Notice of Attendance at PJM INterconnection, L.L.C., Meetings, 16405-16406 [2011-6743]

Download as PDF jlentini on DSKJ8SOYB1PROD with NOTICES Federal Register / Vol. 76, No. 56 / Wednesday, March 23, 2011 / Notices submits tariff filing per 35.17(b): ATC Amendment Notice of Succession VI to be effective 2/9/2011. Filed Date: 03/14/2011. Accession Number: 20110314–5123. Comment Date: 5 p.m. Eastern Time on Monday, April 4, 2011. Docket Numbers: ER11–3081–000. Applicants: Florida Power & Light Company, NextEra Energy Duane Arnold, LLC, NextEra Energy Point Beach, LLC, NextEra Energy SeaBrook, LLC. Description: Request of Florida Power & Light Company and its MarketRegulated Power Sales Affiliates Operating Nuclear Generating Facilities For Waivers of Affiliate Restrictions Related to Nuclear Fuel Design/ Procuement/Fabrication. Filed Date: 03/14/2011. Accession Number: 20110314–5293. Comment Date: 5 p.m. Eastern Time on Monday, April 4, 2011. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. As it relates to any qualifying facility filings, the notices of self-certification [or self-recertification] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self-certification [or self-recertification] simply provides notification that the entity making the filing has determined the facility named in the notice meets the applicable criteria to be a qualifying facility. Intervention and/or protest do not lie in dockets that are qualifying facility self-certifications or selfrecertifications. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). Intervention and protests may be filed in response to notices of qualifying facility dockets other than self-certifications and selfrecertifications. VerDate Mar<15>2010 16:46 Mar 22, 2011 Jkt 223001 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 15, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. 16405 appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on Wednesday, March 23, 2011. [FR Doc. 2011–6777 Filed 3–22–11; 8:45 am] Dated: March 16, 2011. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P [FR Doc. 2011–6740 Filed 3–22–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. PR11–94–000] The Brooklyn Union Gas Company; Notice of Filing Take notice that on March 15, 2011, The Brooklyn Union Gas Company filed to make minor revisions to its Statement of Operating Conditions as more fully described in the filing. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 Notice of Attendance at PJM INterconnection, L.L.C., Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C., (PJM) meetings, as well as other subcommittee or task force meetings that are not currently scheduled, but that are typically scheduled on short notice or meetings that are scheduled on short notice based on items arising from the agenda as posted on the PJM Web site.1 The Commission and Commission staff may attend the following meetings: 1 For example, PJM Subcommittees and Task Forces of the standing committees (Operating, E:\FR\FM\23MRN1.SGM Continued 23MRN1 16406 Federal Register / Vol. 76, No. 56 / Wednesday, March 23, 2011 / Notices PJM Members Committee • • • • • • • March 30, 2011 (Wilmington, DE) March 31, 2011 (Wilmington, DE) May 17–19, 2011 (Cambridge, MD) June 23, 2011 (Wilmington, DE) August 25, 2011 (Wilmington, DE) September 22, 2011 (Wilmington, DE) December 8, 2011 (Wilmington, DE) PJM Markets and Reliability Committee • • • • • • • • • March 23, 2011 (Wilmington, DE) April 27, 2011 (Wilmington, DE) June 22, 2011 (Wilmington, DE) July 20, 2011 (Wilmington, DE) August 17, 2011 (Wilmington, DE) September 15, 2011 (Wilmington, DE) October 12, 2011 (Wilmington, DE) November 16, 2011 (Wilmington, DE) December 22, 2011 (Wilmington, DE) PJM Market Implementation Committee • • • • • • • • • • March 17, 2011 (Wilmington, DE) April 12, 2011 (Wilmington, DE) May 10, 2011 (Wilmington, DE) June 14, 2011 (Wilmington, DE) July 12, 2011 (Wilmington, DE) August 9, 2011 (Wilmington, DE) September 13, 2011 (Wilmington, DE) October 4, 2011 (Wilmington, DE) November 1, 2011 (Wilmington, DE) December 13, 2011 (Wilmington, DE) PJM Planning Committee and Transmission Expansion Advisory Committee • • • • • • • • • April 15, 2011 (Wilmington, DE) May 12, 2011 (Wilmington, DE) June 9, 2011 (Wilmington, DE) July 7, 2011 (Wilmington, DE) August 4, 2011 (Wilmington, DE) September 8, 2011 (Wilmington, DE) October 5, 2011 (Wilmington, DE) November 3, 2011 (Wilmington, DE) December 15, 2011 (Wilmington, DE) PJM Liaison Committee • July 26, 2011 (TBD) • October 19, 2011 (TBD) PJM Governance Assessment Special Team • March 15, 2011 (Wilmington, DE) • March 16, 2011 (Wilmington, DE) • March 31–April 1, 2011 (Wilmington, DE) • April 20, 2011 (Wilmington, DE) • May 5–6, 2011 (Radnor, PA) • May 25–26, 2011 (Radnor, PA) • June 2–3, 2011 (Radnor, PA) • June 16–17, 2011 (Radnor, PA) jlentini on DSKJ8SOYB1PROD with NOTICES PJM Sub-Regional RTEP Committee (Mid-Atlantic, Southern and Western Regions) • Various Dates Planning and Market Implementation) and senior standing committees (Members and Markets and Reliability) meet on a variety of different topics; VerDate Mar<15>2010 16:46 Mar 22, 2011 Jkt 223001 PJM Load Analysis Subcommittee • Various Dates PJM Credit Subcommittee • Various Dates PJM Cost Development Subcommittee • Various Dates PJM Transaction Issues Senior Task Force • Various Dates PJM Regional Planning Process Task Force • Various Dates PJM Intermittent Resources Task Force • Various Dates PJM Load Management Task Force • Various Dates PJM Demand Response Dispatch Senior Task Force • Various Dates PJM Regulation Performance Senior Task Force • Various Dates The discussions at each of the meetings described above may address matters at issue in pending proceedings before the Commission including the following: Docket No. EL05–121, PJM Interconnection, L.L.C. Docket No. ER06–456, PJM Interconnection, L.L.C. Docket No. ER08–686, Pepco Holdings, Inc. Docket No. EL08–47, PJM Interconnection, L.L.C. Docket No. ER08–386, PotomacAppalachian Transmission Highline, LLC Docket No. ER09–1256, PotomacAppalachian Transmission Highline, LLC Docket No. ER09–1063, PJM Interconnection, L.L.C. Docket No. ER09–1148, PPL Electric Utilities Corporation Docket No. ER10–159, Public Service Electric and Gas Company Docket No. EL10–40, EPIC Merchant Energy NJ/PA, L.P., v. PJM Interconnection, L.L.C. Docket Nos. ER10–253 and EL10–14, Primary Power, LLC Docket Nos. ER10–1562 and ER10–2254, Duke Energy Ohio, Inc. and Duke Energy Kentucky, Inc. Docket No. EL10–52, Central Transmission, LLC v. PJM Interconnection, L.L.C. they convene and dissolve on an as-needed basis. Therefore, staff may monitor different meetings as PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 Docket No. EL11–20, PJM Power Providers Group v. PJM Interconnection, L.L.C. Docket No. ER11–2688, PSEG Energy Resources & Trade LLC and PSEG Fossil LLC Docket No. EL10–63, EnerNOC, Inc. v. FirstEnergy Docket No. EL11–23, EnerNOC, Inc. Docket No. ER11–2183, American Electric Power Service Corporation Docket No. ER11, 2074, PJM Interconnection, L.L.C. Docket No. ER11–2622, PJM Interconnection, L.L.C. Docket No. ER11–2288, PJM Interconnection, L.L.C. Docket No. ER11–2929, PJM Interconnection, L.L.C. Docket Nos. ER11–2875 and EL11–20, PJM Interconnection, L.L.C. Docket Nos. ER11–2814 and ER11–2815, PJM Interconnection, L.L.C. and American Transmission Systems, Inc. Docket No. EL11–25, PPL EnergyPlus, LLC v. PJM Interconnection, L.L.C. Docket No. RM04–7, Market-Based Rates for Wholesale Sales of Electric Energy, Capacity, and Ancillary Services by Public Utilities Docket No. RM10–11, Integration of Variable Energy Resources Docket No. RM10–15, Mandatory Reliability Standards for Interconnection Reliability Operating Limits Docket No. RM10–16, System Restoration Reliability Standards For additional meeting information, see: https://www.pjm.com/committeesand-groups.aspx and https:// www.pjm.com/Calendar.aspx. The meetings are open to stakeholders. For more information, contact Valerie Martin, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502– 6139 or Valerie.Martin@ferc.gov. Dated: March 16, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–6743 Filed 3–22–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Preliminary Permit Drawing issues arise and according to postings on the PJM Web site. E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 76, Number 56 (Wednesday, March 23, 2011)]
[Notices]
[Pages 16405-16406]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-6743]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Attendance at PJM INterconnection, L.L.C., Meetings

