Notice of Availability of the Record of Decision for the Final Missouri River Recovery Management Plan and Environmental Impact Statement, 61609 [2018-26040]
Download as PDF
Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices
Contracting Activity: GSA/FAS ADMIN
SVCS ACQUISITION BR(2, New
York, NY
Services
Service Type: Supply Room/Motor
Vehicle Service
Mandatory for: Federal Aviation
Administration: Great Lakes Region,
Des Plaines, IL
Mandatory Source of Supply: Jewish
Vocational Service and
Employment Center, Chicago, IL
Contracting Activity: DEPARTMENT OF
TRANSPORTATION
Service Type: Janitorial Service
Mandatory for: USDA Natural Resources
Conservation Service Shiprock
Field Office, Old Post Office Route
491 Shiprock, NM
Mandatory Source of Supply:
Presbyterian Medical Services,
Santa Fe, NM
Contracting Activity: NATURAL
RESOURCES CONSERVATION
SERVICE, AZ STATE OFFICE
(NRCS)
Service Types: Trash Pick-up Service
Cleaning Service
Mandatory for: Crane Division, Naval
Surface Warfare Center, Crane, IN
Mandatory Source of Supply: Orange
County Rehabilitative and
Developmental Services, Inc., Paoli,
IN
Contracting Activity: DEPT OF THE
NAVY, U S FLEET FORCES
COMMAND
Michael R. Jurkowski,
Business Management Specialist, Business
Operations.
[FR Doc. 2018–26065 Filed 11–29–18; 8:45 am]
BILLING CODE 6353–01–P
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
amozie on DSK3GDR082PROD with NOTICES1
Withdrawal of the Notice of Intent To
Prepare a Draft Environmental Impact
Statement (DEIS) in Cooperation With
the North Carolina Department of
Transportation and South Carolina
Department of Transportation for
Extending SC 31 (Carolina Bays
Parkway), in Horry County, South
Carolina, To Connect to US 17, in
Brunswick County, North Carolina
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice.
Charleston District, Charleston
Regulatory Division (collectively COE)
are issuing this notice to advise the
public that a State (North Carolina
Department of Transportation [NCDOT]
and South Carolina Department of
Transportation [SCDOT]) funded Draft
Environmental Impact Statement (DEIS)
will no longer be prepared by the COE,
while acting as lead federal agency, for
improvements to SC 31 starting near
Little River, Horry County, South
Carolina and running northeast to US
17, in an area between Calabash and
Shallotte, Brunswick County, North
Carolina. On July 6, 2017 the COE
issued a Notice of Intent to prepare a
DEIS for the ‘‘Carolina Bays Parkway
Extension’’, NCDOT Project 44604 and
SCDOT Project P029554. Recent
commitment of federal funds has altered
various aspects of this project, including
the designation of the lead federal
agency. Due to these developments, the
COE will no longer act in this capacity,
but rather as a cooperating agency
throughout the evaluation of the project.
At the appropriate time, a separate
notice will be issued within the Federal
Register identifying the lead agency,
describing the project, and detailing the
evaluation process.
FOR FURTHER INFORMATION CONTACT:
Questions about the COE’s current role
in this project can be directed to Mr.
Brad Shaver, Regulatory Project
Manager (Wilmington District),
Wilmington Regulatory Field Office, 69
Darlington Avenue, Wilmington, NC
28403, by telephone: (910) 251–4611, or
by email at Brad.E.Shaver@
USACE.army.mil or Ms. Amanda Heath,
Regulatory Project Manager (Charleston
District), Charleston Regulatory Office,
69A Hagood Avenue, Charleston, SC
29403, by telephone: (843) 329–8025, or
by email at Amanda.L.Heath@
usace.army.mil.
Scott McLendon,
Chief, Regulatory Division, Wilmington
District.
[FR Doc. 2018–26041 Filed 11–29–18; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
AGENCY:
The U.S. Army Corps of
Engineers, Wilmington District,
Wilmington Regulatory Division and the
U.S. Army Corps of Engineers,
SUMMARY:
VerDate Sep<11>2014
17:00 Nov 29, 2018
Jkt 247001
Notice of Availability of the Record of
Decision for the Final Missouri River
Recovery Management Plan and
Environmental Impact Statement
Department of the Army, U.S.
Army Corps of Engineers, DoD.
AGENCY:
PO 00000
Frm 00011
Fmt 4703
Sfmt 9990
61609
Notice; availability of the
Record of Decision.
