Alternatives Unlimited, Inc.; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 51773-51774 [E5-4736]
Download as PDF
Federal Register / Vol. 70, No. 168 / Wednesday, August 31, 2005 / Notices
An existing mine adit spillway; (2) a 24inch, 4,100-foot-long steel penstock; (3)
a powerhouse containing two units
having a total installed capacity of 500
kW; (4) a 200-foot-long tailrace; (5) a
new 15 kV transmission line; and (6)
appurtenant facilities. There are neither
dams nor reservoirs associated with this
proposed project.
The project would have an annual
generation of 1.34 GWh. The applicant
anticipates generated power will feed
into the nearby existing electrical grid
system and interconnect with an
existing distribution system in the town
of Ophir.
l. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h.
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
VerDate Aug<18>2005
16:33 Aug 30, 2005
Jkt 205001
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
p. Notice of Intent—a notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letter the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and the number of copies
provided by the Commission’s
regulations to: The Secretary, Federal
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
51773
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
t. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4735 Filed 8–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12608–000]
Alternatives Unlimited, Inc.; Notice of
Application Tendered for Filing With
the Commission, Soliciting Additional
Study Requests, and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
August 23, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
From Licensing.
b. Project No.: P–12608–000.
c. Date Filed: August 15, 2005.
d. Applicant: Alternatives Unlimited,
Inc.
e. Name of Project: Alternatives
Hydro Power Project
f. Location: On the Mumford River in
the Town of Northbridge, Worcester
County, Massachusetts. The project does
not utilize lands of the United States.
g. Filed Pursuant to: Public Utilities
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Kathleen D.
Hervol, Beals and Thomas, Inc.,
Reservoir Corporate Center, 144
Turnpike Road (Road 9), Southborough,
MA 01772–6232, (508) 366–0560.
i. FERC Contact: Stefanie Harris, (202)
502–6653 or stefanie.harris@ferc.gov.
j. Cooperating Agencies: We are
asking Federal, State, and local agencies
and Indian tribes with jurisdiction and/
or special expertise with respect to
E:\FR\FM\31AUN1.SGM
31AUN1
51774
Federal Register / Vol. 70, No. 168 / Wednesday, August 31, 2005 / Notices
environmental issues to cooperate with
us in the preparation of the
environmental document. Agencies who
would like to request cooperating status
should follow the instructions for filing
comments described in item l below.
k. Pursuant to Section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: October 14, 2005.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Additional study requests and
requests for cooperating agency status
may be filed electronically via the
internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
(https://www.ferc.gov) under the
‘‘eFiling’’ link.
m. This application is not ready for
environmental analysis at this time.
n. Description of Project: The
Alternatives Hydro Power Project
consists of: (1) The existing 127-footlong by 15.5-foot-high Ring Shop Dam
consisting of a concrete 9.5-foot-high
spillway topped with 2.5-foot-high
flashboards, a waste gate, and two inlet
structures located at the north and south
ends of the spillway; (2) a 2-acre
reservoir with a normal full pond
elevation of 285.1 feet above mean sea
level; (3) a restored 8-foot-wide head
gated intake structure; (4) a new 23-foot
by 6-foot metal service platform (to be
enclosed for a future powerhouse)
located at the south side of the dam
containing three generating units with a
VerDate Aug<18>2005
16:33 Aug 30, 2005
Jkt 205001
total installed capacity of 45 kilowatts;
and (5) appurtenant facilities. The
restored project would have an average
annual generation of 340 megawatthours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the three digits in the
docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Massachusetts
State Historic Preservation Officer
(SHPO), as required by section 106,
National Historic Preservation Act, and
the regulations of the Advisory Council
on Historic Preservation, 36 CFR 800.4.
q. Procedural schedule and final
amendments: The application will be
processed according to the following
Hydro Licensing Schedule. Revisions to
the schedule will be made as
appropriate. The Commission staff
proposes to issue one environmental
assessment rather than issue a draft and
final EA. Comments, terms and
conditions, recommendations,
prescriptions, and reply comments, if
any, will be addressed in an EA. Staff
intents to give at least 30 days for
entities to comment on the EA, and will
take into consideration all comments
received on the EA before final action is
taken on the license application.
