Notice of Attendance at PJM INterconnection, L.L.C., Meetings, 16405-16406 [2011-6743]
Download as PDF
jlentini on DSKJ8SOYB1PROD with NOTICES
Federal Register / Vol. 76, No. 56 / Wednesday, March 23, 2011 / Notices
submits tariff filing per 35.17(b): ATC
Amendment Notice of Succession VI to
be effective 2/9/2011.
Filed Date: 03/14/2011.
Accession Number: 20110314–5123.
Comment Date: 5 p.m. Eastern Time
on Monday, April 4, 2011.
Docket Numbers: ER11–3081–000.
Applicants: Florida Power & Light
Company, NextEra Energy Duane
Arnold, LLC, NextEra Energy Point
Beach, LLC, NextEra Energy SeaBrook,
LLC.
Description: Request of Florida Power
& Light Company and its MarketRegulated Power Sales Affiliates
Operating Nuclear Generating Facilities
For Waivers of Affiliate Restrictions
Related to Nuclear Fuel Design/
Procuement/Fabrication.
Filed Date: 03/14/2011.
Accession Number: 20110314–5293.
Comment Date: 5 p.m. Eastern Time
on Monday, April 4, 2011.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
As it relates to any qualifying facility
filings, the notices of self-certification
[or self-recertification] listed above, do
not institute a proceeding regarding
qualifying facility status. A notice of
self-certification [or self-recertification]
simply provides notification that the
entity making the filing has determined
the facility named in the notice meets
the applicable criteria to be a qualifying
facility. Intervention and/or protest do
not lie in dockets that are qualifying
facility self-certifications or selfrecertifications. Any person seeking to
challenge such qualifying facility status
may do so by filing a motion pursuant
to 18 CFR 292.207(d)(iii). Intervention
and protests may be filed in response to
notices of qualifying facility dockets
other than self-certifications and selfrecertifications.
VerDate Mar<15>2010
16:46 Mar 22, 2011
Jkt 223001
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: March 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
16405
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 23, 2011.
[FR Doc. 2011–6777 Filed 3–22–11; 8:45 am]
Dated: March 16, 2011.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2011–6740 Filed 3–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. PR11–94–000]
The Brooklyn Union Gas Company;
Notice of Filing
Take notice that on March 15, 2011,
The Brooklyn Union Gas Company filed
to make minor revisions to its Statement
of Operating Conditions as more fully
described in the filing.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Notice of Attendance at PJM
INterconnection, L.L.C., Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and Commission staff may attend
upcoming PJM Interconnection, L.L.C.,
(PJM) meetings, as well as other
subcommittee or task force meetings
that are not currently scheduled, but
that are typically scheduled on short
notice or meetings that are scheduled on
short notice based on items arising from
the agenda as posted on the PJM Web
site.1 The Commission and Commission
staff may attend the following meetings:
1 For example, PJM Subcommittees and Task
Forces of the standing committees (Operating,
E:\FR\FM\23MRN1.SGM
Continued
23MRN1
16406
Federal Register / Vol. 76, No. 56 / Wednesday, March 23, 2011 / Notices
PJM Members Committee
•
•
•
•
•
•
•
March 30, 2011 (Wilmington, DE)
March 31, 2011 (Wilmington, DE)
May 17–19, 2011 (Cambridge, MD)
June 23, 2011 (Wilmington, DE)
August 25, 2011 (Wilmington, DE)
September 22, 2011 (Wilmington, DE)
December 8, 2011 (Wilmington, DE)
PJM Markets and Reliability Committee
•
•
•
•
•
•
•
•
•
