Engineers Corps – Federal Register Recent Federal Regulation Documents

Results 251 - 300 of 608
Intent To Prepare a Draft Environmental Impact Statement for Shoreline Protection for Flagler County, FL
Document Number: E8-20722
Type: Notice
Date: 2008-09-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Jacksonville District, U.S. Army Corps (Corps) of Engineers intends to prepare a Draft Environmental Impact Statement (EIS) for protection of 18-Miles of coastal shoreline in Flagler County, FL. The project is a cooperative effort between the U.S. Army Corps of Engineers (lead Federal agency) and City of Flagler Beach (non-Federal sponsor and cooperating agency).
Missouri River Recovery Implementation Committee; Meeting
Document Number: E8-20721
Type: Notice
Date: 2008-09-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 5018 (b) of the Water Resources Act of 2007, announcement is made of the following committee meeting: Name of Committee: Missouri River Recovery Implementation Committee. Date: September 29-October 1, 2008. Time: 1 p.m. to 6 p.m. (September 29, 2008). 8:30 a.m. to 6 p.m. (September 30, 2008). 8:30 a.m. to 6 p.m. (October 1, 2008). Place: Sheraton Clayton Plaza Hotel, 7730 Bonhomme Avenue, Clayton, MO 63105.
Availability of Final Supplemental Environmental Impact Statement for Atlantic Coast of Maryland Shoreline Protection Project-General Reevaluation Study: Borrow Sources for 2010-2044, Ocean City, MD
Document Number: E8-20720
Type: Notice
Date: 2008-09-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act (NEPA), the Baltimore District, U.S. Army Corps of Engineers (USACE), has prepared a Final Supplemental Environmental Impact Statement (SEIS) for the Atlantic Coast of Maryland Shoreline Protection Project (Atlantic Coast Project). The SEIS evaluated new borrow sources to provide sand for routine periodic beach nourishment of Ocean City, MD, for the years 2010-2044. Existing borrow sources in state waters are anticipated to be exhausted after about 2010. Between 6,800,000 and 15,000,000 cubic yards of sand would be needed through 2044, depending on future storm frequency and intensity. Three offshore shoals in Federal waters are proposed as sand sources: Weaver, Isle of Wight, and ``A.'' Sand may also be dredged from Shoal ``B,'' also known as Bass Grounds or First Lump, in the future, but only if its value as a fishing ground declines substantially. Guidelines to minimize long-term impacts to the offshore shoals were formulated in coordination with resource agency personnel and academic experts. Dredging would be conducted in accordance with these guidelines. Specific dredging plans would be developed in coordination with resource agencies prior to each beach nourishment cycle.
Board on Coastal Engineering Research
Document Number: E8-20358
Type: Notice
Date: 2008-09-03
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Board on Coastal Engineering Research. Date of Meeting: September 23-25, 2008. Place: Pavilion Ballroom, Hilton Portland and Executive Tower, 921 SW 6th Avenue, Portland, OR 97204. Time: 8 a.m. to 5 p.m. (September 23, 2008); 8 a.m. to 5:30 p.m. (September 24, 2008); 8 a.m. to 5 p.m. (September 25, 2008).
Public Scoping Meetings for Update of the Water Control Manual for the Alabama-Coosa-Tallapoosa River Basin in Alabama and Georgia
Document Number: E8-19487
Type: Notice
Date: 2008-08-22
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Mobile District, issued a Notice of Intent (NOI) in the Federal Register (72 FR 63561), published on November 9, 2007, describing the preparation of a Draft Environmental Impact Statement (EIS), as required by the National Environmental Policy Act (NEPA), to address the proposed update of the Water Control Manual (WCM) for the Alabama-Coosa-Tallapoosa (ACT) River Basin. The Corps will hold four public scoping meetings during the month of September as part of its review and update of the WCM for the ACT River Basin. The public is invited to attend the scoping meetings which will provide information on the WCM update process and afford the opportunity to receive input from the public about their issues and concerns regarding that process. All four public meetings will be held using an open house format, allowing time for participants to review specific information and to provide comments to the resource staff attending the meeting.
Intent To Prepare a Draft Environmental Impact Statement for the Expansion of an Operating Open Pit Taconite Mine and Expansion of an Operating Taconite Ore Processing Facility Proposed by U.S. Steel-Minnesota Ore Operations Near Keewatin in Itasca County and St. Louis County, MN
Document Number: E8-18019
Type: Notice
Date: 2008-08-06
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
U.S. SteelMinnesota Ore Operations (U.S. Steel) has applied to the St. Paul District, Corps of Engineers (Corps) for a Clean Water Act Section 404 permit to discharge fill material into jurisdictional wetlands to facilitate the expansion of an operating open pit taconite mine and expansion of an operating taconite ore processing facility near Keewatin in Itasca County and St. Louis County, MN. Tailings would be discharged into an existing, operating tailings basin. The proposed project is known as the Keetac Expansion Project. Iron ore mining and taconite pellet production have been on-going at the Keetac site since 1967, when the original Phase I taconite processing plant began operation. In 1977, the Phase II expansion added a second grate-kiln pellet line. The Phase I facility was idled in December 1980, leaving the Phase II facility as the only operating pellet production line. U.S. Steel now proposes to increase the capacity at the Keetac facility by restarting the Phase I line and upgrading the mining, concentrating, and agglomerating processes. The restart would involve the installation of energy-efficient technologies in addition to new emission controls. The expansion would increase the project impact area by approximately 1,272 acres to a total of approximately 12,864 acres. The project would continue to operate 24 hours per day; 365 days per year. Taconite pellet production output would increase by 3.6 million tons to a total output of 9.6 million tons per year. The mining process would require the construction of overburden, waste rock, and lean ore stockpiles adjacent to the open pit mine. There is currently adequate ore crushing capacity for the proposed expansion. The existing tailings basin would be expanded slightly in order to reinforce the dikes so that the height of the tailings can be increased. The currently permitted mine could also be used to provide ore for the proposed expanded operation, but this would reduce the life of the mine and therefore an expansion of the mine is proposed to maintain twenty-five years of permitted capacity. The project would require the discharge of fill material into approximately 620 acres of wetlands. While some of the wetlands may be isolated, the majority of the wetlands are abutting or adjacent to an unnamed tributary to Welcome Creek, which is a tributary to O'Brien Creek, which is a tributary to the Swan River, which is a tributary to the Mississippi River, which is a navigable water of the United States. U.S. Steel proposes to utilize approximately 395 acres of wetlands that have been restored and are being monitored adjacent to the existing tailings basin to compensate for the first five years of lost wetland functions and values that would be caused by the proposed project. Those restored wetlands have been identified as being suitable for wetland banking. In addition, U.S. Steel will submit a compensatory wetland mitigation plan to identify compensation for the remainder of the proposed wetland impacts. The discharge of dredged or fill material into waters of the United States requires a permit issued by the Corps under Section 404 of the Clean Water Act. The Final Environmental Impact Statement (FEIS) will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act (NEPA).
