4282
Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14730–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14730) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: January 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01458 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14732–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Energy Resources USA, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing And Soliciting
Comments, Motions To Intervene, and
Competing Applications
On November 27, 2015, Energy
Resources, USA, Inc. filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of a hydropower project
located at the U.S. Army Corps of
Engineers’ (Corps) Green River Lock and
Dam No. 3, located on the Green River
in Muhlenberg County, Kentucky. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
VerDate Sep<11>2014
21:57 Jan 25, 2016
Jkt 238001
The proposed project would consist of
the following: (1) a 770-foot-long, 300foot-wide intake channel with a 85-footlong retaining wall; (2) a 98-foot-long,
82-foot-wide powerhouse containing
two generating units with a total
capacity of 10 megawatts; (3) a 1,000foot-long, 220-foot-wide tailrace with a
40-foot-long retaining wall; (4) a 4.16/69
kilo-Volt (kV) substation; and (5) a 1mile-long, 69 kV transmission line. The
proposed project would have an average
annual generation of 54,900 megawatthours, and operate utilizing surplus
water from the Green River Lock and
Dam No. 3, as directed by the Corps.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA, Inc.,
2655 Le Jeune Road, Suite 804, Coral
Gables, Florida 33134. (954) 248–8425.
FERC Contact: Dustin Wilson,
Dustin.Wilson@ferc.gov; (202) 502–
6528.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14732–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Dated: January 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01460 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–39–000.
Applicants: Bethel Wind Farm LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Bethel Wind Farm
LLC.
Filed Date: 1/20/16.
Accession Number: 20160120–5083.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: EG16–40–000.
Applicants: Tenaska Pennsylvania
Partners, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Tenaska
Pennsylvania Partners, LLC.
Filed Date: 1/19/16.
Accession Number: 20160119–5422.
Comments Due: 5 p.m. ET 2/9/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2331–052;
ER14–630–027; ER10–2319–043; ER10–
2317–043; ER13–1351–025; ER10–2330–
050.
Applicants: J.P. Morgan Ventures
Energy Corporation, AlphaGen Power
LLC, BE Alabama LLC, BE CA LLC,
Florida Power Development LLC, Utility
Contract Funding, L.L.C.
Description: Non-Material Change in
Status of the J.P. Morgan Sellers.
Filed Date: 1/19/16.
Accession Number: 20160119–5414.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER12–1436–010;
ER14–152–005; ER14–153–005; ER14–
154–005; ER13–1793–007; ER10–3300–
010; ER13–2386–006; ER10–3099–016;
ER10–2740–009; ER10–3143–017;
ER10–2742–008; ER12–1260–009;
ER10–2329–007.
Applicants: Eagle Point Power
Generation LLC, Elgin Energy Center,
LLC, Gibson City Energy Center, LLC,
Grand Tower Energy Center, LLC, Hazle
Spindle, LLC, La Paloma Generating
Company, LLC, Lakeswind Power
Partners, LLC, RC Cape May Holdings,
LLC, Rocky Road Power, LLC, Sabine
E:\FR\FM\26JAN1.SGM
26JAN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices
Cogen, LP, Tilton Energy LLC,
Stephentown Spindle, LLC, Vineland
Energy LLC
Description: Notice of Change in
Status of the Rockland Sellers.
Filed Date: 1/19/16.
Accession Number: 20160119–5412.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER15–1873–004.
Applicants: Buckeye Wind Energy
LLC.
Description: Notification of Change in
Facts Under Market-Based Rate
Authority of Buckeye Wind Energy LLC.
Filed Date: 1/19/16.
Accession Number: 20160119–5405.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER15–2620–002.
Applicants: Little Elk Wind Project,
LLC.
Description: Compliance filing: Little
Elk Wind Project, LLC MBR Tariff to be
effective 10/1/2015.
Filed Date: 1/20/16.
Accession Number: 20160120–5130.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16–165–001.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Compliance Filing in ER16–165—
Revisions to Clarify Treatment of PTP
Revenues to be effective 1/1/2016.
Filed Date: 1/20/16.
Accession Number: 20160120–5054.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16–518–001.
Applicants: Central Maine Power
Company.
Description: Tariff Amendment:
Amendment to Executed
Interconnection Agreement Hackett
Mills Hydro Associates to be effective 1/
1/2016.
Filed Date: 1/20/16.
Accession Number: 20160120–5094.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16–750–000.
Applicants: Bethel Wind Farm LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 3/21/2016.
Filed Date: 1/20/16.
Accession Number: 20160120–5077.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16–750–001.
Applicants: Bethel Wind Farm LLC.
Description: Tariff Amendment:
Supplement to Application for MarketBased Rate Authorization to be effective
3/21/2016.
Filed Date: 1/20/16.
Accession Number: 20160120–5088.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16–751–000.
Applicants: PJM Interconnection,
L.L.C.
VerDate Sep<11>2014
21:57 Jan 25, 2016
Jkt 238001
Description: Section 205(d) Rate
Filing: Service Agreement No. 4395;
Queue No. AA1–092 to be effective 12/
21/2015.
Filed Date: 1/20/16.
Accession Number: 20160120–5120.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16–752–000.
Applicants: Carousel Wind Farm,
LLC.
Description: Section 205(d) Rate
Filing: Carousel Wind Farm, LLC Notice
of Non-Material Change in Status to be
effective 10/31/2015.
Filed Date: 1/20/16.
Accession Number: 20160120–5131.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16–753–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: Second Revised Service
Agreement No. 2962; Queue Position
W4–016 to be effective 12/21/2015.
