Notice Announcing Preliminary Permit Drawing, 16406-16407 [2011-6776]
Download as PDF
16406
Federal Register / Vol. 76, No. 56 / Wednesday, March 23, 2011 / Notices
PJM Members Committee
•
•
•
•
•
•
•
March 30, 2011 (Wilmington, DE)
March 31, 2011 (Wilmington, DE)
May 17–19, 2011 (Cambridge, MD)
June 23, 2011 (Wilmington, DE)
August 25, 2011 (Wilmington, DE)
September 22, 2011 (Wilmington, DE)
December 8, 2011 (Wilmington, DE)
PJM Markets and Reliability Committee
•
•
•
•
•
•
•
•
•
March 23, 2011 (Wilmington, DE)
April 27, 2011 (Wilmington, DE)
June 22, 2011 (Wilmington, DE)
July 20, 2011 (Wilmington, DE)
August 17, 2011 (Wilmington, DE)
September 15, 2011 (Wilmington, DE)
October 12, 2011 (Wilmington, DE)
November 16, 2011 (Wilmington, DE)
December 22, 2011 (Wilmington, DE)
PJM Market Implementation Committee
•
•
•
•
•
•
•
•
•
•
March 17, 2011 (Wilmington, DE)
April 12, 2011 (Wilmington, DE)
May 10, 2011 (Wilmington, DE)
June 14, 2011 (Wilmington, DE)
July 12, 2011 (Wilmington, DE)
August 9, 2011 (Wilmington, DE)
September 13, 2011 (Wilmington, DE)
October 4, 2011 (Wilmington, DE)
November 1, 2011 (Wilmington, DE)
December 13, 2011 (Wilmington, DE)
PJM Planning Committee and
Transmission Expansion Advisory
Committee
•
•
•
•
•
•
•
•
•
April 15, 2011 (Wilmington, DE)
May 12, 2011 (Wilmington, DE)
June 9, 2011 (Wilmington, DE)
July 7, 2011 (Wilmington, DE)
August 4, 2011 (Wilmington, DE)
September 8, 2011 (Wilmington, DE)
October 5, 2011 (Wilmington, DE)
November 3, 2011 (Wilmington, DE)
December 15, 2011 (Wilmington, DE)
PJM Liaison Committee
• July 26, 2011 (TBD)
• October 19, 2011 (TBD)
PJM Governance Assessment Special
Team
• March 15, 2011 (Wilmington, DE)
• March 16, 2011 (Wilmington, DE)
• March 31–April 1, 2011 (Wilmington,
DE)
• April 20, 2011 (Wilmington, DE)
• May 5–6, 2011 (Radnor, PA)
• May 25–26, 2011 (Radnor, PA)
• June 2–3, 2011 (Radnor, PA)
• June 16–17, 2011 (Radnor, PA)
jlentini on DSKJ8SOYB1PROD with NOTICES
PJM Sub-Regional RTEP Committee
(Mid-Atlantic, Southern and Western
Regions)
• Various Dates
Planning and Market Implementation) and senior
standing committees (Members and Markets and
Reliability) meet on a variety of different topics;
VerDate Mar<15>2010
16:46 Mar 22, 2011
Jkt 223001
PJM Load Analysis Subcommittee
• Various Dates
PJM Credit Subcommittee
• Various Dates
PJM Cost Development Subcommittee
• Various Dates
PJM Transaction Issues Senior Task
Force
• Various Dates
PJM Regional Planning Process Task
Force
• Various Dates
PJM Intermittent Resources Task Force
• Various Dates
PJM Load Management Task Force
• Various Dates
PJM Demand Response Dispatch Senior
Task Force
• Various Dates
PJM Regulation Performance Senior
Task Force
• Various Dates
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission including the
following:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER06–456, PJM
Interconnection, L.L.C.
Docket No. ER08–686, Pepco Holdings,
Inc.
Docket No. EL08–47, PJM
Interconnection, L.L.C.
Docket No. ER08–386, PotomacAppalachian Transmission Highline,
LLC
Docket No. ER09–1256, PotomacAppalachian Transmission Highline,
LLC
Docket No. ER09–1063, PJM
Interconnection, L.L.C.
