Combined Notice of Filings #1, 51031-51033 [E5-4705]
Download as PDF
Federal Register / Vol. 70, No. 166 / Monday, August 29, 2005 / Notices
Coordinator, at the address and phone
number listed above.
Issued at Washington, DC, on August 24,
2005.
Rachel Samuel,
Deputy Advisory Committee Management
Officer.
[FR Doc. 05–17108 Filed 8–26–05; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board, Savannah
River
Department of Energy.
Notice of open meeting.
AGENCY:
ACTION:
SUMMARY: This notice announces a
meeting of the Environmental
Management Site-Specific Advisory
Board (EMSSAB), Savannah River. The
Federal Advisory Committee Act (Pub.
L. No. 92–463, 86 Stat. 770) requires
that public notice of this meeting be
announced in the Federal Register.
DATES: Monday, September 26, 2005, 1
p.m.–6 p.m.
Tuesday, September 27, 2005, 8:30
a.m.–4 p.m.
ADDRESSES: Holiday Inn Coliseum at the
University of South Carolina, 630
Assembly Street, Columbia, SC 29201.
FOR FURTHER INFORMATION CONTACT:
Gerri Flemming, Closure Project Office,
Department of Energy Savannah River
Operations Office, P.O. Box A, Aiken,
SC 29802; Phone: (803) 952–7886.
SUPPLEMENTARY INFORMATION: Purpose of
the Board: The purpose of the Board is
to make recommendations to DOE in the
areas of environmental restoration,
waste management, and related
activities.
Tentative Agenda
Monday, September 26, 2005
1 p.m.
Combined Committee Session.
5:15 p.m.
Adjourn.
5:15 p.m.
Executive Committee Meeting.
6 p.m.
Adjourn.
Tuesday, September 27, 2005
8:30 a.m.
Approval of Minutes, Agency
Updates.
9 a.m.
Public Comment Session.
9:15 a.m.
Chair and Facilitator Update.
9:45 a.m.
Waste Management Committee
VerDate Aug<18>2005
15:17 Aug 26, 2005
Jkt 205001
Report.
11:45 a.m.
Public Comments.
12 p.m.
Lunch Break.
1 p.m.
National Nuclear Security
Administration.
1:30 p.m.
Facilities Disposition & Site
Remediation Committee Report.
2 p.m.
Strategic and Legacy Management
Committee Report.
2:45 p.m.
Nuclear Materials Committee Report.
3:30 p.m.
Administrative Committee Report.
3:50 p.m.
Public Comments.
4 p.m.
Adjourn.
If needed, time will be allotted after
public comments for items added to the
agenda, and administrative details. A
final agenda will be available at the
meeting Monday, September 26, 2005.
Public Participation: The meeting is
open to the public. Written statements
may be filed with the Board either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact Gerri Flemming’s office at the
address or telephone listed above.
Requests must be received five days
prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct business. Individuals wishing
to make public comment will be
provided a maximum of five minutes to
present their comments.
Minutes: The minutes of this meeting
will be available for public review and
copying at the U.S. Department of
Energy’s Freedom of Information Public
Reading Room, 1E–190, Forrestal
Building, 1000 Independence Avenue,
SW., Washington, DC 20585 between 9
a.m. and 4 p.m., Monday through
Friday, except Federal holidays.
Minutes will also be available by
writing to Gerri Flemming, Department
of Energy Savannah River Operations
Office, P.O. Box A, Aiken, SC 29802, or
by calling her at (803) 952–7886.
Issued at Washington, DC, on August 24,
2005.
Rachel M. Samuel,
Deputy Advisory Committee Management
Officer.
[FR Doc. 05–17109 Filed 8–26–05; 8:45 am]
BILLING CODE 6450–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
51031
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
August 23, 2005.
Take notice that the Commission
received the following electric rate
filings.
Docket Numbers: ER97–2904–006.
Applicants: Lake Benton Power
Partners, LLC.
Description: Lake Benton Power
Partners, LLC submits it’s triennial
market power review in support of its
market-based rate authority and request
for market-based rate authority for sales
of ancillary services.
Filed Date: 07/28/2005.
Accession Number: 20050801–0020.
