Notice of Intent To Prepare an Environmental Impact Statement for the Willamette Valley System Operations and Maintenance; Correction
The Department of the Army, Corps of Engineers published a document in the Federal Register of April 1, 2019, concerning the Portland District, U.S. Army Corps of Engineers intending to prepare an Environmental Impact Statement to address the continued operations and maintenance of the Willamette Valley System. The document contained an incorrect website address.
Intent To Prepare a Draft Environmental Impact Statement for the Upper Baritaria Basin, LA Study
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers, New Orleans District (USACE) intends to prepare a Draft Integrated Feasibility Report and Environmental Impact Statement (DIFR-EIS) to assess the potential social, economic, and environmental impacts associated with the proposed project titled, Upper Barataria Basin Coastal Feasibility Study. The DIFR-EIS will document the existing condition of environmental resources in and around areas considered for construction, and potential impacts on those resources as a result of implementing the alternatives.
Notice of Intent To Prepare a Draft Environmental Impact Statement for the South Central Coast Louisiana Flood Risk Management Feasibility Study
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), New Orleans District intends to prepare a Draft Integrated Feasibility Report and Environmental Impact Statement (DIFR-EIS) for the Draft Environmental Impact Statement (DEIS) to assess the potential social, economic, and environmental impacts associated with the proposed project titled, South Central Coast Louisiana Flood Risk Management Feasibility Study. The DIFR-EIS documents the existing condition of environmental resources in and around areas considered for development, and potential impacts on those resources as a result of implementing the alternatives.
Notice of Intent To Prepare a Draft Environmental Impact Statement for the Lake Pontchartrain and Vicinity General Re-Evaluation Report, Louisiana
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers, New Orleans District (USACE) intends to prepare a Draft Integrated General Re-evaluation Report and Environmental Impact Statement (DGRR-EIS) for the Lake Pontchartrain and Vicinity Coastal Storm Risk Management Project. The study seeks to determine if the work necessary to sustain the 1% level of hurricane storm damage risk reduction is technically feasible, environmentally acceptable, and economically justified.
Intent To Prepare a Draft Environmental Impact Statement for the Amite River and Tributaries-East of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers, New Orleans District (USACE) intends to prepare a Draft Integrated Feasibility Report and Environmental Impact Statement (DIFR-EIS) to assess the potential social, economic, and environmental impacts associated with the proposed project titled, ``Amite River and TributariesEast of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study.'' The DIFR-EIS will document the existing conditions of environmental resources in and around areas considered for construction, and potential impacts on those resources as a result of implementing the alternatives.
Notice of Intent To Prepare a Draft Environmental Impact Statement for the West Bank and Vicinity General Re-evaluation Report, Louisiana
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers, New Orleans District (USACE) intends to prepare a Draft Integrated General Re-evaluation Report and Environmental Impact Statement (DGRR-EIS) for the West Bank and Vicinity Coastal Storm Risk Management Project. The study seeks to determine if the work necessary to sustain the 1% level of hurricane storm damage risk reduction is technically feasible, environmentally acceptable, and economically justified.
Notice of Intent/NEPA Scoping Meeting and Public Comment Period for the Grand River Habitat Restoration and Invasive Species Control Project, Grand Rapids, Michigan
Pursuant to the requirements of the National Environmental Policy Act (NEPA) of 1969, as implemented by the Council on Environmental Quality Regulations, the U.S. Army Corps of Engineers (USACE) Detroit District, announces its intent to conduct public scoping and solicit public comments to gather information to prepare a draft Environmental Impact Statement (EIS) on behalf of the Great Lakes Fishery Commission (GLFC) related to the proposed Grand River Habitat Restoration and Invasive Species Control Project in Grand Rapids, Michigan. The project must provide a means to block sea lamprey from moving upstream, as this invasive species is currently blocked by the existing 6th Street Dam in the Grand River, must maintain or reduce the current risk of flooding upstream, and must provide for fish passage into upstream areas. If implemented, the project is expected to adversely impact existing healthy mussel population, which includes the federally-listed endangered scaleshell and snuffbox mussels as well as a number of state-listed mussel species.
Scoping Period Extension for Environmental Impact Statement for Implementing Test Releases From Fort Peck Dam, Montana
The U.S. Army Corps of Engineers (USACE), Omaha District, is extending the scoping period through March 26, 2019. The scoping period was originally scheduled to end on March 11, 2019.
Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement for the New Jersey Back Bay Coastal Storm Risk Management Feasibility Study
The U.S. Army Corps of Engineers, Philadelphia District, Planning Division is notifying interested parties that it has withdrawn the Notice of Intent (NOI) to develop an EIS for the proposed New Jersey Back Bay (NJBB) Coastal Storm Risk Management (CSRM) Feasibility Study. The original NOI to Prepare an EIS was published in the Federal Register on Wednesday, December 27, 2017.
Revised Definition of “Waters of the United States”
The Environmental Protection Agency and the Department of the Army (``the agencies'') are publishing for public comment a proposed rule defining the scope of waters federally regulated under the Clean Water Act (CWA). This proposal is the second step in a comprehensive, two-step process intended to review and revise the definition of ``waters of the United States'' consistent with the Executive Order signed on February 28, 2017, ``Restoring the Rule of Law, Federalism, and Economic Growth by Reviewing the `Waters of the United States' Rule.'' This proposed rule is intended to increase CWA program predictability and consistency by increasing clarity as to the scope of ``waters of the United States'' federally regulated under the Act. This proposed definition revision is also intended to clearly implement the overall objective of the CWA to restore and maintain the quality of the nation's waters while respecting State and tribal authority over their own land and water resources.
Atlantic Ocean South of Entrance to Chesapeake Bay; Firing Range
The Corps of Engineers is proposing to amend an existing permanent danger zone in the waters of the Atlantic Ocean south of the entrance to the Chesapeake Bay off of the coast of Virginia. For decades, the Dam Neck Surface Danger Zone (SDZ) served as a firing range for gunnery training at what is now Naval Air Station Oceana's Dam Neck Annex. While the Navy continues to use the SDZ for training, fixed-mount gunnery operations have not been conducted there for over 30 years. The proposed amendment is necessary to accurately identify the hazards associated with training and mission operations to protect the public. The proposed amendment will identify the area within the current danger zone boundary where live fire exercises are no longer conducted and no restriction to surface navigation exists. In addition, the proposed amendment will remove references to live fire range conditions and safety procedures as shore-to-sea gunnery operations are no longer conducted.
Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement (EIS) for the New York New Jersey Harbor and Tributaries (NYNJHAT) Coastal Storm Risk Management Feasibility Study
The U.S. Army Corps of Engineers, New York District, Planning Division is notifying interested parties that it has withdrawn the Notice of Intent (NOI) to develop an EIS for the proposed NYNJHAT Coastal Storm Risk Management (CSRM) Feasibility Study. The original NOI to Prepare an EIS was published in the Federal Register on Wednesday, December 27, 2017.
Availability of the Draft Feasibility Report and Environmental Impact Statement/Environmental Impact Report for the Prado Basin Ecosystem Restoration and Water Conservation Integrated Feasibility Study, Riverside, San Bernardino and Orange Counties, California
The U.S. Army Corps of Engineers (Corps) in cooperation with the Orange County Water District announces the availability of a Draft Feasibility Report and Environmental Impact Statement/Environmental Impact Report (FR/EIS/EIR) for the Prado Basin Ecosystem Restoration and Water Conservation Integrated Feasibility Study for review and comment. The study area is located within and downstream of Prado Dam Reservoir and includes portions of Riverside, San Bernardino and Orange Counties, California. The study evaluates alternatives for the restoration of degraded ecosystem structure, function, and dynamic processes to a less degraded, more natural condition within Prado Dam Reservoir and the Santa Ana River downstream of the dam. The study also includes water conservation through re-operation of Prado Dam to capture, retain and release additional water volumes impounded during flood risk management operations. Details of the potential ecosystem restoration measures, water conservation plan and an array of alternatives are identified in the Draft FR/EIS/EIR. Four alternatives are evaluated in the Draft FR/EIS/EIR, including the No Federal Action/ No Project Alternative. Potential environmental impacts associated with these project alternatives are addressed in the Draft FR/EIS/EIR. A Notice of Intent for the EIS/EIR was published on November 16, 2012 (73 FR 72455).
Notice of Intent To Prepare an Environmental Impact Statement for Implementing Test Releases From Fort Peck Dam, Montana
Pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended, the U.S. Army Corps of Engineers (USACE), Omaha District, intends to prepare an Environmental Impact Statement (EIS) for implementing test flow releases from Fort Peck Dam, Montana, intended to benefit the federally endangered pallid sturgeon (Scaphirynchus albus).
