Intent To Prepare a Draft Environmental Impact Statement for the Amite River and Tributaries-East of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study, 12602-12603 [2019-06353]
Download as PDF
amozie on DSK9F9SC42PROD with NOTICES
12602
Federal Register / Vol. 84, No. 63 / Tuesday, April 2, 2019 / Notices
All interested parties are invited to
comment at this time, and anyone
interested in the DIFR–DEIS should
request to be included on the
distribution list. The scoping period
will extend for 45 days after the date of
this Notice of Intent publication.
Comments should be as specific as
possible. Additional public involvement
will be sought through the
implementation of the public
involvement plan and the agency
coordination team. Comments may be
mailed, emailed or entered at: https://
www.mvn.usace.army.mil/SouthCentral-Coast/.
A Scoping Meeting Notice
announcing the locations, dates and
times for scoping meetings is
anticipated to be posted on the project
website, https://
www.mvn.usace.army.mil/SouthCentral-Coast/ and through various
advertising avenues widely available to
the public no later than 15 days prior to
the meeting dates.
6. Environmental Consultation and
Review. The USACE will serve as the
lead Federal agency in the preparation
of the DIFR–DEIS. Other Federal and/or
state agencies may participate as
cooperating and/or commenting
agencies throughout the study process.
The U.S. Fish and Wildlife Service
(USFWS) will assist in documenting
existing conditions and assessing effects
of project alternatives through the Fish
and Wildlife Coordination Act
consultation procedures. In addition,
because the proposed project may affect
federally listed species, the USACE will
consult with the USFWS and the
National Marine Fisheries Service
(NMFS) in accordance with the
Endangered Species Act, Section 7. The
USACE will consult the NMFS
regarding the effects of the project on
Essential Fish Habitat per the
Magnuson-Stevens Fishery
Conservation and Management Act. The
USACE will consult with affected
Federally Recognized Tribes. Other
environmental review and consultation
requirements for the proposed project
include the need for Louisiana
Department of Environmental Quality
Clean Water Act Section 401 water
quality certification and Clean Air Act
coordination. The USACE will consult
with the State Historic Preservation
Officer under National Historic
Preservation Act, Section 106,
concerning properties listed or
potentially eligible for listing. The
USACE will coordinate with the
Louisiana Department of Natural
Resources for coastal zone management
consistency per the Coastal Zone
Management Act.
VerDate Sep<11>2014
19:32 Apr 01, 2019
Jkt 247001
7. Availability. The USACE currently
estimates the DIFR–DEIS will be
available for public review and
comment in December 2019. At that
time, the USACE will provide a 45-day
public review period for individuals
and agencies to review and comment.
The USACE will notify all interested
agencies, organizations, and individuals
of the availability of the draft document
at that time.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2019–06355 Filed 4–1–19; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
Intent To Prepare a Draft
Environmental Impact Statement for
the Amite River and Tributaries-East of
the Mississippi River, Louisiana, Flood
Risk Management Feasibility Study
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of intent.
AGENCY:
Pursuant to the National
Environmental Policy Act (NEPA), the
U.S. Army Corps of Engineers, New
Orleans District (USACE) intends to
prepare a Draft Integrated Feasibility
Report and Environmental Impact
Statement (DIFR–EIS) to assess the
potential social, economic, and
environmental impacts associated with
the proposed project titled, ‘‘Amite
River and Tributaries—East of the
Mississippi River, Louisiana, Flood Risk
Management Feasibility Study.’’ The
DIFR–EIS will document the existing
conditions of environmental resources
in and around areas considered for
construction, and potential impacts on
those resources as a result of
implementing the alternatives.
DATES: A Scoping Meeting Notice
announcing the locations, dates and
times for scoping meetings is
anticipated to be posted on the project
website, https://
www.mvn.usace.army.mil/About/
Projects/BBA-2018/studies/ and
published in the local newspapers no
later than 15 days prior to the meeting
dates.
ADDRESSES: Ms. Kaitlyn Carriere,
CEMVN–PMR, Room 331, 7400 Leake
Avenue, New Orleans, LA 70118.
AmiteFS@usace.army.mil.
FOR FURTHER INFORMATION CONTACT: If
you have questions or comments about
the proposed action or would like to be
SUMMARY:
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
added to the project mailing list, please
call Ms. Kaitlyn Carriere at (504) 862–
1798. For additional information, please
visit the following https://
www.mvn.usace.army.mil/About/
Projects/BBA-2018/studies/.
