NEPA) to evaluate and compare alternatives and to assess associated impacts.
Notice of Intent To Prepare a Draft Environmental Impact Statement on Beach and Dune Restoration in St. Lucie County, FL
The U.S. Army Corps of Engineers (Corps), Jacksonville District, has received a permit application for a Department of the Army permit under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act from the St. Lucie County Erosion Control District (County) to construct a beach nourishment and dune restoration project along St. Lucie County. As part of the permit process, the Corps is evaluating the environmental effects associated with beach nourishment and dune restoration.
Restricted Areas and Danger Zone at Naval Station Mayport, FL
The U.S. Army Corps of Engineers (Corps) is revising its regulations by expanding the existing restricted area as well as establishing two new restricted areas and a new danger zone in the waters adjacent to and within the boundaries of Naval Station (NAVSTA) Mayport in Florida. The NAVSTA Mayport is the third largest naval facility in the continental United States and is unique in that it is home to a busy seaport as well as an air facility which conducts more than 135,000 flight operations each year. This amendment to the existing regulation is necessary to enhance the safety of the local community by ensuring safe navigation of the adjacent waterways, to preserve military security force protection measures, and to adhere to military munitions regulations.
Notice of Intent To Prepare an Environmental Impact Statement for the Missouri River Authorized Purposes Study, Missouri River Basin, United States
Pursuant to Division C, Title I, Section 108 of the Omnibus Appropriations Act of 2009 (Pub. L. 111-8), and the National Environmental Policy Act of 1969 (NEPA), as amended, the U.S Army Corps of Engineers (USACE) Omaha and Kansas City Districts intend to conduct the Missouri River Authorized Purposes Study (MRAPS). The study is anticipated to produce a comprehensive feasibility-type report with an integrated Environmental Impact Statement (EIS).
Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Proposed Baseload Power Plant, East Kentucky Power Cooperative, Inc., Clark County, KY
The U.S. Army Corps of Engineers (USACE), in accordance with 42 U.S.C. 4321 to 4370(f), is issuing this notice to advise the public that a Draft Supplemental Environmental Impact Statement (SEIS) has been prepared and is available for review and comment.
Intent To Prepare a Draft Environmental Impact Statement for the “Flood Control, Mississippi River & Tributaries, St. Johns Bayou and New Madrid Floodway, Missouri, First Phase” (SJNM) Project
The U.S. Army Corps of Engineers is announcing its intent to prepare a Draft Environmental Impact Statement (DEIS) for the Mississippi River and Tributaries, St. Johns Bayou and New Madrid
Intent To Prepare a Draft Environmental Impact Statement for the Broward County Shore Protection Project, North County Line to Hillsboro Inlet (Segment I) General Reevaluation Report, Located in Broward County, FL
The U.S. Army Corps of Engineers (Corps), Jacksonville District, intends to prepare a Draft Supplemental Environmental Impact Statement (DSEIS) for the Broward County Shore Protection Project(Segment I) General Re-Evaluation Report. The project is being sponsored locally by the city of Deerfield Beach.
Intent To Prepare a Draft Environmental Impact Statement for Hurricane and Storm Damage Reduction for South Ponte Vedra Beach, Vilano Beach, and Summer Haven Beach Reaches, St. Johns County, FL
The U.S. Army Corps of Engineers, Jacksonville District, intends to prepare a Draft Environmental Impact Statement (DEIS) for evaluation of the feasibility of providing hurricane and storm damage reduction (HSDR), and related purposes to the shores of St. Johns County, Florida. In cooperation with St. Johns County, the study will evaluate alternatives that will maximize HSDR while minimizing environmental impacts within three reaches designated critically eroded by Florida Department of Environmental Protection (FDEP): (1) South Ponte Vedra Beach (R84-R110/5 miles), (2) Vilano Beach (R110-R122/2.5 miles) and (3) Summer Haven Beach (R197-R209/2.3 miles).
Notice of Intent To Grant Exclusive License of U.S. Patent Application No. 12/432,842 Filed April 30, 2009 Entitled: “A Soil Stabilization Soil Comprising Same, and a Method of Stabilizing Soil”
In accordance with 37 CFR 404.7(a)(1)(i), announcement is made of a prospective exclusive license of the following U.S. Patent Application No. 12/432,842 Filed April 30, 2009.
