Commission Information Collection Activities (FERC-732); Comment Request; Extension
In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, Electric Rate Schedules and Tariffs: Long-Term Firm Transmission Rights in Organized Electricity Markets.
Endangered and Threatened Wildlife and Plants; 90-Day Findings on Petitions To Delist U.S. Captive Populations of the Scimitar-Horned Oryx, Dama Gazelle, and Addax
We, the U.S. Fish and Wildlife Service (``Service''), announce 90-day findings on two petitions to remove the U.S. captive-bred and U.S. captive populations of three antelope species, the scimitar-horned oryx (Oryx dammah), dama gazelle (Gazella dama), and addax (Addax nasomaculatus), from the List of Endangered and Threatened Wildlife as determined under the Endangered Species Act of 1973, as amended (Act or ESA). Based on our review, we find that the petitions present substantial information indicating that delisting the U.S. captive animals or U.S. captive-bred members of these species may be warranted. Therefore, with the publication of this notice, we are initiating a review of the status of the U.S. captive members of these species to determine if delisting the U.S. captive specimens is warranted. Based on the status review, we will issue a 12-month finding on these two petitions, which will address whether the petitioned action is warranted, as provided in section 4(b)(3)(B) of the Act.
Georgia Transmission Corporation: Notice of Intent To Prepare an Environmental Assessment and To Hold Public Scoping Meetings
The Rural Utilities Service (RUS) intends to prepare an Environmental Assessment (EA) and hold public scoping meetings and to meet its responsibilities under the National Environmental Policy Act (NEPA), the Council on Environmental Quality's regulations for implementing NEPA (40 CFR parts 1500-1508), and RUS's Environmental and Policies and Procedures (7 CFR part 1794) in connection with potential impacts related to a proposal by Georgia Transmission Corporation (GTC). The proposal consists of constructing approximately 40 to 45 miles of 230 kilovolt (kV) transmission line in portions of Atkinson, Berrien, Clinch, Coffee, and Lanier Counties, Georgia. GTC is requesting that RUS provide financial assistance for the proposal.
Central Idaho Resource Advisory Committee
The Central Idaho Resource Advisory Committee will meet in Salmon, Idaho. The committee is authorized under the Secure Rural Schools and Community Self-Determination Act (Pub. L. 110-343) (the Act) and operates in compliance with the Federal Advisory Committee Act. The purpose of the committee is to improve collaborative relationships and to provide advice and recommendations to the Forest Service concerning projects and funding consistent with the title II of the Act. The meeting is open to the public. The purpose of the meeting is to review and recommend projects to be funded under Public Law 112- 141.
Proposed Renewal of Existing Information Collection; Records of Preshift and Onshift Inspections of Slope and Shaft Areas of Slope and Shaft Sinking Operations at Coal Mines
The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a pre-clearance consultation program to provide the general public and Federal agencies with an opportunity to comment on proposed and continuing collections of information in accordance with the Paperwork Reduction Act of 1995. This program helps to assure that requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and the impact of collection requirements on respondents can be properly assessed. Currently, the Mine Safety and Health Administration is soliciting comments concerning the extension of the information collection for 30 CFR 77.1901. OMB last approved this information collection request on January 8, 2010. The package expires on January 31, 2013.
Proposed Extension of Existing Information Collection; Explosive Materials and Blasting Units (Pertains to Metal and Nonmetal Underground Mines Deemed To Be Gassy
The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a pre-clearance consultation program to provide the general public and Federal agencies with an opportunity to comment on proposed and continuing collections of information in accordance with the Paperwork Reduction Act of 1995. This program helps to assure that requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and the impact of collection requirements on respondents can be properly assessed. Currently, the Mine Safety and Health Administration is soliciting comments concerning the extension of the information collection for requirements under 30 CFR 57.22606(a). OMB last approved this information collection request (ICR) on February 1, 2010.
Proposed Renewal of Existing Information Collection; Fire Protection (Underground Coal Mines)
The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a pre-clearance consultation program to provide the general public and Federal agencies with an opportunity to comment on proposed and continuing collections of information in accordance with the Paperwork Reduction Act of 1995. This program helps to assure that requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and the impact of collection requirements on respondents can be properly assessed. Currently, the Mine Safety and Health Administration is soliciting comments concerning the extension of the information collection for 30 CFR 75.1100-3, 75.1103-5(a)(2)(ii), 75.1103-8(b) and (c), 75.1103-11, 75.1501(a)(3), and 75.1502(a) and (b). OMB last approved this information collection request on January 8, 2010. The package expires on January 31, 2013.