Notice of Availability Supplemental Draft Environmental Impact Statement for the White River Minimum Flow Reallocation Study, Arkansas
Document Number: E8-18018
Type: Notice
Date: 2008-08-06
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers (USACE), Little Rock District, has prepared a Supplemental Draft Environmental Impact Statement (SDEIS) for the proposed implementation of the White River Minimum Flow, Arkansas. This SDEIS is being made available for a 45-day public comment period.
Intent to Prepare an Environmental Impact Statement for the Conveyance of Federal Lands at Lake Texoma to the City of Denison, Grayson County, TX
Document Number: E8-18017
Type: Notice
Date: 2008-08-06
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The purpose of the Environmental Impact Statement (EIS) is to address alternatives and environmental impacts associated with the conveyance of approximately 900 acres of Federal land at Lake Texoma, Oklahoma and Texas, to the city of Denison, TX.
Solicitation for Public Sector Nominations To Serve on the Committee on Levee Safety
Document Number: E8-17341
Type: Notice
Date: 2008-07-29
Agency: Department of Defense, United States Army Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (USACE) is soliciting nominations from the private sector to serve on the Committee on Levee Safety. The Water Resources Development Act (WRDA) of 2007 requires formation of a sixteen member Committee on Levee Safety (Committee) charged with developing recommendations for a national levee safety program, including a strategic implementation plan. Two representatives of the private sector will be selected to serve on the Committee.
Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Corte Madera Creek Flood Control Project, Marin County, CA
Document Number: E8-15329
Type: Notice
Date: 2008-07-07
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) authorized through the Flood Control Act of 1962, Public Law No. 87-4, 87th Congress, 2nd Session, approved October 23, 1962, and amended by Section 204 of Pub. L. No. 89-789, the Flood Control Act of 1966, and the Water Resources Development Act of 1986, will address channel modification opportunities to Unit 4 of Corte Madera Creek, Marin County, CA. The purpose of the Corte Madera Creek Flood Control Project is to provide flood risk management for Corte Madera Creek, from the upstream end of the existing Unit 3 concrete channel to Sir Francis Drake Boulevard at the border of Ross and San Anselmo. Although Units 1, 2, and 3 channel modifications were completed in 1971, public concerns led to a delay in the planned actions for Unit 4. In 1996, Marin County requested the completion of Unit 4 by the Corps, and damages incurred by the December 2005 flood have also renewed public interest in finding solutions to minimize the risk of future floods. Since 1971, additional technical studies were conducted that provide another opportunity to formulate and review new alternatives in order to complete the project. This is a notice of intent to prepare a joint Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) to consider all reasonable alternatives and to evaluate potential impacts associated with the proposed actions. The U.S. Army Corps of Engineers is the lead agency for this project under the National Environmental Policy Act (NEPA) and Marin County Flood Control and Water Conservation District Zone 9 is the lead agency under the California Environmental Quality Act (CEQA).
Spring Bayou, Louisiana, Ecosystem Restoration Feasibility Study
Document Number: E8-14240
Type: Notice
Date: 2008-06-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Vicksburg District, in conjunction with the Avoyelles Parish Police Jury, the non-Federal sponsor, is undertaking studies to investigate the feasibility of restoring the Spring Bayou area ecosystem.
Intent To Prepare a Draft Environmental Impact Statement for the Clear Creek General Reevaluation Study, Brazoria, Fort Bend, Galveston and Harris Counties, TX
Document Number: E8-14239
Type: Notice
Date: 2008-06-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Clear Creek watershed drains portions of Fort Bend, Harris, Galveston, and Brazoria counties, Texas, including portions of Houston and the smaller towns of League City, Friendswood and Pearland, among others. The watershed also forms part of the boundary between Harris County to the north and Galveston and Brazoria counties to the south. Clear Creek flows into the west side of upper Galveston Bay through Clear Lake. The Draft Environmental Impact Statement (DEIS) will evaluate several flood detention and conveyance features to reduce flooding of homes and businesses in the Clear Creek Watershed. The study will focus on environmental and social conditions currently present and those likely to be affected by the proposed changes in the watershed. The flood-control project includes construction of several miles of high flow channel adjacent to the existing channel, while preserving the existing channel and floodplain forest. Detention of flood waters would also be provided in some areas where the high flow channel diverges from the low flow channel and in off-line detention areas adjacent to the creek. All flood control measures on Clear Creek occur upstream of the Dixie Farm Road crossing. The proposed project also includes widening three tributaries to Clear Creek, Mud Gully, Turkey Creek, and Mary's Creek, for improved conveyance of flood flows, with detention basins constructed adjacent to Mary's Creek and between Clear Creek and Mud Gully.
United States Navy Restricted Area, SUPSHIP Bath Detachment Mobile, Mobile, AL
Document Number: E8-13283
Type: Proposed Rule
Date: 2008-06-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) is proposing to establish a restricted area around the AUSTAL, USA shipbuilding facility located in Mobile, Alabama, because of the sensitive nature of the on-going and potential future activities at that facility. The Supervisor of Shipbuilding, Conversion and Repair (SUPERVISOR), located in Bath, Maine is responsible for United States Navy shipbuilding activities at AUSTAL, USA located in Mobile, Alabama. The proposed restricted area will be used for on-going construction when vessels are placed in the water. The proposed restricted area is essential to protect persons and property from the dangers associated with the operation and safeguard the area from accidents, sabotage and other subversive acts.