United States Navy Restricted Area, Puget Sound, Naval Station Everett, Washington
The U.S. Army Corps of Engineers is proposing to amend its regulations for the restricted area established in the waters of Puget Sound adjacent to Naval Station Everett, Everett, Snohomish County, Washington. The amendments will enable the affected units of the United States military to enhance safety and security around an active military establishment. The regulations are necessary to safeguard military vessels and United States government facilities from sabotage and other subversive acts, accidents, or incidents of similar nature. The regulations are also necessary to protect the public from potentially hazardous conditions that may exist as a result of military use of the area.
Notice of Availability for Comments Regarding the Planned Environmental Assessment Interim Report IIIa Fish Deterrent Barriers, Illinois and Chicago Area Waterways
The U.S. Army Corps of Engineers, Chicago District is requesting public comments for a planned Environmental Assessment. The Corps is directed to conduct a study of technologies that may enhance the efficacy of the Chicago Sanitary and Ship Canal Dispersal Barriers System. The study is structured as a series of interim reports. Interim Report IIIa, limited to the impacts of implementing additional in- stream barrier/deterrent technologies at key locations in the Illinois and Chicago Area Waterways is the focus of this planned EA. The specific technologies under consideration include acoustic deterrents, air bubble curtains, and strobe lights used both individually and in combination. Comments are requested to assist in determining the level of analysis and impacts to be considered for implementing these in- stream barrier/deterrent technologies. Any comments received by the Corps on the proposed EA will be considered fully for the Federal action associated with the Project.
Inland Waterways Users Board
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting.
Process for Requesting a Variance From Vegetation Standards for Levees and Floodwalls
In the February 9, 2010 issue of the Federal Register (75 FR 6364), the U.S. Army Corps of Engineers (Corps), published its proposed update to its current process for requesting a variance from vegetation standards for levees and floodwalls for public comment. In that notice, the Corps stated that written comments must be submitted on or before March 11, 2010. Instructions for submitting comments are provided in the February 9, 2010, Federal Register notice. In response to several requests, the Corps has decided to extend the public comment period to April 25, 2010.
Intent To Prepare a Draft Environmental Impact Statement for the Everglades Restoration Transition Plan-Phase 1
The Jacksonville District, U.S. Army Corps of Engineers intends to prepare a Draft Environmental Impact Statement (EIS) for the Everglades Restoration Transition Plan (ERTP)Phase 1. The ERTP will supersede the 2006 IOP for the Cape Sable Seaside Sparrow which currently regulates operations for Central & South Florida (C&SF) project features in the south Dade area. The ERTP Phase 1 aims to implement operational flexibilities based on multi-species management. This project is ``phase 1'' in anticipation of subsequent operational modifications that will be needed to move towards Everglades restoration. Development of the plan will include evaluation of relevant new species information and hydrological data. The ERTP Draft EIS will evaluate the anticipated affects of implementation of operations to support the recommendations of the U. S. Fish and Wildlife Service (FWS) Biological Opinion.
Atlantic Ocean off John F. Kennedy Space Center, FL; Restricted Area
The U.S. Army Corps of Engineers (Corps) is proposing to revise its regulations to establish a new restricted area in the Atlantic Ocean off the coast of the John F. Kennedy Space Center (KSC), Florida. The KSC is the main launch facility for the National Aeronautics and Space Administration (NASA) and they need to have the capability to secure their shoreline at KSC. This amendment to the existing regulations is necessary to enhance KSC's ability to secure their shoreline to counter postulated threats to their facilities and to provide for safe launch operations.
Notice of Intent To Prepare a Draft Environmental Impact Statement for the Proposed Duke Energy Carolinas, LLC, Offshore Wind Demonstration Project Within the Pamlico Sound, Dare County, NC
The U.S. Army Corps of Engineers (USACE), Wilmington District, Regulatory Division has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, from Duke Energy Carolinas, LLC, to construct up to three (3) power generating wind turbines within the Pamlico Sound and to conduct research relating to the development of future offshore wind energy projects. This project is located within a 3-mile square area located approximately 7.3 miles west of Avon and 9.1 miles north of Frisco within the Pamlico Sound, NC. In order to maximize exposure to prevailing winds, the turbines will be oriented in a northwest to southeast configuration (NW corner: Lat. 35.23.9.78 N, Long. 75.39.26.32 W/SE corner: Lat. 35.22.4.26 N, Long. 75.38.20.80 W). Construction will require barge-supported equipment to install the foundations supporting the turbines, rock aprons may be installed to protect the base of each structure, and an approximately 6-inch diameter electric cable will be buried within the bottom of Pamlico Sound for connection to an existing, land-based substation near the communities of either Avon, Buxton, Frisco, or Hatteras, NC. Power generated by this project would be supplied to the electric grid on Hatteras Island. The University of North Carolina at Chapel Hill (UNC) will conduct research on the project to evaluate water user conflicts, ecological risks, engineering obstacles, and measures to mitigate the effects of the turbines on the public.