Takes of Marine Mammals Incidental to Specified Activities; Marine Geophysical Survey off the Central Coast of California, November to December, 2012
NMFS has received an application from the Lamont-Doherty Earth Observatory of Columbia University (L-DEO), in cooperation with the Pacific Gas and Electric Company (PG&E), for an Incidental Harassment Authorization (IHA) to take marine mammals, by harassment, incidental to conducting a marine geophysical (seismic) survey off the central coast of California, November to December, 2012. Pursuant to the Marine Mammal Protection Act (MMPA), NMFS is requesting comments on its proposal to issue an IHA to L-DEO and PG&E to incidentally harass, by Level B harassment only, 25 species of marine mammals during the specified activity.
Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of Information Collection: Operating Requirements: Commuter and On Demand Operations
In accordance with the Paperwork Reduction Act of 1995, FAA invites public comments about our intention to request the Office of Management and Budget (OMB) approval to renew an information collection. The Federal Register Notice with a 60-day comment period soliciting comments on the following collection of information was published on July 9, 2012, vol. 77, no. 131, page 40404. 14 CFR part 135 prescribes requirement for Air Carrier/Commercial Operators. The info collected shows compliance and applicant eligibility.
Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of Information Collection: FAA Acquisition Management System (FAAAMS)
In accordance with the Paperwork Reduction Act of 1995, FAA invites public comments about our intention to request the Office of Management and Budget (OMB) approval to renew an information collection. The Federal Register Notice with a 60-day comment period soliciting comments on the following collection of information was published on July 9, 2012, vol. 77, no. 131, page 40403. The FAA Acquisition Management System establishes policies and internal procedures for FAA acquisition. The information collection is necessary to solicit, award, and administer contracts for supplies, equipment, services, facilities, and real property to fulfill FAA's mission.
Records Schedules; Availability and Request for Comments
The National Archives and Records Administration (NARA) publishes notice at least once monthly of certain Federal agency requests for records disposition authority (records schedules). Once approved by NARA, records schedules provide mandatory instructions on what happens to records when no longer needed for current Government business. They authorize the preservation of records of continuing value in the National Archives of the United States and the destruction, after a specified period, of records lacking administrative, legal, research, or other value. Notice is published for records schedules in which agencies propose to destroy records not previously authorized for disposal or reduce the retention period of records already authorized for disposal. NARA invites public comments on such records schedules, as required by 44 U.S.C. 3303a(a).
Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of Information Collection: Changes in Permissible Stage 2 Airplane Operations
In accordance with the Paperwork Reduction Act of 1995, FAA invites public comments about our intention to request the Office of Management and Budget (OMB) approval to renew an information collection. The Federal Register Notice with a 60-day comment period soliciting comments on the following collection of information was published on July 9, 2012, vol. 77, no. 131, page 40405. This information is used to issue special flight authorizations for non- revenue transports and non-transport jet operations of Stage 2 airplanes at U.S. airports. A minimal amount of data is requested to identify the affected parties and determine whether the purpose for the flight is one enumerated by law.
Nixon Presidential Historical Materials: Opening of Materials
This notice announces the opening of additional Nixon Presidential Historical Materials by the Richard Nixon Presidential Library and Museum, a division of the National Archives and Records Administration. Notice is hereby given that, in accordance with section 104 of Title I of the Presidential Recordings and Materials Preservation Act (PRMPA, 44 U.S.C. 2111 note) and 1275.42(b) of the PRMPA Regulations implementing the Act (36 CFR Part 1275), the Agency has identified, inventoried, and prepared for public access additional textual materials with certain information redacted as required by law, including the PRMPA.
Fourth Meeting: RTCA Special Committee 226, Audio Systems and Equipment
The FAA is issuing this notice to advise the public of the fourth meeting of the RTCA Special Committee 226, Audio Systems and Equipment.
