Notice of FERC Staff Attendance at Southwest Power Pool Independent Coordinator of Transmission (ICT) Transmission Summit Meeting, 43927-43928 [E8-17282]

Download as PDF Federal Register / Vol. 73, No. 146 / Tuesday, July 29, 2008 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on August 4, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–17279 Filed 7–28–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER08–1281–000] New York Independent System Operator, Inc.; Notice of Filing July 22, 2008. jlentini on PROD1PC65 with NOTICES Take notice that on July 21, 2008, the New York Independent System Operator, Inc. tendered for filing its Exigent Circumstances Filing Requesting Authority to Amend its Tariffs to Preclude the Scheduling of Certain External Transactions, Requesting Prospective Limited Tariff Waivers, Seeking Expedited Commission Act, Requesting Shortened Notice and Comment Periods and Contingent Request for Consideration Under Section 206 of the Federal Power Act. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Docket Docket Docket Docket Docket Docket Docket Docket Docket No. No. No. No. No. No. No. No. No. Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on August 1, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–17280 Filed 7–28–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RR07–16–004] North American Electric, Reliability Corporation; Notice of Filing 16:12 Jul 28, 2008 Jkt 214001 of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 pm Eastern Time on August 11, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–17277 Filed 7–28–08; 8:45 am] BILLING CODE 6717–01–P July 22, 2008. Take notice that on July 21, 2008, the North American Electric Reliability Corporation tendered for filing additional information, directed to NERC, of its business plans and budgets of the eight Regional Entities in compliance with the Commission’sJune 19, 2008 Order. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy EL07–52 .............................................................................. OA07–32 ............................................................................. ER05–1065 .......................................................................... EL00–66 .............................................................................. EL95–33 .............................................................................. ER00–2854 .......................................................................... EL05–15 .............................................................................. ER08–845 ............................................................................ ER08–844 ............................................................................ VerDate Aug<31>2005 43927 PO 00000 Frm 00016 Fmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at Southwest Power Pool Independent Coordinator of Transmission (ICT) Transmission Summit Meeting July 22, 2008. The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting noted below. Their attendance is part of the Commission’s ongoing outreach efforts. ICT Transmission Summit July 29, 2008 ( 8 a.m.–3 p.m. CST), Astor Crowne Plaza Hotel, 729 Canal Street,New Orleans, LA 70130. The discussions may address matters at issue in the following proceedings: Louisiana Public Service Commission v. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Louisiana Public Service Commission v. Entergy Louisiana Public Service Commission v. Entergy Arkansas Electric Cooperative, Corp. v. Entergy Arkansas, Inc. Entergy Services, Inc. Entergy Services, Inc. Sfmt 4703 E:\FR\FM\29JYN1.SGM 29JYN1 43928 Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. Federal Register / Vol. 73, No. 146 / Tuesday, July 29, 2008 / Notices EL01–88 .............................................................................. ER08–885 ............................................................................ ER03–583 ............................................................................ ER08–879 ............................................................................ ER01–2214 .......................................................................... ER07–628 ............................................................................ ER07–629 ............................................................................ ER07–630 ............................................................................ EL08–59 .............................................................................. EL08–60 .............................................................................. ER08–750 ............................................................................ ER08–751 ............................................................................ ER08–752 ............................................................................ OA08–92 ............................................................................. OA08–75 ............................................................................. ER08–572 ............................................................................ ER08–927 ............................................................................ OA08–59 ............................................................................. ER07–1252 .......................................................................... EL03–230 ............................................................................ ER08–774 ............................................................................ ER08–1006 .......................................................................... ER08–1078 .......................................................................... ER08–1079 .......................................................................... ER08–1040 .......................................................................... ER08–1041 .......................................................................... ER08–1056 .......................................................................... ER08–1057 .......................................................................... ER08–1075 .......................................................................... ER08–682 ............................................................................ EL08–72 .............................................................................. These meetings are open to the public. For more information, contact Doug Roe, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502–6566 or douglas.roe@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. E8–17282 Filed 7–28–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13179–000; Project No. 13180– 000] FFP Missouri; FFP Missouri 2, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications jlentini on PROD1PC65 with NOTICES July 22, 2008. On April 18, 2008, FFP Missouri 1, LLC and FFP Missouri 2, LLC (Free Flow Power Corporation) each filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Missouri River 1 and the Missouri River 2 Projects, to be located in the Missouri River in St. Charles and St. Louis Counties, Missouri. VerDate Aug<31>2005 16:12 Jul 28, 2008 Jkt 214001 Louisiana Public Service Commission v. Entergy Entergy Gulf States Louisiana, LLC Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Arkansas, Inc. Entergy Arkansas, Inc. Entergy Arkansas, Inc. ConocoPhillips v. Entergy Services, Inc. Union Electric v. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. ExxonMobil v. Entergy. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services. Inc. NRG Energy, Inc. v. Entergy Services, Inc. The proposed Missouri River 1 project consists of: (1) 2,760 proposed 20kilowatt Free Flow generating units having a total installed capacity of 55.2megawatts, (2) a mooring system, (3) a proposed transmission line, and (4) appurtenant facilities. The proposed Missouri River 1 Project would have an average annual generation of 241,776gigawatt-hours and be sold to a local utility. The proposed Missouri River 2 project consists of: (1) 3,180 proposed 20kilowatt Free Flow generating units having a total installed capacity of 63.6megawatts, (2) a mooring system, (3) a proposed transmission line, and (4) appurtenant facilities. The proposed Missouri River Project 2 would have an average annual generation of 278,568gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. Daniel R. Irwin, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930, phone: 978–232–3536. FERC Contact: Patricia W. Gillis (202) 502–8735. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s website under the PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13179 or P–13180) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. Kimberly D. Bose, Secretary. [FR Doc. E8–17284 Filed 7–28–08; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\29JYN1.SGM 29JYN1