Extension of the Public Comment Period for the Draft Environmental Impact Statement for the Moffat Collection System Project, City and County of Denver, Adams County, Boulder County, Jefferson County, and Grand County, CO
The U.S. Army Corps of Engineers (Corps) Omaha District is announcing a 16-day extension of the public comment period for the Moffat Collection System Project (Moffat Project) Draft Environmental Impact Statement (Draft EIS). The originally announced comment period ends on March 1, 2010, but has been extended until March 17, 2010. The original Notice of Availability of the Draft EIS was published in the Federal Register on Friday, October 30, 2009 (74 FR 56186) and included an initial 90-day comment period (October 30, 2009 to January 27, 2010). A second Notice of Availability announcing an extension of 32 days (January 27, 2010 to March 1, 2010) was issued on December 18, 2009 (74 FR 67180).
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the State of Alaska's Proposed Alaska Stand Alone Pipeline (ASAP) Natural Gas Transportation Pipeline
In December 4, 2009, issue of the Federal Register (74 FR 63736), the Alaska District, U.S. Army Corps of Engineers (Corps), published a Notice of Intent to prepare a Draft Environmental Impact Statement (DEIS) to identify and analyze the potential impacts associated with the construction of the proposed Alaska Stand Alone Pipeline (ASAP) natural gas transportation pipeline. In that notice, the Alaska District stated that the scoping period would end on February 5, 2010. In response to several requests, the Alaska District has decided to extend the scoping period to March 8, 2010.
Notice of Availability for a Draft General Conformity Determination for the Pacific L.A. Marine Terminal LLC Crude Oil Terminal Project, Port of Los Angeles, Los Angeles County, CA
In November 2008, the Los Angeles Harbor Department (LAHD) and the U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) published a joint Final Supplemental Environmental Impact Statement and Subsequent Environmental Impact Report (SEIS/SEIR) for the development of a marine oil terminal at Berth 408 on Pier 400 in the Port of Los Angeles, Los Angeles County, California (Project). The Corps is currently processing a permit application submitted by the LAHD to undertake various activities and construct structures in and over navigable waters of the U.S. associated with the Project. Issuance of a Corps permit is a Federal action, which must comply with the air quality general conformity requirements specified in Section 176(c) of the Clean Air Act.
Process for Requesting a Variance From Vegetation Standards for Levees and Floodwalls
The U.S. Army Corps of Engineers (Corps) is proposing to update its current process for requesting a variance from vegetation standards for levees and floodwalls to reflect organizational changes and incorporate current agency-wide review processes.
Intent To Prepare a Draft Environmental Impact Statement To Evaluate Improvements to the Federal Deep-Draft Pascagoula Harbor Navigation Channel in Jackson County, MS
The Mobile District, U.S. Army Corps of Engineers (Corps) intends to prepare a Draft Environmental Impact Statement (DEIS) to
Availability of a Draft Environmental Impact Statement To Consider Issuance of a Department of the Army Permit Pursuant to Section 404 of the Clean Water Act for the Angelina & Neches River Authority's Proposal to Construct Lake Columbia, a Proposed 10,133-Surface-Acre Water Supply Reservoir in Cherokee and Smith Counties, TX
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE) Fort Worth District has prepared a Draft Environmental Impact Statement (DEIS). This DEIS evaluates potential impacts to the natural, physical and human environment as a result of the Angelina & Neches River Authority's proposal to construct Lake Columbia. The USACE regulates this proposed project pursuant to Section 404 of the Clean Water Act. The proposed activity would involve the discharge of dredged and fill material into waters of the United States associated with the proposed construction of Lake Columbia.
