Department of Energy July 2008 – Federal Register Recent Federal Regulation Documents
Results 1 - 50 of 211
DOE/Advanced Scientific Computing Advisory Committee
This notice announces a meeting of the Advanced Scientific Computing Advisory Committee (ASCAC). Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.
Standards for Business Practices and Communication Protocols for Public Utilities
The Federal Energy Regulatory Commission (Commission) is revising its regulations to incorporate by reference the latest version (Version 001) of certain standards adopted by the Wholesale Electric Quadrant (WEQ) of the North American Energy Standards Board (NAESB). NAESB's standards revise its Open Access Same-Time Information Systems (OASIS) business practice standards, revise four business practice standards relating to reliability issues, add new standards on transmission loading relief for the Eastern Interconnection, add new standards for public key infrastructure, and add a new OASIS implementation guide. Incorporating these revised standards will provide customers with information that will enable them to obtain transmission service on a non-discriminatory basis and will assist the Commission in supporting needed infrastructure and the reliability of the interstate transmission grid.
Shepherds Flat Wind Project
The Bonneville Power Administration (BPA) has decided to offer contract terms for the electrical interconnection into the Federal Columbia River Transmission System (FCRTS) of up to 846 megawatts of power to be generated by the proposed Shepherds Flat Wind Project (Wind Project). Caithness Shepherds Flat LLC proposes to construct and operate the proposed Wind Project in Gilliam and Morrow Counties, Oregon, and has requested interconnection to the FCRTS at BPA's Slatt Substation in Gilliam County, Oregon. BPA will construct a new 230-kV yard at the Slatt Substation to accommodate this additional power in the FCRTS. This decision to interconnect the Wind Project is consistent with and tiered to BPA's Business Plan Final Environmental Impact Statement (DOE/EIS-0183, June 1995), and Business Plan ROD (August 1995).
Energy Conservation Program for Consumer Products: Energy Conservation Standards for Residential Furnaces and Boilers
This final rule clarifies the standards that are applicable to residential furnaces and boilers that were not subject to a final rule published by the Department of Energy on November 19, 2007. Additionally, today's final rule codifies in the Department's regulations the requirements that are applicable to residential boilers as established in the Energy Independence and Security Act of 2007.
Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards
Pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) approves five of six modified Reliability Standards submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC). The Commission directs NERC to submit a filing that provides an explanation regarding one aspect of the sixth modified Reliability Standard submitted by NERC. The Commission also approves NERC's proposed interpretations of five specific requirements of Commission-approved Reliability Standards.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.