Comment Date: 5 p.m. eastern time on
Friday, September 2, 2005.
Docket Numbers: ER98–4515–003.
Applicants: Cadillac Renewable
Energy LLC.
Description: Cadillac Renewable
Energy LLC submits its updated market
power study and an amendment to its
market-based rate tariff.
Filed Date: 07/28/2005.
Accession Number: 20050804–0011.
Comment Date: 5 p.m. eastern time on
Friday, September 2, 2005.
Docket Numbers: ER99–1228–004.
Applicants: Storm Lake Power
Partners II, LLC.
Description: Storm Lake Power
Partners II, LLC submits its triennial
market power review and a request for
market-based rate authority for sales of
ancillary services.
Filed Date: 07/28/2005.
Accession Number: 20050801–0019.
Comment Date: 5 p.m. eastern time on
Friday, September 2, 2005.
Docket Numbers: ER01–2398–010.
Applicants: Liberty Electric Power,
LLC.
Description: Liberty Electric Power,
LLC supplements its 7/7/05 compliance
filing as amended on 7/20/05 and
tenders for filing a revised tariff sheet
designated as FERC Electric Tariff, First
Revised Volume No. 1, Substitute
Original Sheet No. 2.
Filed Date: 08/18/2005.
Accession Number: 20050822–0079.
Comment Date: 5 p.m. eastern time on
Thursday, September 08, 2005.
Docket Numbers: ER02–1695–002.
Applicants: Cabazon Power Partners
LLC.
Description: Cabazon Power Partners
LLC submits notice of change status and
motion to withdraw its qualifying
status.
E:\FR\FM\29AUN1.SGM
29AUN1
51032
Federal Register / Vol. 70, No. 166 / Monday, August 29, 2005 / Notices
Filed Date: 05/17/2005.
Accession Number: 20050519–0110.
Comment Date: 5 p.m. eastern time on
Friday, September 2, 2005.
Docket Numbers: ER03–715–003.
Applicants: Marina Energy, L.L.C.
Description: Marina Energy, L.L.C.
submits Substitute Original Sheet No. 2
to its Original Rate Schedule No. 1, in
compliance with Commission’s letter
order issued 7/20/05 in Docket No.
ER03–715–002.
Filed Date: 08/18/2005.
Accession Number: 20050822–0081.
Comment Date: 5 p.m. eastern time on
Thursday, September 08, 2005.
Docket Numbers: ER04–23–014.
Applicants: Devon Power LLC,
Middletown Power LLC; Montville
Power LLC; Norwalk Power LLC .
Description: Devon Power, LLC;
Middletown Power LLC; Montville
Power LLC; Norwalk Power LLC
(collectively, NRG) submit a Revised
Schedule No. 1 to the Cost-of-Service
Agreement among NRG and ISO New
England Inc., a refund report of the
refunds made by NRG to ISO New
England, and a report of the payments
made by ISO New England to NRG.
Filed Date: 08/17/2005.
Accession Number: 20050822–0087.
Comment Date: 5 p.m. eastern time on
Wednesday, September 07, 2005.
Docket Numbers: ER05–725–003.
Applicants: Deephaven RV Sub Fund
Ltd.
Description: Deephaven RV Sub Fund
Ltd. submits First Revised 3 to Rate
Schedule No. 1 containing corrected
language for Market Behavior Rule 2(B).
Filed Date: 08/17/2005.
Accession Number: 20050822–0078.
Comment Date: 5 p.m. eastern time on
Wednesday, September 07, 2005.
Docket Numbers: ER05–810–002.
Applicants: UGI Energy Services, Inc.
Description: UGI Energy Services, Inc.
submits substitute original Sheet No. 3,
to its FERC Electric Tariff No. 1, in
compliance with the Commission’s
letter order issued 7/20/05 in Docket
Nos. ER05–810–000 and 001.
Filed Date: 08/16/2005.
Accession Number: 20050822–0080.
Comment Date: 5 p.m. eastern time on
Tuesday, September 06, 2005.
Docket Numbers: ER05–1009–000.
Applicants: MidAmerican Energy
Company.
Description: MidAmerican Energy
Company submits notice of withdrawal
of its 5/23/05 filing in Docket No. ER05–
1009 of a Facilities Agreement with the
City of Ames, Iowa.
