Combined Notice of Filings, 4285-4286 [2016-01457]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices
Windpower, LLC, Kit Carson
Windpower, LLC, Laurel Hill Wind
Energy, LLC, North Allegheny Wind,
LLC, Ohio Valley Electric Corporation,
Seville Solar One LLC, Seville Solar
Two LLC, Silver Sage Windpower, LLC,
Tallbear Seville LLC, Three Buttes
Windpower, LLC, Top of the World
Wind Energy, LLC.
Description: Notification of NonMaterial Change in Status of Duke
Energy Corporation MBR Sellers.
Filed Date: 1/15/16.
Accession Number: 20160115–5676.
Comments Due: 5 p.m. ET 2/5/16.
Docket Numbers: ER15–1019–004.
Applicants: Fowler Ridge IV Wind
Farm LLC.
Description: Notice of Non-Material
Change in Status of Fowler Ridge IV
Wind Farm LLC.
Filed Date: 1/15/16.
Accession Number: 20160115–5650.
Comments Due: 5 p.m. ET 2/5/16.
Docket Numbers: ER15–1861–000.
Applicants: Tucson Electric Power
Company.
Description: Report Filing: Response
to Deficiency Letter to be effective N/A.
Filed Date: 1/19/16.
Accession Number: 20160119–5223.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER16–118–001.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc.
Description: Compliance filing: 2016–
01–19_ALLETE Transmission Rate
Compliance Filing to be effective 1/1/
2016.
Filed Date: 1/19/16.
Accession Number: 20160119–5237.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER16–737–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: Attachment H, Attachment L and
Section 34.8 Clean-up FIling to be
effective 1/1/2016.
Filed Date: 1/15/16.
Accession Number: 20160115–5494.
Comments Due: 5 p.m. ET 2/5/16.
Docket Numbers: ER16–738–000.
Applicants: Colonial Eagle Solar, LLC.
Description: Section 205(d) Rate
Filing: Amendment to MBR Tariff to be
effective 11/20/2015.
Filed Date: 1/15/16.
Accession Number: 20160115–5512.
Comments Due: 5 p.m. ET 2/5/16.
Docket Numbers: ER16–739–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: Original WMPA Service
Agreement No. 4360, Queue No. AA1–
080 to be effective 12/21/2015.
VerDate Sep<11>2014
21:57 Jan 25, 2016
Jkt 238001
Filed Date: 1/19/16.
Accession Number: 20160119–5185.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER16–740–000.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing: ITC
Great Plains, LLC Formula Rate
Compliance Filing to be effective 1/1/
2016.
Filed Date: 1/19/16.
Accession Number: 20160119–5186.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER16–741–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: Original WMPA Service
Agreement No. 4361, Queue No. AA1–
096 to be effective 12/21/2015.
Filed Date: 1/19/16.
Accession Number: 20160119–5191.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER16–742–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: Original Service Agreement No.
4392; Queue AA1–093 (WMPA) to be
effective 12/21/2015.
Filed Date: 1/19/16.
Accession Number: 20160119–5232.
Comments Due: 5 p.m. ET 2/9/16.
Docket Numbers: ER16–744–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
WPPI Energy.
Description: Filing for Authorization
of Regulatory Asset Amount of
Midcontinent Independent System
Operator, Inc., on behalf of WPPI
Energy.
Filed Date: 1/15/16.
Accession Number: 20160115–5681.
Comments Due: 5 p.m. ET 2/5/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
4285
Dated: January 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01453 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16–383–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Section 4(d) Rate Filing:
01/14/16 Negotiated Rates—Sequent
Energy Management (HUB) 3075–89 to
be effective 1/13/2016.
Filed Date: 1/14/16.
Accession Number: 20160114–5154.
Comments Due: 5 p.m. ET 1/26/16.
Docket Numbers: RP16–384–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Section 4(d) Rate Filing:
01/14/16 Negotiated Rates—Mercuria
Energy Gas Trading LLC (HUB) 7540–89
to be effective 1/13/2016.
Filed Date: 1/14/16.
Accession Number: 20160114–5236.
Comments Due: 5 p.m. ET 1/26/16.
Docket Numbers: RP16–385–000.
Applicants: Paiute Pipeline Company.
Description: Section 4(d) Rate Filing:
Nonconforming TSA 48–A to be
effective 1/15/2016.
Filed Date: 1/14/16.
Accession Number: 20160114–5284.
Comments Due: 5 p.m. ET 1/26/16.
Docket Numbers: RP16–386–000.
Applicants: Dominion Transmission,
Inc.
Description: Section 4(d) Rate Filing:
DTI—January 14, 2016 Nonconforming
Service Agreement to be effective 2/1/
2016.
Filed Date: 1/14/16.
Accession Number: 20160114–5291.
Comments Due: 5 p.m. ET 1/26/16.
Docket Numbers: RP16–387–000.
Applicants: Guardian Pipeline, L.L.C.
Description: Section 4(d) Rate Filing:
Negotiated Rate PAL Agreement—
MIECO INC. to be effective 1/15/2016.
Filed Date: 1/14/16.
Accession Number: 20160114–5372.
Comments Due: 5 p.m. ET 1/26/16.
Docket Numbers: RP16–388–000.
Applicants: East Cheyenne Gas
Storage, LLC.
E:\FR\FM\26JAN1.SGM
26JAN1
4286
Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices
Description: Section 4(d) Rate Filing:
ECGS Limited Section 4 Filing to be
effective 2/14/2016.
Filed Date: 1/14/16.
Accession Number: 20160114–5379.