Docket No. ER09–1148, PPL Electric
Utilities Corporation
Docket No. ER10–159, Public Service
Electric and Gas Company
Docket No. EL10–40, EPIC Merchant
Energy NJ/PA, L.P., v. PJM
Interconnection, L.L.C.
Docket Nos. ER10–253 and EL10–14,
Primary Power, LLC
Docket Nos. ER10–1562 and ER10–2254,
Duke Energy Ohio, Inc. and Duke
Energy Kentucky, Inc.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
they convene and dissolve on an as-needed basis.
Therefore, staff may monitor different meetings as
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Docket No. EL11–20, PJM Power
Providers Group v. PJM
Interconnection, L.L.C.
Docket No. ER11–2688, PSEG Energy
Resources & Trade LLC and PSEG
Fossil LLC
Docket No. EL10–63, EnerNOC, Inc. v.
FirstEnergy
Docket No. EL11–23, EnerNOC, Inc.
Docket No. ER11–2183, American
Electric Power Service Corporation
Docket No. ER11, 2074, PJM
Interconnection, L.L.C.
Docket No. ER11–2622, PJM
Interconnection, L.L.C.
Docket No. ER11–2288, PJM
Interconnection, L.L.C.
Docket No. ER11–2929, PJM
Interconnection, L.L.C.
Docket Nos. ER11–2875 and EL11–20,
PJM Interconnection, L.L.C.
Docket Nos. ER11–2814 and ER11–2815,
PJM Interconnection, L.L.C. and
American Transmission Systems, Inc.
Docket No. EL11–25, PPL EnergyPlus,
LLC v. PJM Interconnection, L.L.C.
Docket No. RM04–7, Market-Based
Rates for Wholesale Sales of Electric
Energy, Capacity, and Ancillary
Services by Public Utilities
Docket No. RM10–11, Integration of
Variable Energy Resources
Docket No. RM10–15, Mandatory
Reliability Standards for
Interconnection Reliability Operating
Limits
Docket No. RM10–16, System
Restoration Reliability Standards
For additional meeting information,
see: https://www.pjm.com/committeesand-groups.aspx and https://
www.pjm.com/Calendar.aspx.
The meetings are open to
stakeholders. For more information,
contact Valerie Martin, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6139 or Valerie.Martin@ferc.gov.
Dated: March 16, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–6743 Filed 3–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
issues arise and according to postings on the PJM
Web site.
E:\FR\FM\23MRN1.SGM
23MRN1
16407
Federal Register / Vol. 76, No. 56 / Wednesday, March 23, 2011 / Notices
Lock+ Hydro Friends Fund XXXVI .................................................................................................................................
FFP Missouri 8, LLC .......................................................................................................................................................
Solia 6 Hydroelectric, LLC ..............................................................................................................................................
The Commission has received three
preliminary permit applications deemed
filed on May 18, 2010, at 8:30 a.m.,1 for
proposed projects to be located at the
Army Corps of Engineers’ Montgomery
Lock and Dam on the Ohio River, in
Beaver County, Pennsylvania. The
applications were filed by Lock+ Hydro
Friends Fund XXXVI for Project No.
13733, FFP Missouri 8, LLC, for Project
No. 13752, and Solia 6 Hydroelectric,
LLC, for Project No. 13768.2
On March 24, 2011, at 10 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.3 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St., NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: March 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–6776 Filed 3–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
Lock+ Hydro Friends Fund XLVI ....................................................................................................................................
FFP Missouri 17, LLC .....................................................................................................................................................
Solia 3 Hydroelectric, LLC ..............................................................................................................................................
Three Rivers Hydro LLC .................................................................................................................................................
The Commission has received four
preliminary permit applications deemed
filed on May 18, 2010, at 8:30 a.m.,1 for
proposed projects to be located at the
Army Corps of Engineers’ Hildebrand
Lock and Dam on the Monongahela
River, in Monongahela County, West
Virginia. The applications were filed by
Lock+ Hydro Friends Fund XLVI for
Project No. 13734, FFP Missouri 17,
LLC, for Project No. 13754, Solia 3
Hydroelectric, LLC, for Project No.