March 23, 2011 (Wilmington, DE)
April 27, 2011 (Wilmington, DE)
June 22, 2011 (Wilmington, DE)
July 20, 2011 (Wilmington, DE)
August 17, 2011 (Wilmington, DE)
September 15, 2011 (Wilmington, DE)
October 12, 2011 (Wilmington, DE)
November 16, 2011 (Wilmington, DE)
December 22, 2011 (Wilmington, DE)
PJM Market Implementation Committee
•
•
•
•
•
•
•
•
•
•
March 17, 2011 (Wilmington, DE)
April 12, 2011 (Wilmington, DE)
May 10, 2011 (Wilmington, DE)
June 14, 2011 (Wilmington, DE)
July 12, 2011 (Wilmington, DE)
August 9, 2011 (Wilmington, DE)
September 13, 2011 (Wilmington, DE)
October 4, 2011 (Wilmington, DE)
November 1, 2011 (Wilmington, DE)
December 13, 2011 (Wilmington, DE)
PJM Planning Committee and
Transmission Expansion Advisory
Committee
•
•
•
•
•
•
•
•
•
April 15, 2011 (Wilmington, DE)
May 12, 2011 (Wilmington, DE)
June 9, 2011 (Wilmington, DE)
July 7, 2011 (Wilmington, DE)
August 4, 2011 (Wilmington, DE)
September 8, 2011 (Wilmington, DE)
October 5, 2011 (Wilmington, DE)
November 3, 2011 (Wilmington, DE)
December 15, 2011 (Wilmington, DE)
PJM Liaison Committee
• July 26, 2011 (TBD)
• October 19, 2011 (TBD)
PJM Governance Assessment Special
Team
• March 15, 2011 (Wilmington, DE)
• March 16, 2011 (Wilmington, DE)
• March 31–April 1, 2011 (Wilmington,
DE)
• April 20, 2011 (Wilmington, DE)
• May 5–6, 2011 (Radnor, PA)
• May 25–26, 2011 (Radnor, PA)
• June 2–3, 2011 (Radnor, PA)
• June 16–17, 2011 (Radnor, PA)
jlentini on DSKJ8SOYB1PROD with NOTICES
PJM Sub-Regional RTEP Committee
(Mid-Atlantic, Southern and Western
Regions)
• Various Dates
Planning and Market Implementation) and senior
standing committees (Members and Markets and
Reliability) meet on a variety of different topics;
VerDate Mar<15>2010
16:46 Mar 22, 2011
Jkt 223001
PJM Load Analysis Subcommittee
• Various Dates
PJM Credit Subcommittee
• Various Dates
PJM Cost Development Subcommittee
• Various Dates
PJM Transaction Issues Senior Task
Force
• Various Dates
PJM Regional Planning Process Task
Force
• Various Dates
PJM Intermittent Resources Task Force
• Various Dates
PJM Load Management Task Force
• Various Dates
PJM Demand Response Dispatch Senior
Task Force
• Various Dates
PJM Regulation Performance Senior
Task Force
• Various Dates
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission including the
following:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER06–456, PJM
Interconnection, L.L.C.
Docket No. ER08–686, Pepco Holdings,
Inc.
Docket No. EL08–47, PJM
Interconnection, L.L.C.
Docket No. ER08–386, PotomacAppalachian Transmission Highline,
LLC
Docket No. ER09–1256, PotomacAppalachian Transmission Highline,
LLC
Docket No. ER09–1063, PJM
Interconnection, L.L.C.
Docket No. ER09–1148, PPL Electric
Utilities Corporation
Docket No. ER10–159, Public Service
Electric and Gas Company
Docket No. EL10–40, EPIC Merchant
Energy NJ/PA, L.P., v. PJM
Interconnection, L.L.C.
Docket Nos. ER10–253 and EL10–14,
Primary Power, LLC
Docket Nos. ER10–1562 and ER10–2254,
Duke Energy Ohio, Inc. and Duke
Energy Kentucky, Inc.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
they convene and dissolve on an as-needed basis.
Therefore, staff may monitor different meetings as
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Docket No. EL11–20, PJM Power
Providers Group v. PJM
Interconnection, L.L.C.
Docket No. ER11–2688, PSEG Energy
Resources & Trade LLC and PSEG
Fossil LLC
Docket No. EL10–63, EnerNOC, Inc. v.
FirstEnergy
Docket No. EL11–23, EnerNOC, Inc.
Docket No. ER11–2183, American
Electric Power Service Corporation
Docket No. ER11, 2074, PJM
Interconnection, L.L.C.