SUPPLEMENTARY INFORMATION: The lead
agency for this proposed action is the
USACE. Louisiana Department of
Transportation and Development
(LDOTD) is the non-Federal sponsor.
1. Authority. The USACE is preparing
the DIFR–EIS study under the standing
authority of Bipartisan Budget Act of
2018, (Pub. L. 115–123), Division B,
Subdivision 1, H. R. 1892—13, Title IV,
Corps Of Engineers—Civil, Department
Of The Army, Investigations. The
Bipartisan Budget Act authorizes the
USACE proposed Amite River and
Tributaries—East of the Mississippi
River, Louisiana, Flood Risk
Management Feasibility Study planning
and potential construction project. The
study phase is 100% federal funding.
2. Background. The study area, which
includes the Amite River Basin,
encompasses an area of approximately
3,450 square miles consisting of 8
Louisiana parishes (East Feleciana, St.
Helena, East Baton Rouge, Livingston,
Iberville, Ascension, St. James, and St.
John the Baptist), Maurepas Lake, and 4
Mississippi counties (Amite, Wilkinson,
Franklin, and Lincoln). Over threefourths of the study area lies in the
parishes of southeastern Louisiana,
located east of the Mississippi River and
north of Lake Maurepas. The upper onefourth of the study area’s drainage area
lies in the southwestern Mississippi
counties.
The Amite River and its tributaries
has caused flood damages to industrial,
commercial, agricultural facilities, and
residential and nonresidential
structures. As recently as August 2016,
the President issued disaster
declarations for parishes in the Amite
River Basin due to impacts from ‘‘The
Great Flood of 2016’’. The flood was
responsible for 13 deaths and the rescue
of at least 19,000 people. The study area
experienced historic flooding to
thousands of homes and businesses and
impacts to the Nation’s critical
infrastructure because both the I–10 and
I–12 transportation system were
shutdown for days. Major urban centers
in the basin saw significant flooding
well outside of normal flood stages.
The Amite River Basin primarily has
flooding from two different sources. The
Upper Basin flooding is caused from
headwater flooding from rainfall events.
The lower basin flooding is caused by
a combination of drainage from
headwaters and backwater flooding
E:\FR\FM\02APN1.SGM
02APN1
amozie on DSK9F9SC42PROD with NOTICES
Federal Register / Vol. 84, No. 63 / Tuesday, April 2, 2019 / Notices
from tides and wind setup. Critical
infrastructure throughout the region,
includes the I–10 and I–12
transportation system, government
facilities, and schools are expected to
have increased risk of damage from
rainfall damage from rainfall events as
a result of climate change.
The USACE will focus their analysis
on the following resources as
applicable: Aesthetics and visual
resources, water quality, aquatic
resources/wetlands, fish and wildlife
resources, threatened/endangered
species and other protected species of
concern, cultural & historic resources
and tribal trust resources, floodplains,
hazardous, toxic & radioactive waste,
hydrology, land use, navigation and
public infrastructure, socio-economics,
environmental justice and soils.
3. Alternatives. The USACE will
evaluate a range of alternatives for the
proposed action including structural
and nonstructural measures. For the
reasonable and practicable alternatives,
the USACE will fully evaluate them,
including the no action alternative.
Alternatives may result in avoidance
and minimization, and mitigation
measures of impacts to reduce or offset
any impacts.
4. Public Involvement. Public
involvement, an essential part of the
NEPA process, is integral to assessing
the environmental consequences of the
proposed action and improving the
quality of the environmental decision
making. The public includes affected
and interested Federal, state, and local
agencies, Indian tribes, concerned
citizens, stakeholders, and other
interested parties. Public participation
in the NEPA process will be strongly
encouraged, both formally and
informally, to enhance the probability of
a more technically accurate,
economically feasible, and socially
acceptable EIS. Public involvement will
include, but is not limited to:
Information dissemination;
identification of problems, needs and
opportunities; idea generation; public
education; problem solving; providing
feedback on proposals; evaluation of
alternatives; conflict resolution; public
and scoping notices and meetings;
public, stakeholder and advisory groups
consultation and meetings; and making
the EIS and supporting information
readily available in conveniently
located places, such as libraries and on
the world wide web.
