Notice of FERC Staff Attendance at Southwest Power Pool Independent Coordinator of Transmission (ICT) Transmission Summit Meeting, 43927-43928 [E8-17282]
Download as PDF
Federal Register / Vol. 73, No. 146 / Tuesday, July 29, 2008 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 4, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17279 Filed 7–28–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER08–1281–000]
New York Independent System
Operator, Inc.; Notice of Filing
July 22, 2008.
jlentini on PROD1PC65 with NOTICES
Take notice that on July 21, 2008, the
New York Independent System
Operator, Inc. tendered for filing its
Exigent Circumstances Filing
Requesting Authority to Amend its
Tariffs to Preclude the Scheduling of
Certain External Transactions,
Requesting Prospective Limited Tariff
Waivers, Seeking Expedited
Commission Act, Requesting Shortened
Notice and Comment Periods and
Contingent Request for Consideration
Under Section 206 of the Federal Power
Act.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
No.
No.
No.
No.
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 1, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17280 Filed 7–28–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RR07–16–004]
North American Electric, Reliability
Corporation; Notice of Filing
16:12 Jul 28, 2008
Jkt 214001
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 pm Eastern Time on
August 11, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17277 Filed 7–28–08; 8:45 am]
BILLING CODE 6717–01–P
July 22, 2008.
Take notice that on July 21, 2008, the
North American Electric Reliability
Corporation tendered for filing
additional information, directed to
NERC, of its business plans and budgets
of the eight Regional Entities in
compliance with the Commission’sJune
19, 2008 Order.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
EL07–52 ..............................................................................
OA07–32 .............................................................................
ER05–1065 ..........................................................................
EL00–66 ..............................................................................
EL95–33 ..............................................................................
ER00–2854 ..........................................................................
EL05–15 ..............................................................................
ER08–845 ............................................................................
ER08–844 ............................................................................
VerDate Aug<31>2005
43927
PO 00000
Frm 00016
Fmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of FERC Staff Attendance at
Southwest Power Pool Independent
Coordinator of Transmission (ICT)
Transmission Summit Meeting
July 22, 2008.
The Federal Energy Regulatory
Commission hereby gives notice that
members of its staff may attend the
meeting noted below. Their attendance
is part of the Commission’s ongoing
outreach efforts.
ICT Transmission Summit
July 29, 2008 ( 8 a.m.–3 p.m. CST),
Astor Crowne Plaza Hotel, 729 Canal
Street,New Orleans, LA 70130.
The discussions may address matters
at issue in the following proceedings:
Louisiana Public Service Commission v. Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy
Louisiana Public Service Commission v. Entergy
Louisiana Public Service Commission v. Entergy
Arkansas Electric Cooperative, Corp. v. Entergy Arkansas, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Sfmt 4703
E:\FR\FM\29JYN1.SGM
29JYN1
43928
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Federal Register / Vol. 73, No. 146 / Tuesday, July 29, 2008 / Notices
EL01–88 ..............................................................................
ER08–885 ............................................................................
ER03–583 ............................................................................
ER08–879 ............................................................................
ER01–2214 ..........................................................................
ER07–628 ............................................................................
ER07–629 ............................................................................
ER07–630 ............................................................................
EL08–59 ..............................................................................
EL08–60 ..............................................................................
ER08–750 ............................................................................
ER08–751 ............................................................................
ER08–752 ............................................................................
OA08–92 .............................................................................
OA08–75 .............................................................................
ER08–572 ............................................................................
ER08–927 ............................................................................
OA08–59 .............................................................................
ER07–1252 ..........................................................................
EL03–230 ............................................................................
ER08–774 ............................................................................
ER08–1006 ..........................................................................
ER08–1078 ..........................................................................
ER08–1079 ..........................................................................
ER08–1040 ..........................................................................
ER08–1041 ..........................................................................
ER08–1056 ..........................................................................
ER08–1057 ..........................................................................
ER08–1075 ..........................................................................
ER08–682 ............................................................................
EL08–72 ..............................................................................
These meetings are open to the
public.
For more information, contact Doug
Roe, Office of Energy Market Regulation,
Federal Energy Regulatory Commission
at (202) 502–6566 or
douglas.roe@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17282 Filed 7–28–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13179–000; Project No. 13180–
000]
FFP Missouri; FFP Missouri 2, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
jlentini on PROD1PC65 with NOTICES
July 22, 2008.
On April 18, 2008, FFP Missouri 1,
LLC and FFP Missouri 2, LLC (Free
Flow Power Corporation) each filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Missouri
River 1 and the Missouri River 2
Projects, to be located in the Missouri
River in St. Charles and St. Louis
Counties, Missouri.
VerDate Aug<31>2005
16:12 Jul 28, 2008
Jkt 214001
Louisiana Public Service Commission v. Entergy
Entergy Gulf States Louisiana, LLC
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Arkansas, Inc.
Entergy Arkansas, Inc.
Entergy Arkansas, Inc.
ConocoPhillips v. Entergy Services, Inc.
Union Electric v. Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
ExxonMobil v. Entergy.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services. Inc.