Agencies

[Federal Register Volume 73, Number 146 (Tuesday, July 29, 2008)]
[Notices]
[Pages 43927-43928]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-17282]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of FERC Staff Attendance at Southwest Power Pool 
Independent Coordinator of Transmission (ICT) Transmission Summit 
Meeting

July 22, 2008.
    The Federal Energy Regulatory Commission hereby gives notice that 
members of its staff may attend the meeting noted below. Their 
attendance is part of the Commission's ongoing outreach efforts.

ICT Transmission Summit

    July 29, 2008 ( 8 a.m.-3 p.m. CST), Astor Crowne Plaza Hotel, 729 
Canal Street,New Orleans, LA 70130.
    The discussions may address matters at issue in the following 
proceedings:

Docket No. EL07-52............................  Louisiana Public Service Commission v. Entergy Services, Inc.
Docket No. OA07-32............................  Entergy Services, Inc.
Docket No. ER05-1065..........................  Entergy Services, Inc.
Docket No. EL00-66............................  Louisiana Public Service Commission v. Entergy
Docket No. EL95-33............................  Louisiana Public Service Commission v. Entergy
Docket No. ER00-2854..........................  Louisiana Public Service Commission v. Entergy
Docket No. EL05-15............................  Arkansas Electric Cooperative, Corp. v. Entergy Arkansas, Inc.
Docket No. ER08-845...........................  Entergy Services, Inc.
Docket No. ER08-844...........................  Entergy Services, Inc.

[[Page 43928]]

 
Docket No. EL01-88............................  Louisiana Public Service Commission v. Entergy
Docket No. ER08-885...........................  Entergy Gulf States Louisiana, LLC
Docket No. ER03-583...........................  Entergy Services, Inc.
Docket No. ER08-879...........................  Entergy Services, Inc.
Docket No. ER01-2214..........................  Entergy Services, Inc.
Docket No. ER07-628...........................  Entergy Arkansas, Inc.
Docket No. ER07-629...........................  Entergy Arkansas, Inc.
Docket No. ER07-630...........................  Entergy Arkansas, Inc.
Docket No. EL08-59............................  ConocoPhillips v. Entergy Services, Inc.
Docket No. EL08-60............................  Union Electric v. Entergy Services, Inc.
Docket No. ER08-750...........................  Entergy Services, Inc.
Docket No. ER08-751...........................  Entergy Services, Inc.
Docket No. ER08-752...........................  Entergy Services, Inc.
Docket No. OA08-92............................  Entergy Services, Inc.
Docket No. OA08-75............................  Entergy Services, Inc.
Docket No. ER08-572...........................  Entergy Services, Inc.
Docket No. ER08-927...........................  Entergy Services, Inc.
Docket No. OA08-59............................  Entergy Services, Inc.
Docket No. ER07-1252..........................  Entergy Services, Inc.
Docket No. EL03-230...........................  ExxonMobil v. Entergy.
Docket No. ER08-774...........................  Entergy Services, Inc.
Docket No. ER08-1006..........................  Entergy Services, Inc.
Docket No. ER08-1078..........................  Entergy Services, Inc.
Docket No. ER08-1079..........................  Entergy Services, Inc.
Docket No. ER08-1040..........................  Entergy Services, Inc.
Docket No. ER08-1041..........................  Entergy Services, Inc.
Docket No. ER08-1056..........................  Entergy Services, Inc.
Docket No. ER08-1057..........................  Entergy Services, Inc.
Docket No. ER08-1075..........................  Entergy Services, Inc.
Docket No. ER08-682...........................  Entergy Services. Inc.
Docket No. EL08-72............................  NRG Energy, Inc. v. Entergy Services, Inc.
 

    These meetings are open to the public.
    For more information, contact Doug Roe, Office of Energy Market 
Regulation, Federal Energy Regulatory Commission at (202) 502-6566 or 
douglas.roe@ferc.gov.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-17282 Filed 7-28-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.