Notice of Intent To Prepare a Draft Environmental Impact Statement for Carolinas Cement Company LLC Castle Hayne Project in New Hanover County, NC
Document Number: E8-13100
Type: Notice
Date: 2008-06-11
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Division is amending the request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, from Carolinas Cement Company LLC (a subsidiary of Titan America LLC) to construct the Carolinas Cement Company LLC Castle Hayne Project. This project will include quarrying to support cement manufacturing in northern New Hanover County, NC. The amendment is a change in date and location of the scoping meeting and an extension of the comment period deadline. The original Notice of Intent was published in the Federal Register on May 30, 2008 (73 FR 31072), with a comment deadline of June 30, 2008.
Restricted Area at Blount Island Command and Marine Corps Support Facility-Blount Island, Jacksonville, FL
Document Number: E8-12988
Type: Proposed Rule
Date: 2008-06-10
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) is proposing to amend the existing regulations for a restricted area at Blount Island Command, located on Marine Corps Support Facility-Blount Island, Jacksonville, Florida. Blount Island Command is responsible for managing the United States Marine Corps Prepositioning Programs. Due to the importance of this mission, the current restricted area in this section must be extended due to Department of Defense (DoD) directives that require the implementation of specified force protection measures by all DoD components. This amendment to the existing regulation is necessary to protect U.S. government personnel, equipment, and facilities from potential terrorist attack by providing stand-off corridors encompassing the waters immediately contiguous to Marine Corps Support FacilityBlount Island.
Notice of Availability of the Draft Environmental Impact Statement for the Proposed Stormwater Treatment Areas in Everglades Agricultural Area Located in Palm Beach and Hendry Counties, FL
Document Number: E8-12985
Type: Notice
Date: 2008-06-10
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise the public that a Draft Environmental Impact Statement (Draft EIS) has been completed and is available for review and comment.
Notice of Availability for the Draft Supplemental Environmental Impact Statement/Subsequent Environmental Impact Report for the Pacific L.A. Marine Terminal LLC Crude Oil Terminal Project, Los Angeles County, CA
Document Number: E8-12614
Type: Notice
Date: 2008-06-06
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Los Angeles, has completed a Draft Supplemental Environmental Impact Statement/ Subsequent Environmental Impact Report (SEIS/SEIR) for the Pacific L.A. Marine Terminal LLC Crude Oil Terminal Project. The Port of Los Angeles requires authorization pursuant to Section 404 of the Clean Water Act and Section 10 of the River and Harbor Act for a new crude oil marine terminal at Berth 408 on Pier 400 including: Construction of a new marine terminal to receive crude oil from marine vessels and transfer the oil to tank farm facilities via a new 42-inch-diameter, high-volume pipeline; construction of two tank farms, Tank Farm Site 1 located on Pier 400 and Tank Farm Site 2 located on Pier 300 at Seaside Avenue/ Terminal Way; construction of new pipelines to connect the new tank farm facilities to existing pipeline facilities, with the new tank farm facilities connected to the existing ExxonMobil Southwest Terminal on Terminal Island, the existing Ultramar/Valero Refinery on Anaheim Street near the Terminal Island Freeway, and to Plains All American pipeline systems near Henry Ford Avenue and Alameda Street via new and existing 36-inch, 24-inch, and 16-inch pipelines, and with all new pipelines installed belowground, with the exception of the water crossings at the Pier 400 causeway bridge and at the Valero utility/pipe bridge that crosses the Dominguez Channel west of the Ultramar/Valero Refinery. The new tank farm facilities would provide a total of 4.0 million barrels (bbl) of capacity, primarily receiving crude oil, partially refined crude oil, and occasional deliveries of Marine Gas Oil (MGO).
Notice of Intent To Prepare a Draft Environmental Impact Statement for Carolinas Cement Company LLC Castle Hayne Project in New Hanover County, NC
Document Number: E8-12065
Type: Notice
Date: 2008-05-30
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Division has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, from Carolinas Cement Company LLC (a subsidiary of Titan America LLC) to construct the Carolinas Cement Company LLC Castle Hayne Project. This project will include quarrying to support cement manufacturing in northern New Hanover County, NC. The proposed project will require the excavation of an open pit adjacent to the Northeast Cape Fear River in order to extract and process the raw materials (calcium carbonate and limestone) in order to produce Portland Cement. Existing infrastructure including railroad, interstate highway, and waterways allow for both the shipment of product from the plant and the receipt of materials, such as coal. The Castle Hayne site is the location of former cement manufacturing facility and an unrelated, active aggregate quarry.
Notice of Availability of the Final Environmental Impact Statement (FEIS) for the Proposed Potash Corporation of Saskatchewan Phosphate Mine Continuation Near Aurora, in Beaufort County, NC
Document Number: E8-11585
Type: Notice
Date: 2008-05-23
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE), Wilmington District, Regulatory Division has been reviewing the request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, from Potash Corporation of Saskatchewan Phosphate Division (PCS) for the continuation of its phosphate mining operation near Aurora, Beaufort County, NC. PCS proposes to undertake an approximately 11,909 acre mine expansion into an approximately 15,100 acre project area surrounding its current mining operation. This expansion would occur over a 37 year period and would impact approximately 4,135 acres of waters of the United States including wetlands adjacent to The Pamlico River, South Creek and Durham Creek. The Notice of Availability of the Draft Environmental Impact Statement (DEIS) for this action was published in the Federal Register on Friday, October 20, 2006 (71 FR 61962). The Notice of Availability of Supplement I of the DEIS (SDEIS) was published in the Federal Register on Tuesday, November 6, 2007 (72 FR 62634).
