Notice Announcing Preliminary Permit Drawing, 16408 [2011-6773]

Download as PDF 16408 Federal Register / Vol. 76, No. 56 / Wednesday, March 23, 2011 / Notices Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: March 15, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY [FR Doc. 2011–6774 Filed 3–22–11; 8:45 am] Federal Energy Regulatory Commission Notice Announcing Preliminary Permit Drawing BILLING CODE 6717–01–P Lock+ Hydro Friends Fund XXXVII ................................................................................................................................ FFP Missouri 6, LLC ....................................................................................................................................................... Solia 1 Hydroelectric, LLC .............................................................................................................................................. The Commission has received three preliminary permit applications deemed filed on May 18, 2010, at 8:30 a.m.,1 for proposed projects to be located at the Army Corps of Engineers’ Emsworth Back Channel Dam on the Ohio River, in Allegheny County, Pennsylvania. The applications were filed by Lock+ Hydro Friends Fund XXXVII for Project No. 13738, FFP Missouri 6, LLC, for Project No. 13761, and Solia 1 Hydroelectric, LLC for Project No. 13770. On March 24, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: March 15, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–6773 Filed 3–22–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Preliminary Permit Drawing Lock+ Hydro Friends Fund XLII ..................................................................................................................................... FFP Missouri 10, LLC ..................................................................................................................................................... Solia 7 Hydroelectric, LLC .............................................................................................................................................. The Commission has received three preliminary permit applications deemed filed on May 18, 2010, at 8:30 a.m.,1 for proposed projects to be located at the Army Corps of Engineers’ Braddock Lock and Dam on the Monongahela River, in Allegheny County, Pennsylvania. The applications were filed by Lock+ Hydro Friends Fund XLII for Project No. 13739, FFP Missouri 10, LLC, for Project No. 13751, and Braddock Hydro, LLC for Project No. 13778. On March 24, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. A subsequent notice will be Project No. 13739–000. Project No. 13751–000. Project No. 13778–000. issued by the Secretary announcing the results of the drawing. Dated: March 15, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–6772 Filed 3–22–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Preliminary Permit Drawing Lock+ Hydro Friends Fund XLV ..................................................................................................................................... FFP Missouri 9, LLC ....................................................................................................................................................... Solia 8 Hydroelectric, LLC .............................................................................................................................................. jlentini on DSKJ8SOYB1PROD with NOTICES Project No. 13738–000. Project No. 13761–000. Project No. 13770–000. Project No. 13741–000. Project No. 13748–000. Project No. 13771–000. The Commission has received three preliminary permit applications deemed filed on May 18, 2010, at 8:30 a.m.,1 for proposed projects to be located at the Army Corps of Engineers’ Point Marion Lock and Dam on the Monongahela River, in Fayette and Greene Counties, Pennsylvania, and Monongahela County, West Virginia. The applications were filed by Lock+ Hydro Friends Fund XLV for Project No. 13741, FFP Missouri 9, LLC, for Project No. 13748, 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010). 2 18 CFR 4.37 (2010). 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010). 2 18 CFR 4.37 (2010). 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010). VerDate Mar<15>2010 16:46 Mar 22, 2011 Jkt 223001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 76, Number 56 (Wednesday, March 23, 2011)]
[Notices]
[Page 16408]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-6773]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice Announcing Preliminary Permit Drawing

------------------------------------------------------------------------
 
------------------------------------------------------------------------
Lock+ Hydro Friends Fund XXXVII..  Project No. 13738-000.
FFP Missouri 6, LLC..............  Project No. 13761-000.
Solia 1 Hydroelectric, LLC.......  Project No. 13770-000.
------------------------------------------------------------------------

    The Commission has received three preliminary permit applications 
deemed filed on May 18, 2010, at 8:30 a.m.,\1\ for proposed projects to 
be located at the Army Corps of Engineers' Emsworth Back Channel Dam on 
the Ohio River, in Allegheny County, Pennsylvania. The applications 
were filed by Lock+ Hydro Friends Fund XXXVII for Project No. 13738, 
FFP Missouri 6, LLC, for Project No. 13761, and Solia 1 Hydroelectric, 
LLC for Project No. 13770.
---------------------------------------------------------------------------

    \1\ Under the Commission's Rules of Practice and Procedure, any 
document received after regular business hours is considered filed 
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) 
(2010).
---------------------------------------------------------------------------

    On March 24, 2011, at 10 a.m. (eastern time), the Secretary of the 
Commission, or her designee, will conduct a random drawing to determine 
the filing priority of the applicants identified in this notice. The 
Commission will select among competing permit applications as provided 
in section 4.37 of its regulations.\2\ The priority established by this 
drawing will be used to determine which applicant, among those with 
identical filing times, will be considered to have the first-filed 
application.
---------------------------------------------------------------------------

    \2\ 18 CFR 4.37 (2010).
---------------------------------------------------------------------------

    The drawing is open to the public and will be held in room 2C, the 
Commission Meeting Room, located at 888 First St., NE., Washington, DC 
20426. A subsequent notice will be issued by the Secretary announcing 
the results of the drawing.

    Dated: March 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-6773 Filed 3-22-11; 8:45 am]