    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that members of the Commission and Commission staff may attend 
upcoming PJM Interconnection, L.L.C., (PJM) meetings, as well as other 
subcommittee or task force meetings that are not currently scheduled, 
but that are typically scheduled on short notice or meetings that are 
scheduled on short notice based on items arising from the agenda as 
posted on the PJM Web site.\1\ The Commission and Commission staff may 
attend the following meetings:
---------------------------------------------------------------------------

    \1\ For example, PJM Subcommittees and Task Forces of the 
standing committees (Operating, Planning and Market Implementation) 
and senior standing committees (Members and Markets and Reliability) 
meet on a variety of different topics; they convene and dissolve on 
an as-needed basis. Therefore, staff may monitor different meetings 
as issues arise and according to postings on the PJM Web site.

---------------------------------------------------------------------------

[[Page 16406]]

PJM Members Committee

 March 30, 2011 (Wilmington, DE)
 March 31, 2011 (Wilmington, DE)
 May 17-19, 2011 (Cambridge, MD)
 June 23, 2011 (Wilmington, DE)
 August 25, 2011 (Wilmington, DE)
 September 22, 2011 (Wilmington, DE)
 December 8, 2011 (Wilmington, DE)

PJM Markets and Reliability Committee

 March 23, 2011 (Wilmington, DE)
 April 27, 2011 (Wilmington, DE)
 June 22, 2011 (Wilmington, DE)
 July 20, 2011 (Wilmington, DE)
 August 17, 2011 (Wilmington, DE)
 September 15, 2011 (Wilmington, DE)
 October 12, 2011 (Wilmington, DE)
 November 16, 2011 (Wilmington, DE)
 December 22, 2011 (Wilmington, DE)

PJM Market Implementation Committee

 March 17, 2011 (Wilmington, DE)
 April 12, 2011 (Wilmington, DE)
 May 10, 2011 (Wilmington, DE)
 June 14, 2011 (Wilmington, DE)
 July 12, 2011 (Wilmington, DE)
 August 9, 2011 (Wilmington, DE)
 September 13, 2011 (Wilmington, DE)
 October 4, 2011 (Wilmington, DE)
 November 1, 2011 (Wilmington, DE)
 December 13, 2011 (Wilmington, DE)

PJM Planning Committee and Transmission Expansion Advisory Committee

 April 15, 2011 (Wilmington, DE)
 May 12, 2011 (Wilmington, DE)
 June 9, 2011 (Wilmington, DE)
 July 7, 2011 (Wilmington, DE)
 August 4, 2011 (Wilmington, DE)
 September 8, 2011 (Wilmington, DE)
 October 5, 2011 (Wilmington, DE)
 November 3, 2011 (Wilmington, DE)
 December 15, 2011 (Wilmington, DE)

PJM Liaison Committee

 July 26, 2011 (TBD)
 October 19, 2011 (TBD)

