Notice of Intent To Prepare a Draft Environmental Impact Statement for the Proposed Hawthorne Mill Project, Fairfield, Solano County, CA
Document Number: E9-4201
Type: Notice
Date: 2009-02-27
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (USACE), San Francisco District, has received applications for Department of the Army authorizations from Edenbridge, Incorporated (EI) to construct two projects in the City of Fairfield, Solano County, CA. One project, Hawthorne Mill East, is a mixed-residential development project and the second, Hawthorne Mill West, is a residential development project. Development of Hawthorne Mill East will require permanent placement of fill in 37.8 acres of waters of the U.S. Hawthorne Mill West would result in permanent impacts to 0.5 acres of waters of the U.S. In accordance with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321 et seq.), the USACE has determined that the proposed actions may have a significant impact on the quality of the human environment and therefore requires the preparation of an Environmental Impact Statement (EIS). Although the two projects are separate projects with independent utility, the USACE and the City have elected to consider these two related projects in a single document to allow for concurrent processing of requested entitlements. A combined Environmental Impact Report (EIR)/EIS will be prepared with the USACE as the Federal lead agency and the City of Fairfield (City) as the local lead agency (under the California Environmental Quality Act, or CEQA). The Hawthorne Mill East project is intended to become an integral part of the City's proposed train station by contributing to the creation of a populated, mixed-use transit hub and complementing the urban development principles as contemplated by the City. The proposed action is intended to: (1) Maximize long-term land use opportunities presented by the rail station by including a mix of land uses within walking distance of the station; (2) maximize pedestrian and bicycle access between residential and commercial development and the train station; (3) meet the City's regional housing needs requirements in a manner that minimizes pressure on regional highway facilities; (4) contribute to the clear identity of the train station as a comfortable, attractive, and vibrant public realm; and (5) provide appropriate protection of sensitive natural resources. The purpose of the Hawthorne Mill West project is to provide residential housing to fulfill the unmet needs of the City of Fairfield and to contribute to regional growth management by locating residential development on an infill site that is contiguous with existing development.
Intent To Prepare a Draft Environmental Impact Statement for the Little Colorado River at Winslow, a Feasibility Study of a Portion of the Little Colorado River From Chevelon Canyon to the North End of the Winslow Levee, in and Near Winslow, Navajo County, AZ
Document Number: E9-4200
Type: Notice
Date: 2009-02-27
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Analyses of foreseeable environmental impacts from potential actions along the Little Colorado River in the vicinity of the City of Winslow, Navajo County, AZ, will commence. No explicit plans have been advanced as yet, so contents of the Draft Environmental Impact Statement (DEIS) remain to be determined during the public scoping process. The Little Colorado River at Winslow Study area encompasses the floodplain of the Little Colorado River (LCR) from Chevelon Canyon downstream (northwest) to the north end of the existing Winslow Levee, a distance of about 18 river miles. The study area includes the majority of the City of Winslow, including the Ruby Wash Diversion Levee and the Ruby Wash Levee. The purposes of this Feasibility Study are to develop and evaluate potential non-structural and engineered solutions to address flooding issues within the City of Winslow, and to investigate potential opportunities for ecosystem restoration along the LCR and its tributaries in the vicinity of Winslow. There is also an opportunity to provide much-needed recreational opportunities concurrent with flood risk management and ecosystem restoration. If there are measures and alternatives or plans that could be implemented within the U.S. Army Corps of Engineers, (USACE) missions, Navajo County has indicated their interest to support and provide necessary cost-sharing and other requirements for the project. Navajo County has identified within this length of the river needs associated with loss of native riparian habitat and the presence of significant cultural resources. Those needs will guide the formulation of plans for this segment of the Little Colorado River. The USACE and Navajo County, AZ, will cooperate in conducting this Feasibility Study.
Intent To Prepare an Integrated Feasibility Report and Draft Environmental Impact Statement for the Southwest Florida Feasibility Study/Watershed Plan, Lee, Collier, Charlotte, Hendry, Glades, and Monroe Counties, FL
Document Number: E9-4199
Type: Notice
Date: 2009-02-27
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Jacksonville District, intends to prepare an integrated Feasibility Report/Draft Environmental Impact Statement (FR/DEIS) for the Southwest Florida Feasibility Study/Watershed Plan. The study is a cooperative effort between the Corps and the South Florida Water Management District (SFWMD), which is also a cooperating agency for this DEIS. The goal of the Southwest Florida Feasibility Study is to produce a regional restoration plan that addresses water resources issues within all watersheds in southwest Florida. It is intended that this plan will meet many of the ecological and hydrological restoration needs of southwest Florida. The problems which will be addressed in this study include loss of natural ecosystems and landscape connectivity/ degradation of wildlife habitat, altered, unnatural freshwater flows to wetlands and estuaries (altered surface water hydrology), and water quality degradation in surface waters.
Notice of Availability of the Record of Decision for the Final Environmental Impact Statement for the Brazos River Harbor Navigation District's (Port Freeport) Proposed Widening of the Freeport Harbor Ship Channel
Document Number: E9-4197
Type: Notice
Date: 2009-02-27
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Galveston District announces the availability of the Record of Decision (ROD), for the Final Environmental Impact Statement (FEIS) for the Port Freeport's proposal to widen the Freeport Harbor Ship Channel. The FEIS was made available for public review and comment on January 11, 2008. Comments received during the FEIS comment period are addressed in the ROD. The ROD discloses the decision to issue a Department of the Army permit for the proposed project.
Draft Environmental Impact Statement for Residential, Commercial, and Marine Development Along the Gulf Intracoastal Waterway, Foley Land Cut, Gulf Shores and Orange Beach, Baldwin County, AL
Document Number: E9-3887
Type: Notice
Date: 2009-02-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
This notice of availability announces the public release of the Draft Environmental Impact Statement (EIS) for evaluation of 15 separate permit applications under the authority of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act, for proposed mixed-use waterfront development along the Gulf Intracoastal Waterway (GIWW) in Baldwin County, AL, specifically the stretch known as the ``Foley Land Cut'' (FLC). The Mobile District, U.S. Army Corps of Engineers (Corps) published in the Federal Register, May 26, 2006, (71 FR 30393) a Notice of Intent to Prepare a Draft EIS to evaluate the full range of direct, indirect, and cumulative impacts of the proposed development activities along the shoreline of the FLC. The EIS will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA).
