Notice Announcing Preliminary Permit Drawing, 16409 [2011-6770]

Download as PDF 16409 Federal Register / Vol. 76, No. 56 / Wednesday, March 23, 2011 / Notices and Solia 8 Hydroelectric, LLC, for Project No. 13771.2 On March 24, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.3 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: March 15, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–6771 Filed 3–22–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Preliminary Permit Drawing Lock+ Hydro Friends Fund XXXIV ................................................................................................................................. FFP Missouri 5, LLC ....................................................................................................................................................... Solia 2 Hydroelectric, LLC .............................................................................................................................................. The Commission has received three preliminary permit applications deemed filed on May 18, 2010, at 8:30 a.m.,1 for proposed projects to be located at the Army Corps of Engineers’ Emsworth Lock and Dam on the Ohio River, in Allegheny County, Pennsylvania. The applications were filed by Lock+ Hydro Friends Fund XXXIV for Project No. 13742, FFP Missouri 5, LLC, for Project No. 13757, and Solia 2 Hydroelectric, LLC, for Project No. 13764.2 On March 24, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.3 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: March 15, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–6770 Filed 3–22–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Preliminary Permit Drawing jlentini on DSKJ8SOYB1PROD with NOTICES Lock+ Hydro Friends Fund XLVII ................................................................................................................................... FFP Missouri 16, LLC ..................................................................................................................................................... Solia 7 Hydroelectric, LLC .............................................................................................................................................. Three Rivers Hydro LLC ................................................................................................................................................. The Commission has received four preliminary permit applications deemed filed on May 18, 2010, at 8:30 a.m.,1 for proposed projects to be located at the Army Corps of Engineers’ Opekiska Lock and Dam on the Monongahela River, in Monongahela County, West Virginia. The applications were filed by Lock+ Hydro Friends Fund XLVII for Project No. 13743, FFP Missouri 16, LLC, for Project No. 13753, Solia 7 Hydroelectric, LLC, for Project No. 13769 and Three Rivers Hydro LLC for Project No. 13785.2 On March 24, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its 2 Point Marion Hydro, LLC, also filed a permit application to study the same site for Project No. 13789, which is deemed filed on May 19, 2010. VerDate Mar<15>2010 16:46 Mar 22, 2011 Jkt 223001 regulations.3 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: March 15, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–6769 Filed 3–22–11; 8:45 am] BILLING CODE 6717–01–P 3 18 PO 00000 Fmt 4703 Sfmt 4703 Project Project Project Project No. No. No. No. 13743–000. 13753–000. 13769–000. 13785–000. ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2011–0038; FRL–8868–3] Summitec Corporation; Transfer of Data Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: This notice announces that pesticide related information submitted to EPA’s Office of Pesticide Programs (OPP) pursuant to the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Federal Food, Drug, and Cosmetic Act (FFDCA), including information that may have been claimed as Confidential Business Information (CBI) by the submitter, will be transferred to Summitec Corporation in SUMMARY: CFR 4.37 (2010). Frm 00034 Project No. 13742–000. Project No. 13757–000. Project No. 13764–000. E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 76, Number 56 (Wednesday, March 23, 2011)]
[Notices]
[Page 16409]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-6770]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice Announcing Preliminary Permit Drawing

------------------------------------------------------------------------
 
------------------------------------------------------------------------
Lock+ Hydro Friends Fund XXXIV...  Project No. 13742-000.
FFP Missouri 5, LLC..............  Project No. 13757-000.
Solia 2 Hydroelectric, LLC.......  Project No. 13764-000.
------------------------------------------------------------------------

    The Commission has received three preliminary permit applications 
deemed filed on May 18, 2010, at 8:30 a.m.,\1\ for proposed projects to 
be located at the Army Corps of Engineers' Emsworth Lock and Dam on the 
Ohio River, in Allegheny County, Pennsylvania. The applications were 
filed by Lock+ Hydro Friends Fund XXXIV for Project No. 13742, FFP 
Missouri 5, LLC, for Project No. 13757, and Solia 2 Hydroelectric, LLC, 
for Project No. 13764.\2\
---------------------------------------------------------------------------

    \1\ Under the Commission's Rules of Practice and Procedure, any 
document received after regular business hours is considered filed 
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) 
(2010).
    \2\ Emsworth Hydro, LLC, also filed a permit application to 
study the same site for Project No. 13786, which is deemed filed on 
May 19, 2010.
---------------------------------------------------------------------------

    On March 24, 2011, at 10 a.m. (eastern time), the Secretary of the 
Commission, or her designee, will conduct a random drawing to determine 
the filing priority of the applicants identified in this notice. The 
Commission will select among competing permit applications as provided 
in section 4.37 of its regulations.\3\ The priority established by this 
drawing will be used to determine which applicant, among those with 
identical filing times, will be considered to have the first-filed 
application.
---------------------------------------------------------------------------

    \3\ 18 CFR 4.37 (2010).
---------------------------------------------------------------------------

    The drawing is open to the public and will be held in room 2C, the 
Commission Meeting Room, located at 888 First St., NE., Washington, DC 
20426. A subsequent notice will be issued by the Secretary announcing 
the results of the drawing.

    Dated: March 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-6770 Filed 3-22-11; 8:45 am]
BILLING CODE 6717-01-P