Intent To Hold an Open Meeting of the North Dakota River Task Force Established by the Missouri River Protection and Improvement Act of 2000 (Title VII)
Document Number: E8-11406
Type: Notice
Date: 2008-05-21
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The duties of the Task Force are to prepare and approve a plan for the use of the funds made available under Title VII to promote conservation practices in the Missouri River watershed, control and remove the sediment from the Missouri River, protect recreation on the Missouri River from sedimentation, and protect Indian and non-Indian historical and cultural sites along the Missouri River from erosion.
Programmatic Regulations for the Comprehensive Everglades Restoration Plan
Document Number: E8-11250
Type: Proposed Rule
Date: 2008-05-20
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Army has initiated a review of the programmatic regulations for the Comprehensive Everglades Restoration Plan required by section 601(h)(3)(E) of the Water Resources Development Act of 2000. As part of scoping the review for the regulations, the public is invited to provide comments on this review. Specifically, we welcome your comments on issues concerning the programmatic regulations, any items in the regulations that should be reviewed, or suggestions to improve the programmatic regulations.
Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report for the Middle Harbor Redevelopment Project of the Port of Long Beach, Los Angeles County, CA
Document Number: E8-10908
Type: Notice
Date: 2008-05-16
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Los Angeles District (Corps) in coordination with the Port of Long Beach has completed a Draft Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) for the Middle Harbor Redevelopment project in the Port of Long Beach. The Corps is considering an application for Section 404 and Section 10 permits to conduct dredge and fill activities associated with the proposed consolidation of Piers D, E and F into a single 345-acre marine terminal with a 4,250-foot-long wharf at build-out. This would include redevelopment of 294 acres of existing land, creation of 10.7 acres of new open water and the placement of dredged material in 65.3 acres open water for a net gain of approximately 54.6 acres of new land in the consolidated terminal. The new terminal, which would be constructed over a 10-year time period, is intended to accommodate increasing cargo volumes being produced by the new generation of larger container vessels, and would include four deep-water berths, a container terminal yard, and an intermodal rail yard.
Intent To Prepare a Draft Environmental Impact Statement for the Expansion of an Existing Sand and Aggregate Mining Operation Proposed by Aggregate Industries in a Backwater Area of the Mississippi River in Cottage Grove, MN
Document Number: E8-10782
Type: Notice
Date: 2008-05-14
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Aggregate Industries is proposing a project that will require a St. Paul District, Corps of Engineers (Corps) permit for excavation within a navigable water and to discharge dredged material into waters and wetlands during an aggregate mining operation. Specifically, Aggregate Industries is proposing to dredge and excavate sand and gravel in approximately 230 acres of backwater area adjacent to the main channel of the Mississippi River. A berm would be constructed in the river upstream of the mine area to minimize current velocity in the mining area and to reduce turbidity. Sand and gravel would be excavated using a clamshell-type dredge to a maximum depth of approximately 200 feet. Dredged material would be transported via a conveyor system from the dredge to an existing sand and gravel processing plant located on Grey Cloud Island. Excess sand not used for berm construction would be returned to the mined area. A specific compensatory mitigation plan has not yet been developed for the project. Aggregate Industries intends to work with interested federal and state agencies to develop an acceptable plan that would meet federal and state compensatory mitigation requirements. The project requires Corps of Engineers approval under Section 10 of the Rivers and Harbors Act of 1899 and under Section 404 of the Clean Water Act. The final environmental impact statement will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act (NEPA).
Notice of Availability for the Recirculated Draft Environmental Impact Statement/Environmental Impact Report for the Berths 97-109 [China Shipping] Container Terminal Project, Los Angeles County, CA
Document Number: E8-10280
Type: Notice
Date: 2008-05-09
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Los Angeles, has completed and is re-circulating the Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Berths 97-109 [China Shipping] Container Terminal Project. The Port of Los Angeles requires authorization pursuant to Section 404 of the Clean Water Act and Section 10 of the River and Harbor Act to construct new wharves at Berths 100 and 102; dredge (41,000 cubic yards [yd3] of sediments) and dispose of that material at the upland Port Anchorage Road Disposal Site; develop backlands, including construction of terminal buildings, on 142 acres; install 10 new A-frame cranes at Berths 100 and 102; construct transportation infrastructure improvements in the vicinity of the existing terminal entrance (shared by the Berths 97-109 terminal and the Berths 121-131 terminal); construct two new bridge structures connecting Berths 97-109 terminal and Berths 121-131 terminal across the Southwest Slip; and relocate the Catalina Terminal to south of the Vincent Thomas Bridge at Berth 95.
Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies; Initiation of Revision and Request for Suggested Changes
Document Number: E8-10288
Type: Notice
Date: 2008-05-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Section 2031 of the Water Resources Development Act of 2007 (Pub. L. 110-114) directs the Secretary of the Army to revise the ``Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies'', dated March 10, 1983 consistent with a number of considerations enumerated in the statute. Upon completion the revision will apply to water resources projects, project reevaluations, or project modifications and project feasibility studies carried out by the Secretary except those commenced prior to the completion of the revised guidance. The Secretary intends to craft the revision in two phases, with the first phase of this revision to address revisions to the 1983 Principles and Standards (Chapter I of the existing Guidelines) and the second phase to address revisions to the Procedures (Chapters II through IV of the 1983 Guidelines). The purpose of this notice is to provide opportunity for interested individuals and organizations to submit suggestions for revising the Principles and Standards. Using that input the Secretary intends for the initial draft of the revision to be prepared in June and released for public comments by July.
Bossier Parish, LA, Flood Risk Management Study
Document Number: E8-10286
Type: Notice
Date: 2008-05-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Vicksburg District Corps of Engineers, in conjunction with the Bossier Levee District, the non-Federal sponsor, are undertaking studies to investigate possible solutions to improve the flood risk management capability of Bayou Bodcau Dam, Bossier Parish, LA.
Cross Lake Water Supply Feasibility Study, Shreveport, LA
Document Number: E8-10264
Type: Notice
Date: 2008-05-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Vicksburg District Corps of Engineers, in conjunction with the City of Shreveport, the non-Federal sponsor, are undertaking studies to investigate the feasibility of water supply improvements for the City of Shreveport and Caddo Parish.