Filed Date: 1/20/16.
Accession Number: 20160120–5136.
Comments Due: 5 p.m. ET 2/10/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01463 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
4283
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL00–95–288]
San Diego Gas & Electric Company v.
Sellers of Energy and Ancillary
Services Into Markets Operated by the
California Independent System
Operator Corporation and the
California Power Exchanges; Notice of
Compliance Filing
Take notice that on January 4, 2016,
Shell Energy North America (US), LP
submitted its Compliance Filing to
Order on Rehearing of Opinion No.
536.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 9, 2016.
1 San Diego Gas & Elec. Co. v. Sellers of Energy
& Ancillary Servs., 153 FERC ¶ 61,144 (2015)
(‘‘Order on Rehearing’’), denying rehearing of San
Diego Gas & Elec. Co. v. Sellers of Energy &
Ancillary Servs., Opinion No. 536, 149 FERC
¶ 61,116 (2014) (‘‘Opinion No. 536’’).
Frm 00039
Fmt 4703
Sfmt 4703
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 81, Number 16 (Tuesday, January 26, 2016)]
[Notices]
[Pages 4282-4283]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-01463]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG16-39-000.
Applicants: Bethel Wind Farm LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Bethel Wind Farm LLC.
Filed Date: 1/20/16.
Accession Number: 20160120-5083.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: EG16-40-000.
Applicants: Tenaska Pennsylvania Partners, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Tenaska Pennsylvania Partners, LLC.
Filed Date: 1/19/16.
Accession Number: 20160119-5422.
Comments Due: 5 p.m. ET 2/9/16.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2331-052; ER14-630-027; ER10-2319-043; ER10-
2317-043; ER13-1351-025; ER10-2330-050.
Applicants: J.P. Morgan Ventures Energy Corporation, AlphaGen Power
LLC, BE Alabama LLC, BE CA LLC, Florida Power Development LLC, Utility
Contract Funding, L.L.C.
Description: Non-Material Change in Status of the J.P. Morgan
Sellers.
Filed Date: 1/19/16.
Accession Number: 20160119-5414.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER12-1436-010; ER14-152-005; ER14-153-005; ER14-
154-005; ER13-1793-007; ER10-3300-010; ER13-2386-006; ER10-3099-016;
ER10-2740-009; ER10-3143-017; ER10-2742-008; ER12-1260-009; ER10-2329-
007.
Applicants: Eagle Point Power Generation LLC, Elgin Energy Center,
LLC, Gibson City Energy Center, LLC, Grand Tower Energy Center, LLC,
Hazle Spindle, LLC, La Paloma Generating Company, LLC, Lakeswind Power
Partners, LLC, RC Cape May Holdings, LLC, Rocky Road Power, LLC, Sabine
[[Page 4283]]
Cogen, LP, Tilton Energy LLC, Stephentown Spindle, LLC, Vineland Energy
LLC
Description: Notice of Change in Status of the Rockland Sellers.
Filed Date: 1/19/16.
Accession Number: 20160119-5412.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER15-1873-004.
Applicants: Buckeye Wind Energy LLC.
Description: Notification of Change in Facts Under Market-Based
Rate Authority of Buckeye Wind Energy LLC.
Filed Date: 1/19/16.
Accession Number: 20160119-5405.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER15-2620-002.
Applicants: Little Elk Wind Project, LLC.
Description: Compliance filing: Little Elk Wind Project, LLC MBR
Tariff to be effective 10/1/2015.
Filed Date: 1/20/16.
Accession Number: 20160120-5130.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16-165-001.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Compliance Filing in ER16-165--
Revisions to Clarify Treatment of PTP Revenues to be effective 1/1/
2016.
Filed Date: 1/20/16.
Accession Number: 20160120-5054.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16-518-001.
Applicants: Central Maine Power Company.
Description: Tariff Amendment: Amendment to Executed
Interconnection Agreement Hackett Mills Hydro Associates to be
effective 1/1/2016.
Filed Date: 1/20/16.
Accession Number: 20160120-5094.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16-750-000.
Applicants: Bethel Wind Farm LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization to be effective 3/21/2016.
Filed Date: 1/20/16.
Accession Number: 20160120-5077.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16-750-001.
Applicants: Bethel Wind Farm LLC.
Description: Tariff Amendment: Supplement to Application for
Market-Based Rate Authorization to be effective 3/21/2016.
Filed Date: 1/20/16.
Accession Number: 20160120-5088.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16-751-000.
Applicants: PJM Interconnection, L.L.C.
Description: Section 205(d) Rate Filing: Service Agreement No.
4395; Queue No. AA1-092 to be effective 12/21/2015.
Filed Date: 1/20/16.
Accession Number: 20160120-5120.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16-752-000.
Applicants: Carousel Wind Farm, LLC.
Description: Section 205(d) Rate Filing: Carousel Wind Farm, LLC
Notice of Non-Material Change in Status to be effective 10/31/2015.
Filed Date: 1/20/16.
Accession Number: 20160120-5131.
Comments Due: 5 p.m. ET 2/10/16.
Docket Numbers: ER16-753-000.
Applicants: PJM Interconnection, L.L.C.
Description: Section 205(d) Rate Filing: Second Revised Service
Agreement No. 2962; Queue Position W4-016 to be effective 12/21/2015.
Filed Date: 1/20/16.
Accession Number: 20160120-5136.
Comments Due: 5 p.m. ET 2/10/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01463 Filed 1-25-16; 8:45 am]