Department of Energy March 23, 2011 – Federal Register Recent Federal Regulation Documents

Combined Notice of Filings #1
Document Number: 2011-6787
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Revision to Electric Reliability Organization Definition of Bulk Electric System
Document Number: 2011-6779
Type: Rule
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
The Commission denies rehearing and otherwise reaffirms its determinations in Order No. 743. In addition, the Commission clarifies certain provisions of the Final Rule. Order No. 743 directed the Electric Reliability Organization (ERO) to revise the definition of the term ``bulk electric system'' through the ERO's Reliability Standards Development Process to address the Commission's policy and technical concerns and ensure that the definition encompasses all facilities necessary for operating an interconnected electric transmission network pursuant to section 215 of the Federal Power Act.
Mandatory Reliability Standards for Interconnection Reliability Operating Limits
Document Number: 2011-6778
Type: Rule
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Under section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) approves three new Interconnection Reliability Operations and Coordination Reliability Standards and seven revised Reliability Standards related to Emergency Preparedness and Operations, Interconnection Reliability Operations and Coordination, and Transmission Operations. These Reliability Standards were submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC), which the Commission has certified as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards. The Reliability Standards were designed to prevent instability, uncontrolled separation, or cascading outages that adversely impact the reliability of the interconnection by ensuring that the reliability coordinator has the data necessary to assess its reliability coordinator area during the operations horizon and that it takes prompt action to prevent or mitigate instances of exceeding Interconnection Reliability. Operating Limits. The Commission also approves the addition of two new terms to the NERC Glossary of Terms. In addition, the Commission approves NERC's proposed revisions to Reliability Standards EOP-001-1, IRO-002-2, IRO-004-2, IRO-005-3, TOP- 003-1, TOP-005-2, and TOP-006-2, which remove requirements for the reliability coordinator to monitor and analyze system operating limits other than interconnection reliability operating limits.
Combined Notice of Filings #1
Document Number: 2011-6777
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
Document Number: 2011-6776
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
Document Number: 2011-6775
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
Document Number: 2011-6774
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
Document Number: 2011-6773
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
Document Number: 2011-6772
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
Document Number: 2011-6771
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
Document Number: 2011-6770
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
Document Number: 2011-6769
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #
Document Number: 2011-6767
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #2
Document Number: 2011-6766
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #3
Document Number: 2011-6765
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Planning Resource Adequacy Assessment Reliability Standard
Document Number: 2011-6763
Type: Rule
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Under section 215(d)(2) of the Federal Power Act, the Federal Energy Regulatory Commission approves regional Reliability Standard, BAL-502-RFC-02 (Planning Resource Adequacy Analysis, Assessment and Documentation), developed by ReliabilityFirst Corporation (RFC) and submitted to the Commission by the North American Electric Reliability Corporation. The approved regional Reliability Standard requires planning coordinators within the RFC geographical footprint to analyze, assess and document resource adequacy for load in the RFC footprint annually, to utilize a ``one day in ten years'' loss of load criterion, and to document and post load and resource capability in each area or transmission-constrained sub-area identified. The Commission also approves four regional reliability definitions related to the approved regional Reliability Standard and the violation risk factors and violation severity levels assigned to the BAL-502-RFC-02 Requirements.
Notice of Attendance at PJM INterconnection, L.L.C., Meetings
Document Number: 2011-6743
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Commission Information Collection Activities, Proposed Collection; Comment Request; Extension
Document Number: 2011-6741
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
In compliance with the requirements of section 3506(c)(2)(a) of the Paperwork Reduction Act of 1995 (Pub. L. 104-13), the Federal Energy Regulatory Commission (Commission) is soliciting public comment on the specific aspects of the information collection described below.
The Brooklyn Union Gas Company; Notice of Filing
Document Number: 2011-6740
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
System Restoration Reliability Standards
Document Number: 2011-6739
Type: Rule
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Under section 215 of the Federal Power Act, the Commission approves three Emergency Operations and Preparedness (EOP) Reliability Standards, EOP-001-1 (Emergency Operations Planning), EOP-005-2 (System Restoration from Blackstart Resources), and EOP-006-2 (System Restoration Coordination) as well as the definition of the term ``Blackstart Resource'' submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC), the Electric Reliability Organization certified by the Commission. The approved Reliability Standards require transmission operators, generation operators, and certain transmission owners and distribution providers to ensure that plans, facilities and personnel are prepared to enable system restoration from Blackstart Resources and require reliability coordinators to establish plans and prepare personnel to enable effective coordination of the system restoration process. The Commission also approves the NERC's proposal to retire four existing EOP Reliability Standards and a definition that are replaced by the Standards and definition approved in this Final Rule.
Analysis of Horizontal Market Power Under the Federal Power Act
Document Number: 2011-6738
Type: Notice
Date: 2011-03-23
Agency: Department of Energy, Federal Energy Regulatory Commission
In this Notice of Inquiry, the Federal Energy Regulatory Commission seeks comment on whether, and if so, how, the Commission should revise its approach for examining horizontal market power concerns in transactions under Sec. 203 of the Federal Power Act to reflect the Horizontal Merger Guidelines issued by the Department of Justice and Federal Trade Commission on August 19, 2010 (2010 Guidelines), and what impact the 2010 Guidelines should have, if any, on the Commission's analysis of horizontal market power in its electric market-based rate program.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.