Thoreson Family Ranch, LLC; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 4278-4279 [2016-01461]
Download as PDF
4278
Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices
Environmental Mailing List
The environmental mailing list
federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American Tribes;
other interested parties; and local
libraries and newspapers. This list also
includes all affected landowners (as
defined in the Commission’s
regulations) who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within certain
distances of aboveground facilities, and
anyone who submits comments on the
project. We will update the
environmental mailing list as the
analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies of the EA will be sent to the
environmental mailing list for public
review and comment. If you would
prefer to receive a paper copy of the
document instead of the CD version or
would like to remove your name from
the mailing list, please return the
attached Information Request (appendix
2).
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01464 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the ‘‘Document-less
Intervention Guide’’ under the ‘‘e-filing’’
link on the Commission’s Web site.
Motions to intervene are more fully
described at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
mstockstill on DSK4VPTVN1PROD with NOTICES
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP16–28). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
VerDate Sep<11>2014
21:57 Jan 25, 2016
Jkt 238001
Filings Instituting Proceedings
Docket Numbers: RP16–381–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: Section 4(d) Rate Filing:
LSS and SS–2 Tracker Effective
November 1, 2015 to be effective 11/1/
2015.
Filed Date: 1/13/16.
Accession Number: 20160113–5104.
Comments Due: 5 p.m. ET 1/25/16.
Docket Numbers: RP16–382–000.
Applicants: Alliance Pipeline L.P.
Description: Section 4(d) Rate Filing:
Contract 1000591 Correction & Others to
be effective 12/1/2015.
Filed Date: 1/13/16.
Accession Number: 20160113–5246.
Comments Due: 5 p.m. ET 1/25/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Dated: January 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01454 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD16–5–000]
Becoming an Intervenor
Additional Information
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Thoreson Family Ranch, LLC; Notice
of Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On January 5, 2016, as supplemented
on January 14 and 15, 2016, Thoreson
Family Ranch, LLC, filed a notice of
intent to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Thoreson
Family Ranch Project would have an
installed capacity of 2 kilowatts (kW),
and would be located at the end of an
existing 6-inch-diameter irrigation
pipeline. The project would be located
near Cottage Grove, in Lane County,
Oregon.
Applicant Contact: Stephen Joel
Thoreson, 319 North 20th Street,
Cottage Grove, Oregon 97424, Phone No.
(541) 942–7407.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) An existing
pump house, approximately 8 feet by 10
feet, at the end of an existing 6-inchdiameter irrigation pipeline; (2) one
turbine/generator unit with an installed
capacity of 2 kW; (3) an approximately
5-foot-long tailrace, discharging to
Damewood Creek; and (4) appurtenant
facilities.
The proposed project would have a
total installed capacity of 2 kW.
E:\FR\FM\26JAN1.SGM
26JAN1
4279
Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Satisfies
(Y/N)
Statutory provision
Description
FPA 30(a)(3)(A), as amended by HREA .....
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of
electricity.
The facility is constructed, operated, or maintained for the generation of electric power
and uses for such generation only the hydroelectric potential of a non-federally
owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ........................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing
requirements of Part I of the FPA.
FPA 30(a)(3)(C)(i), as amended by HREA ..
mstockstill on DSK4VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by HREA
Preliminary Determination: The
proposed addition of the hydroelectric
project to the Thoreson Family Ranch’s
existing irrigation conduit will not alter
its primary purpose of distributing
water for irrigation. Thoreson Family
Ranch proposes to continue using the
conduit, as it has historically, to irrigate
fields during July, August, and
September. Therefore, based upon the
above criteria, Commission staff
preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
1 18
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the Web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD16–5) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
CFR 385.2001–2005 (2015).
VerDate Sep<11>2014
21:57 Jan 25, 2016
Jkt 238001
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
Y
Y
Y
Y
Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01461 Filed 1–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12646–014]
City of Broken Bow, Oklahoma; Notice
of Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Surrender of
License.
b. Project No.: 12646–014.
c. Date Filed: December 21, 2015.
d. Licensee: City of Broken Bow,
Oklahoma.
e. Name of Project: Pine Creek Lake
Dam Hydropower Project.
f. Location: The unconstructed project
was licensed to be located at the U.S.
Army Corps of Engineers Pine Creek
Lake Dam on the Little River, near the
town of Broken Bow, McCurtain
County, Oklahoma.
g. Filed Pursuant to: 18 CFR 6.2.
h. Licensee Contact: Ms. Vickie
Pieratt, City of Broken Bow, 210 North
Broadway, Broken Bow, Oklahoma
74728, Telephone: 580–584–2285.
i. FERC Contact: Jennifer Polardino,
(202) 502–6437, Jennifer.Polardino@
ferc.gov.
j. Deadline for filing comments,
interventions and protests is 30 days
from the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests and comments using
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 81, Number 16 (Tuesday, January 26, 2016)]
[Notices]
[Pages 4278-4279]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-01461]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD16-5-000]
Thoreson Family Ranch, LLC; Notice of Preliminary Determination
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On January 5, 2016, as supplemented on January 14 and 15, 2016,
Thoreson Family Ranch, LLC, filed a notice of intent to construct a
qualifying conduit hydropower facility, pursuant to section 30 of the
Federal Power Act (FPA), as amended by section 4 of the Hydropower
Regulatory Efficiency Act of 2013 (HREA). The proposed Thoreson Family
Ranch Project would have an installed capacity of 2 kilowatts (kW), and
would be located at the end of an existing 6-inch-diameter irrigation
pipeline. The project would be located near Cottage Grove, in Lane
County, Oregon.
Applicant Contact: Stephen Joel Thoreson, 319 North 20th Street,
Cottage Grove, Oregon 97424, Phone No. (541) 942-7407.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) An existing pump house, approximately 8
feet by 10 feet, at the end of an existing 6-inch-diameter irrigation
pipeline; (2) one turbine/generator unit with an installed capacity of
2 kW; (3) an approximately 5-foot-long tailrace, discharging to
Damewood Creek; and (4) appurtenant facilities.
The proposed project would have a total installed capacity of 2 kW.
[[Page 4279]]
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the Y
HREA. facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii), as The facility has an Y
amended by HREA. installed capacity
that does not exceed
5 megawatts.
FPA 30(a)(3)(C)(iii), as On or before August 9, Y
amended by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed addition of the
hydroelectric project to the Thoreson Family Ranch's existing
irrigation conduit will not alter its primary purpose of distributing
water for irrigation. Thoreson Family Ranch proposes to continue using
the conduit, as it has historically, to irrigate fields during July,
August, and September. Therefore, based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility, which is
not required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the Web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (i.e., CD16-5) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call
(202) 502-8659.
Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01461 Filed 1-25-16; 8:45 am]
BILLING CODE 6717-01-P