Revised Definition of “Waters of the United States”
On December 11, 2018, the Environmental Protection Agency and the U.S. Department of the Army (the agencies) signed a proposed rule revising the definition of ``waters of the United States'' to clarify the scope of waters federally regulated under the Clean Water Act. The agencies are announcing that a public hearing will be held in Kansas City, Kansas on February 27 and 28, 2019, to provide interested parties the opportunity to present data, views, or information concerning the proposed rule. The pre-publication version of this proposal can be found at https://www.epa.gov/wotus-rule/step-two-revise.
Board on Coastal Engineering Research
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the Board on Coastal Engineering Research. This meeting is open to the public.
Notice of Availability of The Great Lakes and Mississippi River Interbasin Study-Brandon Road Integrated Feasibility Study and Environmental Impact Statement-Will County, Illinois
The U.S. Army Corps of Engineers (USACE), Rock Island and Chicago Districts, are extending the comment period for the report ``The Great Lakes and Mississippi River Interbasin Study (GLMRIS)Brandon Road Integrated Feasibility Study and Environmental Impact Statement (EIS)Will County, Illinois,'' (Final GLMRIS-Brandon Road Report & EIS) for 46 days in response to stakeholder requests for an extension, from January 7, 2019 to February 22, 2019.
Notice of Intent/NEPA Scoping Meeting and Public Comment Period for the Chesapeake Bay Native Oyster Recovery Program, Virginia
Pursuant to the requirements of section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as implemented by the Council on Environmental Quality Regulations, the U.S. Army Corps of Engineers (USACE) plans to prepare an Environmental Impact Statement (EIS) to evaluate environmental impacts from reasonable alternatives and to determine the potential for significant impacts related to implementation of the Chesapeake Native Oyster Recovery Program in the Commonwealth of Virginia.
Inland Waterways Users Board Meeting Notice
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the U.S. Army Corps of Engineers, Inland Waterways Users Board (Board). This meeting is open to the public. For additional information about the Board, please visit the committee's website at https://www.iwr.usace.army.mil/Missions/Navigation/ InlandWaterwaysUsersBoard.aspx.
Intent To Prepare an Environmental Impact Statement for Chicago Area Waterway System Dredged Material Management Plan Study, Chicago, Illinois
The U.S. Army Corps of Engineers (Corps) is preparing an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act (NEPA) for the Chicago Area Waterway System Dredged Material Management Plan Study. The study is sponsored by the Chicago Department of Transportation (CDOT) on behalf of the City of Chicago. The purpose of the EIS is to assess the likely social, economic, and environmental effects of a range of potential alternative plans to ensure that maintenance dredging activities are performed in an environmentally acceptable manner, use sound engineering techniques, are economically warranted, and provide sufficient confined disposal capacity, as needed, for at least the next 20 years. Based on stakeholder and public concerns voiced throughout the process of preparing an Environmental Assessment, the Corps has determined that an EIS is warranted for the study.
Revised Definition of “Waters of the United States”
On December 11, 2018, the Environmental Protection Agency and the U.S. Department of the Army (the agencies) signed a proposed rule revising the definition of ``waters of the United States'' to clarify the scope of waters federally regulated under the Clean Water Act. The agencies are announcing that a public hearing will be held in Kansas City, Kansas on January 23, 2019, to provide interested parties the opportunity to present data, views, or information concerning the proposed rule. The pre-publication version of this proposal can be found at https://www.epa.gov/wotus-rule/step-two-revise.
Notice of Availability of The Great Lakes and Mississippi River Interbasin Study-Brandon Road Integrated Feasibility Study and Environmental Impact Statement-Will County, Illinois
The U.S. Army Corps of Engineers (USACE), Rock Island and Chicago Districts, are extending the comment period for the report ``The Great Lakes and Mississippi River Interbasin Study (GLMRIS) Brandon Road Integrated Feasibility Study and Environmental Impact Statement (EIS)Will County, Illinois,'' (Final GLMRIS-Brandon Road Report & EIS) for 14 days in response to stakeholder requests for an extension, from December 24, 2018 to January 7, 2019.