Board on Coastal Engineering Research
Document Number: E9-3253
Type: Notice
Date: 2009-02-17
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Board on Coastal Engineering Research. Date of Meeting: March 4-5, 2009. Place: Duke of Gloucester Room, Maryland Inn, 16 Church Circle, Annapolis, MD 21401. Time: 8:30 a.m. to 4 p.m. (March 4, 2009). 8 a.m. to 12 p.m. (March 5, 2009).
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Honolulu Seawater Air Conditioning Project, Honolulu, O'ahu, Hawai'i, Department of the Army Regulatory File Number POH-2004-1141
Document Number: E9-3251
Type: Notice
Date: 2009-02-17
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Honolulu Seawater Air Conditioning, LLC proposes to construct a seawater air conditioning system (SWAC) at Kaka'ako on the south shore of O'ahu in order to provide a renewable-energy air conditioning system for downtown Honolulu buildings. The applicants propose to construct intake and return pipelines in adjacent coastal waters to utilize available deep, offshore cold seawater for their planned onshore cooling plant. The proposed pipeline staging and installation sites are located within the navigable waters of the United States and the proposed activity is subject to the regulatory jurisdiction of the U.S. Army Corps of Engineers.
Intent To Prepare a Supplemental Draft Environmental Impact Statement for the Proposed Northern Integrated Supply Project in Northeastern Colorado
Document Number: E9-3249
Type: Notice
Date: 2009-02-17
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE) is preparing a Supplemental Draft Environmental Impact Statement (SDEIS) to further analyze the direct, indirect and cumulative effects of the Northern Integrated Supply Project (NISP). Construction of the proposed Project will result in temporary and permanent impacts to jurisdictional waters of the United States, thereby requiring a Clean Water Act Section 404 permit. The COE released a Draft Environmental Impact Statement (DEIS) for NISP April 30, 2008. Significant comments were received during three public hearings held for the Draft Environmental Impact Statement (DEIS) as well as submitted during the comment period. The COE has determined that substantial additional analysis is required and that the purposes of the National Environmental Policy Act would be furthered through the preparation of the SDEIS.
Draft Comprehensive Plan and Integrated Programmatic Environmental Impact Statement for the Mississippi Coastal Improvement Program, Jackson, Harrison, and Hancock Counties, MS
Document Number: E9-2810
Type: Notice
Date: 2009-02-10
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
This notice of availability announces the public release of the Draft Comprehensive Plan and Integrated Programmatic Environmental Impact Statement (EIS) for the Mississippi Coastal Improvements Program (MsCIP), Jackson, Harrison, and Hancock Counties, MS. The Mobile District, U.S. Army Corps of Engineers (Corps) published in the Federal Register, August 9, 2006, (71 FR 45537) a Notice of Intent to Prepare a Draft EIS to address the potential impacts associated with actions to comprehensively address hurricane and storm damage reduction, prevention of saltwater intrusion, preservation of fish and wildlife, prevention of erosion, and other related water resource purposes in coastal Mississippi. These actions are related to the consequences of hurricanes in the Gulf of Mexico in 2005. The Corps will forward recommendations to Congress as authorized by the Department of Defense Appropriations Act, 2006 (Pub. L. 109-148) dated December 30, 2005. The tentatively selected comprehensive plan elements for construction include ecosystem restoration of the barrier islands, mainland beaches, and sites at Admiral Island, Turkey Creek, Dantzler, Bayou Cumbest, Franklin Creek, Deer Island, and submerged aquatic vegetation in Bayou Cumbest which will restore approximately 3,210 acres of emergent tidal marsh, wet pine savannah, scrub/shrub, submerged aquatic vegetation, and beach and dune habitats. In conjuction with the ecosystem restoration efforts, the Draft Comprehensive Plan/Integrated Programmatic EIS recommends tentatively selected flood damage reduction elements, including Forrest Heights Levee, High Hazard Area Risk Reduction Plan Phase I, Waveland Flood Proofing Pilot Projects, and Moss Point Municipal Facility relocation. The EIS will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA).
Intent To Hold an Open Meeting of the South Dakota River Task Force Established by the Missouri River Restoration Act of 2000 (Title IX)
Document Number: E9-2809
Type: Notice
Date: 2009-02-10
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The duties of the Task Force are to prepare and approve a plan for the use of the funds made available under Title IX to promote conservation practices in the Missouri River watershed, control and remove the sediment from the Missouri River, protect recreation on the Missouri River from sedimentation, and protect Indian and non-Indian historical and cultural sites along the Missouri River from erosion.
Notice of Intent To Prepare a Draft Environmental Impact Statement in Cooperation With the North Carolina Department of Transportation for the Improvement of a 27.3 Mile Segment of US Highway 64 in Tyrrell and Dare Counties, NC
Document Number: E9-2807
Type: Notice
Date: 2009-02-10
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Division is issuing this notice to advise the public that a State of North Carolina funded Draft Environmental Impact Statement (DEIS) will be prepared for the improvement of US 64 to a multilane facility, and replacement of the Lindsey C. Warren bridge in Tyrrell and Dare Counties, North Carolina (TIP Projects R-2544 and R- 2545).
Notice of Availability of the Final 1999 Programmatic Environmental Impact Statement for the Dredged Material Management Plan for the Port of New York and New Jersey
Document Number: E9-2806
Type: Notice
Date: 2009-02-10
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The comment period for the Final 1999 Programmatic Environmental Impact Statement for the Dredged Material Management Plan for the Port of New York and New York published in the Federal Register on Monday, December 22, 2008 (73 FR 78338), required comments be submitted by 45 days (February 1, 2009) following publication in the Federal Register. The comment period has been extended to 60 days (April 3, 2009).
Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Sacramento River Bank Protection Project Phase II Supplemental Authority providing for implementation of up to 80,000 linear feet of additional bank protection in the Sacramento River Flood Control Project area, Butte, Colusa, Contra Costa, Glenn, Placer, Sacramento, Solano, Sutter, Tehama, Yolo, and Yuba Counties, CA
Document Number: E9-2036
Type: Notice
Date: 2009-01-30
Agency: Department of Defense, United States Army Corps of Engineers, Engineers Corps, Army Department
The action being taken is the preparation of a joint environmental impact statement/environmental impact report (EIS/EIR) for the Sacramento River Bank Protection Project (SRBPP) Phase II Supplemental Authority. The SRBPP Phase II Supplemental Authority will result in the implementation of an additional 80,000 linear feet of bank protection in the Sacramento River Flood Control Project area, as authorized by the Water Resources Development Act (WRDA) of 2007. The SRBPP Phase II Supplemental Authority is located in the Sacramento River Flood Control Project (SRFCP) area, consisting of the Sacramento River and its Tributaries, CA.
Notice of Intent To Prepare an Environmental Impact Statement/Environmental Impact Report for the West Sacramento Levee Improvements Program, West Sacramento, CA
Document Number: E9-1678
Type: Notice
Date: 2009-01-27
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The action being taken is the preparation of a programmatic and project-specific Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the West Sacramento Levee Improvements Program (WSLIP) in Yolo County and Solano County, CA. Under 33 U.S.C. 408, the Chief of Engineers grants permission to alter an existing flood control structure if it is not injurious to the public interest and does not impair the usefulness of such work. Under Section 404 of the Clean Water Act, the District Engineer permits the discharge of dredged or fill material into waters of the United States if the discharge meets the requirements for the Environmental Protection Agency's 404(b)(1) guidelines and is not contrary to the public interest. The U.S Army Corps of Engineers (Corps) will consider granting both 408 permission to the Central Valley Flood Protection Board (CVFPB) and 404 permit to West Sacramento Area Flood Control Agency (WSAFCA) for their work on the WSLIP. The CVFPB and WSAFCA are requesting this permission and permit in order to reduce flood risk the City of West Sacramento by meeting the following objectives for the project: Achieve a minimum of a 200-year level (an event that has a 0.5% chance of occurring in any given year) of flood protection for the entire City by improving approximately 50 miles of levees that protect it; Construct levee improvements as soon as possible to reduce flood risk as quickly as possible; and, Provide recreational and open space elements for the City that are compatible with flood improvement actions.
Notice of Intent To Prepare an Environmental Impact Statement for the Missouri River Ecosystem Restoration Plan, Missouri River Basin, United States
Document Number: E9-1629
Type: Notice
Date: 2009-01-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended and in furtherance of the Water Resources Development Act of 2007, the U.S. Army Corps of Engineers, Kansas City and Omaha Districts, intend to prepare the Missouri River Ecosystem Restoration Plan and Environmental Impact Statement (plan/EIS). In developing the plan, the Corps must study actions required to mitigate habitat losses of aquatic and terrestrial habitat, recover federally listed species under the Endangered Species Act and restore ecosystem functions to prevent further declines among other native species. During an extended scoping process, we will invite comment on the draft purpose and need statements for the plan/EIS. The plan/EIS will describe a range of alternatives for achieving the purpose of the plan and assess the effects of those alternatives, including a preferred alternative, on the human environment as defined by NEPA. The goal of this planning effort is to develop and implement a single, comprehensive and integrated plan to guide the implementation of programs associated with mitigation, recovery, and restoration activities in the Missouri River Basin.
Flood Control, Mississippi River & Tributaries, Yazoo River Basin, Yazoo Headwaters Project, Mississippi Tributaries Unit
Document Number: E9-1627
Type: Notice
Date: 2009-01-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Vicksburg District, in conjunction with the Yazoo-Mississippi Delta Levee District, the non- Federal sponsor, is undertaking studies to evaluate the authorized Yazoo Headwaters Project. As part of this work, a Supplemental Environmental Impact Statement (SEIS) is being prepared to update existing National Environmental Policy Act documentation.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Proposed Beluga to Fairbanks (B2F) Natural Gas Transportation Pipeline Proposed by the Alaska Natural Gas Development Authority (ANGDA)
Document Number: E9-1212
Type: Notice
Date: 2009-01-22
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Alaska District, U.S. Army Corps of Engineers (Corps) intends to prepare a Draft Environmental Impact Statement (DEIS) to address the potential impacts associated with the construction of the proposed Beluga to Fairbanks (B2F) Alaska natural gas transportation pipeline. The Corps will be evaluating a permit application for work under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. The Environmental Impact Statement (EIS) will be used as a basis for the permit decision and to ensure compliance with the National Environment Policy Act.
Inland Waterways Users Board
Document Number: E9-875
Type: Notice
Date: 2009-01-16
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting.
Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the River Mile 208, Sacramento River Bank Protection Project, CA
Document Number: E9-584
Type: Notice
Date: 2009-01-14
Agency: Department of Defense, United States Army Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Sacramento District, intends to prepare a joint environmental impact statement/environmental impact report (EIS/EIR) for the construction of bank protection at River Mile 208 on the Sacramento River to prevent continued bank erosion and potential outflanking of the Glenn-Colusa Irrigation District Hamilton City Pumping Plant (HCPP), near Hamilton City, CA. The proposed action is being conducted under the HCPP Fish Screen Improvement Project.
Notice of Availability of the Final Environmental Impact Statement for the Proposed Stormwater Treatment Areas in Everglades Agricultural Area Located in Palm Beach and Hendry Counties, FL
Document Number: E9-219
Type: Notice
Date: 2009-01-09
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise the public that a Draft Environmental Impact Statement (Draft EIS) has been completed and is available for review and comment.
Termination of an Environmental Impact Statement for the Construction and Operation of a 300-MW Coal-Fired Electric Generating Unit Proposed by Wisconsin Power and Light Company Near Cassville in Grant County, WI
Document Number: E9-36
Type: Notice
Date: 2009-01-07
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The St. Paul District, Corps of Engineers (Corps) is canceling the preparation of a federal Environmental Impact Statement (EIS) for the proposal by Wisconsin Power and Light Company (WPL) to conduct work below the ordinary high water mark of the Mississippi River, a navigable water of the U.S., and to discharge dredged or fill material into waters of the U.S. to facilitate the construction and operation of a 300 megawatt (MW) baseload coal-fired electric generating unit, referred to as NED 3, near Cassville in Grant County, WI. The Corps has terminated its review of the WPL permit application due to WPL's withdrawal of their permit application on November 21, 2008.
