Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices Windpower, LLC, Kit Carson Windpower, LLC, Laurel Hill Wind Energy, LLC, North Allegheny Wind, LLC, Ohio Valley Electric Corporation, Seville Solar One LLC, Seville Solar Two LLC, Silver Sage Windpower, LLC, Tallbear Seville LLC, Three Buttes Windpower, LLC, Top of the World Wind Energy, LLC. Description: Notification of NonMaterial Change in Status of Duke Energy Corporation MBR Sellers. Filed Date: 1/15/16. Accession Number: 20160115–5676. Comments Due: 5 p.m. ET 2/5/16. Docket Numbers: ER15–1019–004. Applicants: Fowler Ridge IV Wind Farm LLC. Description: Notice of Non-Material Change in Status of Fowler Ridge IV Wind Farm LLC. Filed Date: 1/15/16. Accession Number: 20160115–5650. Comments Due: 5 p.m. ET 2/5/16. Docket Numbers: ER15–1861–000. Applicants: Tucson Electric Power Company. Description: Report Filing: Response to Deficiency Letter to be effective N/A. Filed Date: 1/19/16. Accession Number: 20160119–5223. Comments Due: 5 p.m. ET 2/9/16. Docket Numbers: ER16–118–001. Applicants: Midcontinent Independent System Operator, Inc., ALLETE, Inc. Description: Compliance filing: 2016– 01–19_ALLETE Transmission Rate Compliance Filing to be effective 1/1/ 2016. Filed Date: 1/19/16. Accession Number: 20160119–5237. Comments Due: 5 p.m. ET 2/9/16. Docket Numbers: ER16–737–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: Attachment H, Attachment L and Section 34.8 Clean-up FIling to be effective 1/1/2016. Filed Date: 1/15/16. Accession Number: 20160115–5494. Comments Due: 5 p.m. ET 2/5/16. Docket Numbers: ER16–738–000. Applicants: Colonial Eagle Solar, LLC. Description: Section 205(d) Rate Filing: Amendment to MBR Tariff to be effective 11/20/2015. Filed Date: 1/15/16. Accession Number: 20160115–5512. Comments Due: 5 p.m. ET 2/5/16. Docket Numbers: ER16–739–000. Applicants: PJM Interconnection, L.L.C. Description: Section 205(d) Rate Filing: Original WMPA Service Agreement No. 4360, Queue No. AA1– 080 to be effective 12/21/2015. VerDate Sep<11>2014 21:57 Jan 25, 2016 Jkt 238001 Filed Date: 1/19/16. Accession Number: 20160119–5185. Comments Due: 5 p.m. ET 2/9/16. Docket Numbers: ER16–740–000. Applicants: Southwest Power Pool, Inc. Description: Compliance filing: ITC Great Plains, LLC Formula Rate Compliance Filing to be effective 1/1/ 2016. Filed Date: 1/19/16. Accession Number: 20160119–5186. Comments Due: 5 p.m. ET 2/9/16. Docket Numbers: ER16–741–000. Applicants: PJM Interconnection, L.L.C. Description: Section 205(d) Rate Filing: Original WMPA Service Agreement No. 4361, Queue No. AA1– 096 to be effective 12/21/2015. Filed Date: 1/19/16. Accession Number: 20160119–5191. Comments Due: 5 p.m. ET 2/9/16. Docket Numbers: ER16–742–000. Applicants: PJM Interconnection, L.L.C. Description: Section 205(d) Rate Filing: Original Service Agreement No. 4392; Queue AA1–093 (WMPA) to be effective 12/21/2015. Filed Date: 1/19/16. Accession Number: 20160119–5232. Comments Due: 5 p.m. ET 2/9/16. Docket Numbers: ER16–744–000. Applicants: Midcontinent Independent System Operator, Inc., WPPI Energy. Description: Filing for Authorization of Regulatory Asset Amount of Midcontinent Independent System Operator, Inc., on behalf of WPPI Energy. Filed Date: 1/15/16. Accession Number: 20160115–5681. Comments Due: 5 p.m. ET 2/5/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 4285 Dated: January 19, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–01453 Filed 1–25–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP16–383–000. Applicants: Iroquois Gas Transmission System, L.P. Description: Section 4(d) Rate Filing: 01/14/16 Negotiated Rates—Sequent Energy Management (HUB) 3075–89 to be effective 1/13/2016. Filed Date: 1/14/16. Accession Number: 20160114–5154. Comments Due: 5 p.m. ET 1/26/16. Docket Numbers: RP16–384–000. Applicants: Iroquois Gas Transmission System, L.P. Description: Section 4(d) Rate Filing: 01/14/16 Negotiated Rates—Mercuria Energy Gas Trading LLC (HUB) 7540–89 to be effective 1/13/2016. Filed Date: 1/14/16. Accession Number: 20160114–5236. Comments Due: 5 p.m. ET 1/26/16. Docket Numbers: RP16–385–000. Applicants: Paiute Pipeline Company. Description: Section 4(d) Rate Filing: Nonconforming TSA 48–A to be effective 1/15/2016. Filed Date: 1/14/16. Accession Number: 20160114–5284. Comments Due: 5 p.m. ET 1/26/16. Docket Numbers: RP16–386–000. Applicants: Dominion Transmission, Inc. Description: Section 4(d) Rate Filing: DTI—January 14, 2016 Nonconforming Service Agreement to be effective 2/1/ 2016. Filed Date: 1/14/16. Accession Number: 20160114–5291. Comments Due: 5 p.m. ET 1/26/16. Docket Numbers: RP16–387–000. Applicants: Guardian Pipeline, L.L.C. Description: Section 4(d) Rate Filing: Negotiated Rate PAL Agreement— MIECO INC. to be effective 1/15/2016. Filed Date: 1/14/16. Accession Number: 20160114–5372. Comments Due: 5 p.m. ET 1/26/16. Docket Numbers: RP16–388–000. Applicants: East Cheyenne Gas Storage, LLC. E:\FR\FM\26JAN1.SGM 26JAN1 4286 Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices Description: Section 4(d) Rate Filing: ECGS Limited Section 4 Filing to be effective 2/14/2016. Filed Date: 1/14/16. Accession Number: 20160114–5379. Comments Due: 5 p.m. ET 1/26/16. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. mstockstill on DSK4VPTVN1PROD with NOTICES Filings in Existing Proceedings Docket Numbers: RP11–1566–000. Applicants: Tennessee Gas Pipeline Company. Description: Report Filing: Revenue Sharing Report—2016. Filed Date: 1/12/16. Accession Number: 20160112–5122. Comments Due: 5 p.m. ET 1/25/16. Docket Numbers: RP15–555–001. Applicants: Columbia Gas Transmission, LLC. Description: Compliance filing TCO RAM Compliance—LAUF Report. Filed Date: 1/15/16. Accession Number: 20160115–5420. Comments Due: 5 p.m. ET 1/27/16. Docket Numbers: RP15–557–001. Applicants: Columbia Gulf Transmission, LLC. Description: Compliance filing TRA LAUF Compliance Report. Filed Date: 1/15/16. Accession Number: 20160115–5575. Comments Due: 5 p.m. ET 1/27/16. Any person desiring to protest in any of the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 19, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–01457 Filed 1–25–16; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 21:57 Jan 25, 2016 Jkt 238001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP16–27–000] Paulsboro Natural Gas Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Delaware River Pipeline Relocation Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Delaware River Pipeline Relocation Project (project) involving construction and operation of facilities by Paulsboro Natural Gas Pipeline Company, LLC (PNGPC) in Delaware County, Pennsylvania, and Gloucester County, New Jersey. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EA. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before February 18, 2016. If you sent comments on this project to the Commission before the opening of this docket on December 11, 2015, you will need to file those comments in Docket No. CP16–27–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. PNGPC provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (www.ferc.gov). Public Participation For your convenience, there are three methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’ as the filing type; or (3) You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the project docket number (CP16–27– 000) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. Summary of the Proposed Project PNGPC is seeking authorization from the Commission under Sections 7(b) and 7(c) of the Natural Gas Act (NGA) to relocate, replace, and abandon approximately 2.4-miles of a 6- and 8inch diameter natural gas pipeline extending across the Delaware River E:\FR\FM\26JAN1.SGM 26JAN1