Withdrawal of the Notice of Intent To Prepare a Draft Environmental Impact Statement for the Dam Safety Modification Study Report for Center Hill Dam, DeKalb County, Tennessee
The U.S. Army Corps of Engineers, Nashville District (USACE), is issuing this notice to inform Federal, State, local governmental agencies, and the public that USACE is withdrawing the Notice of Intent (NOI) to prepare a draft Environmental Impact Statement (EIS) to support the Dam Safety Modification Study Report (DSMSR) for Center Hill Dam.
Availability of a Draft Environmental Impact Statement, Whittier Narrow Dam Safety Modification Study, Los Angeles County, California
The U.S. Army Corps of Engineers (Corps) announces the availability of a Draft Environmental Impact Statement (EIS) for the Whittier Narrows Dam Safety Modification Study, Los Angeles County, California for review and comment. Pursuant to the National Environmental Policy Act (NEPA). The Corps has prepared a Draft EIS for the Whittier Narrows Dam Safety Modification Study (DSMS). The Draft EIS evaluates risk management plans (alternatives) to remediate safety concerns such as overtopping and seepage. The Draft EIS describes and analyses the impacts of risk management plans (RMPs) that are formulated, evaluated and compared through the DSMS process in order to identify a recommended RMP that reduces risks to downstream life-safety and property associated with dam failure. Implementation of the recommended risk management plan would mitigate the intolerable Dam safety risk and allow the Dam to safely function as originally intended and authorized. Without this action, the Dam could fail resulting in life-threatening floods to downstream communities. The Proposed Action is needed to provide life-safety to the communities downstream of the Whittier Narrows Dam.
Military Ocean Terminal Concord, CA; Restricted Area
The U.S. Army Military Surface Deployment and Distribution Command (SDDC) requested that the U.S. Army Corps of Engineers (Corps) change the name of a restricted area from ``Suisun Bay at Naval Weapons Station, Concord; restricted area'' to ``Military Ocean Terminal Concord (MOTCO); restricted area.'' The restricted area is located in Suisun Bay, north of the City of Concord, California. The request to change the name of the restricted area is due to a transfer of real estate from the U.S. Navy to the U.S. Army SDDC. A Memorandum of Agreement between the U.S. Navy and the U.S. Army for the interagency transfer of base closure property and all associated environmental programs for portions of the Naval Weapons Station Seal Beach Detachment Concord was signed on January 24, 2007. The SDDC officially accepted the former U.S. Navy real estate in Fall 2008 to Winter 2009.
Pacific Ocean at Naval Base Guam Telecommunication Site, Finegayan Small Arms Range, on the Northwestern Coast of Guam; Danger Zone
The U.S. Army Corps of Engineers (Corps) is proposing to revise the existing regulations to establish a danger zone at the U.S. Naval Base Guam Telecommunication Site in the Pacific Ocean, Guam. The Navy requested establishment of a danger zone extending over the Pacific Ocean adjacent to the Finegayan Small Arms Range. Establishment of a danger zone would intermittently restrict commercial, public, and private vessels from entering or lingering in the restricted safety zone to ensure public safety during small arms training activities. This danger zone is necessary to minimize potential conflicts between local populace activities and ongoing military training in the subject area.
Intent To Prepare a Draft Supplemental Environmental Impact Statement (DSEIS) for the Haile Gold Mine in Lancaster County, South Carolina
The U.S. Army Corps of Engineers, Charleston District intends to prepare a Draft Supplemental Environmental Impact Statement (DSEIS) to assess the likely social, economic and environmental effects of the proposed expansion of an existing gold mine with the potential to impact Waters of the United States near Kershaw in Lancaster County, South Carolina. The DSEIS will assess potential effects of a range of alternatives.
Withdrawal of the Notice of Intent To Prepare a Draft Environmental Impact Statement (DEIS) in Cooperation With the North Carolina Department of Transportation and South Carolina Department of Transportation for Extending SC 31 (Carolina Bays Parkway), in Horry County, South Carolina, To Connect to US 17, in Brunswick County, North Carolina
The U.S. Army Corps of Engineers, Wilmington District, Wilmington Regulatory Division and the U.S. Army Corps of Engineers, Charleston District, Charleston Regulatory Division (collectively COE) are issuing this notice to advise the public that a State (North Carolina Department of Transportation [NCDOT] and South Carolina Department of Transportation [SCDOT]) funded Draft Environmental Impact Statement (DEIS) will no longer be prepared by the COE, while acting as lead federal agency, for improvements to SC 31 starting near Little River, Horry County, South Carolina and running northeast to US 17, in an area between Calabash and Shallotte, Brunswick County, North Carolina. On July 6, 2017 the COE issued a Notice of Intent to prepare a DEIS for the ``Carolina Bays Parkway Extension'', NCDOT Project 44604 and SCDOT Project P029554. Recent commitment of federal funds has altered various aspects of this project, including the designation of the lead federal agency. Due to these developments, the COE will no longer act in this capacity, but rather as a cooperating agency throughout the evaluation of the project. At the appropriate time, a separate notice will be issued within the Federal Register identifying the lead agency, describing the project, and detailing the evaluation process.