Revisions to the Clean Water Act Regulatory Definition of “Discharge of Dredged Material”; Final Rule
Document Number: E8-30984
Type: Rule
Date: 2008-12-30
Agency: Environmental Protection Agency, Department of the Army, Corps of Engineers, Engineers Corps, Army Department, Department of Defense
The U.S. Army Corps of Engineers (Corps) and the Environmental Protection Agency (EPA) (together, the ``Agencies'') are promulgating a final rule to amend a Clean Water Act (CWA) section 404 regulation that defines the term ``discharge of dredged material.'' This action conforms the Corps' and EPA's regulations to a court order invalidating the January 17, 2001, amendments to the regulatory definition (referred to as the ``Tulloch II'' rule). This final rule responds to the court decision by deleting language from the regulation that was invalidated.
Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report and a Draft General Conformity Determination for the Berths 97-109 [China Shipping] Container Terminal Project, Port of Los Angeles, Los Angeles County, CA
Document Number: E8-30585
Type: Notice
Date: 2008-12-29
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
On April 30, 2008, the U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) in coordination with the Los Angeles Harbor Department (LAHD) completed and published the Recirculated Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Berths 97-109 [China Shipping] Container Terminal Project (Project) in the Port of Los Angeles. The Corps and LAHD considered all comments received in preparing the Final EIS/EIR, which is available for a 30-day review. The Final EIS/EIR includes a draft general conformity determination (see Section 3.2 and Appendix P), pursuant to Section 176(c) of the Clean Air Act. A general conformity determination is necessary because Project construction would require Federal action (i.e., issuance of a Corps permit for activities proposed in and over navigable waters and waters of the U.S.) and not all the Federal action's direct and indirect emissions would be below specified de minimis thresholds (40 CFR 93.153(b)). Pursuant to the general conformity regulations (40 CFR Part 93 Subpart B), general conformity determinations do not have to be included in the EIS and can be separately noticed, but the draft general conformity determination for the Federal action associated with the Project is being included in the Final EIS/EIR in this case. The Final EIS/EIR, including the draft general conformity determination, is available for public review during the next 30 days at the Los Angeles Harbor Department, 425 South Palos Verdes Street, San Pedro, California, on the Port's Web site: https:// www.portoflosangeles.org, and on the Corps' Web site: https:// www.spl.usace.army.mil/regulatory/POLA.htm (scroll down to the links under China Shipping Project). In addition, the Final EIS/EIR, including the draft general conformity determination, is available at the following libraries: L.A. Public Library, Central Branch, 630 West 5th Street, Los Angeles, California; L.A. Public Library, San Pedro Branch, 921 South Gaffey Street, San Pedro, California; and L.A. Public Library, Wilmington Branch, 1300 North Avalon, Wilmington, California. Any comments received by the Corps and LAHD on the Final EIS/EIR or the included draft general conformity determination during the next 30 days will be considered fully before the Corps makes a final general conformity determination and finalizes the Record of Decision (ROD) for the Federal action associated with the Project. The Corps will publish a notice of a final general conformity determination in the Federal Register within 30 days of rendering a final decision. The public can request from the Corps copies of the ROD, which includes responses to comments on the Final EIS/EIR, including any on the draft general conformity determination, following publication of a final general conformity determination and upon execution of the ROD.
Naval Restricted Area, Port Townsend, Indian Island, Walan Point, WA
Document Number: E8-30590
Type: Rule
Date: 2008-12-23
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) is issuing a final rule to enlarge an existing restricted area within Port Townsend Bay, Indian Island, Walan Point, Washington. The purpose of the restricted area is to ensure the security and safety of the public, and satisfy security, safety and operational requirements as they pertain to naval vessels. The restricted area will be marked on navigation charts to ensure security and safety for the public.
Naval Restricted Area, Manchester Fuel Depot, Washington; and Naval Restricted Areas, Sinclair Inlet, WA
Document Number: E8-30588
Type: Rule
Date: 2008-12-23
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) is issuing a final rule establishing a restricted area within Puget Sound at Orchard Point, at the U.S. Navy Manchester Fuel Depot, near Manchester. The Corps is also amending an existing regulation for restricted areas within Sinclair Inlet at the Naval Base Kitsap-Bremerton and the Puget Sound Naval Shipyard, at the City of Bremerton, Kitsap County. The purpose of the new restricted area is to ensure the security and safety of the public, and satisfy security, safety and operational requirements as they pertain to naval vessels. The purpose of the amended restricted area is also to ensure the security and safety of the public, and satisfy security, safety and operational requirements as they pertain to naval vessels, in addition to releasing for unimpeded transit of Washington State Ferries the eastern most area of the established restricted area. The restricted areas will be marked on navigation charts to ensure security and safety for the public.
Chief of Engineers Environmental Advisory Board
Document Number: E8-29732
Type: Notice
Date: 2008-12-16
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Topic: The EAB will discuss national considerations related to ecosystem restoration through integrated water resources management with emphasis on building collaborative partnerships, and the implementation of the Environmental Operating Principles. Date of Meeting: January 15, 2009. Place: Marines' Memorial Club and Hotel, 609 Sutter Street, San Francisco, CA Time: 9 a.m. to 12 p.m. Thirty minutes will be set side for public comment. Members of the public who wish to speak are asked to register prior to the start of the meeting. Registration will begin at 8:30. Statements are limited to 3 minutes.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Arboretum Project, in Rancho Cordova, Sacramento County, CA, Permit Application Number SPK-2007-00133
Document Number: E8-29730
Type: Notice
Date: 2008-12-16
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Sacramento District, (Corps) will prepare an Environmental Impact Statement (EIS) for The Arboretum project, a mixed-use residential and commercial development in Rancho Cordova, Sacramento County, CA. Lewis Operating Corp. has applied for a Department of the Army permit to fill approximately 31.78 acres of waters of the United States, including wetlands, to construct the project.
