Public Utility District No. 1 of Chelan County, Washington; Notice of Application for Approval of Contract for the Sale of Power for a Period Extending Beyond the Term of the License, 43736 [E8-17177]
Download as PDF
43736
Federal Register / Vol. 73, No. 145 / Monday, July 28, 2008 / Notices
Procurement, and Development, Los
Angeles Department of Water and
Power, Suite 921, 111 North Hope St.,
Los Angeles, CA 90012; phone: (213)
367–0381. FERC Contact: Tom
Papsidero, 202–502–6002.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13248) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17143 Filed 7–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2145–089]
Public Utility District No. 1 of Chelan
County, Washington; Notice of
Application for Approval of Contract
for the Sale of Power for a Period
Extending Beyond the Term of the
License
jlentini on PROD1PC65 with NOTICES
July 18, 2008.
Take notice that on July 17, 2008,
Public Utility District No. 1 of Chelan
County, Washington (Chelan PUD) filed
with the Commission an application for
approval of a contract for the sale of
power from its licensed Rocky Reach
Project No. 2145 for a period from June
30, 2011, through October 31, 2028.1
1 The license for the Rocky Reach Project expired
in 2006 and the project is operating under annual
license.
VerDate Aug<31>2005
18:35 Jul 25, 2008
Jkt 214001
The Project is located on the Columbia
River in Washington.
Section 22 of the Federal Power Act,
16 U.S.C. 815, provides that contracts
for the sale and delivery of power for
periods extending beyond the
termination date of a license may be
entered into upon the joint approval of
the Commission and the appropriate
state public service commission or other
similar authority in the state in which
the sale or delivery of power is made.
Chelan PUD asserts that approval of the
submitted contract is in the public
interest.
Comments on the request for approval
of the power sales contract or motions
to intervene may be filed with the
Commission no later than August 18,
2008, and replies to comments no later
than August 26, 2008. The
Commission’s Rules of Practice require
all intervenors filing documents with
the Commission to serve a copy of that
document on each person on the official
service list for the project. Further, if an
intervenor files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
All documents (an original and eight
copies) must be filed with: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please put the name Rocky Reach,
Project No. 2145–089 on the first page
of all documents.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov under the ‘‘e-Filing’’ link.
A copy of the application is available
for review in the Commission’s Public
Reference Room or may be viewed on
the Commission’s Web site https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to these projects or other
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
pending projects. For assistance, contact
FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17177 Filed 7–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13134–000]
Thousand Springs Hydro, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
July 21, 2008.
On February 25, 2008, Thousand
Springs Hydro, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Thousand Springs
Pump Storage Hydroelectric Project,
located on the Thousand Springs Creek,
in Elko County, Nevada.
The proposed pumped storage project
would consist of: (1) An enlargement of
the existing gravity dam to 80 feet in
height, with a crest length of 650 feet,
and a hydraulic head of 60 feet, and an
upper gravity dam 220 feet in height,
with a crest length of 1,700 feet and a
hydraulic head of 200 feet, (2) a
proposed upper reservoir having a
surface area of 350 acres, with a storage
capacity of 11,600 acre-feet and a
normal water surface elevation of 5,680
feet mean sea level (msl), (3) a proposed
lower reservoir having a surface area of
660 acres, with storage capacity of
10,500 acre-feet and normal water
surface elevation of 5,200 feet msl, (4)
a 360-inch-diameter steel penstock
approximately 7,130 feet long, (5) a
proposed powerhouse containing six
generating units having a total installed
capacity of 470 megawatts, (6) a
switchyard, (7) a 115 kV transmission
line approximately 21.7 miles in length,
and (8) appurtenant facilities. The
proposed project would generate
approximately 1,370 gigawatt hours
annually, which would be sold to a
local utility.
Applicant Contact: Mr. Daniel K.
Dygert, COO, Carrus Land Systems,
LLC, 1047 S. 100 W., Ste. 210, Logan,
UT 84321, (435) 787–2211, and Mr.
Brent L. Smith, COO, Symbiotics, LLC,
P.O. Box 535, Rigby, ID 83442, (208)
745–0834.
FERC Contact: Kelly Houff, 202–502–
6393.
E:\FR\FM\28JYN1.SGM
28JYN1
Agencies
[Federal Register Volume 73, Number 145 (Monday, July 28, 2008)]
[Notices]
[Page 43736]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-17177]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2145-089]
Public Utility District No. 1 of Chelan County, Washington;
Notice of Application for Approval of Contract for the Sale of Power
for a Period Extending Beyond the Term of the License
July 18, 2008.
Take notice that on July 17, 2008, Public Utility District No. 1 of
Chelan County, Washington (Chelan PUD) filed with the Commission an
application for approval of a contract for the sale of power from its
licensed Rocky Reach Project No. 2145 for a period from June 30, 2011,
through October 31, 2028.\1\ The Project is located on the Columbia
River in Washington.
---------------------------------------------------------------------------
\1\ The license for the Rocky Reach Project expired in 2006 and
the project is operating under annual license.
---------------------------------------------------------------------------
Section 22 of the Federal Power Act, 16 U.S.C. 815, provides that
contracts for the sale and delivery of power for periods extending
beyond the termination date of a license may be entered into upon the
joint approval of the Commission and the appropriate state public
service commission or other similar authority in the state in which the
sale or delivery of power is made. Chelan PUD asserts that approval of
the submitted contract is in the public interest.
Comments on the request for approval of the power sales contract or
motions to intervene may be filed with the Commission no later than
August 18, 2008, and replies to comments no later than August 26, 2008.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
All documents (an original and eight copies) must be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Please put the name Rocky
Reach, Project No. 2145-089 on the first page of all documents.
Comments may be filed electronically via the Internet in lieu of
paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov under the ``e-Filing'' link.
A copy of the application is available for review in the
Commission's Public Reference Room or may be viewed on the Commission's
Web site https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676,
or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to these projects or other pending projects. For
assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-17177 Filed 7-25-08; 8:45 am]
BILLING CODE 6717-01-P