Comments Due: 5 p.m. ET 1/26/16.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
mstockstill on DSK4VPTVN1PROD with NOTICES
Filings in Existing Proceedings
Docket Numbers: RP11–1566–000.
Applicants: Tennessee Gas Pipeline
Company.
Description: Report Filing: Revenue
Sharing Report—2016.
Filed Date: 1/12/16.
Accession Number: 20160112–5122.
Comments Due: 5 p.m. ET 1/25/16.
Docket Numbers: RP15–555–001.
Applicants: Columbia Gas
Transmission, LLC.
Description: Compliance filing TCO
RAM Compliance—LAUF Report.
Filed Date: 1/15/16.
Accession Number: 20160115–5420.
Comments Due: 5 p.m. ET 1/27/16.
Docket Numbers: RP15–557–001.
Applicants: Columbia Gulf
Transmission, LLC.
Description: Compliance filing TRA
LAUF Compliance Report.
Filed Date: 1/15/16.
Accession Number: 20160115–5575.
Comments Due: 5 p.m. ET 1/27/16.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01457 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
21:57 Jan 25, 2016
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–27–000]
Paulsboro Natural Gas Pipeline
Company, LLC; Notice of Intent To
Prepare an Environmental Assessment
for the Proposed Delaware River
Pipeline Relocation Project and
Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Delaware River Pipeline Relocation
Project (project) involving construction
and operation of facilities by Paulsboro
Natural Gas Pipeline Company, LLC
(PNGPC) in Delaware County,
Pennsylvania, and Gloucester County,
New Jersey. The Commission will use
this EA in its decision-making process
to determine whether the project is in
the public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before February
18, 2016.
If you sent comments on this project
to the Commission before the opening of
this docket on December 11, 2015, you
will need to file those comments in
Docket No. CP16–27–000 to ensure they
are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
PNGPC provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site
(www.ferc.gov).
Public Participation
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has expert staff
available to assist you at (202) 502–8258
or efiling@ferc.gov. Please carefully
follow these instructions so that your
comments are properly recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’ as
the filing type; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP16–27–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Room 1A, Washington, DC 20426.
Summary of the Proposed Project
PNGPC is seeking authorization from
the Commission under Sections 7(b) and
7(c) of the Natural Gas Act (NGA) to
relocate, replace, and abandon
approximately 2.4-miles of a 6- and 8inch diameter natural gas pipeline
extending across the Delaware River
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 81, Number 16 (Tuesday, January 26, 2016)]
[Notices]
[Pages 4285-4286]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-01457]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16-383-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Section 4(d) Rate Filing: 01/14/16 Negotiated Rates--
Sequent Energy Management (HUB) 3075-89 to be effective 1/13/2016.
Filed Date: 1/14/16.
Accession Number: 20160114-5154.
Comments Due: 5 p.m. ET 1/26/16.
Docket Numbers: RP16-384-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Section 4(d) Rate Filing: 01/14/16 Negotiated Rates--
Mercuria Energy Gas Trading LLC (HUB) 7540-89 to be effective 1/13/
2016.
Filed Date: 1/14/16.
Accession Number: 20160114-5236.
Comments Due: 5 p.m. ET 1/26/16.
Docket Numbers: RP16-385-000.
Applicants: Paiute Pipeline Company.
Description: Section 4(d) Rate Filing: Nonconforming TSA 48-A to be
effective 1/15/2016.
Filed Date: 1/14/16.
Accession Number: 20160114-5284.
Comments Due: 5 p.m. ET 1/26/16.
Docket Numbers: RP16-386-000.
Applicants: Dominion Transmission, Inc.
Description: Section 4(d) Rate Filing: DTI--January 14, 2016
Nonconforming Service Agreement to be effective 2/1/2016.
Filed Date: 1/14/16.
Accession Number: 20160114-5291.
Comments Due: 5 p.m. ET 1/26/16.
Docket Numbers: RP16-387-000.
Applicants: Guardian Pipeline, L.L.C.
Description: Section 4(d) Rate Filing: Negotiated Rate PAL
Agreement--MIECO INC. to be effective 1/15/2016.
Filed Date: 1/14/16.
Accession Number: 20160114-5372.
Comments Due: 5 p.m. ET 1/26/16.
Docket Numbers: RP16-388-000.
Applicants: East Cheyenne Gas Storage, LLC.
[[Page 4286]]
Description: Section 4(d) Rate Filing: ECGS Limited Section 4
Filing to be effective 2/14/2016.
Filed Date: 1/14/16.
Accession Number: 20160114-5379.
Comments Due: 5 p.m. ET 1/26/16.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP11-1566-000.
Applicants: Tennessee Gas Pipeline Company.
Description: Report Filing: Revenue Sharing Report--2016.
Filed Date: 1/12/16.
Accession Number: 20160112-5122.
Comments Due: 5 p.m. ET 1/25/16.
Docket Numbers: RP15-555-001.
Applicants: Columbia Gas Transmission, LLC.
Description: Compliance filing TCO RAM Compliance--LAUF Report.
Filed Date: 1/15/16.
Accession Number: 20160115-5420.
Comments Due: 5 p.m. ET 1/27/16.
Docket Numbers: RP15-557-001.
Applicants: Columbia Gulf Transmission, LLC.
Description: Compliance filing TRA LAUF Compliance Report.
Filed Date: 1/15/16.
Accession Number: 20160115-5575.
Comments Due: 5 p.m. ET 1/27/16.
Any person desiring to protest in any of the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01457 Filed 1-25-16; 8:45 am]