Agency Forms Submitted for OMB Review, Request for Comments
In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the Railroad Retirement Board (RRB) is forwarding three Information Collection Requests (ICR) to the Office of Information and Regulatory Affairs (OIRA), Office of Management and Budget (OMB). Our ICR describes the information we seek to collect from the public. Review and approval by OIRA ensures that we impose appropriate paperwork burdens. The RRB invites comments on the proposed collections of information to determine (1) the practical utility of the collections; (2) the accuracy of the estimated burden of the collections; (3) ways to enhance the quality, utility, and clarity of the information that is the subject of collection; and (4) ways to minimize the burden of collections on respondents, including the use of automated collection techniques or other forms of information technology. Comments to the RRB or OIRA must contain the OMB control number of the ICR. For proper consideration of your comments, it is best if the RRB and OIRA receive them within 30 days of the publication date. 1. Title and purpose of information collection: Employee Representative's Status and Compensation Reports; OMB 3220-0014. Under Section 1(b)(1) of the Railroad Retirement Act (RRA), the term ``employee'' includes an individual who is an employee representative. As defined in Section 1(c) of the RRA, an employee representative is an officer or official representative of a railway labor organization other than a labor organization included in the term ``employer,'' as defined in the RRA, who before or after August 29, 1935, was in the service of an employer under the RRA and who is duly authorized and designated to represent employees in accordance with the Railway Labor Act, or, any individual who is regularly assigned to or regularly employed by such officer or official representative in connection with the duties of his or her office. The requirements relating to the application for employee representative status and the periodic reporting of the compensation resulting from such status is contained in 20 CFR part 209.10. The RRB utilizes Forms DC-2a, Employee Representative's Status Report, and DC-2, Employee Representative's Report of Compensation, to obtain the information needed to determine employee representative status and to maintain a record of creditable service and compensation resulting from such status. Completion is required to obtain or retain a benefit. One response is requested of each respondent. Previous Requests for Comments: The RRB has already published the initial 60-day notice (77 FR 40657 on July 10, 2012) required by 44 U.S.C. 3506(c)(2). That request elicited no comments. Information Collection Request (ICR)
Airport Privatization Pilot Program
The Federal Aviation Administration (FAA) received the final application from the Puerto Rico Ports Authority and Puerto Rico Public-Private Partnerships Authority for the participation of Luis Mu[ntilde]oz Mar[iacute]n International Airport, San Juan, Puerto Rico (SJU) in the Airport Privatization Pilot Program and has determined that the final application is substantially complete and accepted for review. The FAA is seeking information and comments from interested parties on the final application. In furtherance of this effort, the Department of Transportation (DOT), the Federal Aviation Administration and the Transportation Security Administration will conduct a public meeting on Friday, September 28, 2012, in San Juan, Puerto Rico. Title 49 U.S.C. Section 47134 establishes an airport privatization pilot program and authorizes the Department of Transportation to grant exemptions from certain Federal statutory and regulatory requirement for up to five airport privatization projects. The FAA Modernization and Reform Act of 2012 expanded the pilot program from five to ten airports. The application procedures require the FAA to publish a notice of receipt of the final application in the Federal Register and accept public comment on the final application for a period of 60 days.
Approval and Promulgation of Implementation Plans; Florida: New Source Review-Prevention of Significant Deterioration; Fine Particulate Matter (PM2.5
EPA is taking final action to approve changes to the Florida State Implementation Plan (SIP), submitted by the Florida Department of Environmental Protection (FDEP) to EPA on March 15, 2012. The March 15, 2012, SIP revision modifies Florida's New Source Review (NSR) Prevention of Significant Deterioration (PSD) permitting regulations to adopt, into the Florida SIP, federal NSR PSD requirements for the fine particulate matter (PM2.5) national ambient air quality standards (NAAQS) as promulgated in EPA's 2008 NSR PM2.5 Implementation Rule and the 2010 PM2.5 PSD Increment, Significant Impact Levels (SILs) and Significant Monitoring Concentration (SMC) Rule. EPA is approving portions of Florida's March 15, 2012, SIP revision because they are consistent with the Clean Air Act (CAA or Act) and EPA regulations regarding NSR permitting.
Approval and Promulgation of Implementation Plans; New Mexico; Albuquerque/Bernalillo County: Infrastructure and Interstate Transport Requirements for the 1997 and 2008 Ozone and the 1997 and 2006 PM2.5
EPA is approving submittals from the Governor of New Mexico for the City of Albuquerque/Bernalillo County area, pursuant to the Clean Air Act (CAA or the Act). These submittals address the infrastructure elements specified in the CAA necessary to implement, maintain, and enforce the 1997 and 2008 8-hour ozone and the 1997 and 2006 fine particulate matter (PM2.5) national ambient air quality standards (NAAQS or standards). We find that the current Albuquerque/Bernalillo County State Implementation Plan (SIP) meets the infrastructure elements for the 1997 and 2008 8-hour ozone NAAQS and the 1997 and 2006 PM2.5 NAAQS. We also find that the current Albuquerque/Bernalillo County SIP meets the CAA requirement that emissions from sources in the area do not interfere with prevention of significant deterioration (PSD) measures required in the SIP of any other state, with regard to the 1997 and 2008 ozone and 1997 and 2006 PM2.5 NAAQS. EPA is also approving SIP revisions that modify the PSD SIP to include nitrogen oxides (NOX) as an ozone precursor. EPA is approving revisions to the Albuquerque/Bernalillo County PSD SIP that identify the PM2.5 precursors and establish significant emission rates for said precursors, consistent with the federal requirements. We are also approving other revisions to the Albuquerque/Bernalillo County PSD SIP to maintain consistency with the federal PSD permitting requirements. In addition to these revisions, EPA is approving other revisions to the Albuquerque/ Bernalillo County SIP necessary to implement the NAAQS.
