Palo Verde Power; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 4281-4282 [2016-01458]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices
The first page of any filing should
include docket number P–12470–010.
k. Description of Project Facilities:
The unconstructed project is authorized
to be located on the downstream side of
the U.S. Army Corps of Engineers
Broken Bow Re-Regulation Dam. The
project license approved the following
new facilities: (1) Three steel 93.5-footlong penstocks inside the 10-footdiameter outlet conduit; (2) trashracks;
(3) a 112-foot-wide by 23-foot-long
powerhouse containing three generating
units having a total installed capacity of
4.0 megawatts; (4) a tailrace returning
flows to the Little River; (5) a 1,891-footlong, 13.5-kilovolt (kV) primary
transmission; and (6) appurtenant
facilities.
l. Description of Proceeding: On
December 21, 2015, the City of Broken
Bow, Oklahoma filed an application to
surrender the license for the
unconstructed Broken Bow ReRegulation Dam Hydropower Project. In
its filing, the licensee states the project
is not financially feasible or
constructible because it is unable to
enter into a power sales agreement to
sell project energy.
m. This filing may be viewed on the
Commission’s Web site at https://www.
ferc.gov/docs-filing/elibrary.asp. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction in the Commission’s
Public Reference Room located at 888
First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502–8371.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .212
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
VerDate Sep<11>2014
21:57 Jan 25, 2016
Jkt 238001
comment date for the particular
application.
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
q. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01467 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
4281
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14730–000]
Palo Verde Power; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On November 19, 2015, Palo Verde
Power filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Palo Verde Hydroelectric Project (Palo
Verde Project or project) to be located
on the Colorado River, near Blythe,
Riverside County, California. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would be
located near the existing discharge
channel north of Palo Verde Irrigation
District’s Palo Verde diversion dam. The
applicant proposes to generate power by
bypassing the releases the irrigation
district now makes through the
discharge channel’s gates into the
project’s new penstock. The proposed
project would consist of: (1) a new 30foot-long concrete and steel penstock;
(2) a new 45-foot-long, 45-foot-wide
powerhouse containing a single turbine
generator unit with an installed capacity
of 29 megawatts; (3) a tailrace
discharging powerhouse flows to the
existing diversion spill area; (4) less
than a mile of 161-kilovolt transmission
line; and (5) appurtenant facilities. The
project would have an estimated average
annual energy generation of 161
gigawatt-hours. There are no federal
lands associated with the project.
Applicant Contact: Michael Blakey,
Palo Verde Power, 9734 Diablo Vista
Ave., Galt, CA 95632; phone: (209) 251–
3105.
FERC Contact: Jim Fargo; phone: (202)
502–6095.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
E:\FR\FM\26JAN1.SGM
26JAN1
4282
Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14730–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14730) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: January 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01458 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14732–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Energy Resources USA, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing And Soliciting
Comments, Motions To Intervene, and
Competing Applications
On November 27, 2015, Energy
Resources, USA, Inc. filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of a hydropower project
located at the U.S. Army Corps of
Engineers’ (Corps) Green River Lock and
Dam No. 3, located on the Green River
in Muhlenberg County, Kentucky. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
VerDate Sep<11>2014
21:57 Jan 25, 2016
Jkt 238001
The proposed project would consist of
the following: (1) a 770-foot-long, 300foot-wide intake channel with a 85-footlong retaining wall; (2) a 98-foot-long,
82-foot-wide powerhouse containing
two generating units with a total
capacity of 10 megawatts; (3) a 1,000foot-long, 220-foot-wide tailrace with a
40-foot-long retaining wall; (4) a 4.16/69
kilo-Volt (kV) substation; and (5) a 1mile-long, 69 kV transmission line. The
proposed project would have an average
annual generation of 54,900 megawatthours, and operate utilizing surplus
water from the Green River Lock and
Dam No. 3, as directed by the Corps.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA, Inc.,
2655 Le Jeune Road, Suite 804, Coral
Gables, Florida 33134. (954) 248–8425.
FERC Contact: Dustin Wilson,
Dustin.Wilson@ferc.gov; (202) 502–
6528.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14732–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Dated: January 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01460 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–39–000.
Applicants: Bethel Wind Farm LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Bethel Wind Farm
LLC.
Filed Date: 1/20/16.
Accession Number: 20160120–5083.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: EG16–40–000.
Applicants: Tenaska Pennsylvania
Partners, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Tenaska
Pennsylvania Partners, LLC.
Filed Date: 1/19/16.
Accession Number: 20160119–5422.
Comments Due: 5 p.m. ET 2/9/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2331–052;
ER14–630–027; ER10–2319–043; ER10–
2317–043; ER13–1351–025; ER10–2330–
050.
Applicants: J.P. Morgan Ventures
Energy Corporation, AlphaGen Power
LLC, BE Alabama LLC, BE CA LLC,
Florida Power Development LLC, Utility
Contract Funding, L.L.C.
Description: Non-Material Change in
Status of the J.P. Morgan Sellers.
Filed Date: 1/19/16.
Accession Number: 20160119–5414.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER12–1436–010;
ER14–152–005; ER14–153–005; ER14–
154–005; ER13–1793–007; ER10–3300–
010; ER13–2386–006; ER10–3099–016;
ER10–2740–009; ER10–3143–017;
ER10–2742–008; ER12–1260–009;
ER10–2329–007.
Applicants: Eagle Point Power
Generation LLC, Elgin Energy Center,
LLC, Gibson City Energy Center, LLC,
Grand Tower Energy Center, LLC, Hazle
Spindle, LLC, La Paloma Generating
Company, LLC, Lakeswind Power
Partners, LLC, RC Cape May Holdings,
LLC, Rocky Road Power, LLC, Sabine
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 81, Number 16 (Tuesday, January 26, 2016)]
[Notices]
[Pages 4281-4282]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-01458]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14730-000]
Palo Verde Power; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On November 19, 2015, Palo Verde Power filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Palo Verde
Hydroelectric Project (Palo Verde Project or project) to be located on
the Colorado River, near Blythe, Riverside County, California. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would be located near the existing discharge
channel north of Palo Verde Irrigation District's Palo Verde diversion
dam. The applicant proposes to generate power by bypassing the releases
the irrigation district now makes through the discharge channel's gates
into the project's new penstock. The proposed project would consist of:
(1) a new 30-foot-long concrete and steel penstock; (2) a new 45-foot-
long, 45-foot-wide powerhouse containing a single turbine generator
unit with an installed capacity of 29 megawatts; (3) a tailrace
discharging powerhouse flows to the existing diversion spill area; (4)
less than a mile of 161-kilovolt transmission line; and (5) appurtenant
facilities. The project would have an estimated average annual energy
generation of 161 gigawatt-hours. There are no federal lands associated
with the project.
Applicant Contact: Michael Blakey, Palo Verde Power, 9734 Diablo
Vista Ave., Galt, CA 95632; phone: (209) 251-3105.
FERC Contact: Jim Fargo; phone: (202) 502-6095.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments,
[[Page 4282]]
motions to intervene, notices of intent, and competing applications
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14730-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14730) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: January 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01458 Filed 1-25-16; 8:45 am]
BILLING CODE 6717-01-P