Availability of the Final Environmental Impact Statement (FEIS) for the Relocation of New River Inlet Ebb Tide Channel Between North Topsail Beach and Onslow Beach, and the Placement of the Dredged Material Along the Ocean Shoreline of North Topsail Beach in Onslow County, NC
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (COE) Wilmington District, Wilmington Regulatory Field Office announces the availability of a Regulatory Program Final EIS for the North Topsail Beach Shoreline Protection Project. The applicant, The Town of North Topsail Beach, is requesting Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, to protect residential homes and town infrastructures by nourishing approximately 11.1 miles of beachfront via repositioning the New River Inlet channel, implementing an inlet management plan to control the positioning of the new inlet channel, and utilizing an offshore borrow area. The new channel will be centrally located and the proposal will be to maintain that position, which essentially will be located perpendicular to the adjacent shorelines of North Topsail Beach and Onslow Beach. The proposed sources of the material for the beach nourishment will come from the repositioning of the inlet and an identified offshore borrow area. The projected amount of material needed to initially nourish the oceanfront shoreline is approximately 3.11 million cubic yards. The placement of beach fill along the Town's shoreline would result in the initial widening of the beach by 50 to 100 feet. The widened beach would be maintained through a program of periodic beach nourishment events with the material extracted from the maintenance of the newly relocated channel. All work will be accomplished using a hydraulic cutterhead dredge. The proposed project construction will be conducted in a five phase approach to correspond with the Town's anticipated annual generation of funds.
Restricted Areas and Danger Zone at Naval Station Mayport, FL
The U.S. Army Corps of Engineers (Corps) is proposing to revise the existing regulations for a restricted area and establish a danger zone in the waters adjacent to and within the boundaries of Naval Station (NAVSTA) Mayport in Florida. The NAVSTA is the third largest naval facility in the continental United States and is unique in that it is home to a busy seaport as well as an air facility which conducts more than 135,000 flight operations each year. This amendment to the existing regulation is necessary to enhance the safety of the local community by ensuring safe navigation of the adjacent waterways, to preserve military security force protection measures, and adhere to military munitions regulations.
Notice of Solicitation for Estuary Habitat Restoration Program
Congress has appropriated limited funds to the U.S. Army Corps of Engineers (Corps) and the National Oceanic and Atmospheric Administration (NOAA) for implementation of the Estuary Habitat Restoration Program as authorized in Section 104 of the Estuary Restoration Act of 2000, Title I of the Estuaries and Clean Waters Act of 2000 (Pub. L. 106-457) (accessible at https://www.usace.army.mil/ CECW/ERA/Pages/home.aspx). On behalf of the Estuary Habitat Restoration Council (Council) the Corps is soliciting proposals for estuary habitat
Notice of Availability of Final Environmental Impact Statement for the Proposed Construction of the Western Wake Regional Wastewater Management Facilities; Which Includes Regional Wastewater Pumping, Conveyance, Treatment, and Discharge Facilities To Serve the Towns of Apex, Cary, Holly Springs and Morrisville, as Well as the Wake County Portion of Research Triangle Park (RTP South) in North Carolina
The comment period for the Final Environmental Impact Statement for the proposed construction of the Western Wake Regional Wastewater Management Facilities, in Wake and Chatham Counties, NC published in the Federal Register on Friday, December 18, 2009 (74 FR 67180), required comments be submitted 33 days (January 19, 2010) following publication in the Federal Register. The comment period has been extended to 54 days (February 9, 2010). This is because the initial Web version of the Final Environmental Impact Statement had problems with the Web links. The web version was corrected on December 28, 2009.
Chief of Engineers Environmental Advisory Board
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Restricted Areas and Danger Zones at Eglin Air Force Base, FL
The U.S. Army Corps of Engineers (Corps) is proposing to revise several existing danger zone and restricted area regulations and to establish four new restricted areas within the Eglin Air Force Base (AFB) facilities and along the Eglin AFB facility shoreline in Florida. The Eglin AFB and Eglin Reservation span over 724 square miles with over 150 miles of waterway boundary. This amendment to the existing regulation is necessary to update their water boundary security plan to provide adequate protection to Eglin personnel and resources.
The Release of the Final Environmental Impact Statement (FEIS) for the Proposed Construction of the Western Wake Regional Wastewater Management Facilities, Which Includes Regional Wastewater Pumping, Conveyance, Treatment, and Discharge Facilities To Serve the Towns of Apex, Cary, Holly Springs and Morrisville, as Well as the Wake County Portion of Research Triangle Park (RTP South) in North Carolina
The U.S. Army Corps of Engineers (COE), Wilmington District, Regulatory Division has been reviewing the request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act from the Town of Cary, acting as the lead applicant for the Western Wake Regional Wastewater Management Facilities Project Partners (Western Wake Partners), to construct Regional Wastewater Management Facility. The proposed project consists of regional wastewater pumping, conveyance, treatment, and discharge facilities to serve the Towns of Apex, Cary, Holly Springs and Morrisville, as well as the Wake County portion of Research Triangle Park (RTP South), NC.