Filed Date: 08/18/2005.
Accession Number: 20050818–5041.
Comment Date: 5 p.m. eastern time on
Thursday, September 08, 2005.
VerDate Aug<18>2005
15:17 Aug 26, 2005
Jkt 205001
Docket Numbers: ER05–1238–001.
Applicants: MidAmerican Energy
Company.
Description: MidAmerican Energy
Company submits an amendment to the
7/22/05 filing of an interconnection
agreement with Indianola Municipal
Utilities.
Filed Date: 08/18/2005.
Accession Number: 20050822–0086.
Comment Date: 5 p.m. eastern time on
Thursday, September 08, 2005.
Docket Numbers: ER05–1299–001.
Applicants: Wabash Valley Power
Association, Inc.
Description: Wabash Valley Power
Association, Inc. submits a correction of
certain information contained in the 8/
8/05 filing in Docket No. ER05–1299–
001.
Filed Date: 08/18/2005.
Accession Number: 20050822–0084.
Comment Date: 5 p.m. eastern time on
Thursday, September 08, 2005.
Docket Numbers: ER05–1360–000.
Applicants: PacifiCorp.
Description: PacifiCorp submits
amended and restated Harrison
Interconnection and Transmission
Facilities Conveyance Agreement with
the Portland General Electric Company.
Filed Date: 08/18/2005.
Accession Number: 20050822–0074.
Comment Date: 5 p.m. eastern time on
Thursday, September 08, 2005.
Docket Numbers: ER05–1361–000.
Applicants: Calpine Fox LLC.
Description: Calpine Fox, LLC (Fox)
submits Rate Schedule No. 2, which sets
forth the cost-based revenue
requirements for the provision of
reactive supply & voltage control from
generator sources service from Fox to
American Transmission Company, LLC
and the Midwest Independent
Transmission System Operator, Inc.
Filed Date: 08/18/2005.
Accession Number: 20050822–0075.
Comment Date: 5 p.m. eastern time on
Thursday, September 08, 2005.
Docket Numbers: ER05–1362–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits an unexecuted facilities
construction agreement among Prairie
State Generating Company, LLC, the
Midwest ISO and Ameren Services
Company, as agent for Union Electric
Company d/b/a AmerenUE.
Filed Date: 08/18/2005.
Accession Number: 20050822–0076.
Comment Date: 5 p.m. eastern time on
Thursday, September 08, 2005.
Docket Numbers: ER05–1363–000.
Applicants: Deseret Generation &
Transmission Co-operative, Inc.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Description: Deseret Generation &
Transmission Co-operative, Inc. submits
amendments to open access
transmission, which is designated as
FERC Electric Tariff, Second Revised
Volume No. 2.
Filed Date: 08/18/2005.
Accession Number: 20050822–0154.
Comment Date: 5 p.m. eastern time on
Thursday, September 08, 2005.
Docket Numbers: ER05–1364–000.
Applicants: Xcel Energy Operating
Companies.
Description: Excel Energy Services
Inc., on behalf of Northern States Power
Company and Northern States Power
Company (Wisconsin) submits revised
tariff sheets to the Restated Agreement
to Coordinate Planning and Operations
and Interchange Power and Energy
between Northern States Power
Company (Minnesota) and Northern
States Power Company (Wisconsin).
Filed Date: 08/17/2005.
Accession Number: 20050822–0083.
Comment Date: 5 p.m. eastern time on
Wednesday, September 07, 2005.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE, Washington, DC 20426.
E:\FR\FM\29AUN1.SGM
29AUN1
Federal Register / Vol. 70, No. 166 / Monday, August 29, 2005 / Notices
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlinSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4705 Filed 8–26–05; 8:45 am]
Commission, 888 First Street, NE.,
Room 1–A, Washington, DC 20426.