Notice of Intent To Prepare a Joint Environmental Impact Statement for Commercial Dredging of Construction Aggregate From the Missouri River in Missouri and Kansas
Document Number: E8-28826
Type: Notice
Date: 2008-12-05
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE) is preparing an Environmental Impact Statement (EIS) to analyze the direct, indirect, and cumulative effects of continued commercial dredging of sand and gravel from the Missouri River in Missouri and Kansas. The proposed dredging will occur in a navigable waterway and the portion of dredged material that is too coarse or too fine to be used will be discharged back into the river, thereby requiring Department of the Army (DA) authorization under Section 10 of the River and Harbors Act and Section 404 of the Clean Water Act. Commercial dredging in the Missouri River has been ongoing for more than 50 years but has increased from approximately 1.3 million tons per year in 1974 to approximately 8 million tons in 2006. The current DA permits for six Missouri River commercial dredging operations will expire December 31, 2009 and those six operations and four proposed operations have applied for new DA permits to dredge up to 12.435 million tons per year beginning in 2010.
Intent To Prepare a Draft Environmental Impact Statement for the West Shore-Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Feasibility Study
Document Number: E8-28823
Type: Notice
Date: 2008-12-05
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
This notice of intent (NOI) supersedes the NOI published in the Federal Register June 23, 1998 (63 FR 34151). The U.S. Army Corps of Engineers, New Orleans District (USACE) intends to prepare an environmental impact statement (EIS) for the West Shore-Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Feasibility Study. This study will determine the feasibility and assess the environmental impacts of providing hurricane and storm damage risk reduction measures in the study area. The study area is bounded by the Bonnet Carre Spillway to the east, the Mississippi River to the south, Lakes Pontchartrain and Maurepas to the north, and St. James Parish/ Ascension Parish line to the west.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Gray's Beach Restoration Project, Waikiki, O'ahu, HI, Department of the Army Regulatory File Number POH-2007-192
Document Number: E8-27176
Type: Notice
Date: 2008-11-17
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In order to establish a stable, sandy beach seaward of the Sheraton Waikiki Hotel, its owners propose to construct three T-head groins extending seaward from the existing seawall which defines the hotel property boundary. They propose to pump sand from nearby marine deposits and place it between the groins to form a protected beach. The proposed project site, which is within the State of Hawai'i Conservation District, would remain state-owned. The project site is located within the navigable waters of the United States and the proposed activity is subject to the regulatory jurisdiction of the U.S. Army Corps of Engineers.
Corps of Engineers; Notice of Availability for an Addendum to the Final Environmental Impact Statement and a Draft General Conformity Determination for the Berths 136-147 [TraPac] Container Terminal Project, Port of Los Angeles, Los Angeles County, CA
Document Number: E8-26977
Type: Notice
Date: 2008-11-14
Agency: Department of Defense, Department of the Army, Engineers Corps, Army Department
In November 2007, the U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) in coordination with the Los Angeles Harbor Department (LAHD) completed and published a joint Final Environmental Impact Statement/Environmental Impact Report (EIS/ EIR) for the Berths 136-147 [TraPac] Container Terminal Project (Project) in the Port of Los Angeles. The Corps is currently processing a permit application submitted by the LAHD to undertake various activities and construct structures in and over navigable waters and waters of the United States associated with the Project. Issuance of a Corps permit is a Federal action, which must comply with the air quality conformity requirements specified in section 176(c) of the Clean Air Act. An addendum to the Final EIS (Addendum) has been prepared that revises the conformity statement included in section 3.2 of the Final EIS and incorporates the Draft General Conformity Determination, as Appendix O to the Final EIS, for the Federal action associated with the Project. The general conformity regulations (40 CFR Part 93 Subpart B) allow general conformity determinations to be included in an EIS, but inclusion of these determinations is not required and can be separately noticed. The Addendum and General Conformity Determination are available for public review during the next 30 days at the Los Angeles Harbor Department, 425 South Palos Verdes Street, San Pedro, California, on the Port's Web site: https://www.portoflosangeles.org, and on the Corps' Web site: https://www.spl.usace.army.mil/regulatory/ POLA.htm (scroll down to the links under TraPac Project). In addition, they are available at the following libraries: L.A. Public Library, Central Branch, 630 West 5th Street, Los Angeles, California; L.A. Public Library, San Pedro Branch, 921 South Gaffey Street, San Pedro, California; and L.A. Public Library, Wilmington Branch, 1300 North Avalon, Wilmington, California. Any comments received by the Corps on the Addendum and Draft General Conformity Determination during the next 30 days will be considered fully before the Corps makes a Final General Conformity Determination and finalizes the Record of Decision (ROD) for the Federal action associated with the Project. The Corps will publish a notice of a Final General Conformity Determination in the Federal Register within 30 days of rendering a final decision. The public can request from the Corps copies of the ROD, which includes responses to comments on the Final EIS, Addendum, and Draft General Conformity Determination, following publication of a Final General Conformity Determination and upon execution of the ROD.
Notice of Availability of the Final Environmental Impact Statement/Section 404 Permit Application for the Southern Beltway Transportation Project from I-79 to the Mon/Fayette Expressway, Washington County, PA
Document Number: E8-26970
Type: Notice
Date: 2008-11-14
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), in cooperation with the Pennsylvania Turnpike Commission and the U.S. Environmental Protection Agency, as a Cooperating Agency, have prepared a Final Environmental Impact Statement (FEIS)/Section 404 Permit Application for the Southern Beltway Transportation Project from I-79 to the Mon/ Fayette Expressway in Washington County, PA. The overall purpose of the project is to provide transportation mobility safety improvements, to relieve congestion, and to support economic development plans in southwestern Pennsylvania. The FEIS assesses the environmental effects of the various alternatives developed to address the project needs.
