Availability of a Final Integrated Feasibility Report (Feasibility Report/Environmental Impact Statement), Little Colorado River at Winslow, Navajo County, Arizona, Flood Risk Management Project, 51678 [2018-22134]
Download as PDF
51678
Federal Register / Vol. 83, No. 198 / Friday, October 12, 2018 / Notices
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
Availability of a Final Integrated
Feasibility Report (Feasibility Report/
Environmental Impact Statement),
Little Colorado River at Winslow,
Navajo County, Arizona, Flood Risk
Management Project
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of availability.
AGENCY:
The U.S. Army Corps of
Engineers (Corps), in cooperation with
Navajo County Flood Control District,
announces the availability of a Final
Integrated Feasibility Report (Final IFR)
including Feasibility Report and
Environmental Impact Statement (EIS)
for the Little Colorado River at Winslow,
Navajo County, Arizona Flood Risk
Management Project for review and
comment. The study evaluates
alternatives to reduce the risk of
damages and to reduce the life, safety,
and health risks caused by flooding of
the Little Colorado River (LCR) to the
City of Winslow, surrounding
community, and public and private
infrastructure.
SUMMARY:
The Final IFR is available for a
30-day review period pursuant to the
National Environmental Policy Act
(NEPA).
DATES:
Questions or comments
concerning the Final IFR may be
directed to: Eduardo T. De Mesa.; Chief,
Planning Division; U.S. Army Corps of
Engineers; Los Angeles District; 915
Wilshire Boulevard, Suite 930; ATTN:
Mr. Kirk C. Brus, CESPL–PD–RL; Los
Angeles, CA 90017–3401 or
LCRWinslow@usace.army.mil.
FOR FURTHER INFORMATION CONTACT: Mr.
Richard Legere, U.S. Army Corps of
Engineers, Los Angeles District, phone
number (602) 230–6907, and Mr. Kirk C.
Brus, U.S. Army Corps of Engineers, Los
Angeles District, phone number (213)
452–3876.
SUPPLEMENTARY INFORMATION: Comments
on the Final IFR may also be given to
the contacts listed under ADDRESSES.
The document is available for review
at:
(1) Online at https://
www.spl.usace.army.mil/Missions/
CivilWorks/ProjectsStudies/
LittleColoradoRiverWinslow.aspx
(2) U.S. Army Corps of Engineers,
Arizona-Nevada Area Office, 3636
N Central Ave., Suite 900, Phoenix,
AZ 85012–1939
khammond on DSK30JT082PROD with NOTICES
ADDRESSES:
VerDate Sep<11>2014
19:19 Oct 11, 2018
Jkt 247001
(3) Navajo County Library District; 121
W Buffalo Street, Holbrook, AZ
86025
(4) Winslow Public Library; 420 W
Gilmore Street, Winslow, AZ 86047
(5) Holbrook Public Library; 403 Park
St., Holbrook, AZ 86025
(6) Hopi Public Library; 1 Main Street
Kykotsmovi, AZ 86039
(7) Navajo County Flood Control
District, 100 W Public Works Drive,
Holbrook, AZ 86025
(8) U.S. Army Corps of Engineers, Los
Angeles District; 915 Wilshire
Blvd., Los Angeles, CA 90017
A Notice of Intent to prepare the Draft
EIS was published in the Federal
Register on February 27, 2009 (74 FR
8918). A Notice of Availability for the
Draft IFR was published in the Federal
Register on June 3, 2016 (81 FR 35756).
Public involvement process included a
formal public scoping meeting in
Winslow, Arizona, on March 24, 2009.
The Draft IFR was made available to the
public through the Corps Los Angeles
District’s website on May 26, 2016, and
notices that information was available to
interested parties and stakeholders were
mailed. Two public meetings were held
in Winslow on June 9, 2016 concurrent
with the release of the Draft IFR, and the
public provided oral and written
comments during these meetings.
Comments on the Draft IFR were also
accepted in writing for a 45-day period
extending from June 3, 2016 through
July 18, 2016. All comments provided
on the Draft IFR and responses to
comments can be found in the Final
IFR, Appendix I (Environmental).
Dated: September 27, 2018.
Aaron C. Barta,
Colonel, U.S. Army, Commander and District
Engineer.
[FR Doc. 2018–22134 Filed 10–11–18; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Notice of Availability of the Final
Missouri River Recovery Management
Plan and Environmental Impact
Statement
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice; second extension of
final EIS waiting period.
AGENCY:
The Notice of Availability for
the Final Missouri River Recovery
Management Plan and Environmental
Impact Statement (MRRMP–FEIS)
published in the Federal Register on
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2018–22145 Filed 10–11–18; 8:45 am]
BILLING CODE 3720–58–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2018–0576; FRL–9984–16]
Pesticide Product Registration;
Receipt of Applications for New Uses
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA has received applications
to register new uses for pesticide
products containing currently registered
active ingredients. Pursuant to the
Federal Insecticide, Fungicide, and
Rodenticide Act (FIFRA), EPA is hereby
providing notice of receipt and
opportunity to comment on these
applications.
SUMMARY:
Comments must be received on
or before November 13, 2018.
