Notice Announcing Preliminary Permit Drawing, 16409 [2011-6770]
Download as PDF
16409
Federal Register / Vol. 76, No. 56 / Wednesday, March 23, 2011 / Notices
and Solia 8 Hydroelectric, LLC, for
Project No. 13771.2
On March 24, 2011, at 10 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.3 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St., NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: March 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–6771 Filed 3–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
Lock+ Hydro Friends Fund XXXIV .................................................................................................................................
FFP Missouri 5, LLC .......................................................................................................................................................
Solia 2 Hydroelectric, LLC ..............................................................................................................................................
The Commission has received three
preliminary permit applications deemed
filed on May 18, 2010, at 8:30 a.m.,1 for
proposed projects to be located at the
Army Corps of Engineers’ Emsworth
Lock and Dam on the Ohio River, in
Allegheny County, Pennsylvania. The
applications were filed by Lock+ Hydro
Friends Fund XXXIV for Project No.
13742, FFP Missouri 5, LLC, for Project
No. 13757, and Solia 2 Hydroelectric,
LLC, for Project No. 13764.2
On March 24, 2011, at 10 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.3 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St., NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: March 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–6770 Filed 3–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
jlentini on DSKJ8SOYB1PROD with NOTICES
Lock+ Hydro Friends Fund XLVII ...................................................................................................................................
FFP Missouri 16, LLC .....................................................................................................................................................
Solia 7 Hydroelectric, LLC ..............................................................................................................................................
Three Rivers Hydro LLC .................................................................................................................................................
The Commission has received four
preliminary permit applications deemed
filed on May 18, 2010, at 8:30 a.m.,1 for
proposed projects to be located at the
Army Corps of Engineers’ Opekiska
Lock and Dam on the Monongahela
River, in Monongahela County, West
Virginia. The applications were filed by
Lock+ Hydro Friends Fund XLVII for
Project No. 13743, FFP Missouri 16,
LLC, for Project No. 13753, Solia 7
Hydroelectric, LLC, for Project No.
13769 and Three Rivers Hydro LLC for
Project No. 13785.2
On March 24, 2011, at 10 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
2 Point Marion Hydro, LLC, also filed a permit
application to study the same site for Project No.
13789, which is deemed filed on May 19, 2010.
VerDate Mar<15>2010
16:46 Mar 22, 2011
Jkt 223001
regulations.3 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St., NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: March 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–6769 Filed 3–22–11; 8:45 am]
BILLING CODE 6717–01–P
3 18
PO 00000
Fmt 4703
Sfmt 4703
Project
Project
Project
Project
No.
No.
No.
No.
13743–000.
13753–000.
13769–000.
13785–000.
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2011–0038; FRL–8868–3]
Summitec Corporation; Transfer of
Data
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
This notice announces that
pesticide related information submitted
to EPA’s Office of Pesticide Programs
(OPP) pursuant to the Federal
Insecticide, Fungicide, and Rodenticide
Act (FIFRA) and the Federal Food, Drug,
and Cosmetic Act (FFDCA), including
information that may have been claimed
as Confidential Business Information
(CBI) by the submitter, will be
transferred to Summitec Corporation in
SUMMARY:
CFR 4.37 (2010).
Frm 00034
Project No. 13742–000.
Project No. 13757–000.
Project No. 13764–000.
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 76, Number 56 (Wednesday, March 23, 2011)]
[Notices]
[Page 16409]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-6770]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
------------------------------------------------------------------------
------------------------------------------------------------------------
Lock+ Hydro Friends Fund XXXIV... Project No. 13742-000.
FFP Missouri 5, LLC.............. Project No. 13757-000.
Solia 2 Hydroelectric, LLC....... Project No. 13764-000.
------------------------------------------------------------------------
The Commission has received three preliminary permit applications
deemed filed on May 18, 2010, at 8:30 a.m.,\1\ for proposed projects to
be located at the Army Corps of Engineers' Emsworth Lock and Dam on the
Ohio River, in Allegheny County, Pennsylvania. The applications were
filed by Lock+ Hydro Friends Fund XXXIV for Project No. 13742, FFP
Missouri 5, LLC, for Project No. 13757, and Solia 2 Hydroelectric, LLC,
for Project No. 13764.\2\
---------------------------------------------------------------------------
\1\ Under the Commission's Rules of Practice and Procedure, any
document received after regular business hours is considered filed
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2)
(2010).
\2\ Emsworth Hydro, LLC, also filed a permit application to
study the same site for Project No. 13786, which is deemed filed on
May 19, 2010.
---------------------------------------------------------------------------
On March 24, 2011, at 10 a.m. (eastern time), the Secretary of the
Commission, or her designee, will conduct a random drawing to determine
the filing priority of the applicants identified in this notice. The
Commission will select among competing permit applications as provided
in section 4.37 of its regulations.\3\ The priority established by this
drawing will be used to determine which applicant, among those with
identical filing times, will be considered to have the first-filed
application.
---------------------------------------------------------------------------
\3\ 18 CFR 4.37 (2010).
---------------------------------------------------------------------------
The drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First St., NE., Washington, DC
20426. A subsequent notice will be issued by the Secretary announcing
the results of the drawing.
Dated: March 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-6770 Filed 3-22-11; 8:45 am]
BILLING CODE 6717-01-P