Transcontinental Gas Pipe Line Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Hester Storage Field Retirement Project and Request for Comments on Environmental Issues, 44244-44246 [E8-17404]
Download as PDF
44244
Federal Register / Vol. 73, No. 147 / Wednesday, July 30, 2008 / Notices
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the Internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: August 13, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17396 Filed 7–29–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
July 24, 2008.
mstockstill on PROD1PC66 with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP08–371–001.
Applicants: Texas Gas Transmission,
LLC.
Description: Texas Gas Transmission,
LLC submits Original Sheet 74B of its
FERC Gas Tariff, Second Revised
Volume 1 effective 7/1/08.
Filed Date: 07/23/2008.
Accession Number: 20080723–0239.
Comment Date: 5 p.m. Eastern Time
on Monday, August 04, 2008.
Docket Numbers: RP08–452–000.
Applicants: Northwest Pipeline GP.
Description: Northwest Pipeline, GP
request that the Commission grant a
waiver of Section 25.2(c) of the General
Terms and Conditions of FERC Gas
Tariff, etc.
Filed Date: 07/23/2008.
Accession Number: 20080724–0021.
Comment Date: 5 p.m. Eastern Time
on Monday, August 04, 2008.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
VerDate Aug<31>2005
23:06 Jul 29, 2008
Jkt 214001
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–17434 Filed 7–29–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–207–000]
Transcontinental Gas Pipe Line
Corporation; Notice of Intent To
Prepare an Environmental Assessment
for the Proposed Hester Storage Field
Retirement Project and Request for
Comments on Environmental Issues
July 23, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Transcontinental Gas Pipe Line
Corporation’s (Transco) Hester Storage
Field Retirement Project (Project)
involving abandonment, construction,
and temporary operation of facilities by
Transco in St. James Parish, Louisiana.
This notice announces the opening of
the scoping process we will use to
gather input from the public and
interested agencies on the project. Your
input will help the Commission staff
determine which issues need to be
evaluated in the EA. Please note that the
scoping period will close on August 22,
2008.
This notice is being sent to affected
landowners; federal, state, and local
government representatives and
agencies; environmental and public
interest groups; Native American tribes;
other interested parties in this
proceeding; and local libraries and
newspapers. We encourage government
representatives to notify their
constituents of this planned project and
encourage them to comment on their
areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice Transco provided to landowners.
This fact sheet addresses a number of
typically asked questions, including
how to participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
The proposed project would involve
temporary compression and minor
modification and installation of yard
pipeline at Compressor Station 64 to
support the final withdrawal of base gas
from the Hester Storage field; eventual
removal and capping of 5 wells of the
Hester Storage Field; closure of
Compressor Station 64, and the
abandonment in place of 4.75 miles of
pipeline lateral.
Specifically, Transco proposes to:
• Temporarily install one 630
horsepower engine/compressor unit
associated yard pipes at Compressor
Station 64;
• Remove gathering lines between
Compressor Station 64 and 5 injection/
withdrawal wells, 1 monitoring well,
and 3 water wells;
• Abandon the 12-inch pipeline
lateral from Compressor station 64
(milepost 8.66) to the interconnect with
Occidental Chemical Corporation
(milepost 3.91);
• Abandon and cap 5 injection/
withdrawal wells, 1 monitoring well,
and 3 water wells; and
E:\FR\FM\30JYN1.SGM
30JYN1
Federal Register / Vol. 73, No. 147 / Wednesday, July 30, 2008 / Notices
• Remove all aboveground buildings
and equipment at Compressor Station
64, including, but not limited to the
compressor building, office/shop, air
compressor building, utility shed, meter
building, condensate and wastewater
tanks, gas coolers, glycol units, gas
scrubbers, 2 existing engine/compressor
units, and associated piping.
The location of the project facilities is
shown in Appendix 1.1
Nonjurisdictional Facilities
There are no non-jurisdictional
facilities associated with this project.
Land Requirements for Construction
Construction of the proposed
temporary facilities would be contained
within the existing Compressor Station
64 fence line, existing well pads and
existing pipeline right-of-way.
Approximately 14.06 acres of land
would be disturbed during the
temporary installation of compression
and the abandonment of wells and
pipeline. Following construction, the
use of the pipeline lateral right-of-way
would revert to the landowner while the
compressor station property would
either be donated to the community or
sold.
