City of Broken Bow, Oklahoma; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 4279-4280 [2016-01466]
Download as PDF
4279
Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Satisfies
(Y/N)
Statutory provision
Description
FPA 30(a)(3)(A), as amended by HREA .....
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of
electricity.
The facility is constructed, operated, or maintained for the generation of electric power
and uses for such generation only the hydroelectric potential of a non-federally
owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ........................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing
requirements of Part I of the FPA.
FPA 30(a)(3)(C)(i), as amended by HREA ..
mstockstill on DSK4VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by HREA
Preliminary Determination: The
proposed addition of the hydroelectric
project to the Thoreson Family Ranch’s
existing irrigation conduit will not alter
its primary purpose of distributing
water for irrigation. Thoreson Family
Ranch proposes to continue using the
conduit, as it has historically, to irrigate
fields during July, August, and
September. Therefore, based upon the
above criteria, Commission staff
preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
1 18
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the Web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD16–5) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
CFR 385.2001–2005 (2015).
VerDate Sep<11>2014
21:57 Jan 25, 2016
Jkt 238001
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
Y
Y
Y
Y
Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01461 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12646–014]
City of Broken Bow, Oklahoma; Notice
of Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Surrender of
License.
b. Project No.: 12646–014.
c. Date Filed: December 21, 2015.
d. Licensee: City of Broken Bow,
Oklahoma.
e. Name of Project: Pine Creek Lake
Dam Hydropower Project.
f. Location: The unconstructed project
was licensed to be located at the U.S.
Army Corps of Engineers Pine Creek
Lake Dam on the Little River, near the
town of Broken Bow, McCurtain
County, Oklahoma.
g. Filed Pursuant to: 18 CFR 6.2.
h. Licensee Contact: Ms. Vickie
Pieratt, City of Broken Bow, 210 North
Broadway, Broken Bow, Oklahoma
74728, Telephone: 580–584–2285.
i. FERC Contact: Jennifer Polardino,
(202) 502–6437, Jennifer.Polardino@
ferc.gov.
j. Deadline for filing comments,
interventions and protests is 30 days
from the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests and comments using
E:\FR\FM\26JAN1.SGM
26JAN1
mstockstill on DSK4VPTVN1PROD with NOTICES
4280
Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–12646–014.
k. Description of Project Facilities:
The unconstructed project is authorized
to be located on the downstream side of
the U.S. Army Corps of Engineers Pine
Creek Lake Dam. The project license
approved the following new facilities:
(1) a 130-foot-wide by 23-foot-long
outlet structure connecting to an
existing 13-foot-diameter outlet conduit;
(2) a steel liner inside the 13-footdiameter outlet conduit; (3) a 112-footwide by 73-foot-long powerhouse
containing two generating units having
a total installed capacity of 6.4
megawatts; (4) a tailrace returning flows
to the Little River; (5) a 0.7-mile-long,
14.4-kilovolt (kV) primary transmission;
and (6) appurtenant facilities.
l. Description of Proceeding: On
December 21, 2015, the City of Broken
Bow, Oklahoma filed an application to
surrender the license for the
unconstructed Pine Creek Lake Dam
Hydropower Project. In its filing, the
licensee states the project is not
financially feasible or constructible
because it is unable to enter into a
power sales agreement to sell project
energy.
m. This filing may be viewed on the
Commission’s Web site at https://www.
ferc.gov/docs-filing/elibrary.asp. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction in the Commission’s
Public Reference Room located at 888
First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502–8371.
n. Individuals desiring to be included
on the Commission’s mailing list should
VerDate Sep<11>2014
21:57 Jan 25, 2016
Jkt 238001
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .212
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
q. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01466 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12470–010]
City of Broken Bow, Oklahoma; Notice
of Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Surrender of
License.
b. Project No.: 12470–010.
c. Date Filed: December 21, 2015.
d. Licensee: City of Broken Bow,
Oklahoma.
e. Name of Project: Broken Bow Reregulation Dam Hydropower Project.
f. Location: The unconstructed project
was licensed to be located at the U.S.
Army Corps of Engineers Broken Bow
Re-regulation Dam on the Little River,
near the town of Broken Bow,
McCurtain County, Oklahoma.
g. Filed Pursuant to: 18 CFR 6.2.
h. Licensee Contact: Mr. Larry
Bachman, City of Broken Bow, 210
North Broadway, Broken Bow,
Oklahoma 74728, Telephone: 580–584–
2285.
i. FERC Contact: Jennifer Polardino,
(202) 502–6437, Jennifer.Polardino@
ferc.gov.
j. Deadline for filing comments,
interventions and protests is 30 days
from the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests and comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 81, Number 16 (Tuesday, January 26, 2016)]
[Notices]
[Pages 4279-4280]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-01466]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12646-014]
City of Broken Bow, Oklahoma; Notice of Application Accepted for
Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Proceeding: Surrender of License.
b. Project No.: 12646-014.
c. Date Filed: December 21, 2015.
d. Licensee: City of Broken Bow, Oklahoma.
e. Name of Project: Pine Creek Lake Dam Hydropower Project.
f. Location: The unconstructed project was licensed to be located
at the U.S. Army Corps of Engineers Pine Creek Lake Dam on the Little
River, near the town of Broken Bow, McCurtain County, Oklahoma.
g. Filed Pursuant to: 18 CFR 6.2.
h. Licensee Contact: Ms. Vickie Pieratt, City of Broken Bow, 210
North Broadway, Broken Bow, Oklahoma 74728, Telephone: 580-584-2285.
i. FERC Contact: Jennifer Polardino, (202) 502-6437,
Jennifer.Polardino@ferc.gov.
j. Deadline for filing comments, interventions and protests is 30
days from the issuance date of this notice. The Commission strongly
encourages electronic filing. Please file motions to intervene,
protests and comments using
[[Page 4280]]
the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-12646-014.
k. Description of Project Facilities: The unconstructed project is
authorized to be located on the downstream side of the U.S. Army Corps
of Engineers Pine Creek Lake Dam. The project license approved the
following new facilities: (1) a 130-foot-wide by 23-foot-long outlet
structure connecting to an existing 13-foot-diameter outlet conduit;
(2) a steel liner inside the 13-foot-diameter outlet conduit; (3) a
112-foot-wide by 73-foot-long powerhouse containing two generating
units having a total installed capacity of 6.4 megawatts; (4) a
tailrace returning flows to the Little River; (5) a 0.7-mile-long,
14.4-kilovolt (kV) primary transmission; and (6) appurtenant
facilities.
l. Description of Proceeding: On December 21, 2015, the City of
Broken Bow, Oklahoma filed an application to surrender the license for
the unconstructed Pine Creek Lake Dam Hydropower Project. In its
filing, the licensee states the project is not financially feasible or
constructible because it is unable to enter into a power sales
agreement to sell project energy.
m. This filing may be viewed on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number
excluding the last three digits in the docket number field to access
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction in the Commission's Public Reference Room located at 888
First Street NE., Room 2A, Washington, DC 20426, or by calling (202)
502-8371.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.212 and .214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
p. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license surrender.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
q. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described proceeding. If any agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments.
Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01466 Filed 1-25-16; 8:45 am]