5. Scoping. Scoping, an early and
open process for identifying the scope of
significant issues related to the
proposed action to be addressed in the
EIS, will be used to: (a) identify the
affected public and agency concerns; (b)
VerDate Sep<11>2014
18:45 Apr 01, 2019
Jkt 247001
facilitate an efficient EIS preparation
process; (c) define the issues and
alternatives that will be examined in
detail in the EIS; and (d) save time in
the overall process by helping to ensure
that the draft EIS adequately addresses
relevant issues. A Scoping Meeting
Notice announcing the locations, dates
and times for scoping meetings is
anticipated to be posted on the project
website, https://www.mvn.usace.army.
mil/About/Projects/BBA-2018/studies/
and published in the local newspapers
no later than 15 days prior to the
meeting dates.
6. Coordination. The USACE will
serve as the lead Federal agency in the
preparation of the EIS. Other federal
and/or state agencies may participate as
cooperating and/or commenting
agencies throughout the EIS process.
In accordance with Executive order,
1307, referred to as One Federal
Decision (OFD), the USACE and other
agencies with environmental review,
authorization, or consultation
responsibilities for major infrastructure
projects should develop a single EIS for
such projects, sign a single Record of
Decision (ROD) and issue all necessary
authorizations within 90 days thereafter,
subject to limited exceptions. An
essential element of the OFD framework
is the development of a schedule,
referred to the ‘‘Permitting Timetable,’’
including key milestones critical to
completion of the environmental review
and issuance of a ROD. Cooperating
agencies required by law to develop
schedules for environmental review or
authorization processes should transmit
a summary of such schedules to the lead
agency for integration into the
Permitting Timetable.
To ensure timely completion of the
environmental review and issuance of
necessary authorizations, OMB and CEQ
recommend the Permitting Timetable
for major infrastructure projects provide
for environmental review according to
the following schedule:
(1) Formal scoping and preparation of
a Draft EIS (DEIS) within 14 months,
beginning on the date of publication of
the NOI to publish an EIS and ending
on the date of the Notice of Availability
of the DEIS;
(2) Completion of the formal public
comment period and development of
the Final EIS (FEIS) within eight months
of the date of the Notice of Availability
of the DEIS; and
(3) Publication of the final ROD
within two months of the publication of
the Notice of Availability of the FEIS.
While the actual schedule for any
given project may vary based upon the
circumstances of the project and
applicable law, agencies should
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
12603
endeavor to meet the two-year goal
established in E.O. 13807.
The U.S. Fish and Wildlife Service
(Service) will assist in documenting
existing conditions and assessing effects
of project alternatives through the Fish
and Wildlife Start Coordination Act
consultation procedures. Other
environmental review and consultation
requirements for the proposed project
include the need for Louisiana
Department of Environmental Quality
Clean Water Act Section 401water
quality. In addition, because the
proposed project may affect federally
listed species, the USACE will consult
with the Service and the National
Marine Fisheries Service (NMFS) in
accordance with Endangered Species
Act, Section 7. The NMFS will be
consulted regarding the effects of this
proposed project on Essential Fish
Habitat per the Magnuson–Stevens Act.
The USACE will also be consulting with
the State Historic Preservation Officer
under Section 106 of the National
Historic Preservation Act concerning
properties listed, or potentially eligible
for listing. The USACE will also be
coordinating with the Louisiana
Department of Natural Resources for
Coastal Zone Management Consistency
per the Coastal Zone Management Act.
7. Availability. The Draft EIS (DEIS) is
expected to be available for public
comment and review no sooner than
December 2019. At that time, a 45-day
public review period will be provided
for individuals and agencies to review
and comment on the DEIS. All
interested parties are encouraged to
respond to this notice and provide a
current address if they wish to be
notified of the DEIS circulation.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2019–06353 Filed 4–1–19; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR17–54–000.
Applicants: B&W Pipeline, LLC.
Description: Supplemental
Information/Request of B&W Pipeline,
LLC under PR17–54. Stipulation and
Agreement.
Filed Date: 3/21/19.