The EA Process
mstockstill on PROD1PC66 with NOTICES
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, the Commission staff
requests public comments on the scope
of the issues to address in the EA. All
comments received are considered
during the preparation of the EA. State
and local government representatives
are encouraged to notify their
constituents of this proposed action and
encourage them to comment on their
areas of concern.
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices, other than Appendix 1 (maps), are
available on the Commission’s Web site at the
‘‘eLibrary’’ link or from the Commission’s Public
Reference Room, 888 First Street, NE., Washington,
DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibrary refer to the last page of
this notice. Copies of the appendices were sent to
all those receiving this notice in the mail.
VerDate Aug<31>2005
23:06 Jul 29, 2008
Jkt 214001
In the EA we 2 will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils.
• Land use.
• Water resources, fisheries, and
wetlands.
• Cultural resources.
• Vegetation and wildlife.
• Air quality and noise.
• Endangered and threatened species.
• Hazardous waste.
• Public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to federal, state,
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the public participation
section below.
Currently Identified Environmental
Issues
We have already identified issues that
we think deserve attention based on a
preliminary review of the proposed
facilities and the environmental
information provided by Transco. This
preliminary list of issues may be
changed based on your comments and
our analysis.
• The project may have air emissions
and noise impacts.
• Safety of the storage field after
abandonment.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the Hester
Storage Field Abandonment Project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects
(OEP).
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
44245
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send in your comments
so that they will be received in
Washington, DC on or before August 22,
2008.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number CP08–207–000 with
your submission. The docket number
can be found on the front of this notice.
The Commission encourages electronic
filing of comments and has dedicated
eFiling expert staff available to assist
you at 202–502–8258 or
efiling@ferc.gov.
(1) You may file your comments
electronically by using the Quick
Comment feature, which is located on
the Commission’s internet Web site at
https://www.ferc.gov under the link to
Documents and Filings. A Quick
Comment is an easy method for
interested persons to submit text-only
comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s internet Web site at
https://www.ferc.gov under the link to
Documents and Filings. eFiling involves
preparing your submission in the same
manner as you would if filing on paper,
and then saving the file on your
computer’s hard drive. You will attach
that file as your submission. New
eFiling users must first create an
account by clicking on ‘‘Sign up’’ or
‘‘eRegister.’’ You will be asked to select
the type of filing you are making. A
comment on a particular project is
considered a ‘‘Comment on a Filing;’’ or
(3) You may file your comments via
mail to the Commission by sending an
original and two copies of your letter to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC
20426.
Label one copy of the comments for
the attention of Gas Branch 3, PJ11.3.
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners whose property may be
used temporarily for project purposes,
who have existing easements from the
pipeline, or who own homes within
distances defined in the Commission’s
regulations of certain aboveground
facilities. By this notice we are also
asking governmental agencies,
E:\FR\FM\30JYN1.SGM
30JYN1
44246
Federal Register / Vol. 73, No. 147 / Wednesday, July 30, 2008 / Notices
especially those in Appendix 2, to
express their interest in becoming
cooperating agencies for the preparation
of the EA.
If you do not want to send comments
at this time but still want to remain on
our mailing list, please return the
Information Request (Appendix 3). If
you do not return the Information
Request, you will be taken off the
mailing list.
mstockstill on PROD1PC66 with NOTICES
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding known as an ‘‘intervenor.’’
Intervenors play a more formal role in
the process. Among other things,
intervenors have the right to receive
copies of case-related Commission
documents and filings by other
intervenors. Likewise, each intervenor
must send one electronic copy (using
the Commission’s eFiling system) or 14
paper copies of its filings to the
Secretary of the Commission and must
send a copy of its filings to all other
parties on the Commission’s service list
for this proceeding.
If you want to become an intervenor
you must file a motion to intervene
according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214). Only
intervenors have the right to seek
rehearing of the Commission’s decision.
The Notice of Application for this
proposed project issued on May 6, 2008
identified the date for the filing of
interventions as May 28, 2008.
However, affected landowners and
parties with environmental concerns
may be granted late intervenor status
upon showing good cause by stating that
they have a clear and direct interest in
this proceeding which would not be
adequately represented by any other
parties. You do not need intervenor
status to have your environmental
comments considered.