13765, and Three Rivers Hydro LLC for
Project No. 13783.2
On March 24, 2011, at 10 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.3 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St., NE., Washington, DC
20426. A subsequent notice will be
Project No. 13733–000.
Project No. 13752–000.
Project No. 13768–000.
Project
Project
Project
Project
No.
No.
No.
No.
13734–000.
13754–000.
13765–000.
13783–000.
issued by the Secretary announcing the
results of the drawing.
Dated: March 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–6775 Filed 3–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
Lock+ Hydro Friends Fund XLIV ....................................................................................................................................
FFP Missouri 11, LLC .....................................................................................................................................................
Solia 5 Hydroelectric, LLC ..............................................................................................................................................
Project No. 13737–000.
Project No. 13759–000.
Project No. 13766–000.
jlentini on DSKJ8SOYB1PROD with NOTICES
The Commission has received three
preliminary permit applications deemed
filed on May 18, 2010, at 8:30 a.m.,1 for
proposed projects to be located at the
Army Corps of Engineers’ Maxwell Lock
and Dam on the Monongahela River, in
Washington County, Pennsylvania. The
applications were filed by Lock+ Hydro
Friends Fund XLIV for Project No.
13737, FFP Missouri 11, LLC, for Project
No. 13759, and Solia 5 Hydroelectric,
LLC, for Project No. 13766.2
On March 24, 2011, at 10 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.3 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2010).
2 Montgomery Hydro, LLC, also filed a permit
application to study the same site for Project No.
13792, which is deemed filed on May 19, 2010.
3 18 CFR 4.37 (2010).
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2010).
2 Hildebrand Hydro, LLC, also filed a permit
application to study the same site for Project No.
13790, which is deemed filed on May 19, 2010.
3 18 CFR 4.37 (2010).
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2010).
2 Maxwell Hydro, LLC, also filed a permit
application to study the same site for Project No.
13787, which is deemed filed on May 19, 2010.
3 18 CFR 4.37 (2010).
VerDate Mar<15>2010
16:46 Mar 22, 2011
Jkt 223001
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 76, Number 56 (Wednesday, March 23, 2011)]
[Notices]
[Pages 16406-16407]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-6776]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
[[Page 16407]]
------------------------------------------------------------------------
------------------------------------------------------------------------
Lock+ Hydro Friends Fund XXXVI... Project No. 13733-000.
FFP Missouri 8, LLC.............. Project No. 13752-000.
Solia 6 Hydroelectric, LLC....... Project No. 13768-000.
------------------------------------------------------------------------
The Commission has received three preliminary permit applications
deemed filed on May 18, 2010, at 8:30 a.m.,\1\ for proposed projects to
be located at the Army Corps of Engineers' Montgomery Lock and Dam on
the Ohio River, in Beaver County, Pennsylvania. The applications were
filed by Lock+ Hydro Friends Fund XXXVI for Project No. 13733, FFP
Missouri 8, LLC, for Project No. 13752, and Solia 6 Hydroelectric, LLC,
for Project No. 13768.\2\
---------------------------------------------------------------------------
\1\ Under the Commission's Rules of Practice and Procedure, any
document received after regular business hours is considered filed
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2)
(2010).
\2\ Montgomery Hydro, LLC, also filed a permit application to
study the same site for Project No. 13792, which is deemed filed on
May 19, 2010.
---------------------------------------------------------------------------
On March 24, 2011, at 10 a.m. (eastern time), the Secretary of the
Commission, or her designee, will conduct a random drawing to determine
the filing priority of the applicants identified in this notice. The
Commission will select among competing permit applications as provided
in section 4.37 of its regulations.\3\ The priority established by this
drawing will be used to determine which applicant, among those with
identical filing times, will be considered to have the first-filed
application.
---------------------------------------------------------------------------
\3\ 18 CFR 4.37 (2010).
---------------------------------------------------------------------------
The drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First St., NE., Washington, DC
20426. A subsequent notice will be issued by the Secretary announcing
the results of the drawing.
Dated: March 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-6776 Filed 3-22-11; 8:45 am]
BILLING CODE 6717-01-P