E:\FR\FM\02APN1.SGM
02APN1
Agencies
[Federal Register Volume 84, Number 63 (Tuesday, April 2, 2019)]
[Notices]
[Pages 12602-12603]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-06353]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Intent To Prepare a Draft Environmental Impact Statement for the
Amite River and Tributaries-East of the Mississippi River, Louisiana,
Flood Risk Management Feasibility Study
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: Pursuant to the National Environmental Policy Act (NEPA), the
U.S. Army Corps of Engineers, New Orleans District (USACE) intends to
prepare a Draft Integrated Feasibility Report and Environmental Impact
Statement (DIFR-EIS) to assess the potential social, economic, and
environmental impacts associated with the proposed project titled,
``Amite River and Tributaries--East of the Mississippi River,
Louisiana, Flood Risk Management Feasibility Study.'' The DIFR-EIS will
document the existing conditions of environmental resources in and
around areas considered for construction, and potential impacts on
those resources as a result of implementing the alternatives.
DATES: A Scoping Meeting Notice announcing the locations, dates and
times for scoping meetings is anticipated to be posted on the project
website, https://www.mvn.usace.army.mil/About/Projects/BBA-2018/studies/ and published in the local newspapers no later than 15 days
prior to the meeting dates.
ADDRESSES: Ms. Kaitlyn Carriere, CEMVN-PMR, Room 331, 7400 Leake
Avenue, New Orleans, LA 70118. [email protected].
FOR FURTHER INFORMATION CONTACT: If you have questions or comments
about the proposed action or would like to be added to the project
mailing list, please call Ms. Kaitlyn Carriere at (504) 862-1798. For
additional information, please visit the following https://www.mvn.usace.army.mil/About/Projects/BBA-2018/studies/.
SUPPLEMENTARY INFORMATION: The lead agency for this proposed action is
the USACE. Louisiana Department of Transportation and Development
(LDOTD) is the non-Federal sponsor.
1. Authority. The USACE is preparing the DIFR-EIS study under the
standing authority of Bipartisan Budget Act of 2018, (Pub. L. 115-123),
Division B, Subdivision 1, H. R. 1892--13, Title IV, Corps Of
Engineers--Civil, Department Of The Army, Investigations. The
Bipartisan Budget Act authorizes the USACE proposed Amite River and
Tributaries--East of the Mississippi River, Louisiana, Flood Risk
Management Feasibility Study planning and potential construction
project. The study phase is 100% federal funding.
2. Background. The study area, which includes the Amite River
Basin, encompasses an area of approximately 3,450 square miles
consisting of 8 Louisiana parishes (East Feleciana, St. Helena, East
Baton Rouge, Livingston, Iberville, Ascension, St. James, and St. John
the Baptist), Maurepas Lake, and 4 Mississippi counties (Amite,
Wilkinson, Franklin, and Lincoln). Over three-fourths of the study area
lies in the parishes of southeastern Louisiana, located east of the
Mississippi River and north of Lake Maurepas. The upper one-fourth of
the study area's drainage area lies in the southwestern Mississippi
counties.
The Amite River and its tributaries has caused flood damages to
industrial, commercial, agricultural facilities, and residential and
nonresidential structures. As recently as August 2016, the President
issued disaster declarations for parishes in the Amite River Basin due
to impacts from ``The Great Flood of 2016''. The flood was responsible
for 13 deaths and the rescue of at least 19,000 people. The study area
experienced historic flooding to thousands of homes and businesses and
impacts to the Nation's critical infrastructure because both the I-10
and I-12 transportation system were shutdown for days. Major urban
centers in the basin saw significant flooding well outside of normal
flood stages.
The Amite River Basin primarily has flooding from two different
sources. The Upper Basin flooding is caused from headwater flooding
from rainfall events. The lower basin flooding is caused by a
combination of drainage from headwaters and backwater flooding
[[Page 12603]]
from tides and wind setup. Critical infrastructure throughout the
region, includes the I-10 and I-12 transportation system, government
facilities, and schools are expected to have increased risk of damage
from rainfall damage from rainfall events as a result of climate
change.
The USACE will focus their analysis on the following resources as
applicable: Aesthetics and visual resources, water quality, aquatic
resources/wetlands, fish and wildlife resources, threatened/endangered
species and other protected species of concern, cultural & historic
resources and tribal trust resources, floodplains, hazardous, toxic &
radioactive waste, hydrology, land use, navigation and public
infrastructure, socio-economics, environmental justice and soils.
3. Alternatives. The USACE will evaluate a range of alternatives
for the proposed action including structural and nonstructural
measures. For the reasonable and practicable alternatives, the USACE
will fully evaluate them, including the no action alternative.
Alternatives may result in avoidance and minimization, and mitigation
measures of impacts to reduce or offset any impacts.