Availability of Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
VerDate Aug<31>2005
23:06 Jul 29, 2008
Jkt 214001
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17404 Filed 7–29–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 13, 2008.
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17397 Filed 7–29–08; 8:45 am]
[Docket No. EF08–2011–000]
BILLING CODE 6717–01–P
Bonneville Power Administration;
Notice of Filing
DEPARTMENT OF ENERGY
July 23, 2008.
Take notice that on July 14, 2008, the
Bonneville Power Administration (BPA)
filed its proposed Average system Cost
Methodology (2008 ASCM) for the
Commission’s review and approval on
an interim basis, effective October 1,
2008, vested in the Commission by
Pacific Northwest Electric Power
Planning and Conservation Act, under
section 5(c)(7), and Commission
regulations, 16 U.S.C. section 839c(c)(7).
BPA also requests the Commission to
revise its regulations at 18 CFR section
301.1 to reflect BPA’s 2008 ASCM once
it is approved.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. EF08–2021–000]
Bonneville Power Administration;
Notice of Filing
July 23, 2008.
Take notice that on July 17, 2008,
Bonneville Power Administration, filed
its 2009 Wind Integration—Within-Hour
Balancing Service rate schedule for the
Commission’s confirmation and
approval on an interim basis by
September 30, 2008 and final approval
effective October 1, 2008 through
September 30, 2008, vested in the
Commission by Pacific Northwest
Electric Power Planning and
Conservation Act, under sections 7(a)(2)
and 7(i)(6), and Commission
regulations, 16 U.S.C. 839e(a)(2) and
839e(i)(6), and Subpart B of Part 300, 18
CFR part 300.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
E:\FR\FM\30JYN1.SGM
30JYN1
Agencies
[Federal Register Volume 73, Number 147 (Wednesday, July 30, 2008)]
[Notices]
[Pages 44244-44246]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-17404]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-207-000]
Transcontinental Gas Pipe Line Corporation; Notice of Intent To
Prepare an Environmental Assessment for the Proposed Hester Storage
Field Retirement Project and Request for Comments on Environmental
Issues
July 23, 2008.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of Transcontinental Gas Pipe Line
Corporation's (Transco) Hester Storage Field Retirement Project
(Project) involving abandonment, construction, and temporary operation
of facilities by Transco in St. James Parish, Louisiana.
This notice announces the opening of the scoping process we will
use to gather input from the public and interested agencies on the
project. Your input will help the Commission staff determine which
issues need to be evaluated in the EA. Please note that the scoping
period will close on August 22, 2008.
This notice is being sent to affected landowners; federal, state,
and local government representatives and agencies; environmental and
public interest groups; Native American tribes; other interested
parties in this proceeding; and local libraries and newspapers. We
encourage government representatives to notify their constituents of
this planned project and encourage them to comment on their areas of
concern.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice Transco provided to landowners. This fact sheet
addresses a number of typically asked questions, including how to
participate in the Commission's proceedings. It is available for
viewing on the FERC Internet Web site (https://www.ferc.gov).
Summary of the Proposed Project
The proposed project would involve temporary compression and minor
modification and installation of yard pipeline at Compressor Station 64
to support the final withdrawal of base gas from the Hester Storage
field; eventual removal and capping of 5 wells of the Hester Storage
Field; closure of Compressor Station 64, and the abandonment in place
of 4.75 miles of pipeline lateral.
Specifically, Transco proposes to:
Temporarily install one 630 horsepower engine/compressor
unit associated yard pipes at Compressor Station 64;
Remove gathering lines between Compressor Station 64 and 5
injection/withdrawal wells, 1 monitoring well, and 3 water wells;
Abandon the 12-inch pipeline lateral from Compressor
station 64 (milepost 8.66) to the interconnect with Occidental Chemical
Corporation (milepost 3.91);
Abandon and cap 5 injection/withdrawal wells, 1 monitoring
well, and 3 water wells; and
[[Page 44245]]
Remove all aboveground buildings and equipment at
Compressor Station 64, including, but not limited to the compressor
building, office/shop, air compressor building, utility shed, meter
building, condensate and wastewater tanks, gas coolers, glycol units,
gas scrubbers, 2 existing engine/compressor units, and associated
piping.