Disapproval of Implementation Plan Revisions; State of California; South Coast VMT Emissions Offset Demonstrations
EPA is proposing to withdraw its final approvals of state implementation plan revisions submitted by the State of California to meet the vehicle-miles-traveled emissions offset requirement under the Clean Air Act for the Los Angeles-South Coast Air Basin 1-hour and 8- hour ozone nonattainment areas. EPA is also proposing to disapprove the same plan revisions. EPA is proposing the withdrawal and disapproval actions in response to a remand by the Ninth Circuit Court of Appeals in Association of Irritated Residents v. EPA. The effect of this action, if finalized as proposed, would be to trigger deadlines by which new plan revisions meeting the applicable requirements must be submitted by the State of California and approved by EPA to avoid sanctions and to avoid an obligation on EPA to promulgate a federal implementation plan.
Finding of Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South Coast
In response to a remand by the Ninth Circuit Court of Appeals, and pursuant to the Clean Air Act, EPA is proposing to find that the California State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South Coast) is substantially inadequate to comply with the obligation to adopt and implement a plan providing for attainment of the 1-hour ozone standard. If EPA finalizes this proposed finding of substantial inadequacy, California would be required to revise its SIP to correct these deficiencies within 12 months of the effective date of our final rule. If EPA finds that California has failed to submit a complete SIP revision as required by a final rule or if EPA disapproves such a revision, such finding or disapproval would trigger clocks for mandatory sanctions and an obligation for EPA to impose a Federal Implementation Plan. EPA is also proposing that if EPA makes such a finding or disapproval, sanctions would apply consistent with our regulations, such that the offset sanction would apply 18 months after such finding or disapproval and highway funding restrictions would apply six months later unless EPA first takes action to stay the imposition of the sanctions or to stop the sanctions clock based on the State curing the SIP deficiencies.
Withdrawal of Approval of Air Quality Implementation Plans; California; San Joaquin Valley; 1-Hour and 8-Hour Ozone Extreme Area Plan Elements
EPA is proposing to withdraw a March 8, 2010 final action approving state implementation plan (SIP) revisions submitted by the State of California under the Clean Air Act (CAA) to provide for attainment of the 1-hour ozone National Ambient Air Quality Standards (NAAQS) in the San Joaquin Valley extreme ozone nonattainment area. This proposed action is in response to a decision issued by the U.S. Court of Appeals for the Ninth Circuit (Sierra Club v. EPA, 671 F.3d 955 (9th Cir. 2012)) remanding EPA's approval of these SIP revisions. In addition, EPA is proposing to withdraw our approval of a portion of a March 1, 2012 final rule approving SIP revisions submitted by California to provide for attainment of the 1997 8-hour ozone NAAQS in the San Joaquin Valley. The portion of this final action for which EPA is proposing to withdraw its approval addressed requirements regarding emissions growth caused by growth in vehicle miles traveled under the CAA. This proposed action is in response to a decision issued by the U.S. Court of Appeals for the Ninth Circuit (Association of Irritated Residents, 632 F.3d 584 (9th Cir. 2011), as amended Jan. 27, 2012), rejecting EPA's interpretation of the CAA, which had provided the basis for this portion of EPA's March 1, 2012 final rule.
Notice of Receipt of Requests To Voluntarily Cancel Certain Pesticide Registrations
In accordance with the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), EPA is issuing a notice of receipt of requests by registrants to voluntarily cancel certain pesticide registrations. EPA intends to grant these requests at the close of the comment period for this announcement unless the Agency receives substantive comments within the comment period that would merit its further review of the requests, or unless the registrants withdraw its requests. If these requests are granted, any sale, distribution, or use of products listed in this notice will be permitted after the registration has been cancelled only if such sale, distribution, or use is consistent with the terms as described in the final order.
