Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report for the Newhall Ranch Resource Management and Development Plan and Spineflower Conservation Plan, Los Angeles County, CA, 34709 [2010-14802]
Download as PDF
Federal Register / Vol. 75, No. 117 / Friday, June 18, 2010 / Notices
Dated: June 10, 2010.
David J. Castanon,
Chief, Regulatory Division, Los Angeles
District.
[FR Doc. 2010–14776 Filed 6–17–10; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Notice of Availability for the Final
Environmental Impact Statement/
Environmental Impact Report for the
Newhall Ranch Resource Management
and Development Plan and
Spineflower Conservation Plan, Los
Angeles County, CA
Department of the Army—U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of availability.
srobinson on DSKHWCL6B1PROD with NOTICES
AGENCY:
SUMMARY: The U.S. Army Corps of
Engineers, Los Angeles District
(Regulatory Division), in coordination
with the California Department of Fish
and Game (CDFG), has completed a
Final Environmental Impact Statement/
Environmental Impact Report (EIS/EIR)
for the Newhall Ranch Resource
Management and Development Plan and
Spineflower Conservation Plan. The
project proponent and landowner, The
Newhall Land and Farming Company,
requires a long-term Section 404 permit
from the Corps of Engineers for
permanent impacts to approximately
93.3 acres of waters of the United States,
including, 20.5 acres of wetlands, for
the construction of various facilities in
waters of the United States associated
with the development of a new
community composed of a broad range
of residential, mixed-use and
nonresidential land uses in the 12,000acre project area located in Santa
Clarita, Los Angeles County, California.
The Corps considered all comments
received in preparing the Final EIS/EIR,
which is available for a 30-day review.
The Final EIS/EIR includes a draft
general conformity determination (see
Section 3.2, Section 4.7 and Appendix
D.7), pursuant to Section 176(c) of the
Clean Air Act. A general conformity
determination is necessary because
construction of the proposed project
would require Federal action (i.e.,
issuance of a Corps permit for activities
proposed in waters of the U.S.) and not
all the Federal action’s direct and
indirect emissions would be below
specified de minimis thresholds (40
CFR 93.153(b)). Pursuant to the general
conformity regulations (40 CFR part 93
Subpart B), general conformity
VerDate Mar<15>2010
16:17 Jun 17, 2010
Jkt 220001
determinations do not have to be
included in the EIS and can be
separately noticed, but the draft general
conformity determination for the
Federal action associated with the
proposed project is being included in
the Final EIS/EIR in this case.
The Final EIS/EIR, including the draft
general conformity determination and a
Draft 404(b)(1) alternatives analysis, is
available for public review during the
next 30 days at the U.S. Army Corps of
Engineers Ventura Office, 2151
Alessandro Drive, Suite 110, Ventura,
California; in addition, the Final EIS/
EIR, including the draft general
conformity determination, is available at
the following libraries: County of Los
Angeles Newhall Branch, Castaic
Branch, Sylmar Branch, Valencia
Branch; County of Ventura Fillmore
Branch and H.P. Wright Library Branch.
The Final EIS/EIR is available at the
Corps’ Web site: https://
www.spl.usace.army.mil/regulatory/
NewhallRanch.htm (see links under
Newhall Ranch) and it is also available
via the CDFG’s Web page: https://
www.dfg.ca.gov/regions/5/newhall/.
Any comments received by the Corps on
the Final EIS/EIR or the included draft
general conformity determination
during the next 30 days will be
considered fully before the Corps makes
a final general conformity determination
and finalizes the Record of Decision
(ROD) for the Federal action associated
with the proposed project. The Corps
will publish a notice of a final general
conformity determination in the Federal
Register within 30 days of rendering a
final decision. The public can request
from the Corps copies of the ROD,
which includes responses to comments
on the Final EIS/EIR, including any on
the draft general conformity
determination, following publication of
a final general conformity determination
and upon execution of the ROD.
FOR FURTHER INFORMATION CONTACT:
Questions or comments concerning the
Final EIS/EIR or the included draft
general conformity determination
should be directed within the next 30
days to Dr. Aaron O. Allen, Chief, North
Coast Branch, Regulatory Division, U.S.
Army Corps of Engineers, 2151
Alessandro Drive, Suite 110, Ventura,
California 93001, (805) 585–2148.
SUPPLEMENTARY INFORMATION:
None.
David J. Castanon,
Chief, Regulatory Division, Los Angeles
District.
[FR Doc. 2010–14802 Filed 6–17–10; 8:45 am]
BILLING CODE 3720–58–P
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
34709
DEPARTMENT OF DEFENSE
Department of the Air Force
[Docket ID USAF–2010–0016]
Privacy Act of 1974; System of
Records
AGENCY:
Department of the Air Force,
DoD.
ACTION: Notice to amend a system of
records.
SUMMARY: The Department of the Air
Force is proposing to amend a system of
records notice in its existing inventory
of records systems subject to the Privacy
Act of 1974, (5 U.S.C. 552a), as
amended.
DATES: The changes will be effective on
July 19, 2010, unless comments are
received that would result in a contrary
determination.
ADDRESSES: You may submit comments,
identified by docket number and title,
by any of the following methods:
• Federal Rulemaking Portal: https://
www.regulations.gov. Follow the
instructions for submitting comments.