Notice of Availability of Supplemental Draft Environmental Impact Statement for the Proposed Rio del Oro Specific Plan Project, in the City of Rancho Cordova, Sacramento County, CA
Document Number: E8-10216
Type: Notice
Date: 2008-05-07
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Sacramento District published a notice in the Federal Register on December 8, 2006 (71 FR 71142-71143), informing the public of the availability of the Draft Environmental Impact Statement (DEIS) for the Rio del Oro Specific Plan Project. USACE, Sacramento District has prepared a Supplemental Draft Environmental Impact Statement (SDEIS) in response to new information. It is now available for review and comment. The SDEIS provides new information and additional analyses related to utilities and service systems (specifically, water supply) and biological resources. Like the 2006 DEIS, the SDEIS analyzes the potential effects of implementing each of five alternative scenarios for a mixed-use development in the approximately 3,828-acre Rio del Oro Specific Plan area, in the City of Rancho Cordova, Sacramento County, CA. The alternatives considered in detail in the SDEIS are: (1) Proposed Project/Proposed Action (i.e., Proposed Project Alternative), the Applicants' Preferred Alternative; (2) High Density (Increased Densities Consistent with Sacramento Area Council of Governments Blueprint); (3) Impact Minimization; (4) No Federal Action (No Section 404 of the Clean Water Act Permit); and (5) No Project/No Action (No development).
Intent To Prepare a Supplemental Environmental Impact Statement/Environmental Impact Report (SEIS/EIR) for the Seven Oaks Dam To Implement Measures To Sustain Federally-Listed Species as Identified in the 2002 Biological Opinion Within the Woolly Star Preserve Area in San Bernardino County, CA
Document Number: E8-9488
Type: Notice
Date: 2008-05-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The purpose of the study is to develop implementation plans to sustain federally-listed species within the Woolly Star Preserve Area, including the Slender-horned spineflower, San Bernardino Kangaroo Rat, and Santa Ana Woolly Star. As a requirement of the Biological Opinion (2002), for construction and operation of Seven Oaks Dam (SOD), the Corps prepared a Multi-Species Habitat Management Plan (MSHMP) to identify potential management measures and implementation strategies. Recommendations in the Draft MSHMP have been developed in collaboration with the U.S. Fish and Wildlife Service, California Department of Fish and Game, and other stakeholders. The Draft MSHMP identifies non- structural and structural measures. Non-structural measures could include, but are not limited to, herbicide treatment for non-native invasive grass control and providing water to the mitigation area through pipelines or trucks to hydraulically spread sand for substrate enhancement. Structural measures could include, but not limited to, controlled releases from SOD and dikes (permanent and/or temporary) used to direct hydraulic spreading of sand for substrate enhancement. The SEIS/EIR will examine the details of the measures identified above and other feasible alternatives based on hydrological, geotechnical, environmental, and technical factors. Management activities would be conducted within the Woolly Star Preserve Area and other adjacent lands.
United States Navy Restricted Area, Menominee River, Marinette Marine Corporation Shipyard, Marinette, WI
Document Number: E8-8525
Type: Proposed Rule
Date: 2008-04-21
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Corps of Engineers is proposing to amend its regulations to establish a restricted area in the Menominee River, at the Marinette Marine Corporation Shipyard, Marinette, Wisconsin, to provide adequate protection for the Littoral Combat Ship (LCS Freedom 1) during its construction. The regulations are necessary to provide adequate protection of the ship, its materials, equipment to be installed therein, and its crew, while it is located at the property of Marinette Marine Corporation.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for a Proposed Special Area Management Plan for the Otay River Watershed, San Diego County, CA
Document Number: E8-8523
Type: Notice
Date: 2008-04-21
Agency: Department of Defense, Corps of Engineers, Department of the Army, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps of Engineers) is announcing its intent to prepare a Draft Environmental Impact Statement (DEIS) for a Special Area Management Plan (SAMP). The SAMP is being developed to address potential effects of anticipated development, infrastructure, and maintenance projects on aquatic resources in the Otay River Watershed (SAMP study area). The DEIS will assess the impacts of various land development and aquatic resource protection alternatives as set forth below and further identified during the preparation of the SAMP. It is anticipated that the DEIS will be utilized by the local agencies in lieu of an Environmental Impact Report (EIR) pursuant to the California Environmental Quality Act (CEQA). The SAMP will provide a comprehensive plan for protecting and enhancing aquatic resources while providing for the permitting of reasonable economic development and public infrastructure, consistent with the goals and objectives of local land use plans and with the regional Multiple Species Conservation Plan (MSCP) for southwestern San Diego County developed by local governments in collaboration with the U.S. Fish and Wildlife Service and California Department of Fish and Game. The SAMP will provide a framework for a long-term program-level permitting process for projects in the watershed subject to the Corps of Engineers' permit authority under Section 404 of the Clean Water Act (CWA). Section 404 of the CWA regulates the discharge of dredged or fill material into waters of the United States, including wetlands. The SAMP may also be utilized by other agencies in the administration of their regulatory programs, including the California Department of Fish and Game (i.e., Section 1600 et seq. of the Fish and Game Code) and the Regional Water Quality Control Board (i.e., Section 401 of the CWA). In addition, the SAMP will include a comprehensive program involving conservation, restoration, and management of aquatic resources within the study area.
Notice of Availability for the Final Environmental Impact Report/ Environmental Impact Statement for the Carryover Storage and San Vicente Dam Raise Project (CSP), San Diego County, CA
Document Number: E8-8282
Type: Notice
Date: 2008-04-18
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers, Los Angeles District (Corps) Regulatory Branch, in coordination with the San Diego County Water Authority (Water Authority), has completed a Final Environmental Impact Report/ Environmental Impact Statement (EIR/EIS) for the Carryover Storage and San Vicente Dam Raise Project (CSP). Four alternatives were co-equally analyzed in the EIR/EIS, including Alternative 1 (100,000 acre-feet of carryover storage at San Vicente), Alternative 2 (100,000 acre-feet of carryover storage at Moosa Canyon), Alternative 3 (50,000 acre-feet of carryover storage at San Vicente and 50,000 acre-feet of carryover storage at Moosa Canyon) and the No Action Alternative, as required by NEPA. As the project proponent and applicant, the Water Authority selected Alternative 1 as its preferred alternative. The proposed CSP requires authorization pursuant to section 404 of the Clean Water Act for approximately 0.34 acre of fill placement in jurisdictional waters of the United States, including wetlands, to construct an expansion of the existing San Vicente Dam to store approximately 100,000 acre-feet of carryover storage water.