Please affix ‘‘Orono Project No. 2710’’ to
all comments. Comments may be filed
electronically via Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. For further
information, contact Patrick Murphy
(202) 502–8755.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4703 Filed 8–26–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Southwestern Power Administration
DEPARTMENT OF ENERGY
Robert D. Willis Power Rate
Federal Energy Regulatory
Commission
[Project No. 2710–035–ME]
PPL Maine, LLC; Notice of Availability
of Environmental Assessment
August 19, 2005.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the
Office of Energy Projects has reviewed
the application for a new license for the
Orono Hydroelectric Project, located on
the Stillwater Branch of the Penobscot
River, in Penobscot County, Maine, and
has prepared an Environmental
Assessment (EA). In the EA,
Commission staff analyze the potential
environmental effects of relicensing the
project and conclude that issuing a new
license for the project, with appropriate
environmental measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Any comments should be filed within
30 days from the issuance date of this
notice, and should be addressed to the
Secretary, Federal Energy Regulatory
VerDate Aug<18>2005
15:17 Aug 26, 2005
Southwestern Power
Administration, DOE.
ACTION: Notice of public review and
comment.
AGENCY:
Jkt 205001
SUMMARY: The Administrator,
Southwestern Power Administration
(Southwestern), has prepared Current
and Revised 2005 Power Repayment
Studies that show the need for an
increase in annual revenues to meet cost
recovery criteria. Such increased
revenues are required primarily due to
significant increases in expected U.S.
Army Corps of Engineers’ generation
investment and increases in operations
and maintenance expenses at the
project. The Administrator has
developed a proposed Robert D. Willis
rate schedule, which is supported by a
power repayment study, to recover the
required revenues. Beginning January 1,
2006, the proposed rates would increase
annual revenues approximately 43.1
percent from $452,952 to $648,096.
DATES: The consultation and comment
period will begin on the date of
publication of this Federal Register
notice and will end October 28, 2005.
1. Public Information Forum—
September 13, 2005, 1 p.m. central time,
Tulsa, OK.
2. Public Comment Forum—October
13, 2005, 1 p.m. central time, Tulsa, OK.
ADDRESSES: If forums are requested,
they will be held in Southwestern’s
offices, Room 1402, Williams Center
Tower I, One West Third Street, Tulsa,
Oklahoma 74103.
FOR FURTHER INFORMATION CONTACT: Mr.
Forrest E. Reeves, Assistant
Administrator, Office of Corporate
Operations, Southwestern Power
Administration, U.S. Department of
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
51033
Energy, One West Third Street, Tulsa,
Oklahoma 74103, (918) 595–6696,
gene.reeves@swpa.gov.
SUPPLEMENTARY INFORMATION: The U.S.
Department of Energy was created by an
Act of the U.S. Congress, Department of
Energy Organization Act, Pub. L. 95–91,
dated August 4, 1977. Southwestern’s
power marketing activities were
transferred from the Department of the
Interior to the Department of Energy,
effective October 1, 1977. Guidelines for
preparation of power repayment studies
are included in DOE Order No. RA
6120.2 entitled Power Marketing
Administration Financial Reporting.
Procedures for Public Participation in
Power and Transmission Rate
Adjustments of the Power Marketing
Administrations are found at Title 10,
part 903, Subpart A of the Code of
Federal Regulations (10 CFR part 903).
Procedures for the confirmation and
approval of rates for the Federal Power
Marketing Administrations are found at
title 18, part 300, Subpart L of the Code
of Federal Regulations (18 CFR part
300).
Southwestern markets power from 24
multi-purpose reservoir projects, with
hydroelectric power facilities
constructed and operated by the U.S.
Army Corps of Engineers. These projects
are located in the states of Arkansas,
Missouri, Oklahoma, and Texas.
Southwestern’s marketing area includes
these States plus Kansas and Louisiana.
The costs associated with the
hydropower facilities of 22 of the 24
projects are repaid via revenues
received under the Integrated System
rates, as are Southwestern’s
transmission facilities that consist of
1,380 miles of high-voltage transmission
lines, 24 substations, and 46 microwave
and VHF radio sites. Costs associated
with the Robert D. Willis and Sam
Rayburn Dams, two projects that are
isolated hydraulically, electrically, and
financially from the Integrated System
are repaid by separate rate schedules.
