Department of Energy January 26, 2016 – Federal Register Recent Federal Regulation Documents
Results 1 - 21 of 21
Revised Critical Infrastructure Protection Reliability Standards
The Federal Energy Regulatory Commission (Commission) approves seven critical infrastructure protection (CIP) Reliability Standards: CIP-003-6 (Security Management Controls), CIP-004-6 (Personnel and Training), CIP-006-6 (Physical Security of BES Cyber Systems), CIP-007- 6 (Systems Security Management), CIP-009-6 (Recovery Plans for BES Cyber Systems), CIP-010-2 (Configuration Change Management and Vulnerability Assessments), and CIP-011-2 (Information Protection). The proposed Reliability Standards address the cyber security of the bulk electric system and improve upon the current Commission-approved CIP Reliability Standards. In addition, the Commission directs NERC to develop certain modifications to improve the CIP Reliability Standards.
Notice of Interim Waiver and Request for Waiver From Panasonic Appliances Refrigeration Systems Corporation of America Corporation (PAPRSA) From the Department of Energy Refrigerator and Refrigerator-Freezer Test Procedures
This notice announces receipt of a request for an extension to hybrid basic model PR6180WBC of a previously granted waiver and for an interim waiver from Panasonic Appliances Refrigeration Systems Corporation of America (Case No. RF-043) with respect to the U.S. Department of Energy's electric refrigerator and refrigerator-freezer test procedures. Panasonic seeks to apply the alternative test procedure for measuring the energy usage of similar hybrid wine chiller/beverage center basic models, which DOE required in response to prior waiver requests. Because of a an error discovered in the equation used to calculate the energy usage of these products, DOE has rescinded the prior waivers and is proposing to correct this equation to ensure the accuracy of the calculations provided under the alternative test procedure. DOE solicits comments on its proposed modifications to correct the procedure contained in prior waivers issued to PAPRSA. DOE has issued an interim waiver for hybrid basic model PR6180WBC and all other PAPRSA hybrid basic models previously subject to a waiver.
Proposed Agency Information Collection
The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology.
Orders Granting Authority To Import and Export Natural Gas, To Import and Export Liquefied Natural Gas, Denying Request for Rehearing, and To Vacate Prior Authorization During December 2015
The Office of Fossil Energy (FE) of the Department of Energy gives notice that during December 2015, it issued orders granting authority to import and export natural gas, to import and export liquefied natural gas (LNG), denying request for rehearing, and to vacate prior authority. These orders are summarized in the attached appendix and may be found on the FE Web site at https://energy. gov/fe/ downloads/listing-doefe-authorizationsorders-issued-2015. They are also available for inspection and copying in the U.S. Department of Energy (FE-34), Division of Natural Gas Regulation, Office of Regulation and International Engagement, Office of Fossil Energy, Docket Room 3E-033, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 20585, (202) 586-9478. The Docket Room is open between the hours of 8:00 a.m. and 4:30 p.m., Monday through Friday, except Federal holidays.
Energy Conservation Program: Energy Conservation Standards for Pumps
The Energy Policy and Conservation Act of 1975 (EPCA), as amended, sets forth a variety of provisions designed to improve energy efficiency. Part C of Title III establishes the ``Energy Conservation Program for Certain Industrial Equipment.'' The covered equipment includes pumps. In this final rule, the U.S. Department of Energy (DOE) adopts new energy conservation standards for pumps. DOE has determined that the new energy conservation standards for pumps would result in significant conservation of energy, and are technologically feasible and economically justified.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.