ACTION:
The U.S. Army Corps of
Engineers (USACE) announces the
availability of the Record of Decision
(ROD) for the Final Missouri River
Recovery Management Plan and
Environmental Impact Statement
(MRRMP–FEIS) published in the
Federal Register on Friday, August 31,
2018. The USACE Northwestern
Division Commander signed the ROD on
November 20, 2018. Copies of the ROD
along with the MRRMP–FEIS and other
supporting documents are available for
viewing on the Missouri River Recovery
Program website at: https://
www.nwo.usace.army.mil/mrrp/mgmtplan/.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Tiffany Vanosdall, U.S. Army Corps of
Engineers at (402) 995–2695 or by email
at tiffany.k.vanosdall@usace.army.mil.
The
USACE has developed the MRRMP–
FEIS in cooperation with the U.S. Fish
and Wildlife Service (USFWS). This
document is the USACE Record of
Decision for the MRRMP–FEIS dated
August, 2018. The MRRMP–FEIS is a
programmatic assessment of major
federal actions necessary to avoid a
finding of jeopardy for the pallid
sturgeon (Scaphirhynchus albus),
interior least tern (Sterna antillarum),
and the Northern Great Plains piping
plover (Charadrius melodus) caused by
operation of the Missouri and Kansas
River reservoir systems and operation
and maintenance of the Missouri River
Bank Stabilization and Navigation
Project. After consultation with the
USFWS, and extensive collaboration,
analysis, and independent scientific
review, USACE has identified
Alternative 3 (Mechanical Construction
Only) as the selected alternative.
Alternative 3 will meet the species
objectives and fulfill the purpose and
need of the plan while avoiding and
minimizing adverse impacts to
stakeholders. Importantly, Alternative 3
would be implemented within an
adaptive management framework
detailed in the Science and Adaptive
Management Plan (SAMP). The ROD
documents why the USACE has chosen
to implement Alternative 3 as described
in the MRRMP–FEIS.
SUPPLEMENTARY INFORMATION:
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2018–26040 Filed 11–29–18; 8:45 am]
BILLING CODE 3720–58–P
E:\FR\FM\30NON1.SGM
30NON1
Agencies
[Federal Register Volume 83, Number 231 (Friday, November 30, 2018)]
[Notices]
[Page 61609]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-26040]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Notice of Availability of the Record of Decision for the Final
Missouri River Recovery Management Plan and Environmental Impact
Statement
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Notice; availability of the Record of Decision.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers (USACE) announces the
availability of the Record of Decision (ROD) for the Final Missouri
River Recovery Management Plan and Environmental Impact Statement
(MRRMP-FEIS) published in the Federal Register on Friday, August 31,
2018. The USACE Northwestern Division Commander signed the ROD on
November 20, 2018. Copies of the ROD along with the MRRMP-FEIS and
other supporting documents are available for viewing on the Missouri
River Recovery Program website at: https://www.nwo.usace.army.mil/mrrp/mgmt-plan/.
FOR FURTHER INFORMATION CONTACT: Tiffany Vanosdall, U.S. Army Corps of
Engineers at (402) 995-2695 or by email at
[email protected].
SUPPLEMENTARY INFORMATION: The USACE has developed the MRRMP-FEIS in
cooperation with the U.S. Fish and Wildlife Service (USFWS). This
document is the USACE Record of Decision for the MRRMP-FEIS dated
August, 2018. The MRRMP-FEIS is a programmatic assessment of major
federal actions necessary to avoid a finding of jeopardy for the pallid
sturgeon (Scaphirhynchus albus), interior least tern (Sterna
antillarum), and the Northern Great Plains piping plover (Charadrius
melodus) caused by operation of the Missouri and Kansas River reservoir
systems and operation and maintenance of the Missouri River Bank
Stabilization and Navigation Project. After consultation with the
USFWS, and extensive collaboration, analysis, and independent
scientific review, USACE has identified Alternative 3 (Mechanical
Construction Only) as the selected alternative. Alternative 3 will meet
the species objectives and fulfill the purpose and need of the plan
while avoiding and minimizing adverse impacts to stakeholders.
Importantly, Alternative 3 would be implemented within an adaptive
management framework detailed in the Science and Adaptive Management
Plan (SAMP). The ROD documents why the USACE has chosen to implement
Alternative 3 as described in the MRRMP-FEIS.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2018-26040 Filed 11-29-18; 8:45 am]
BILLING CODE 3720-58-P