Docket No. ER11–2622, PJM
Interconnection, L.L.C.
Docket No. ER11–2288, PJM
Interconnection, L.L.C.
Docket No. ER11–2929, PJM
Interconnection, L.L.C.
Docket Nos. ER11–2875 and EL11–20,
PJM Interconnection, L.L.C.
Docket Nos. ER11–2814 and ER11–2815,
PJM Interconnection, L.L.C. and
American Transmission Systems, Inc.
Docket No. EL11–25, PPL EnergyPlus,
LLC v. PJM Interconnection, L.L.C.
Docket No. RM04–7, Market-Based
Rates for Wholesale Sales of Electric
Energy, Capacity, and Ancillary
Services by Public Utilities
Docket No. RM10–11, Integration of
Variable Energy Resources
Docket No. RM10–15, Mandatory
Reliability Standards for
Interconnection Reliability Operating
Limits
Docket No. RM10–16, System
Restoration Reliability Standards
For additional meeting information,
see: https://www.pjm.com/committeesand-groups.aspx and https://
www.pjm.com/Calendar.aspx.
The meetings are open to
stakeholders. For more information,
contact Valerie Martin, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6139 or Valerie.Martin@ferc.gov.
Dated: March 16, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–6743 Filed 3–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
issues arise and according to postings on the PJM
Web site.
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 76, Number 56 (Wednesday, March 23, 2011)]
[Notices]
[Pages 16405-16406]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-6743]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at PJM INterconnection, L.L.C., Meetings
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission and Commission staff may attend
upcoming PJM Interconnection, L.L.C., (PJM) meetings, as well as other
subcommittee or task force meetings that are not currently scheduled,
but that are typically scheduled on short notice or meetings that are
scheduled on short notice based on items arising from the agenda as
posted on the PJM Web site.\1\ The Commission and Commission staff may
attend the following meetings:
---------------------------------------------------------------------------
\1\ For example, PJM Subcommittees and Task Forces of the
standing committees (Operating, Planning and Market Implementation)
and senior standing committees (Members and Markets and Reliability)
meet on a variety of different topics; they convene and dissolve on
an as-needed basis. Therefore, staff may monitor different meetings
as issues arise and according to postings on the PJM Web site.
---------------------------------------------------------------------------
[[Page 16406]]
PJM Members Committee
March 30, 2011 (Wilmington, DE)
March 31, 2011 (Wilmington, DE)
May 17-19, 2011 (Cambridge, MD)
June 23, 2011 (Wilmington, DE)
August 25, 2011 (Wilmington, DE)
September 22, 2011 (Wilmington, DE)
December 8, 2011 (Wilmington, DE)
PJM Markets and Reliability Committee
March 23, 2011 (Wilmington, DE)
April 27, 2011 (Wilmington, DE)
June 22, 2011 (Wilmington, DE)
July 20, 2011 (Wilmington, DE)
August 17, 2011 (Wilmington, DE)
September 15, 2011 (Wilmington, DE)
October 12, 2011 (Wilmington, DE)
November 16, 2011 (Wilmington, DE)
December 22, 2011 (Wilmington, DE)
PJM Market Implementation Committee
March 17, 2011 (Wilmington, DE)
April 12, 2011 (Wilmington, DE)
May 10, 2011 (Wilmington, DE)
June 14, 2011 (Wilmington, DE)
July 12, 2011 (Wilmington, DE)
August 9, 2011 (Wilmington, DE)
September 13, 2011 (Wilmington, DE)
October 4, 2011 (Wilmington, DE)
November 1, 2011 (Wilmington, DE)
December 13, 2011 (Wilmington, DE)
PJM Planning Committee and Transmission Expansion Advisory Committee
April 15, 2011 (Wilmington, DE)
May 12, 2011 (Wilmington, DE)