Notice of Availability of the Record of Decision for the Final Missouri River Recovery Management Plan and Environmental Impact Statement
The U.S. Army Corps of Engineers (USACE) announces the availability of the Record of Decision (ROD) for the Final Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP-FEIS) published in the Federal Register on Friday, August 31, 2018. The USACE Northwestern Division Commander signed the ROD on November 20, 2018. Copies of the ROD along with the MRRMP-FEIS and other supporting documents are available for viewing on the Missouri River Recovery Program website at: https://www.nwo.usace.army.mil/mrrp/ mgmt-plan/.
Notice of Availability of the Great Lakes and Mississippi River Interbasin Study-Brandon Road Integrated Feasibility Study and Environmental Impact Statement-Will County, Illinois
The U.S. Army Corps of Engineers (USACE), Rock Island and Chicago Districts, have developed ``The Great Lakes and Mississippi River Interbasin Study (GLMRIS)Brandon Road Integrated Feasibility Study and Environmental Impact Statement (EIS)Will County, Illinois,'' (Final GLMRIS-Brandon Road Report & EIS). The Final GLMRIS- Brandon Road Report & EIS presents a plan that could prevent aquatic nuisance species (ANS) transfer from the Mississippi River Basin to the Great Lakes Basin through an aquatic connection in the Chicago Area Waterway System. The purpose of this Study was to evaluate structural and nonstructural options and technologies near the Brandon Road Lock and Dam to prevent the upstream transfer of ANS while minimizing impacts to existing waterways uses and users. USACE analyzed and evaluated available controls to address ANS of concern and formulated alternatives specifically for the Brandon Road site.
Intent To Grant an Exclusive License for a U.S. Army Owned Invention to Integrated Composite Construction Systems, LLC
The Department of the Army announces that, unless there is an objection, after 15 days it intends to grant an exclusive license to Integrated Composite Construction Systems, LLC., a corporation having a place of business in Culpepper, VA on United States Patent No. 8,016,938 entitled ``Structures and Components Comprising Blast Resistant Concrete also Suitable for Limiting Penetration of Ballistic Fragments,'' issued September 13, 2011.
Inland Waterways Users Board; Notice of Federal Advisory Committee Meeting
The notice of an open meeting scheduled for November 28, 2018 published in the Federal Register on October 26, 2018 has a new date. The meeting will be held on November 29, 2018.
Notice of Availability of the Draft Integrated Feasibility Report Draft Environmental Impact Statement/Draft Environmental Impact Report (DEIS/DEIR) for Westminster, East Garden Grove, California Flood Risk Management Study
The U.S. Army Corps of Engineers (USACE), in cooperation with Orange County Public Works, Orange County, CA announces the availability of a Draft Integrated Feasibility Report (Draft IFR) including Feasibility Report and Environmental Impact Statement (EIS) for the Westminster, East Garden Grove, California Flood Risk Management Study for review and comment. The Draft IFR presents alternatives to address flood risk to the residents of the communities in the Westminster watershed. The purpose of this study is to evaluate the flood risk within the Westminster watershed that is primarily attributable to drainage channels overwhelmed with having to collect and convey more surface runoff downstream towards eventual discharge into the Pacific Ocean than what they were designed for. USACE evaluated and analyzed various flood control measures and formulated alternatives specifically for the Westminster watershed. USACE also evaluated the potential impacts of the alternatives and ways to minimize such impacts. A Notice of Intent to prepare the Draft EIS was published on January 13, 2006. A public scoping meeting was conducted on January 25, 2006 in the City of Garden Grove, CA.