Notice of Receipt of Requests To Voluntarily Cancel Certain Pesticide Registrations
In accordance with the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), EPA is issuing a notice of receipt of requests by registrants to voluntarily cancel certain pesticide registrations. EPA intends to grant these requests at the close of the comment period for this announcement unless the Agency receives substantive comments within the comment period that would merit its further review of the requests, or unless the registrants withdraw its requests. If these requests are granted, any sale, distribution, or use of products listed in this notice will be permitted after the registration has been cancelled only if such sale, distribution, or use is consistent with the terms as described in the final order.
Addition of Certain Persons to the Entity List; Removal of Person From the Entity List Based on Removal Request; and Implementation of Entity List Annual Review Changes
This rule amends the Export Administration Regulations (EAR) by adding six persons under eight entries to the Entity List. The persons who are added to the Entity List have been determined by the U.S. Government to be acting contrary to the national security or foreign policy interests of the United States. These persons will be listed on the Entity List under Iran and the United Arab Emirates (U.A.E.). In addition, this rule removes one person from the Entity List, as the result of a request for removal submitted by the person, a review of information provided in the removal request in accordance with the EAR, and further review conducted by the End-User Review Committee (ERC). Lastly, this rule amends the Entity List on the basis of the annual review conducted by the ERC. The ERC conducts annual reviews to determine if any entries on the Entity List should be removed or modified. This rule reflects the results of the annual review of entities located in Belarus, Canada, the People's Republic of China (China), Egypt, Germany, Hong Kong, Ireland, Israel, Kuwait, Lebanon, Malaysia, Pakistan, Singapore, South Africa, Taiwan, and the United Kingdom. On the basis of the annual review, this rule removes fourteen entries, adds three entries, and amends thirty-six other entries. The Entity List provides notice to the public that certain exports, reexports, and transfers (in-country) to entities identified on the Entity List require a license from the Bureau of Industry and Security (BIS) and that availability of license exceptions in such transactions is limited.
Prince of Wales Resource Advisory Committee
The Prince of Wales Resource Advisory Committee will meet in Craig, AK. The committee is authorized under the Secure Rural Schools and Community Self-Determination Act (Pub. L. 112-141) (the Act) and operates in compliance with the Federal Advisory Committee Act. The purpose of the committee is to improve collaborative relationships and to provide advice and recommendations to the Forest Service concerning projects and funding consistent with the title II of the Act. The meeting is open to the public. The purpose of the meeting is to review and recommend projects authorized under title II of the Act.
Airworthiness Directives; Lycoming Engines Reciprocating Engines
We are superseding an existing airworthiness directive (AD) for certain Lycoming Engines (L)O-360, (L)IO-360, AEIO-360, O-540, IO- 540, AEIO-540, (L)TIO-540, IO-580, and IO-720 series reciprocating engines. That AD currently requires replacing certain crankshafts in the affected engines. This AD continues to require replacing certain crankshafts, corrects the start date of affected engine models in Lycoming Mandatory Service Bulletin (MSB) No. 569A to the start date in Supplement No. 1 to Lycoming MSB No. 569A, dated May 27, 2009, and includes additional (formerly experimental) IO-390, AEIO-390, and AEIO- 580 series engine models having affected crankshafts. This AD was prompted by Lycoming Engines discovering that the start date of affected engine models in MSB No. 569A is incorrect and the need to include additional engine models having the affected crankshafts. We are issuing this AD to prevent failure of the crankshaft, which will result in total engine power loss, in-flight engine failure, and possible loss of the aircraft.
Granting of Relief; Federal Firearms Privileges (2011R-13T)
Northrop Grumman Guidance and Electronics Company, Inc. (NGGECI) (formerly Litton Systems, Inc.), a subsidiary of Northrop Grumman Corporation (NGC), has been granted relief from the disabilities imposed by Federal laws by the Director of ATF with respect to the acquisition, transfer, receipt, shipment, or possession of firearms.
Action Subject to Intergovernmental Review
We, the Office of Surface Mining Reclamation and Enforcement, are notifying the public that we intend to grant funds to eligible applicants for purposes authorized under the Abandoned Mine Land (AML) Reclamation Program. Additionally we are notifying the public that we intend to grant funds to eligible applicants for regulating coal mining within their jurisdictional borders. We will award these grants after October 1, 2012, because our award authority commences at the beginning of the fiscal year.