Intent To Prepare an Environmental Impact Statement/Environmental Impact Report for the Proposed South Coast Rail Project, Commonwealth of Massachusetts, Department of the Army Permit Application Number NAE-2007-00698
Document Number: E8-25987
Type: Notice
Date: 2008-10-31
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969, as implemented by the Council on Environmental Quality regulations (40 CFR parts 1500-1508), the U.S. Army Corps of Engineers, New England District (Corps) announces its intent to prepare an Environmental Impact Statement (EIS) to evaluate a proposed establishment of passenger rail service between Boston and New Bedford/Fall River, MA. The Massachusetts Executive Office of Transportation and Public Works (EOT) has submitted an application for a Department of the Army permit to discharge fill material into waters of the United States (U.S.), ranging in area from less than one acre to approximately eight acres (depending on the alternative selected), including wetlands, incidental to the establishment of the passenger rail service. The EOT has stated that the purpose of their proposed project is to more fully meet the existing and future demand for public transportation between Fall River/New Bedford and Boston, MA, and to enhance regional mobility, while supporting smart growth planning and development strategies in the affected communities. The cities of Taunton, Fall River, and New Bedford are the only cities within 50 miles of Boston that are not currently served by passenger rail. The EIS will also be prepared with the intent to serve as a joint Massachusetts Environmental Policy Act (MEPA) and NEPA document that will comply with the procedural requirements of both state and federal law and serve as a combined EIS/Environmental Impact Report (EIR). The MEPA review will be conducted simultaneously with the NEPA process. The EIS/EIR will evaluate a range of alternative transit routes to determine the Least Environmentally Damaging Practicable Alternative (``LEDPA''), in accordance with the U.S. Environmental Protection Agency Guidelines for Specification of Disposal Sites for Dredged or Fill Material (40 CFR Part 230). Alternative routes presently identified include four principal rail routes: (1) The ``Attleboro Alternative'', (2) the ``Stoughton Alternative'', (3) the ``Middleborough Alternative'', and (4) the ``Attleboro-Middleborough Hybrid Alternative''. A fifth alternative is a Rapid Bus Alternative using modified highway infrastructure. A No Build/Transportation Surface Management alternative will also be evaluated. Public scoping may identify other alternatives for evaluation in the EIS/EIR.
Intent To Prepare a Draft Environmental Impact Statement To Permit Construction of Dam and Reservoir along Murder Creek, Conecuh County, AL
Document Number: E8-25986
Type: Notice
Date: 2008-10-31
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Mobile District, U.S. Army Corps of Engineers (Corps) intends to prepare a Draft Environmental Impact Statement (EIS) to address the potential impacts associated with permitting construction of a dam and reservoir along Murder Creek in Conecuh County, AL. Evaluation of the proposed project via an EIS will proceed in compliance with the National Environmental Policy Act (NEPA). Upon completion of the EIS, the Corps will evaluate a permit application for the proposed work under the authority of Section 404 of the Clean Water Act.
Availability of a Draft Supplemental Environmental Impact Statement/Environmental Impact Report for the Hamilton Wetland Restoration Project, Dredged Material Aquatic Transfer Facility in Marin County, CA
Document Number: E8-24848
Type: Notice
Date: 2008-10-20
Agency: Department of Defense, Department of the Army, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (USACE) and California State Coastal Conservancy (Conservancy), in collaboration with the Long Term Management Strategy for Dredged Material in San Francisco Bay (LTMS) agencies, are proposing the use of an aquatic transfer facility (ATF) to beneficially use dredged material in restoring tidal wetlands at the original Hamilton Wetland Restoration Project site and the Bel Marin Keys Unit V Expansion site (collectively, the HWRP). The USACE is the lead agency for this project under the National Environmental Policy Act (NEPA). The Conservancy is the lead agency for this project under the California Environmental Quality Act (CEQA).
Intent To Prepare an Environmental Impact Statement on an Application for a Department of the Army Permit under Section 404 of the Clean Water Act by the Upper Trinity Regional Water District for the Construction of Lake Ralph Hall, a Proposed 7,605-Surface-Acre Water Supply Reservoir in Fannin County, TX
Document Number: E8-24818
Type: Notice
Date: 2008-10-17
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Fort Worth District (USACE) has received an application for a Department of the Army permit under Section 404 of the Clean Water Act (CWA) from the Upper Trinity Regional Water District (UTRWD) to construct Lake Ralph Hall. In accordance with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321 et seq.), the USACE has determined that issuance of such a permit may have a significant impact on the quality of the human environment and, therefore, requires the preparation of an Environmental Impact Statement (EIS). The USACE intends to prepare an EIS to assess the environmental, social, and economic effects of issuance of a Department of the Army permit under Section 404 of the CWA for discharges of dredged and fill material into waters of the United States (U.S.) associated with the construction of the proposed water supply reservoir. In the EIS, the USACE will assess potential impacts associated with a range of alternatives.
Inland Waterways Users Board
Document Number: E8-24679
Type: Notice
Date: 2008-10-17
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: November 18, 2008. Location: Chicago Marriott O'Hare, 8535 West Higgins Road, Chicago, Illinois 60631, (773-693-4444 or 800-228-9290). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 1 p.m. Agenda: The Board will hear briefings on the status of the funding for inland navigation projects and studies, an assessment of the Inland Waterways Trust Fund, and a preliminary plan for a future business model for inland waterways projects.
Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report (DEIS/EIR) for a Permit Application for the Sanitation Districts of Los Angeles County's (Sanitation Districts) Clearwater Program in Los Angeles County, CA
Document Number: E8-23528
Type: Notice
Date: 2008-10-06
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In compliance with the National Environmental Policy Act (NEPA) of 1969, 40 CFR 1508.22, and 33 CFR Parts 230 and 325, and in conjunction with the Sanitation Districts, the U.S. Army Corps of Engineers (Corps) is announcing its intent to prepare a DEIS/EIR for the Clearwater Program. The Clearwater Program is a strategic planning initiative to identify wastewater conveyance, wastewater treatment, effluent management, solids processing, and biosolids management needs for the Sanitation Districts' Joint Outfall System through the year 2050. The Clearwater Program will entail the preparation of a new Master Facilities Plan (MFP), which will guide the management, and upgrade/development of the Sanitation Districts' infrastructure. A major component of the MFP is the construction of a new ocean outfall structure extending from the coastline in the vicinity of White Point, Point Fermin, or the Port of Los Angeles up to approximately 7 miles seaward of San Pedro Bay in the Pacific Ocean. The construction of the structure would entail discharge of dredged and fill material in waters of the United States, work in navigable waters of the United States, and potentially the transport of dredged material for ocean disposal. Accordingly, the Sanitation Districts intend to submit a Department of Army application pursuant to Section 404 of the Clean Water Act (CWA), Section 10 of the Rivers and Harbors Act (RHA), and if necessary Section 103 of the Marine Protection, Research, and Sanctuaries Act (MPRSA). For Additional Information Contact: Kenneth Wong, Project Manager, at (213) 452-3290 (kenneth.wong@usace.army.mil), U.S. Army Corps of Engineers, Los Angeles District, P.O. Box 532711, Los Angeles, CA 90053-2325.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Ala Wai Canal Project, Honolulu, Oahu, HI
Document Number: E8-23221
Type: Notice
Date: 2008-10-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to Section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, the U.S. Army Corps of Engineers (USACE) and the State of Hawaii Department of Land and Natural Resources (DLNR) gives notice that an Environmental Impact Statement is being prepared for the Ala Wai Canal Project, City and County of Honolulu, HI. This effort is a multi-purpose project being proposed under Section 209 of the Flood Control Act of 1962 (Pub. L. 87-874) and will incorporate both flood hazard reduction and ecosystem restoration components into a single, comprehensive strategy.