Following Department of Energy
guidelines, the Administrator,
Southwestern, prepared a Current
Power Repayment study using the
existing Robert D. Willis rate. The Study
indicates that Southwestern’s legal
requirement to repay the investment in
the power generating facility for power
and energy marketed by Southwestern
will not be met without an increase in
revenues. The need for increased
revenues is due to expected increases in
generation investment and operations
and maintenance power-related
expenses. The Revised Power
Repayment Study shows that an
increase in annual revenue of $195,144
E:\FR\FM\29AUN1.SGM
29AUN1
Agencies
[Federal Register Volume 70, Number 166 (Monday, August 29, 2005)]
[Notices]
[Pages 51031-51033]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4705]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
August 23, 2005.
Take notice that the Commission received the following electric
rate filings.
Docket Numbers: ER97-2904-006.
Applicants: Lake Benton Power Partners, LLC.
Description: Lake Benton Power Partners, LLC submits it's triennial
market power review in support of its market-based rate authority and
request for market-based rate authority for sales of ancillary
services.
Filed Date: 07/28/2005.
Accession Number: 20050801-0020.
Comment Date: 5 p.m. eastern time on Friday, September 2, 2005.
Docket Numbers: ER98-4515-003.
Applicants: Cadillac Renewable Energy LLC.
Description: Cadillac Renewable Energy LLC submits its updated
market power study and an amendment to its market-based rate tariff.
Filed Date: 07/28/2005.
Accession Number: 20050804-0011.
Comment Date: 5 p.m. eastern time on Friday, September 2, 2005.
Docket Numbers: ER99-1228-004.
Applicants: Storm Lake Power Partners II, LLC.
Description: Storm Lake Power Partners II, LLC submits its
triennial market power review and a request for market-based rate
authority for sales of ancillary services.
Filed Date: 07/28/2005.
Accession Number: 20050801-0019.
Comment Date: 5 p.m. eastern time on Friday, September 2, 2005.
Docket Numbers: ER01-2398-010.
Applicants: Liberty Electric Power, LLC.
Description: Liberty Electric Power, LLC supplements its 7/7/05
compliance filing as amended on 7/20/05 and tenders for filing a
revised tariff sheet designated as FERC Electric Tariff, First Revised
Volume No. 1, Substitute Original Sheet No. 2.
Filed Date: 08/18/2005.
Accession Number: 20050822-0079.
Comment Date: 5 p.m. eastern time on Thursday, September 08, 2005.
Docket Numbers: ER02-1695-002.
Applicants: Cabazon Power Partners LLC.
Description: Cabazon Power Partners LLC submits notice of change
status and motion to withdraw its qualifying status.
[[Page 51032]]
Filed Date: 05/17/2005.
Accession Number: 20050519-0110.
Comment Date: 5 p.m. eastern time on Friday, September 2, 2005.
Docket Numbers: ER03-715-003.
Applicants: Marina Energy, L.L.C.
Description: Marina Energy, L.L.C. submits Substitute Original
Sheet No. 2 to its Original Rate Schedule No. 1, in compliance with
Commission's letter order issued 7/20/05 in Docket No. ER03-715-002.
Filed Date: 08/18/2005.
Accession Number: 20050822-0081.
Comment Date: 5 p.m. eastern time on Thursday, September 08, 2005.
Docket Numbers: ER04-23-014.
Applicants: Devon Power LLC, Middletown Power LLC; Montville Power
LLC; Norwalk Power LLC .
Description: Devon Power, LLC; Middletown Power LLC; Montville
Power LLC; Norwalk Power LLC (collectively, NRG) submit a Revised
Schedule No. 1 to the Cost-of-Service Agreement among NRG and ISO New
England Inc., a refund report of the refunds made by NRG to ISO New
England, and a report of the payments made by ISO New England to NRG.
Filed Date: 08/17/2005.
Accession Number: 20050822-0087.
Comment Date: 5 p.m. eastern time on Wednesday, September 07, 2005.
Docket Numbers: ER05-725-003.
Applicants: Deephaven RV Sub Fund Ltd.
Description: Deephaven RV Sub Fund Ltd. submits First Revised 3 to
Rate Schedule No. 1 containing corrected language for Market Behavior
Rule 2(B).
Filed Date: 08/17/2005.
Accession Number: 20050822-0078.
Comment Date: 5 p.m. eastern time on Wednesday, September 07, 2005.
Docket Numbers: ER05-810-002.
Applicants: UGI Energy Services, Inc.