New York and New Jersey Harbor Anchorages General Reevaluation Study NEPA Scoping Meeting and Public Comment Period
In accordance with all applicable laws and regulations, the U.S. Army Corps of Engineers (USACE) plans to prepare a General Reevaluation Study (GRR) with an integrated Environmental Impact Statement (EIS) to evaluate environmental impacts from reasonable project alternatives and to determine the potential for significant impacts related to the improvement of the anchorages included in the Federal navigation project to take into account changed conditions and/or assumptions since the original feasibility study was completed in 2000. The GRR will address the need for anchorage areas capable of safely accommodating the vessels navigating the anchorages at present and reasonably projected to be navigating them in the future; or find that no plan is currently justified.
Intent To Prepare an Environmental Impact Statement for Nebraska Department of Transportation U.S. Highway 275 West Point to Scribner Project
The U.S. Army Corps of Engineers (Corps) is preparing an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act (NEPA) for U.S. Highway 275 (US-275) West Point to Scribner Project (Project) sponsored by the Nebraska Department of Transportation (NDOT). NDOT proposes to expand US-275 from a two-lane highway to a four-lane expressway along an approximately 20-mile segment from northwest of West Point to southeast of Scribner, including a bypass around Scribner (referred to as ``Scribner Bypass''), in Cuming and Dodge Counties, Nebraska. Construction of the Project is expected to impact jurisdictional waters of the United States, thereby requiring a Clean Water Act Section 404 permit. Additionally, NDOT is proposing to build segments of the Scribner Bypass on an existing federally authorized levee, which would require a Section 408 authorization. The Project may also affect Natural Resources Conservation Service (NRCS) Wetland Reserve Program (WRP) easements. Due to these requirements, the Corps has determined an EIS is necessary for the Project. The Corps has determined that the provisions of Executive Order 13807 (``One Federal Decision'') apply to this Project. One Federal Decision is intended to streamline federal permitting processes, including environmental reviews and authorization decisions, for major infrastructure projects.
Joint Notice of Availability for the Coastal Texas Protection and Restoration Study Draft Integrated Feasibility Report and Environmental Impact Statement
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers, Galveston District (USACE) announces the release of the Draft Integrated Feasibility Report and Environmental Impact Statement (DIFR-EIS) for the Tentatively Selected Plan (TSP) of the Coastal Texas Protection and Restoration Study, Texas. The DIFR-EIS documents the existing condition of environmental resources in and around areas considered for development, and potential impacts on those resources as a result of implementing the alternatives. This public notice is also issued for the purpose of advising all known interested parties that there is pending before the Texas Commission on Environmental Quality (TCEQ) a decision on water quality certification. A copy of the public notice, with a description of work, has been made available for review in the TCEQ's Austin office.
Inland Waterways Users Board Meeting Notice
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the U.S. Army Corps of Engineers, Inland Waterways Users Board (Board). This meeting is open to the public. For additional information about the Board, please visit the committee's website at https:// www.iwr.usace.army.mil/Missions/Navigation/ InlandWaterwaysUsersBoard.aspx.
Notice of Availability of the Final Missouri River Recovery Management Plan and Environmental Impact Statement
The Notice of Availability for the Final Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP- FEIS) published in the Federal Register on Friday, August 31, 2018, stated the waiting period for signature of the MRRMP-FEIS Record of Decision would end on October 9, 2018. The U.S. Army Corps of Engineers previously extended the waiting period through October 22, 2018 with a notice published in the Federal Register on Friday, September 28, 2018. Through this notice, the U.S. Army Corps of Engineers is extending the waiting period again through November 9, 2018.
Availability of a Final Integrated Feasibility Report (Feasibility Report/Environmental Impact Statement), Little Colorado River at Winslow, Navajo County, Arizona, Flood Risk Management Project
The U.S. Army Corps of Engineers (Corps), in cooperation with Navajo County Flood Control District, announces the availability of a Final Integrated Feasibility Report (Final IFR) including Feasibility Report and Environmental Impact Statement (EIS) for the Little Colorado River at Winslow, Navajo County, Arizona Flood Risk Management Project for review and comment. The study evaluates alternatives to reduce the risk of damages and to reduce the life, safety, and health risks caused by flooding of the Little Colorado River (LCR) to the City of Winslow, surrounding community, and public and private infrastructure.