Intent To Prepare a Draft Environmental Impact Statement for the Mississippi River-Gulf Outlet Ecosystem Restoration Feasibility Study
Document Number: E8-23219
Type: Notice
Date: 2008-10-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Corps of Engineers (Corps) intends to prepare an Environmental Impact Statement (EIS) for the Mississippi River-Gulf Outlet (MRGO) Ecosystem Restoration Feasibility Study within the Middle and Lower Pontchartrain Basin and areas of southern Mississippi. The Corps will evaluate a full range of comprehensive restoration measures to restore important estuarine components and ecosystem processes within the areas affected by the MRGO navigation channel and assess the impacts associated with implementing the plan. The MRGO was authorized by Congress in 1956 as a Federal navigation channel to provide a direct route between the Port of New Orleans and the Gulf of Mexico. Construction began in 1958 and was completed in 1968 to authorized dimensions (36-foot depth by 500-foot width: 38-foot depth by 600-foot bottom width in Bar Channel). Construction of the MRGO channel created a direct deep water link between the Inner Harbor Navigation Canal and the Gulf of Mexico allowing higher salinity waters to enter Lake Borgne and Lake Pontchartrain estuaries. Construction resulted in direct wetland losses, damages to the Bayou LaLoutre Ridge and alteration of the adjacent landscape and hydrology by placement of dredge material adjacent to the channel in upland confined disposal facilities. Since Hurricane Katrina made landfall in 2005, the MRGO navigation channel has not been maintained. A June closure plan and accompanying Legislative EIS and Record of Decision titled ``Integrated Final Report to Congress and Legislative Environmental Impact Statement for the Mississippi River-Gulf Outlet Deep-Draft De-Authorization Study'' was signed on June 5, 2008, officially deauthorizing the MRGO navigation channel (from the Gulf of Mexico to Mile 60 at the southern bank of the Gulf Intracoastal Waterway) and authorizing construction of a closure structure at the south ridge of Bayou LaLoutre in St. Bernard Parish, Louisiana and development of plan to restore the areas affected by the MRGO Navigation channel.
Availability of a Final Integrated Feasibility Report and Environmental Impact Statement for the Mid-Chesapeake Bay Island Ecosystem Restoration Project in Dorchester County, on Maryland's Eastern Shore
Document Number: E8-22764
Type: Notice
Date: 2008-09-29
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Final Integrated Feasibility Report and Environmental Impact Statement (EIS) for the Mid-Chesapeake Bay Island Ecosystem Restoration Project in Dorchester County, on Maryland's Eastern Shore. Approximately 90 to 95 million cubic yards of material, primarily dredged during maintenance of the Chesapeake Bay approach channels to Baltimore Harbor, would be placed behind dikes at James Island. Material placed at Barren Island would be from authorized maintenance dredging of Federal navigation channels in the Honga River. After placement, the material would be shaped and planted to provide 2,144 acres of island habitat at James and Barren Islands as well as protect existing island ecosystem habitat, including critical submerged aquatic vegetation. A Record of Decision may be signed no earlier than 30 days after the EPA Notice of Availability for the Final document.
Exchange of Government Property at Soldier Systems Center (SSC), Natick, MA, to a Development Company (To Be Selected) for Future Development
Document Number: E8-22759
Type: Notice
Date: 2008-09-29
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with 10 United States Code 2869, the Department of the Army intends to enter into an Exchange Agreement with a Development Company (to be selected) for the exchange of three (3) separate parcels (totaling 94.79+/-acres) of Government owned land at Soldier Systems Center, Natick, Massachusetts, in exchange for the construction and renovation to several buildings at Soldier Systems Center. The purpose of this notice is to effect the exchange pursuant to provisions of 10 U.S.C. 2869. This is a partial transfer of the entire acreage located at the facility. Additional information is on file with the U.S. Army Engineer District, Corps of Engineers, Baltimore, Maryland.
Notice of Availability for the Draft Environmental Impact Statement/ Environmental Impact Report for the San Pedro Waterfront Project, Los Angeles County, CA
Document Number: E8-22641
Type: Notice
Date: 2008-09-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Los Angeles, has completed a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Pedro Waterfront Project, encompassing approximately 400 acres of land and water primarily along the west side of the Main Channel westward to Harbor Boulevard from the Vincent Thomas Bridge southward to Inner Cabrillo Beach in the Port of Los Angeles. The Port of Los Angeles requires authorization pursuant to section 404 of the Clean Water Act, section 10 of the Rivers and Harbors Act, and section 103 of the Marine Protection, Research, and Sanctuaries Act, to implement various regulated activities in and over waters of the U.S. associated with redeveloping San Pedro Waterfront, which would include the following elements:
Public Scoping Meetings for Update of the Water Control Manual for the Apalachicola-Chattahoochee-Flint River Basin in Georgia, Florida, and Alabama
Document Number: E8-21912
Type: Notice
Date: 2008-09-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Mobile District, issued a Notice of Intent (NOI) in the Federal Register (73 FR 9780) published on February 22, 2008, describing the preparation of a Draft Environmental Impact Statement (EIS), as required by the National Environmental Policy Act (NEPA) to address the proposed update of the Water Control Manual (WCM) for the Apalachicola-Chattahoochee-Flint (ACF) River Basin located in Georgia, Florida, and Alabama. The Corps will hold five public scoping meetings during the month of October as part of its review and update of the WCM for the ACF River Basin. The public is invited to attend the scoping meetings which will provide information on the WCM update process and afford the opportunity to receive input from the public about their issues and concerns regarding that process. All five public meetings will be held using an open house format, allowing time for participants to review specific information and to provide comments to the resource staff attending the meeting.