PJM Governance Assessment Special Team

 March 15, 2011 (Wilmington, DE)
 March 16, 2011 (Wilmington, DE)
 March 31-April 1, 2011 (Wilmington, DE)
 April 20, 2011 (Wilmington, DE)
 May 5-6, 2011 (Radnor, PA)
 May 25-26, 2011 (Radnor, PA)
 June 2-3, 2011 (Radnor, PA)
 June 16-17, 2011 (Radnor, PA)

PJM Sub-Regional RTEP Committee

(Mid-Atlantic, Southern and Western Regions)

 Various Dates

PJM Load Analysis Subcommittee

 Various Dates

PJM Credit Subcommittee

 Various Dates

PJM Cost Development Subcommittee

 Various Dates

PJM Transaction Issues Senior Task Force

 Various Dates

PJM Regional Planning Process Task Force

 Various Dates

PJM Intermittent Resources Task Force

 Various Dates

PJM Load Management Task Force

 Various Dates

PJM Demand Response Dispatch Senior Task Force

 Various Dates

PJM Regulation Performance Senior Task Force

 Various Dates

    The discussions at each of the meetings described above may address 
matters at issue in pending proceedings before the Commission including 
the following:

Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. ER06-456, PJM Interconnection, L.L.C.
Docket No. ER08-686, Pepco Holdings, Inc.
Docket No. EL08-47, PJM Interconnection, L.L.C.
Docket No. ER08-386, Potomac-Appalachian Transmission Highline, LLC
Docket No. ER09-1256, Potomac-Appalachian Transmission Highline, LLC
Docket No. ER09-1063, PJM Interconnection, L.L.C.
Docket No. ER09-1148, PPL Electric Utilities Corporation
Docket No. ER10-159, Public Service Electric and Gas Company
Docket No. EL10-40, EPIC Merchant Energy NJ/PA, L.P., v. PJM 
Interconnection, L.L.C.
Docket Nos. ER10-253 and EL10-14, Primary Power, LLC
Docket Nos. ER10-1562 and ER10-2254, Duke Energy Ohio, Inc. and Duke 
Energy Kentucky, Inc.
Docket No. EL10-52, Central Transmission, LLC v. PJM Interconnection, 
L.L.C.
Docket No. EL11-20, PJM Power Providers Group v. PJM Interconnection, 
L.L.C.
Docket No. ER11-2688, PSEG Energy Resources & Trade LLC and PSEG Fossil 
LLC
Docket No. EL10-63, EnerNOC, Inc. v. FirstEnergy
Docket No. EL11-23, EnerNOC, Inc.
Docket No. ER11-2183, American Electric Power Service Corporation
Docket No. ER11, 2074, PJM Interconnection, L.L.C.
Docket No. ER11-2622, PJM Interconnection, L.L.C.
Docket No. ER11-2288, PJM Interconnection, L.L.C.
Docket No. ER11-2929, PJM Interconnection, L.L.C.
Docket Nos. ER11-2875 and EL11-20, PJM Interconnection, L.L.C.
Docket Nos. ER11-2814 and ER11-2815, PJM Interconnection, L.L.C. and 
American Transmission Systems, Inc.
Docket No. EL11-25, PPL EnergyPlus, LLC v. PJM Interconnection, L.L.C.
Docket No. RM04-7, Market-Based Rates for Wholesale Sales of Electric 
Energy, Capacity, and Ancillary Services by Public Utilities
Docket No. RM10-11, Integration of Variable Energy Resources
Docket No. RM10-15, Mandatory Reliability Standards for Interconnection 
Reliability Operating Limits
Docket No. RM10-16, System Restoration Reliability Standards

    For additional meeting information, see: https://www.pjm.com/committees-and-groups.aspx and https://www.pjm.com/Calendar.aspx.
    The meetings are open to stakeholders. For more information, 
contact Valerie Martin, Office of Energy Market Regulation, Federal 
Energy Regulatory Commission at (202) 502-6139 or 
Valerie.Martin@ferc.gov.

    Dated: March 16, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-6743 Filed 3-22-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.