Notice of Availability of the Draft Environmental Impact Statement for the Lake Ralph Hall Regional Water Supply Reservoir Project, Fannin County, TX
The U.S. Army Corps of Engineers (USACE) Fort Worth District has prepared a Draft Environmental Impact Statement (EIS) to analyze the direct, indirect and cumulative effects of the construction of the Lake Ralph Hall Regional Water Supply Reservoir Project in Fannin County, TX, proposed by the Upper Trinity Regional Water District (UTRWD). This action requires authorization from USACE under Section 404 of the Clean Water Act for construction and operation of the proposed project. The proposed project is a regional water supply project intended to provide approximately 34,050 acre-feet (AF) per year of new water for 20 water providers, special districts, and municipalities in Denton County and small portions of Dallas, Collin, Grayson, Wise and Cooke counties to the extent that Denton County Customers' service areas extend outside the County. Construction of the reservoir and support facilities would result in permanent direct impacts to waters of the U.S. of approximately 8 acres of wetlands and 384 acres of other waters including streams, impoundments, and ponds. The proposed project pipeline will cross 59 streams with 11,893 lineal feet of temporary impact as well as 0.4 acres of stock tanks.
Availability of the Final Integrated City of Norfolk Coastal Storm Risk Management Feasibility Study Report/Environmental Impact Statement, Norfolk, VA
The U.S. Army Corps of Engineers (USACE) Norfolk District, in cooperation with our non-federal sponsor, the City of Norfolk, announce the availability of a Final Integrated Feasibility Report and Environmental Impact Statement (Final IFR/EIS) and Draft Record of Decision (ROD) for the City of Norfolk Coastal Storm Risk Management Feasibility Study, for review and comment. The study evaluates identified flood risks and develops and evaluates coastal storm risk management measures for the City of Norfolk. These measures were formulated to reduce flood risk to residents, industries and businesses which are critical to the Nation's economy in ways that support the long-term resilience due to sea level rise, local subsidence and storms, within the City of Norfolk. Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, the USACE determined that the project has the potential to have significant environmental impacts, and developed the Final EIS and Draft ROD to examine and assess the impacts of all proposed action.
Notice of Availability of the Final Missouri River Recovery Management Plan and Environmental Impact Statement
The Notice of Availability for the Final Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP- FEIS) published in the Federal Register on Friday, August 31, 2018, stated the waiting period for signature of the MRRMP-FEIS Record of Decision would end on October 9, 2018. The U.S. Army Corps of Engineers is extending the waiting period through October 22, 2018.
Intent To Prepare an Environmental Impact Statement for Chehalis River Basin Flood Damage Reduction Project Proposed by the Chehalis River Basin Flood Control Zone District, Lewis County, WA
The U.S. Army Corps of Engineers (Corps) Seattle District received a permit application from the Chehalis River Basin Flood Control Zone District (applicant) for the construction of a flood retention structure on the upper Chehalis River and the raising of levees at the Centralia-Chehalis Airport. A Department of the Army (DA) permit is required for the project pursuant to Section 404 of the Clean Water Act. The Corps has determined the proposed project may have significant individual and/or cumulative impacts on the human environment. An environmental impact statement (EIS) will be prepared in accordance with the National Environmental Policy Act (NEPA). Preparation of the EIS will support the Corps' eventual decision to either issue, issue with modification or deny the DA permit for the proposed action. The EIS will assess the potential social, economic, and environmental impacts of the projects and is intended to be sufficient in scope to address Federal, State, and local requirements, environmental and socio-economic issues concerning the proposed action, and permit reviews. The EIS process begins with the publication of this Notice of Intent. The EIS will be prepared according to the Corps' procedures for implementing NEPA, and consistent with the Corps' policy to facilitate public understanding and review of agency proposals. The Corps will serve as the lead federal agency for this EIS pursuant to the requirements of NEPA. The Washington State Department of Ecology (Ecology) will serve as the lead agency for the separate EIS pursuant to the requirements of the State Environmental Policy Act (SEPA). The Corps and Ecology have agreed to participate in joint scoping to simplify the public comment process for the two separate EISs.
Policy and Procedural Guidance for Processing Requests To Alter US Army Corps of Engineers Civil Works Projects
The US Army Corps of Engineers (USACE) has issued Engineer Circular (EC) 1165-2-220, Policy and Procedural Guidance for Processing Requests to Alter US Army Corps of Engineers Civil Works Projects Pursuant to Section 408. This agency policy document provides the policies and procedures related to how USACE will process certain requests by others to alter a USACE Civil Works project under Section 14 of the Rivers and Harbors Act of 1899 (more commonly referred to as Section 408). The draft version of this EC was made available for public comment from February 5, 2018 to April 6, 2018. USACE reviewed and considered all comments received, and revised the EC to reflect those comments to the maximum extent possible. The final EC is available on the USACE publications website (https:// www.publications.usace.army.mil/) and via hyperlink on the USACE Section 408 website (https://www.usace.army.mil/Missions/Civil-Works/ Section408/). The EC is effective beginning September 10, 2018.