• Mail: Federal Docket Management
System Office, 1160 Defense Pentagon,
Washington, DC 20301–1160.
Instructions: All submissions received
must include the agency name and
docket number for this Federal Register
document. The general policy for
comments and other submissions from
members of the public is to make these
submissions available for public
viewing on the Internet at https://
www.regulations.gov as they are
received without change, including any
personal identifiers or contact
information.
FOR FURTHER INFORMATION CONTACT: Mr.
Ben Swilley at (703) 696–6172.
SUPPLEMENTARY INFORMATION: The
Department of the Air Force systems of
records notices subject to the Privacy
Act of 1974, (5 U.S.C. 552a), as
amended, have been published in the
Federal Register and are available from
the Air Force Privacy Act Officer, Office
of Warfighting Integration and Chief
Information Officer, SAF/XCPPF, 1800
Air Force Pentagon, Washington, DC
20330–1800.
The specific changes to the records
system being amended are set forth
below followed by the notice, as
amended, published in its entirety. The
proposed amendments are not within
the purview of subsection (r) of the
Privacy Act of 1974, (5 U.S.C. 552a), as
amended, which requires the
submission of a new or altered system
report.
E:\FR\FM\18JNN1.SGM
18JNN1
Agencies
[Federal Register Volume 75, Number 117 (Friday, June 18, 2010)]
[Notices]
[Page 34709]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-14802]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Notice of Availability for the Final Environmental Impact
Statement/Environmental Impact Report for the Newhall Ranch Resource
Management and Development Plan and Spineflower Conservation Plan, Los
Angeles County, CA
AGENCY: Department of the Army--U.S. Army Corps of Engineers, DoD.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers, Los Angeles District
(Regulatory Division), in coordination with the California Department
of Fish and Game (CDFG), has completed a Final Environmental Impact
Statement/Environmental Impact Report (EIS/EIR) for the Newhall Ranch
Resource Management and Development Plan and Spineflower Conservation
Plan. The project proponent and landowner, The Newhall Land and Farming
Company, requires a long-term Section 404 permit from the Corps of
Engineers for permanent impacts to approximately 93.3 acres of waters
of the United States, including, 20.5 acres of wetlands, for the
construction of various facilities in waters of the United States
associated with the development of a new community composed of a broad
range of residential, mixed-use and nonresidential land uses in the
12,000-acre project area located in Santa Clarita, Los Angeles County,
California. The Corps considered all comments received in preparing the
Final EIS/EIR, which is available for a 30-day review. The Final EIS/
EIR includes a draft general conformity determination (see Section 3.2,
Section 4.7 and Appendix D.7), pursuant to Section 176(c) of the Clean
Air Act. A general conformity determination is necessary because
construction of the proposed project would require Federal action
(i.e., issuance of a Corps permit for activities proposed in waters of
the U.S.) and not all the Federal action's direct and indirect
emissions would be below specified de minimis thresholds (40 CFR
93.153(b)). Pursuant to the general conformity regulations (40 CFR part
93 Subpart B), general conformity determinations do not have to be
included in the EIS and can be separately noticed, but the draft
general conformity determination for the Federal action associated with
the proposed project is being included in the Final EIS/EIR in this
case.
The Final EIS/EIR, including the draft general conformity
determination and a Draft 404(b)(1) alternatives analysis, is available
for public review during the next 30 days at the U.S. Army Corps of
Engineers Ventura Office, 2151 Alessandro Drive, Suite 110, Ventura,
California; in addition, the Final EIS/EIR, including the draft general
conformity determination, is available at the following libraries:
County of Los Angeles Newhall Branch, Castaic Branch, Sylmar Branch,
Valencia Branch; County of Ventura Fillmore Branch and H.P. Wright
Library Branch. The Final EIS/EIR is available at the Corps' Web site:
https://www.spl.usace.army.mil/regulatory/NewhallRanch.htm (see links
under Newhall Ranch) and it is also available via the CDFG's Web page:
https://www.dfg.ca.gov/regions/5/newhall/. Any comments received by the
Corps on the Final EIS/EIR or the included draft general conformity
determination during the next 30 days will be considered fully before
the Corps makes a final general conformity determination and finalizes
the Record of Decision (ROD) for the Federal action associated with the
proposed project. The Corps will publish a notice of a final general
conformity determination in the Federal Register within 30 days of
rendering a final decision. The public can request from the Corps
copies of the ROD, which includes responses to comments on the Final
EIS/EIR, including any on the draft general conformity determination,
following publication of a final general conformity determination and
upon execution of the ROD.
FOR FURTHER INFORMATION CONTACT: Questions or comments concerning the
Final EIS/EIR or the included draft general conformity determination
should be directed within the next 30 days to Dr. Aaron O. Allen,
Chief, North Coast Branch, Regulatory Division, U.S. Army Corps of
Engineers, 2151 Alessandro Drive, Suite 110, Ventura, California 93001,
(805) 585-2148.
SUPPLEMENTARY INFORMATION: None.
David J. Castanon,
Chief, Regulatory Division, Los Angeles District.
[FR Doc. 2010-14802 Filed 6-17-10; 8:45 am]
BILLING CODE 3720-58-P