June 9, 2011 (Wilmington, DE)
July 7, 2011 (Wilmington, DE)
August 4, 2011 (Wilmington, DE)
September 8, 2011 (Wilmington, DE)
October 5, 2011 (Wilmington, DE)
November 3, 2011 (Wilmington, DE)
December 15, 2011 (Wilmington, DE)
PJM Liaison Committee
July 26, 2011 (TBD)
October 19, 2011 (TBD)
PJM Governance Assessment Special Team
March 15, 2011 (Wilmington, DE)
March 16, 2011 (Wilmington, DE)
March 31-April 1, 2011 (Wilmington, DE)
April 20, 2011 (Wilmington, DE)
May 5-6, 2011 (Radnor, PA)
May 25-26, 2011 (Radnor, PA)
June 2-3, 2011 (Radnor, PA)
June 16-17, 2011 (Radnor, PA)
PJM Sub-Regional RTEP Committee
(Mid-Atlantic, Southern and Western Regions)
Various Dates
PJM Load Analysis Subcommittee
Various Dates
PJM Credit Subcommittee
Various Dates
PJM Cost Development Subcommittee
Various Dates
PJM Transaction Issues Senior Task Force
Various Dates
PJM Regional Planning Process Task Force
Various Dates
PJM Intermittent Resources Task Force
Various Dates
PJM Load Management Task Force
Various Dates
PJM Demand Response Dispatch Senior Task Force
Various Dates
PJM Regulation Performance Senior Task Force
Various Dates
The discussions at each of the meetings described above may address
matters at issue in pending proceedings before the Commission including
the following:
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. ER06-456, PJM Interconnection, L.L.C.
Docket No. ER08-686, Pepco Holdings, Inc.
Docket No. EL08-47, PJM Interconnection, L.L.C.
Docket No. ER08-386, Potomac-Appalachian Transmission Highline, LLC
Docket No. ER09-1256, Potomac-Appalachian Transmission Highline, LLC
Docket No. ER09-1063, PJM Interconnection, L.L.C.
Docket No. ER09-1148, PPL Electric Utilities Corporation
Docket No. ER10-159, Public Service Electric and Gas Company
Docket No. EL10-40, EPIC Merchant Energy NJ/PA, L.P., v. PJM
Interconnection, L.L.C.
Docket Nos. ER10-253 and EL10-14, Primary Power, LLC
Docket Nos. ER10-1562 and ER10-2254, Duke Energy Ohio, Inc. and Duke
Energy Kentucky, Inc.
Docket No. EL10-52, Central Transmission, LLC v. PJM Interconnection,
L.L.C.
Docket No. EL11-20, PJM Power Providers Group v. PJM Interconnection,
L.L.C.
Docket No. ER11-2688, PSEG Energy Resources & Trade LLC and PSEG Fossil
LLC
Docket No. EL10-63, EnerNOC, Inc. v. FirstEnergy
Docket No. EL11-23, EnerNOC, Inc.
Docket No. ER11-2183, American Electric Power Service Corporation
Docket No. ER11, 2074, PJM Interconnection, L.L.C.
Docket No. ER11-2622, PJM Interconnection, L.L.C.
Docket No. ER11-2288, PJM Interconnection, L.L.C.
Docket No. ER11-2929, PJM Interconnection, L.L.C.
Docket Nos. ER11-2875 and EL11-20, PJM Interconnection, L.L.C.
Docket Nos. ER11-2814 and ER11-2815, PJM Interconnection, L.L.C. and
American Transmission Systems, Inc.
Docket No. EL11-25, PPL EnergyPlus, LLC v. PJM Interconnection, L.L.C.
Docket No. RM04-7, Market-Based Rates for Wholesale Sales of Electric
Energy, Capacity, and Ancillary Services by Public Utilities
Docket No. RM10-11, Integration of Variable Energy Resources
Docket No. RM10-15, Mandatory Reliability Standards for Interconnection
Reliability Operating Limits
Docket No. RM10-16, System Restoration Reliability Standards
For additional meeting information, see: https://www.pjm.com/committees-and-groups.aspx and https://www.pjm.com/Calendar.aspx.
The meetings are open to stakeholders. For more information,
contact Valerie Martin, Office of Energy Market Regulation, Federal
Energy Regulatory Commission at (202) 502-6139 or
Valerie.Martin@ferc.gov.
Dated: March 16, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-6743 Filed 3-22-11; 8:45 am]