Availability of the Draft Feasibility Report and Supplemental Environmental Impact Statement and Draft State Environmental Impact Report for the Boston Harbor Deep Draft Navigation Improvement Project
Document Number: E8-8202
Type: Notice
Date: 2008-04-18
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, New England District in partnership with the Massachusetts Port Authority (Massport) has prepared a joint Draft Supplemental Environmental Impact Statement and State Draft Environmental Impact Report (DSEIS/DEIR) examining improvements to deep-draft navigation channels in Boston Harbor, Boston, MA. Four separate improvements were developed. The first examined deepening the outer and lower harbor's existing 40-foot channel system to provide deeper access to Massport's Conley Terminal in South Boston for containership traffic. All depths are referenced to minus mean lower low water (MLLW). Navigation channel depths of between 45 to 50 feet were examined, with a depth of 48 feet recommended, with an additional two feet in the entrance channel. Under this plan the following project features would be improved: the 40-foot lane of the Broad Sound North Entrance Channel would be deepened to 50 feet and widened through the bend at Finn's Ledge. The 40-foot lane of the Main Ship Channel from the Broad Sound North Entrance Channel upstream through President Roads to the Reserved Channel would be deepened to 48 feet and its 600-foot-wide reaches widened to between 800 and 900 feet, with additional width in the bends. The 40-foot lower reach of Reserved Channel and its turning area would be deepened to 48 feet, with the turning area also widened to 1600 feet. The 40-foot President Roads Anchorage would be deepened to 48 feet. The second improvement would deepen the existing 40-foot lane of the Main Ship Channel from the Reserved Channel Turning Area upstream to just below the Third Harbor Tunnel to a depth of 45 feet, to improve access to the Massport Marine Terminal in South Boston. The third improvement would deepen a portion of the 35-foot Mystic River Channel lane to 40 feet to improve access to Massport's Medford Street Terminal. The fourth and final improvement would deepen the 38-foot Chelsea River Channel to 40 feet, with minor widening in the bridge approaches and the bend between the bridges. In conjunction with work in the Federal channels, the Massachusetts Port Authority would deepen vessel berths at the Conley Terminal and Marine Terminal. Terminals on the Chelsea River would also deepen their berths to match the new channel depth. A total of about 12.1 million cubic yards (cy) of parent material, and 1.2 million cy of rock, would be removed by dredging and placed at the Massachusetts Bay Disposal Site (MBDS). Beneficial use opportunities for the dredged material have been identified and would be considered further during final design of the project. Those beneficial use opportunities include: creation of rock reefs in Massachusetts Bay and Broad Sound, and using the non-rock material as cover at the former Industrial Waste Site, which overlaps the MBDS. This joint Federal and State document builds on the lessons learned from the final EIR/S prepared in June of 1995 for the previous navigation improvement project in Boston Harbor.
Compensatory Mitigation for Losses of Aquatic Resources
Document Number: E8-6918
Type: Rule
Date: 2008-04-10
Agency: Department of Defense, Environmental Protection Agency, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (the Corps) and the Environmental Protection Agency (EPA) are issuing regulations governing compensatory mitigation for activities authorized by permits issued by the Department of the Army. The regulations establish performance standards and criteria for the use of permittee-responsible compensatory mitigation, mitigation banks, and in-lieu programs to improve the quality and success of compensatory mitigation projects for activities authorized by Department of the Army permits. This rule improves the planning, implementation and management of compensatory mitigation projects by emphasizing a watershed approach in selecting compensatory mitigation project locations, requiring measurable, enforceable ecological performance standards and regular monitoring for all types of compensation and specifying the components of a complete compensatory mitigation plan, including assurances of long-term protection of compensation sites, financial assurances, and identification of the parties responsible for specific project tasks. This rule applies equivalent standards to permittee-responsible compensatory mitigation, mitigation banks and in-lieu fee mitigation to the maximum extent practicable. Since a mitigation bank must have an approved mitigation plan and other assurances in place before any of its credits can be used to offset permitted impacts, this rule establishes a preference for the use of mitigation bank credits, which reduces some of the risks and uncertainties associated with compensatory mitigation. This rule also significantly revises the requirements for in-lieu fee programs to address concerns regarding their past performance and equivalency with the standards for mitigation banks and permittee-responsible compensatory mitigation.
Chief of Engineers Environmental Advisory Board
Document Number: E8-7318
Type: Notice
Date: 2008-04-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Topic: The EAB will discuss national considerations related to ecosystem restoration through integrated water resources management with emphasis on communications and the implementation of the Environmental Operating Principles. Date of Meeting: April 30, 2008. Place: Red Lion Hotel, 1415 5th Avenue, Seattle, WA. Time: 9 a.m. to 12 p.m. Forty-five minutes will be set side for public comment. Members of the public who wish to speak are asked to register prior to the start of the meeting. Registration will begin at 8:30. Statements are limited to 3 minutes.