NRG Energy, Inc. v. Entergy Services, Inc.
The proposed Missouri River 1 project
consists of: (1) 2,760 proposed 20kilowatt Free Flow generating units
having a total installed capacity of 55.2megawatts, (2) a mooring system, (3) a
proposed transmission line, and (4)
appurtenant facilities. The proposed
Missouri River 1 Project would have an
average annual generation of 241,776gigawatt-hours and be sold to a local
utility.
The proposed Missouri River 2 project
consists of: (1) 3,180 proposed 20kilowatt Free Flow generating units
having a total installed capacity of 63.6megawatts, (2) a mooring system, (3) a
proposed transmission line, and (4)
appurtenant facilities. The proposed
Missouri River Project 2 would have an
average annual generation of 278,568gigawatt-hours and be sold to a local
utility.
Applicant Contact: Mr. Daniel R.
Irwin, Free Flow Power Corporation, 33
Commercial Street, Gloucester, MA
01930, phone: 978–232–3536.
FERC Contact: Patricia W. Gillis (202)
502–8735.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s website under the
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13179 or P–13180) in the docket
number field to access the document.
For assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17284 Filed 7–28–08; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\29JYN1.SGM
29JYN1
Agencies
[Federal Register Volume 73, Number 146 (Tuesday, July 29, 2008)]
[Notices]
[Pages 43927-43928]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-17282]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of FERC Staff Attendance at Southwest Power Pool
Independent Coordinator of Transmission (ICT) Transmission Summit
Meeting
July 22, 2008.
The Federal Energy Regulatory Commission hereby gives notice that
members of its staff may attend the meeting noted below. Their
attendance is part of the Commission's ongoing outreach efforts.
ICT Transmission Summit
July 29, 2008 ( 8 a.m.-3 p.m. CST), Astor Crowne Plaza Hotel, 729
Canal Street,New Orleans, LA 70130.
The discussions may address matters at issue in the following
proceedings:
Docket No. EL07-52............................ Louisiana Public Service Commission v. Entergy Services, Inc.
Docket No. OA07-32............................ Entergy Services, Inc.
Docket No. ER05-1065.......................... Entergy Services, Inc.
Docket No. EL00-66............................ Louisiana Public Service Commission v. Entergy
Docket No. EL95-33............................ Louisiana Public Service Commission v. Entergy
Docket No. ER00-2854.......................... Louisiana Public Service Commission v. Entergy
Docket No. EL05-15............................ Arkansas Electric Cooperative, Corp. v. Entergy Arkansas, Inc.
Docket No. ER08-845........................... Entergy Services, Inc.
Docket No. ER08-844........................... Entergy Services, Inc.
[[Page 43928]]
Docket No. EL01-88............................ Louisiana Public Service Commission v. Entergy
Docket No. ER08-885........................... Entergy Gulf States Louisiana, LLC
Docket No. ER03-583........................... Entergy Services, Inc.
Docket No. ER08-879........................... Entergy Services, Inc.
Docket No. ER01-2214.......................... Entergy Services, Inc.
Docket No. ER07-628........................... Entergy Arkansas, Inc.
Docket No. ER07-629........................... Entergy Arkansas, Inc.
Docket No. ER07-630........................... Entergy Arkansas, Inc.
Docket No. EL08-59............................ ConocoPhillips v. Entergy Services, Inc.
Docket No. EL08-60............................ Union Electric v. Entergy Services, Inc.
Docket No. ER08-750........................... Entergy Services, Inc.
Docket No. ER08-751........................... Entergy Services, Inc.
Docket No. ER08-752........................... Entergy Services, Inc.
Docket No. OA08-92............................ Entergy Services, Inc.
Docket No. OA08-75............................ Entergy Services, Inc.
Docket No. ER08-572........................... Entergy Services, Inc.
Docket No. ER08-927........................... Entergy Services, Inc.
Docket No. OA08-59............................ Entergy Services, Inc.
Docket No. ER07-1252.......................... Entergy Services, Inc.
Docket No. EL03-230........................... ExxonMobil v. Entergy.
Docket No. ER08-774........................... Entergy Services, Inc.
Docket No. ER08-1006.......................... Entergy Services, Inc.
Docket No. ER08-1078.......................... Entergy Services, Inc.
Docket No. ER08-1079.......................... Entergy Services, Inc.
Docket No. ER08-1040.......................... Entergy Services, Inc.
Docket No. ER08-1041.......................... Entergy Services, Inc.
Docket No. ER08-1056.......................... Entergy Services, Inc.
Docket No. ER08-1057.......................... Entergy Services, Inc.
Docket No. ER08-1075.......................... Entergy Services, Inc.
Docket No. ER08-682........................... Entergy Services. Inc.
Docket No. EL08-72............................ NRG Energy, Inc. v. Entergy Services, Inc.
These meetings are open to the public.
For more information, contact Doug Roe, Office of Energy Market
Regulation, Federal Energy Regulatory Commission at (202) 502-6566 or
douglas.roe@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-17282 Filed 7-28-08; 8:45 am]
BILLING CODE 6717-01-P