Agencies

[Federal Register Volume 81, Number 16 (Tuesday, January 26, 2016)]
[Notices]
[Pages 4285-4286]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-01457]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP16-383-000.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: Section 4(d) Rate Filing: 01/14/16 Negotiated Rates--
Sequent Energy Management (HUB) 3075-89 to be effective 1/13/2016.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5154.
    Comments Due: 5 p.m. ET 1/26/16.

    Docket Numbers: RP16-384-000.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: Section 4(d) Rate Filing: 01/14/16 Negotiated Rates--
Mercuria Energy Gas Trading LLC (HUB) 7540-89 to be effective 1/13/
2016.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5236.
    Comments Due: 5 p.m. ET 1/26/16.

    Docket Numbers: RP16-385-000.
    Applicants: Paiute Pipeline Company.
    Description: Section 4(d) Rate Filing: Nonconforming TSA 48-A to be 
effective 1/15/2016.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5284.
    Comments Due: 5 p.m. ET 1/26/16.

    Docket Numbers: RP16-386-000.
    Applicants: Dominion Transmission, Inc.
    Description: Section 4(d) Rate Filing: DTI--January 14, 2016 
Nonconforming Service Agreement to be effective 2/1/2016.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5291.
    Comments Due: 5 p.m. ET 1/26/16.

    Docket Numbers: RP16-387-000.
    Applicants: Guardian Pipeline, L.L.C.
    Description: Section 4(d) Rate Filing: Negotiated Rate PAL 
Agreement--MIECO INC. to be effective 1/15/2016.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5372.
    Comments Due: 5 p.m. ET 1/26/16.

    Docket Numbers: RP16-388-000.
    Applicants: East Cheyenne Gas Storage, LLC.

[[Page 4286]]

    Description: Section 4(d) Rate Filing: ECGS Limited Section 4 
Filing to be effective 2/14/2016.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5379.
    Comments Due: 5 p.m. ET 1/26/16.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

Filings in Existing Proceedings

    Docket Numbers: RP11-1566-000.
    Applicants: Tennessee Gas Pipeline Company.
    Description: Report Filing: Revenue Sharing Report--2016.
    Filed Date: 1/12/16.
    Accession Number: 20160112-5122.
    Comments Due: 5 p.m. ET 1/25/16.

    Docket Numbers: RP15-555-001.
    Applicants: Columbia Gas Transmission, LLC.
    Description: Compliance filing TCO RAM Compliance--LAUF Report.
    Filed Date: 1/15/16.
    Accession Number: 20160115-5420.
    Comments Due: 5 p.m. ET 1/27/16.

    Docket Numbers: RP15-557-001.
    Applicants: Columbia Gulf Transmission, LLC.
    Description: Compliance filing TRA LAUF Compliance Report.
    Filed Date: 1/15/16.
    Accession Number: 20160115-5575.
    Comments Due: 5 p.m. ET 1/27/16.

    Any person desiring to protest in any of the above proceedings must 
file in accordance with Rule 211 of the Commission's Regulations (18 
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified 
comment date.
    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: January 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01457 Filed 1-25-16; 8:45 am]
BILLING CODE 6717-01-P