Issue Acceptance Letter or Deficiency
Letter—October 2005
Issue Scoping Document—February 2006
Notice of application is ready for
environmental analysis—April 2006
Notice of the availability of the EA—October
2006
Ready for Commission’s decision on the
application—December 2006
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
date of the notice of ready for
environmental analysis.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4736 Filed 8–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters
August 23, 2005.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2413–070.
c. Date Filed: July 27, 2005.
d. Applicant: Georgia Power
Company.
e. Name of Project: Wallace Dam
Project.
f. Location: The proposed
development is located on Lake Oconee
in Putnam County, Georgia. This project
does not occupy any Federal or tribal
lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a), 825(r) and 799
and 801.
h. Applicant Contact: Mr. Lee Glenn,
Georgia Power Company, 125 Wallace
Dam Road, NE., Eatonton, GA 31024,
(706) 485–8704.
i. FERC Contact: Any questions on
this notice should be addressed to
Shana High at (202) 502–8764, or e-mail
address: shana.high@ferc.gov.
j. Deadline for filing comments and/
or motions: September 12, 2005.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Please include the project number (P–
2413–070) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
k. Description of Request: Georgia
Power Company is seeking Commission
approval to permit the construction of
two, ten slip docks on approximately
1.1 acres within the project boundary.
The proposed docks are adjacent to a
condominium development that is
E:\FR\FM\31AUN1.SGM
31AUN1
Agencies
[Federal Register Volume 70, Number 168 (Wednesday, August 31, 2005)]
[Notices]
[Pages 51773-51774]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4736]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12608-000]
Alternatives Unlimited, Inc.; Notice of Application Tendered for
Filing With the Commission, Soliciting Additional Study Requests, and
Establishing Procedural Schedule for Licensing and Deadline for
Submission of Final Amendments
August 23, 2005.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption From Licensing.
b. Project No.: P-12608-000.
c. Date Filed: August 15, 2005.
d. Applicant: Alternatives Unlimited, Inc.
e. Name of Project: Alternatives Hydro Power Project
f. Location: On the Mumford River in the Town of Northbridge,
Worcester County, Massachusetts. The project does not utilize lands of
the United States.
g. Filed Pursuant to: Public Utilities Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
h. Applicant Contact: Kathleen D. Hervol, Beals and Thomas, Inc.,
Reservoir Corporate Center, 144 Turnpike Road (Road 9), Southborough,
MA 01772-6232, (508) 366-0560.
i. FERC Contact: Stefanie Harris, (202) 502-6653 or
stefanie.harris@ferc.gov.
j. Cooperating Agencies: We are asking Federal, State, and local
agencies and Indian tribes with jurisdiction and/or special expertise
with respect to
[[Page 51774]]
environmental issues to cooperate with us in the preparation of the
environmental document. Agencies who would like to request cooperating
status should follow the instructions for filing comments described in
item l below.
k. Pursuant to Section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: October 14, 2005.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Additional study requests and requests for cooperating agency
status may be filed electronically via the internet in lieu of paper.
The Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
at (https://www.ferc.gov) under the ``eFiling'' link.
m. This application is not ready for environmental analysis at this
time.
n. Description of Project: The Alternatives Hydro Power Project
consists of: (1) The existing 127-foot-long by 15.5-foot-high Ring Shop
Dam consisting of a concrete 9.5-foot-high spillway topped with 2.5-
foot-high flashboards, a waste gate, and two inlet structures located
at the north and south ends of the spillway; (2) a 2-acre reservoir
with a normal full pond elevation of 285.1 feet above mean sea level;
(3) a restored 8-foot-wide head gated intake structure; (4) a new 23-
foot by 6-foot metal service platform (to be enclosed for a future
powerhouse) located at the south side of the dam containing three
generating units with a total installed capacity of 45 kilowatts; and
(5) appurtenant facilities. The restored project would have an average
annual generation of 340 megawatt-hours.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the three digits in the docket
number field to access the document. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866)
208-3676, or for TTY, contact (202) 502-8659. A copy is also available
for inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
p. With this notice, we are initiating consultation with the
Massachusetts State Historic Preservation Officer (SHPO), as required
by section 106, National Historic Preservation Act, and the regulations
of the Advisory Council on Historic Preservation, 36 CFR 800.4.
q. Procedural schedule and final amendments: The application will
be processed according to the following Hydro Licensing Schedule.
Revisions to the schedule will be made as appropriate. The Commission
staff proposes to issue one environmental assessment rather than issue
a draft and final EA. Comments, terms and conditions, recommendations,
prescriptions, and reply comments, if any, will be addressed in an EA.
Staff intents to give at least 30 days for entities to comment on the
EA, and will take into consideration all comments received on the EA
before final action is taken on the license application.
Issue Acceptance Letter or Deficiency Letter--October 2005
Issue Scoping Document--February 2006
Notice of application is ready for environmental analysis--April
2006
Notice of the availability of the EA--October 2006
Ready for Commission's decision on the application--December 2006
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Magalie R. Salas,
Secretary.
[FR Doc. E5-4736 Filed 8-30-05; 8:45 am]