Department of Energy August 2005 – Federal Register Recent Federal Regulation Documents
Results 1 - 50 of 308
Environmental Management Site-Specific Advisory Board, Savannah River
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EMSSAB), Savannah River. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Agency Information Collection Activities: Proposed Collection; Cancellation of Comment Request
On June 30, 2005, the EIA issued a Federal Register notice (70 FR 37798) soliciting comments on EIA's Voluntary Reporting of Greenhouse Gases Program (Form EIA-1605). Upon further consideration, EIA has decided to cancel the request for comments on the proposed revised form and instructions for the Program.
Notice of Availability of the Environmental Assessment Supporting the Department of Energy's Application to the Department of the Interior for a Public Land Order To Withdraw Public Lands Within and Around the Caliente Rail Corridor, Nevada, From Surface Entry and New Mining Claims
This notice announces the availability, and opportunity for public review and comment, of the environmental assessment (EA) that supports the Department of Energy's (DOE) application to the Department of the Interior, filed with the Bureau of Land Management (BLM), for a Public Land Order to withdraw public lands within and surrounding the Caliente Rail Corridor. As applied for, the withdrawal would preclude surface entry and new mining claim locations for a 20 year period.
Environmental Management Site-Specific Advisory Board, Savannah River
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EMSSAB), Savannah River. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Environmental Management Site-Specific Advisory Board, Idaho National Laboratory
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EMSSAB), Idaho National Laboratory. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Environmental Management Site-Specific Advisory Board, Paducah
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EMSSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Washoe Project-Rate Order No. WAPA-119
The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-119 and Rate Schedule SNF-6, placing a non-firm power formula rate from the Stampede Powerplant of the Washoe Project (Stampede) of the Western Area Power Administration (Western) into effect on an interim basis. The provisional formula rate will be in effect until the Federal Energy Regulatory Commission (Commission) confirms, approves, and places it into effect on a final basis or until replaced by other rates. The provisional rate will provide sufficient revenue to pay all annual costs, including interest expense, and repay power investment and irrigation aid, within the allowable periods.
Sam Rayburn Dam Power Rate
The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2005 Power Repayment Studies that show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are required due to significant increases in expected U.S. Army Corps of Engineers' generation investment and slight increases in operations and maintenance expenses at the project. The Administrator has developed a proposed Sam Rayburn Dam rate schedule, which is supported by a power repayment study, to recover the required revenues. Beginning January 1, 2006, the proposed rate would increase annual revenues 12 percent from $2,513,724 to $2,816,064.
Robert D. Willis Power Rate
The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2005 Power Repayment Studies that show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are required primarily due to significant increases in expected U.S. Army Corps of Engineers' generation investment and increases in operations and maintenance expenses at the project. The Administrator has developed a proposed Robert D. Willis rate schedule, which is supported by a power repayment study, to recover the required revenues. Beginning January 1, 2006, the proposed rates would increase annual revenues approximately 43.1 percent from $452,952 to $648,096.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.