Description: UGI Energy Services, Inc. submits substitute original
Sheet No. 3, to its FERC Electric Tariff No. 1, in compliance with the
Commission's letter order issued 7/20/05 in Docket Nos. ER05-810-000
and 001.
Filed Date: 08/16/2005.
Accession Number: 20050822-0080.
Comment Date: 5 p.m. eastern time on Tuesday, September 06, 2005.
Docket Numbers: ER05-1009-000.
Applicants: MidAmerican Energy Company.
Description: MidAmerican Energy Company submits notice of
withdrawal of its 5/23/05 filing in Docket No. ER05-1009 of a
Facilities Agreement with the City of Ames, Iowa.
Filed Date: 08/18/2005.
Accession Number: 20050818-5041.
Comment Date: 5 p.m. eastern time on Thursday, September 08, 2005.
Docket Numbers: ER05-1238-001.
Applicants: MidAmerican Energy Company.
Description: MidAmerican Energy Company submits an amendment to the
7/22/05 filing of an interconnection agreement with Indianola Municipal
Utilities.
Filed Date: 08/18/2005.
Accession Number: 20050822-0086.
Comment Date: 5 p.m. eastern time on Thursday, September 08, 2005.
Docket Numbers: ER05-1299-001.
Applicants: Wabash Valley Power Association, Inc.
Description: Wabash Valley Power Association, Inc. submits a
correction of certain information contained in the 8/8/05 filing in
Docket No. ER05-1299-001.
Filed Date: 08/18/2005.
Accession Number: 20050822-0084.
Comment Date: 5 p.m. eastern time on Thursday, September 08, 2005.
Docket Numbers: ER05-1360-000.
Applicants: PacifiCorp.
Description: PacifiCorp submits amended and restated Harrison
Interconnection and Transmission Facilities Conveyance Agreement with
the Portland General Electric Company.
Filed Date: 08/18/2005.
Accession Number: 20050822-0074.
Comment Date: 5 p.m. eastern time on Thursday, September 08, 2005.
Docket Numbers: ER05-1361-000.
Applicants: Calpine Fox LLC.
Description: Calpine Fox, LLC (Fox) submits Rate Schedule No. 2,
which sets forth the cost-based revenue requirements for the provision
of reactive supply & voltage control from generator sources service
from Fox to American Transmission Company, LLC and the Midwest
Independent Transmission System Operator, Inc.
Filed Date: 08/18/2005.
Accession Number: 20050822-0075.
Comment Date: 5 p.m. eastern time on Thursday, September 08, 2005.
Docket Numbers: ER05-1362-000.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator, Inc.
submits an unexecuted facilities construction agreement among Prairie
State Generating Company, LLC, the Midwest ISO and Ameren Services
Company, as agent for Union Electric Company d/b/a AmerenUE.
Filed Date: 08/18/2005.
Accession Number: 20050822-0076.
Comment Date: 5 p.m. eastern time on Thursday, September 08, 2005.
Docket Numbers: ER05-1363-000.
Applicants: Deseret Generation & Transmission Co-operative, Inc.
Description: Deseret Generation & Transmission Co-operative, Inc.
submits amendments to open access transmission, which is designated as
FERC Electric Tariff, Second Revised Volume No. 2.
Filed Date: 08/18/2005.
Accession Number: 20050822-0154.
Comment Date: 5 p.m. eastern time on Thursday, September 08, 2005.
Docket Numbers: ER05-1364-000.
Applicants: Xcel Energy Operating Companies.
Description: Excel Energy Services Inc., on behalf of Northern
States Power Company and Northern States Power Company (Wisconsin)
submits revised tariff sheets to the Restated Agreement to Coordinate
Planning and Operations and Interchange Power and Energy between
Northern States Power Company (Minnesota) and Northern States Power
Company (Wisconsin).
Filed Date: 08/17/2005.
Accession Number: 20050822-0083.
Comment Date: 5 p.m. eastern time on Wednesday, September 07, 2005.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St. NE, Washington, DC 20426.
[[Page 51033]]
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please e-mail FERCOnlinSupport@ferc.gov. or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-4705 Filed 8-26-05; 8:45 am]
BILLING CODE 6717-01-P