The location of the project facilities is shown in Appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices, other
than Appendix 1 (maps), are available on the Commission's Web site
at the ``eLibrary'' link or from the Commission's Public Reference
Room, 888 First Street, NE., Washington, DC 20426, or call (202)
502-8371. For instructions on connecting to eLibrary refer to the
last page of this notice. Copies of the appendices were sent to all
those receiving this notice in the mail.
---------------------------------------------------------------------------
Nonjurisdictional Facilities
There are no non-jurisdictional facilities associated with this
project.
Land Requirements for Construction
Construction of the proposed temporary facilities would be
contained within the existing Compressor Station 64 fence line,
existing well pads and existing pipeline right-of-way. Approximately
14.06 acres of land would be disturbed during the temporary
installation of compression and the abandonment of wells and pipeline.
Following construction, the use of the pipeline lateral right-of-way
would revert to the landowner while the compressor station property
would either be donated to the community or sold.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
This process is referred to as ``scoping.'' The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this Notice of Intent, the Commission staff
requests public comments on the scope of the issues to address in the
EA. All comments received are considered during the preparation of the
EA. State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
In the EA we \2\ will discuss impacts that could occur as a result
of the construction and operation of the proposed project under these
general headings:
---------------------------------------------------------------------------
\2\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
Geology and soils.
Land use.
Water resources, fisheries, and wetlands.
Cultural resources.
Vegetation and wildlife.
Air quality and noise.
Endangered and threatened species.
Hazardous waste.
Public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section below.
Currently Identified Environmental Issues
We have already identified issues that we think deserve attention
based on a preliminary review of the proposed facilities and the
environmental information provided by Transco. This preliminary list of
issues may be changed based on your comments and our analysis.
The project may have air emissions and noise impacts.
Safety of the storage field after abandonment.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the Hester Storage Field Abandonment
Project. Your comments should focus on the potential environmental
effects, reasonable alternatives, and measures to avoid or lessen
environmental impacts. The more specific your comments, the more useful
they will be. To ensure that your comments are timely and properly
recorded, please send in your comments so that they will be received in
Washington, DC on or before August 22, 2008.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number CP08-207-000 with your submission.
The docket number can be found on the front of this notice. The
Commission encourages electronic filing of comments and has dedicated
eFiling expert staff available to assist you at 202-502-8258 or
efiling@ferc.gov.
(1) You may file your comments electronically by using the Quick
Comment feature, which is located on the Commission's internet Web site
at https://www.ferc.gov under the link to Documents and Filings. A Quick
Comment is an easy method for interested persons to submit text-only
comments on a project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's internet Web site at
https://www.ferc.gov under the link to Documents and Filings. eFiling
involves preparing your submission in the same manner as you would if
filing on paper, and then saving the file on your computer's hard
drive. You will attach that file as your submission. New eFiling users
must first create an account by clicking on ``Sign up'' or
``eRegister.'' You will be asked to select the type of filing you are
making. A comment on a particular project is considered a ``Comment on
a Filing;'' or
(3) You may file your comments via mail to the Commission by
sending an original and two copies of your letter to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First St., NE.,
Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas Branch 3,
PJ11.3.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project. This includes all landowners whose
property may be used temporarily for project purposes, who have
existing easements from the pipeline, or who own homes within distances
defined in the Commission's regulations of certain aboveground
facilities. By this notice we are also asking governmental agencies,
[[Page 44246]]
especially those in Appendix 2, to express their interest in becoming
cooperating agencies for the preparation of the EA.
If you do not want to send comments at this time but still want to
remain on our mailing list, please return the Information Request
(Appendix 3). If you do not return the Information Request, you will be
taken off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding known as an
``intervenor.'' Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must send one electronic copy (using the
Commission's eFiling system) or 14 paper copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding.
If you want to become an intervenor you must file a motion to
intervene according to Rule 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.214). Only intervenors have the right to seek
rehearing of the Commission's decision.
The Notice of Application for this proposed project issued on May
6, 2008 identified the date for the filing of interventions as May 28,
2008. However, affected landowners and parties with environmental
concerns may be granted late intervenor status upon showing good cause
by stating that they have a clear and direct interest in this
proceeding which would not be adequately represented by any other
parties. You do not need intervenor status to have your environmental
comments considered.
Availability of Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link.
Click on the eLibrary link, click on ``General Search'' and enter the
docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-17404 Filed 7-29-08; 8:45 am]
BILLING CODE 6717-01-P