ADDRESSES: Submit your comments,
identified by the Docket Identification
(ID) Number and the File Symbol or
EPA Registration Number of interest as
shown in the body of this document, by
one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Do not submit electronically any
information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute.
• Mail: OPP Docket, Environmental
Protection Agency Docket Center (EPA/
DATES:
Department of the Army, Corps of
Engineers
SUMMARY:
Friday, August 31, 2018, stated the
waiting period for signature of the
MRRMP–FEIS Record of Decision
would end on October 9, 2018. The U.S.
Army Corps of Engineers previously
extended the waiting period through
October 22, 2018 with a notice
published in the Federal Register on
Friday, September 28, 2018. Through
this notice, the U.S. Army Corps of
Engineers is extending the waiting
period again through November 9, 2018.
FOR FURTHER INFORMATION CONTACT:
Tiffany Vanosdall, U.S. Army Corps of
Engineers at (402) 995–2695 or by email
at tiffany.k.vanosdall@usace.army.mil.
SUPPLEMENTARY INFORMATION: The
MRRMP–FEIS can be downloaded
online at: https://
www.nwo.usace.army.mil/mrrp/mgmtplan/ or at: https://
parkplanning.nps.gov/MRRMP.
E:\FR\FM\12OCN1.SGM
12OCN1
Agencies
[Federal Register Volume 83, Number 198 (Friday, October 12, 2018)]
[Notices]
[Page 51678]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-22134]
[[Page 51678]]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Availability of a Final Integrated Feasibility Report
(Feasibility Report/Environmental Impact Statement), Little Colorado
River at Winslow, Navajo County, Arizona, Flood Risk Management Project
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers (Corps), in cooperation with
Navajo County Flood Control District, announces the availability of a
Final Integrated Feasibility Report (Final IFR) including Feasibility
Report and Environmental Impact Statement (EIS) for the Little Colorado
River at Winslow, Navajo County, Arizona Flood Risk Management Project
for review and comment. The study evaluates alternatives to reduce the
risk of damages and to reduce the life, safety, and health risks caused
by flooding of the Little Colorado River (LCR) to the City of Winslow,
surrounding community, and public and private infrastructure.
DATES: The Final IFR is available for a 30-day review period pursuant
to the National Environmental Policy Act (NEPA).
ADDRESSES: Questions or comments concerning the Final IFR may be
directed to: Eduardo T. De Mesa.; Chief, Planning Division; U.S. Army
Corps of Engineers; Los Angeles District; 915 Wilshire Boulevard, Suite
930; ATTN: Mr. Kirk C. Brus, CESPL-PD-RL; Los Angeles, CA 90017-3401 or
[email protected].
FOR FURTHER INFORMATION CONTACT: Mr. Richard Legere, U.S. Army Corps of
Engineers, Los Angeles District, phone number (602) 230-6907, and Mr.
Kirk C. Brus, U.S. Army Corps of Engineers, Los Angeles District, phone
number (213) 452-3876.
SUPPLEMENTARY INFORMATION: Comments on the Final IFR may also be given
to the contacts listed under ADDRESSES.
The document is available for review at:
(1) Online at https://www.spl.usace.army.mil/Missions/CivilWorks/ProjectsStudies/LittleColoradoRiverWinslow.aspx
(2) U.S. Army Corps of Engineers, Arizona-Nevada Area Office, 3636 N
Central Ave., Suite 900, Phoenix, AZ 85012-1939
(3) Navajo County Library District; 121 W Buffalo Street, Holbrook, AZ
86025
(4) Winslow Public Library; 420 W Gilmore Street, Winslow, AZ 86047
(5) Holbrook Public Library; 403 Park St., Holbrook, AZ 86025
(6) Hopi Public Library; 1 Main Street Kykotsmovi, AZ 86039
(7) Navajo County Flood Control District, 100 W Public Works Drive,
Holbrook, AZ 86025
(8) U.S. Army Corps of Engineers, Los Angeles District; 915 Wilshire
Blvd., Los Angeles, CA 90017
A Notice of Intent to prepare the Draft EIS was published in the
Federal Register on February 27, 2009 (74 FR 8918). A Notice of
Availability for the Draft IFR was published in the Federal Register on
June 3, 2016 (81 FR 35756). Public involvement process included a
formal public scoping meeting in Winslow, Arizona, on March 24, 2009.
The Draft IFR was made available to the public through the Corps Los
Angeles District's website on May 26, 2016, and notices that
information was available to interested parties and stakeholders were
mailed. Two public meetings were held in Winslow on June 9, 2016
concurrent with the release of the Draft IFR, and the public provided
oral and written comments during these meetings. Comments on the Draft
IFR were also accepted in writing for a 45-day period extending from
June 3, 2016 through July 18, 2016. All comments provided on the Draft
IFR and responses to comments can be found in the Final IFR, Appendix I
(Environmental).
Dated: September 27, 2018.
Aaron C. Barta,
Colonel, U.S. Army, Commander and District Engineer.
[FR Doc. 2018-22134 Filed 10-11-18; 8:45 am]
BILLING CODE 3720-58-P