4. Public Involvement. Public involvement, an essential part of the
NEPA process, is integral to assessing the environmental consequences
of the proposed action and improving the quality of the environmental
decision making. The public includes affected and interested Federal,
state, and local agencies, Indian tribes, concerned citizens,
stakeholders, and other interested parties. Public participation in the
NEPA process will be strongly encouraged, both formally and informally,
to enhance the probability of a more technically accurate, economically
feasible, and socially acceptable EIS. Public involvement will include,
but is not limited to: Information dissemination; identification of
problems, needs and opportunities; idea generation; public education;
problem solving; providing feedback on proposals; evaluation of
alternatives; conflict resolution; public and scoping notices and
meetings; public, stakeholder and advisory groups consultation and
meetings; and making the EIS and supporting information readily
available in conveniently located places, such as libraries and on the
world wide web.
5. Scoping. Scoping, an early and open process for identifying the
scope of significant issues related to the proposed action to be
addressed in the EIS, will be used to: (a) identify the affected public
and agency concerns; (b) facilitate an efficient EIS preparation
process; (c) define the issues and alternatives that will be examined
in detail in the EIS; and (d) save time in the overall process by
helping to ensure that the draft EIS adequately addresses relevant
issues. A Scoping Meeting Notice announcing the locations, dates and
times for scoping meetings is anticipated to be posted on the project
website, https://www.mvn.usace.army.mil/About/Projects/BBA-2018/studies/ and published in the local newspapers no later than 15 days
prior to the meeting dates.
6. Coordination. The USACE will serve as the lead Federal agency in
the preparation of the EIS. Other federal and/or state agencies may
participate as cooperating and/or commenting agencies throughout the
EIS process.
In accordance with Executive order, 1307, referred to as One
Federal Decision (OFD), the USACE and other agencies with environmental
review, authorization, or consultation responsibilities for major
infrastructure projects should develop a single EIS for such projects,
sign a single Record of Decision (ROD) and issue all necessary
authorizations within 90 days thereafter, subject to limited
exceptions. An essential element of the OFD framework is the
development of a schedule, referred to the ``Permitting Timetable,''
including key milestones critical to completion of the environmental
review and issuance of a ROD. Cooperating agencies required by law to
develop schedules for environmental review or authorization processes
should transmit a summary of such schedules to the lead agency for
integration into the Permitting Timetable.
To ensure timely completion of the environmental review and
issuance of necessary authorizations, OMB and CEQ recommend the
Permitting Timetable for major infrastructure projects provide for
environmental review according to the following schedule:
(1) Formal scoping and preparation of a Draft EIS (DEIS) within 14
months, beginning on the date of publication of the NOI to publish an
EIS and ending on the date of the Notice of Availability of the DEIS;
(2) Completion of the formal public comment period and development
of the Final EIS (FEIS) within eight months of the date of the Notice
of Availability of the DEIS; and
(3) Publication of the final ROD within two months of the
publication of the Notice of Availability of the FEIS.
While the actual schedule for any given project may vary based upon
the circumstances of the project and applicable law, agencies should
endeavor to meet the two-year goal established in E.O. 13807.
The U.S. Fish and Wildlife Service (Service) will assist in
documenting existing conditions and assessing effects of project
alternatives through the Fish and Wildlife Start Coordination Act
consultation procedures. Other environmental review and consultation
requirements for the proposed project include the need for Louisiana
Department of Environmental Quality Clean Water Act Section 401water
quality. In addition, because the proposed project may affect federally
listed species, the USACE will consult with the Service and the
National Marine Fisheries Service (NMFS) in accordance with Endangered
Species Act, Section 7. The NMFS will be consulted regarding the
effects of this proposed project on Essential Fish Habitat per the
Magnuson-Stevens Act. The USACE will also be consulting with the State
Historic Preservation Officer under Section 106 of the National
Historic Preservation Act concerning properties listed, or potentially
eligible for listing. The USACE will also be coordinating with the
Louisiana Department of Natural Resources for Coastal Zone Management
Consistency per the Coastal Zone Management Act.
7. Availability. The Draft EIS (DEIS) is expected to be available
for public comment and review no sooner than December 2019. At that
time, a 45-day public review period will be provided for individuals
and agencies to review and comment on the DEIS. All interested parties
are encouraged to respond to this notice and provide a current address
if they wish to be notified of the DEIS circulation.
Brenda S. Bowen,
Army Federal Register Liaison Officer.