Extension of the Public Comment Period for the Draft Environmental Impact Statement for the Moffat Collection System Project, City and County of Denver, Adams County, Boulder County, Jefferson County, and Grand County, CO
The U.S. Army Corps of Engineers (Corps) Omaha District is announcing a 32-day extension of the public comment period for the Moffat Collection System Project (Moffat Project) Draft Environmental Impact Statement (Draft EIS). The originally announced comment period ends on January 28, 2010, but has been extended until March 1, 2010. The original Notice of Availability of the Draft EIS was published in the Federal Register on Friday, October 30, 2009 (74 FR 56186).
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Mather Specific Plan, Sacramento County, CA, Permit Application number SPK-2002-561
The U.S. Army Corps of Engineers, Sacramento District, (Corps) will prepare an Environmental Impact Statement (EIS) for the Mather Specific Plan in Sacramento County, CA. The Sacramento County Department of Economic Development has applied for a Department of the Army permit to fill approximately 35.4 acres of waters of the United States, including wetlands, to construct the project.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the State of Alaska's Proposed Alaska Stand Alone Pipeline (ASAP) Natural Gas Transportation Pipeline
The Alaska District, U.S. Army Corps of Engineers (Corps) intends to prepare a Draft Environmental Impact Statement (DEIS) to identify and analyze the potential impacts associated with the construction of the proposed Alaska Stand Alone Pipeline (ASAP) natural gas transportation pipeline. The Corps is the lead federal agency and the Bureau of Land Management (BLM), National Park Service (NPS) and Environmental Protection Agency (EPA) are participating as cooperating agencies in the DEIS development process. The Environmental Impact Statement (EIS) will be used as a basis for the Corps permit decision and to ensure compliance with the National Environmental Policy Act (NEPA). The Corps will be evaluating a permit application for work under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Because ASAP would require decisions and actions by other federal agencies (such as right-of-way grants and other permits), this DEIS will also fulfill the NEPA responsibilities of those federal agencies.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Proposed Point Thomson Project To Develop the Thomson Sand Reservoir by Extracting Gas Condensate and Oil for the Purpose of Commercial Production as Proposed by the Exxon Mobil Corporation (ExxonMobil)
The Alaska District, U.S. Army Corps of Engineers (Corps) intends to prepare a Draft Environmental Impact Statement (DEIS) to identify and analyze the potential impacts associated with the development of the Thomson Sand Reservoir, including construction and operation of the proposed project. The Corps will be evaluating a permit application for work under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. The Environmental Impact Statement (EIS) will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act.
The Release of the Draft Environmental Impact Statement (DEIS) for the Town of Nags Head Proposed Beach Nourishment Project in Dare County, NC
The U.S. Army Corps of Engineers (COE), Wilmington District, Regulatory Division, has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899, from the Town of Nags Head to dredge up to 4.6 million cubic yards of beach-quality sediment from an offshore borrow source, and deposit the material along approximately 10 miles of ocean shoreline in the Town of Nags Head.
Notice of Intent To Revise Scope of Draft Environmental Impact Statement for Updating the Water Control Manuals for the Apalachicola-Chattahoochee-Flint River Basin To Account for Federal District Court Ruling
Notice is hereby given that the U.S. Army Corps of Engineers (Corps), Mobile District, intends to revise the scope of the Environmental Impact Statement (EIS) for the Water Control Manuals updates for the Apalachicola-Chattahoochee-Flint (ACF) River Basin in Alabama, Florida, and Georgia, to account for a July 17, 2009 Federal court ruling. On July 17, 2009, Judge Paul A. Magnuson issued a memorandum and order in the case In re Tri-State Water Rights Litigation (M.D. Fla. No. 3:07-md-01),
Restricted Areas at Cape Canaveral Air Force Station, Patrick AFB, FL
The U.S. Army Corps of Engineers (Corps) published a document in the Federal Register on July 23, 2009 (74 FR 36400), revising the restricted areas at Cape Canaveral Air Force Station, Patrick Air Force Base (AFB), Florida. The revision included the establishment of a restricted area within the waters of the Atlantic Ocean offshore of the Cape Canaveral Air Force Station. The regulation included information regarding the boundaries of the new restricted area, including a reference to the offshore (eastern) boundary as being 1.5 miles offshore of the mean high water line. The final rule did not reference the type of mile unit to be used for the boundary line of the restricted area. The intent was to use nautical miles as the unit type. Since the use of nautical miles changes the coordinates for the northeast and southeast corner points of the restricted area, we are also correcting those coordinates. This document corrects the final regulation by revising this section.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.