Intent To Prepare an Environmental Impact Statement for the Proposed University of California Merced and University Community Project, Corps Permit Application Number 199900203
Document Number: E8-7315
Type: Notice
Date: 2008-04-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The University of California, Merced (University) and University Community Land Company (UCLC) LLC have submitted an application to the U.S. Army Corps of Engineers (Corps) under the Clean Water Act Section 404 and River and Harbor Act Section 10 for a proposal to construct an approximately 810-acre campus and an associated University Community in Merced County. The Proposed Action is located in eastern Merced County, east of Lake Road and Yosemite Lake, approximately 2 miles northeast of the City of Merced, California. The Proposed Action consists of three major components: the 810- acre Campus; the 870-acre Community North; and the 1,245-acre Community South. The University controls the land that comprises the campus. University Community Land Company, LLC (UCLC), a not-for-profit corporation, owns the land that comprises Community North. LWH Farms, LLC owns the land that comprises Community South. The University is currently preparing an amendment to its Long Range Development Plan to guide the development of the proposed campus. The proposed campus and Community North would consist of the following five districts: Academic Core; Gateway District; Student Neighborhoods; University Community Town Center; and University Community Neighborhoods. Community South would be developed in accordance with the previously adopted University Community Plan, which designates the Community South area for Multiple Use Urban Development and agricultural uses. The Campus and the northern portion of the University Community would affect 76.6 acres of the waters of the United States, including vernal pools and other wetlands. The primary federal involvement is the fill materials within waters of the United States, work and structures in affecting navigable waters of the United States, and potential impacts on the human environment from such activities.
Notice of Cancellation of Intent To Prepare a Draft Environmental Impact Statement for Expansion of the Tampa Harbor (Hilisborough County) FL
Document Number: E8-6370
Type: Notice
Date: 2008-03-31
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Jacksonville District, U.S. Army Corps of Engineers hereby cancels its Notice of Intent to prepare a Draft Environmental Impact Statement as published in FR, Vol. 66, No. 105, Pages 29557 and 29558, May 31, 2001.
Notice of Intent To Prepare a Draft Environmental Impact Statement (EIS) for the Potable Water Supply for Washington Parish Reservoir, Project
Document Number: E8-6447
Type: Notice
Date: 2008-03-28
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The study area comprises Washington Parish in southeast Louisiana. Washington Parish currently consumes approximately 40 million gallons of water daily, 70 percent of which is supplied by groundwater. Decreasing groundwater levels (quantity) and groundwater quality, in combination with forecasted growth within the Parish require alternative water supplies to be developed. The purpose of the project is to identify a new water supply to address the current and future potable water demands of Washington Parish. The Local Project Sponsor is the Washington Parish Reservoir Commission.
Intent To Prepare an Environmental Impact Statement for the Proposed Sierra Vista Specific Plan Project, Corps Permit Application Number 200601050
Document Number: E8-6444
Type: Notice
Date: 2008-03-28
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Sierra Vista Landowner Group proposes to implement a large-scale, mixed-use, mixed-density master planned community with residential, commercial, office, public/quasi-public, and open space land uses, and parks. The Sierra Vista Specific Plan would include approximately 1,148 acres of residential uses; 281 acres of commercial, office, and commercial-mixed uses; 162 acres of parks and paseos; 83 acres of public/quasi-public land uses; 31 acres of urban reserve; and 190 acres of roadways and landscape corridors. The Specific Plan would also include 244 acres of open space; of these, 38 acres would be graded as part of the project and the remaining 206 acres would be preservation areas. The Specific Plan would include 9,995 dwelling units (in a mix of low, medium, and high densities) and approximately 2,419,113 square feet of retail and office uses. The project would also provide four elementary schools, one middle school, and a fire station. The proposed project is expected to generate about 25,219 new residents and 5,821 jobs. It is anticipated that construction would begin in spring 2010. The duration of construction would depend on market conditions; full buildout would likely be completed within 20 years from construction commencement. The proposed project site is approximately 2,138 acres and contains 51.87 acres of waters of the United States. The project, as proposed, would result in direct impacts to approximately 37.74 acres of waters of the United States. These acreages do not include indirect impacts from the proposed action or impacts anticipated to result from offsite infrastructure that may be determined to be required as part of the project through the Environmental Impact Statement (EIS) process.
Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report (DEIS/EIR) for the San Bernardino Lakes and Streams, San Bernardino County, CA
Document Number: E8-5141
Type: Notice
Date: 2008-03-14
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The purpose of the study is to evaluate approximately a 16- mile reach of the Santa Ana River along the southern boundary of the City of San Bernardino and the northern boundary of the City of Redlands located in San Bernardino County, CA. The focus will be on watershed improvements by developing alternatives for ecosystem restoration, and incorporating flood risk management features in some areas in downtown San Bernardino and Redlands. The restoration project will concentrate on revitalization of the riparian vegetation community; establish environmental corridor to benefit wildlife and sensitive species; and address flood risk management uses. The portion of the Santa Ana River to be studied is located entirely within San Bernardino County, CA.
Intent to Prepare an Environmental Impact Statement for the San Francisco Bay to Stockton (John F. Baldwin and Stockton Ship Channels) Navigation Improvement Project, California
Document Number: E8-5133
Type: Notice
Date: 2008-03-14
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (Corps), San Francisco District, the Port of Stockton, and the Contra Costa County Water Agency are preparing an Environmental Impact Statement/Environmental Impact Report (EIS/EIR) to evaluate the efficiency of the movement of goods along the existing deep draft navigation route extending from the San Francisco Bay to the Port of Stockton. The proposed action consists of altering the depth of the deep draft navigation route. The authority for the San Francisco Bay to Stockton Navigation Improvement Project was provided under House Document 208, House Report 89-973 cited in Section 301 of the Rivers and Harbors Act of 1965, Pub. L. 89-298, Sec. 204, 79 Stat. 1073. This is a notice of intent to prepare an EIS/ EIR, and to consider all reasonable alternatives, evaluate potential impacts of the proposed action, and identify appropriate mitigation measures.
Coastal Engineering Research Board (CERB)
Document Number: E8-5132
Type: Notice
Date: 2008-03-14
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Coastal Engineering Research Board (CERB). Date of Meeting: April 2, 2008. Place: Marriott New Orleans Metairie at Lakeway, 3838 N. Causeway Boulevard, Metairie, LA 70002. Time: 8 a.m. to 3:30 p.m.