Restricted Area at Blount Island Command and Marine Corps Support Facility-Blount Island, Jacksonville, FL
Document Number: E8-21895
Type: Rule
Date: 2008-09-18
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) is amending the existing regulations for a restricted area at Blount Island Command, located on Marine Corps Support FacilityBlount Island, Jacksonville, Florida. Blount Island Command is responsible for managing the United States Marine Corps Prepositioning Programs. Due to the importance of this mission, the current restricted area in this section must be extended due to Department of Defense (DoD) directives that require the implementation of specified force protection measures by all DoD components. This amendment to the existing regulation is necessary to protect U.S government personnel, equipment, and facilities from potential terrorist attack by providing stand-off corridors encompassing the waters immediately contiguous to Marine Corps Support FacilityBlount Island.
Notice of Intent To Prepare a Draft Environmental Impact Statement for the City of Raleigh, Little River Reservoir Project in Wake County, NC
Document Number: E8-21426
Type: Notice
Date: 2008-09-15
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Division has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act, from the City of Raleigh to construct a drinking water reservoir on Little River to satisfy the future demands for the service area which includes Raleigh, Garner, Knightdale, Rolesville, Wake Forest, Wendell, and Zebulon, NC. The proposed project would require the construction of a dam north of U.S. Highway 64 on Little River, a tributary in the Neuse River Basin. In addition, infrastructure improvements including a water treatment plant, water lines, and raising and/or closing existing roadways are expected.
Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies; Availability of Proposed Principles and Request for Comments
Document Number: E8-21294
Type: Notice
Date: 2008-09-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Section 2031 of the Water Resources Development Act of 2007 (Pub. L. 110-114) directs the Secretary of the Army to revise the Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies (P&G), which the Water Resources Council issued on March 10, 1983. The Army Corps of Engineers (``Corps'') proposes to craft the revision in phases. The first phase would address the basic principles of water resources planning (``Principles'') and the next phase or phases would provide more detailed implementing guidance. This notice includes a copy of the proposed Principles (see SUPPLEMENTARY INFORMATION), which would replace the first two pages of the P&G. The proposed Principles may also be found at: https:// www.usace.army.mil/cw/hot_topics/ht_2008/pandg_rev.htm.
United States Navy Restricted Area, Naval Support Activity, Panama City, FL
Document Number: E8-21292
Type: Rule
Date: 2008-09-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) is establishing ten restricted areas at Naval Support Activity (NSA), Panama City (PC), Florida. NSA, Panama City, and its major tenant command, the Naval Surface Warfare Center (NSWC), have been recognized as one of the lead research, development, test and evaluation laboratories of the U.S. Navy. In addition, the Naval Diving and Salvage Training Center (NDSTC) was relocated from the Washington Navy Yard to NSA PC and now hosts a consolidated training for the U.S. Army Corps of Engineers, U.S. Coast Guard, the Navy's satellite dive schools, the U.S. Marine Corps and the U.S. Air Force. As such, a large majority of military dive training is now concentrated at NSA, PC. The restricted areas in Panama City waters meet strict military training parameters that cannot be duplicated elsewhere. Military training in and around St. Andrews Bay has existed in harmony with local boat traffic and development since 1945. NSA, PC is formalizing these ongoing activities within the waters of St. Andrews Bay in an effort to maximize public safety and to preserve current military training vital to the Global War on Terror and to all service military readiness.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Folsom South of U.S. Highway 50 Specific Plan Project, in Sacramento County, CA, Corps Permit Application Number SPK-2007-02159
Document Number: E8-21289
Type: Notice
Date: 2008-09-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The South Folsom Property Owners Group proposes to implement a large-scale, mixed-use, mixed-density master planned community with residential, commercial, office, public/quasi-public uses, open space, and parks. The proposed project consists of approximately 1,464 acres of residential development, 523 acres of mixed-use and commercial development, 109 acres of parks, and 1,053 acres of open space. The majority of the 1,053 acres of open space would be located in the western portion of the project site. This area includes Alder Creek, numerous cultural resources sites, and the highest concentration of oak woodland habitat within the project site. The proposed Folsom South of 50 Specific Plan includes development of up to 10,045 mixed-density residential homes and approximately 7.4 million square feet of retail and office uses within an area south of Highway 50 that would be annexed to the City of Folsom. The proposed project would provide five elementary schools, one joint middle school/ high school, and a campus for the Sacramento County Day School. It is anticipated that construction would begin in 2010. The initiation and duration of construction would depend on market conditions and receipt of environmental permits and clearances; full build-out would likely be completed within 20 years from construction commencement. The project site is approximately 3,502 acres and contains 82.89 acres of waters of the United States. The proposed project would directly affect approximately 21.28 acres of waters of the United States, including vernal pools and other wetlands. These acreages do not include indirect impacts from the proposed action or impacts anticipated to result from off-site infrastructure that may be determined to be required as part of the U.S. Army Corps of Engineers' (USACE) Environmental Impact Statement (EIS) process. The EIS will be prepared as a joint document with the City of Folsom. The City is the local agency responsible for preparing an Environmental Impact Report in compliance with the California Environmental Quality Act (CEQA).
Notice of Intent To Prepare an Environmental Impact Statement (EIS) for the Intake Diversion Dam Modification, Lower Yellowstone Project, Montana
Document Number: E8-21188
Type: Notice
Date: 2008-09-12
Agency: Department of Defense, Department of the Interior, Department of the Army, Corps of Engineers, Bureau of Reclamation, Engineers Corps, Army Department
Pursuant to section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, and the Council on Environmental Quality's (CEQ) regulations for implementing the procedural provisions of NEPA, the Bureau of Reclamation (Reclamation) and the U.S. Army, Corps of Engineers (Corps) propose to jointly prepare an EIS that analyzes and discloses effects associated with modifications to Intake Diversion Dam. The proposed Federal action is to modify Intake Diversion Dam and canal headworks, features of Reclamation's Lower Yellowstone Project, to improve passage and reduce entrainment for endangered pallid sturgeon and other native fish in the lower Yellowstone River. Reclamation and the Corps will serve as joint lead Federal agencies in the preparation of the Intake Diversion Dam Modification EIS. Reclamation will act as administrative lead for NEPA compliance activities during preparation of the EIS. Reclamation and the Corps will each consider and approve a Record of Decision regarding actions and decisions for which the respective agencies are responsible.