Notice of Availability of the Final Missouri River Recovery Management Plan and Environmental Impact Statement
The Kansas City and Omaha Districts of the U.S. Army Corps of Engineers (USACE), in cooperation with the U.S. Fish and Wildlife Service (USFWS), have developed the Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP-EIS). This document is a programmatic assessment of major federal actions necessary to avoid a finding of jeopardy to the pallid sturgeon (Scaphirhynchus albus), interior least tern (Sterna antillarum athalassos), and the Northern Great Plains piping plover (Charadrius melodus) caused by operation of the Missouri River Mainstem System and the Kansas River Reservoir System and operation and maintenance of the Missouri River Bank Stabilization and Navigation Project (BSNP) in accordance with the Endangered Species Act (ESA) of 1973, as amended. This programmatic document also assesses the Missouri River BSNP fish and wildlife mitigation project described in the 2003 Record of Decision (ROD) and authorized by the Water Resources Development Act (WRDA) of 1986, 1999, and 2007 as it relates to endangered species.
Notice of Intent To Prepare Supplement II to the Final Environmental Impact Statement, Mississippi River and Tributaries (MR&T) Project, Mississippi River Mainline Levees and Channel Improvement
USACE is announcing the public scoping meeting dates, times, and locations and extending the scoping comment period for the Notice of Intent (NOI) to prepare Supplement II (SEIS II) to the Final Environmental Impact Statement, Mississippi River and Tributaries (MR&T) Project, Mississippi River Mainline Levees and Channel Improvement of 1976 (1976 EIS), as updated and supplemented by Supplement No. 1, Mississippi River and Tributaries Project, Mississippi River Mainline Levee Enlargement and Seepage Control of 1998 (SEIS I) to the 1976 EIS. The NOI was published in the Federal Register on July 13, 2018. The public comment period on the NOI was scheduled to end on October 1, 2018. USACE is extending the comment period by 14 days and will now consider comments received through October 15, 2018.
Availability of the Arlington National Cemetery Southern Expansion Project and Associated Roadway Realignment Draft Environmental Assessment, Arlington, VA
The U.S. Army Corps of Engineers (USACE) Norfolk District, on behalf of the Arlington National Cemetery (ANC), announces the availability of a Draft Environmental Assessment (Draft EA) for the Arlington National Cemetery Southern Expansion Project and Associated Roadway Realignment project, for review and comment. The Draft EA evaluates the proposal to increase the cemetery's contiguous acreage, realign roadways, and maximize burial space by utilizing an area adjacent to the existing cemetery that includes the former Navy Annex site, located south of the existing cemetery, in Arlington, Virginia. The cemetery has been working with the owners and operators of the adjacent road network, Arlington County and the Virginia Department of Transportation, and the Federal Highway Administration, on a roadway realignment that supports the short- and long-term multimodal transportation system for the Commonwealth of Virginia and Arlington County.
Inland Waterways Users Board; Notice of Federal Advisory Committee Meeting
The notice of an open meeting scheduled for August 30, 2018 published in the Federal Register on July 11, 2018 has a new date and time. The meeting will now be held on August 28, 2018 at 1:00 p.m.
Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement (EIS) for the City of Abilene, TX, Cedar Ridge Reservoir Water Supply Project
The U.S. Army Corps of Engineers, Fort Worth District, Regulatory Division is notifying interested parties that it has withdrawn the Notice of Intent (NOI) to develop an EIS for the proposed Cedar Ridge Reservoir. The original NOI to Prepare an EIS was published in the Federal Register on Friday, April 13, 2018.
Availability of the Final Environmental Impact Statement for the Northern Integrated Supply Project, Larimer and Weld Counties, Colorado
The comment period for the Availability of the Final Environmental Impact Statement for the Northern Integrated Supply Project, Larimer and Weld Counties, Colorado published in the Federal Register on Friday, July 20, 2018, and required comments be postmarked on or before September 4, 2018. The Corps is extending the deadline for submitting public comments to October 4, 2018.