Notice of Availability for the Draft Program Environmental Impact Statement/ Environmental Impact Report for the San Diego Creek Watershed Special Area Management Plan (SAMP)/Watershed Streambed Alteration Agreement (WSAA) Process, Orange County, CA
Document Number: E8-4574
Type: Notice
Date: 2008-03-07
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps), in coordination with the California Department of Fish and Game, Habitat Conservation Planning, South Coast Region (Department), has completed a Draft Program Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Diego Creek Watershed Special Area Management Plan (SAMP)/ Watershed Streambed Alteration Agreement (WSAA) Process. The San Diego Creek Watershed SAMP is a plan, which is comprised of the following elements: an Analytical Framework for Corps and Department decisionmaking; modified, watershed-specific permitting processes, including watershed- and resource-based permitting protocols and a mitigation framework for the Corps and the Department; a Strategic Mitigation Plan, which is based upon a riparian ecosystem restoration plan; a Mitigation Coordination Program to achieve implementation of the Strategic Mitigation Plan and foster a coordinated approach to aquatic resource management in the Watershed; and an implementation plan for the SAMP. The SAMP establishes alternative (aquatic resource- based and watershed-specific) permitting procedures for projects within the San Diego Creek Watershed that will alter the bed, bank or channel of rivers, streams, and lakes and associated riparian habitats under the Department's jurisdiction, and discharge dredged or fill material into waters of the United States subject to the Corps jurisdiction. The SAMP permitting procedures will improve the capacity of the Corps and the Department to evaluate such projects, as compared to the process each agency would normally follow in permitting such projects on a case-by-case basis.
Notice of Intent To Prepare an Environmental Impact Statement for the American River Common Features General Reevaluation Report, Sacramento, CA
Document Number: E8-3922
Type: Notice
Date: 2008-02-29
Agency: Department of Defense, United States Army Corps of Engineers, Engineers Corps, Army Department
The action being taken is the preparation of an environmental impact statement (EIS) for the American River Common Features General Reevaluation Report (GRR). The Common Features Project GRR will re- evaluate the currently authorized plan as well as develop and evaluate other viable alternatives, including a locally-preferred plan, with the goal of identifying a comprehensive plan that will lower the risk of flooding in and around the City of Sacramento. The Common Features Project GRR is located in Sacramento, Sutter and Yolo Counties, CA.
Notice of Intent To Prepare an Environmental Impact Statement for 408 Permission and 404 Permit to Three Rivers Levee Improvement Authority for the Feather River Levee Repair Project, California, Segment 2
Document Number: E8-3919
Type: Notice
Date: 2008-02-29
Agency: Department of Defense, United States Army Corps of Engineers, Engineers Corps, Army Department
The action being taken is the preparation of an Environmental Impact Statement (EIS) for the issuance of both the 408 permission to the Central Valley Flood Protection Board and 404 Permit to Three Rivers Levee Improvement Authority (TRLIA) for their work on the Feather River Levee Repair Project (FRLRP). Under 33 U.S.C. 408, the Chief of Engineers grants permission to alter an existing flood control structure if it is not injurious to the public interest and does not impair the usefulness of such work. Under section 404 of the Clean Water Act, the District Engineer permits the discharge of dredged or fill material into waters of the United States if the discharge meets the requirements of the Environmental Protection Agency's 404(b)(1) guidelines and is not contrary to the public interest. The FRLRP is located in Yuba County, CA. TRLIA is requesting this permission and permit in order to complete construction along the east levee of the Feather River.
Inland Waterways Users Board
Document Number: E8-3317
Type: Notice
Date: 2008-02-22
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: March 27, 2008. Location: Baton Rouge Marriott Hotel, 5500 Hilton Avenue, Baton Rouge, Louisiana 70808, (225-924-5000). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 1 p.m. Agenda: The Board will consider its project investment priorities for the next fiscal year. The Board will also hear briefings on the status of both the funding for inland navigation projects and studies, and the Inland Waterways Trust Fund, and be provided updates of various inland waterways projects.
Intent To Prepare Draft Environmental Impact Statement for Updated Water Control Manuals for the Apalachicola-Chattahoochee-Flint River Basin
Document Number: E8-3315
Type: Notice
Date: 2008-02-22
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Mobile District, intends to prepare an update and revision of the water control manuals for the Apalachicola-Chattahoochee-Flint (ACF) River Basin. Concurrent with that revision, a Draft Environmental Impact Statement (EIS) will be prepared, as required by the National Environmental Policy Act (NEPA). The Draft EIS will address updated operating criteria and guidelines for managing the water storage and release actions of agency water managers and associated environmental impacts.
Notice of Intent To Prepare a Draft Environmental Impact Statement on Rock Mining in Wetlands in Levy County, FL
Document Number: E8-2979
Type: Notice
Date: 2008-02-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) Jacksonville District intends to prepare a Draft Environmental Impact Statement (DEIS), referred to as the Tarmac King Road Limestone Mine DEIS, to evaluate potential impacts of rock mining within wetlands in southern Levy County, FL.
Notice of Intent to Grant Partially Exclusive License of U.S. Patent Application No. 11/82,432 Entitled “A Method and System for Treating Metal-Containing Fluid Emissions” and U.S. Patent Application No. 10/931,232 “Perlite Sorbents for Vapor Phase Metals and Metals Compounds” to Bouldin & Lawson, LLC
Document Number: E8-2358
Type: Notice
Date: 2008-02-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The notice published in the Federal Register on January 25, 2008 (73 FR 4544) was missing the corporation name. The partially exclusive license will be granted to Bouldin & Lawson, LLC., 70 Easy Street, McMinnville, TN 37110.
Notice of Intent To Prepare an Environmental Impact Statement for 408 Permission and 404 Permit to Sacramento Area Flood Control Agency for the Natomas Levee Improvement Project, Sacramento, CA
Document Number: E8-1753
Type: Notice
Date: 2008-01-31
Agency: Department of Defense, United States Army Corps of Engineers, Engineers Corps, Army Department
The action being taken is the preparation of an environmental impact statement (EIS) for the issuance of both the 408 permission and 404 permit to SAFCA for their work on the Natomas Levee Improvement Project (NLIP). The 408 is permission to alter existing flood control structures and the 404 permit is required for the discharge of dredged or fill material into the waters of U.S. under the Clean Water Act. The NLIP is located in Sacramento and Sutter Counties, California. SAFCA is requesting this permission and permit in order to complete construction along the Natomas Cross Canal and on the landside of the east levee of the Sacramento River.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.