Actions on Special Permit Applications
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given of the actions on special permits applications in (August to August 2012). The mode of transportation involved are identified by a number in the ``Nature of Application'' portion of the table below as follows: 1Motor vehicle, 2Rail freight, 3Cargo vessel, 4Cargo aircraft only, 5Passenger-carrying aircraft. Application numbers prefixed by the letters EE represent applications for Emergency Special Permits. It should be noted that some of the sections cited were those in effect at the time certain special permits were issued.
Notice of Application for Special Permits
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. Each mode of transportation for which a particular special permit is requested is indicated by a number in the ``Nature of Application'' portion of the table below as follows: 1Motor vehicle, 2Rail freight, 3Cargo vessel, 4Cargo aircraft only, 5Passenger-carrying aircraft.
Notice of Applications for Modification of Special Permit
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the applications described herein. This notice is abbreviated to expedite docketing and public notice. Because the sections affected, modes of transportation, and the nature of application have been shown in earlier Federal Register publications, they are not repeated here. Requests for modification of special permits (e.g. to provide for additional hazardous materials, packaging design changes, additional mode of transportation, etc.) are described in footnotes to the application number. Application numbers with the suffix ``M'' denote a modification request. These applications have been separated from the new application for special permits to facilitate processing.
Notice of Delays in Processing of Special Permits Applications
In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.
Clopyralid; Pesticide Tolerances
This regulation establishes tolerances for residues of clopyralid in or on multiple commodities which are identified and discussed later in this document. This regulation additionally removes several established individual tolerances, as they will be superseded by inclusion in subgroup tolerances. Interregional Research Project Number 4 (IR-4) requested these tolerances under the Federal Food, Drug, and Cosmetic Act (FFDCA).
Airworthiness Directives; Turbomeca S.A. Turboshaft Engines
We are superseding an existing airworthiness directive (AD) for certain Turbomeca S.A. Arriel 2B and 2B1 turboshaft engines. That AD currently requires accomplishment of the TU166 modification. This new AD requires adding the Arriel 2S2 and 2C2 engines to the applicability of engines requiring the TU166 modification with different compliance times. This AD was prompted by reports of an accident involving a twin-engine helicopter powered by two Arriel 2S2 engines. We are issuing this AD to prevent rupture of a gas generator (GG) turbine blade, which could result in an uncommanded in-flight shutdown and a forced landing or accident.
Airworthiness Directives; The Cessna Aircraft Company Airplanes
We are adopting a new airworthiness directive (AD) for certain The Cessna Aircraft Company Model 750 airplanes. This AD was prompted by reports of direct current (DC) generator overvoltage events. This AD requires replacing the auxiliary power unit (APU) generator control unit (GCU). We are issuing this AD to prevent DC generator overvoltage events, which could result in smoke in the cockpit and loss of avionics and electrical systems.
Airworthiness Directives; The Boeing Company Airplanes
We are superseding an existing airworthiness directive (AD) for all The Boeing Company Model 737-100, -200, -200C, -300, -400, and -500 series airplanes. That AD currently requires repetitive inspections to detect cracking in the web of the aft pressure bulkhead at body station 1016 at the aft fastener row attachment to the ``Y'' chord, and corrective actions if necessary. This new AD adds various inspections for discrepancies at the aft pressure bulkhead, and related investigative and corrective actions if necessary. This AD was prompted by several reports of fatigue cracking at that location. We are issuing this AD to detect and correct such fatigue cracking, which could result in rapid decompression of the fuselage.
Airworthiness Directives; Bombardier, Inc. Airplanes
We are adopting a new airworthiness directive (AD) for certain Bombardier, Inc. Model CL-600-2C10 (Regional Jet Series 700, 701, & 702), CL-600-2D15 (Regional Jet Series 705), and CL-600-2D24 (Regional Jet Series 900) airplanes. This AD was prompted by reports of failures of a hydraulic accumulator's screw-cap/end cap while on the ground that resulted in loss of use of that hydraulic system, and in high-energy impact damage to adjacent systems and structures. This AD requires an inspection for part numbers; repetitive inspections for any cracking of certain hydraulic system accumulators, and replacement, if necessary; and revising the maintenance program to include a life limit for certain hydraulic system accumulators. We are issuing this AD to prevent loss of use of a hydraulic system, which could result in reduced controllability of the airplane.
Airworthiness Directives; Eurocopter France Helicopters
We are adopting a new airworthiness directive (AD) for Eurocopter France (Eurocopter) Model SA330F, SA330G, SA330J, AS332C, AS332L, AS332L1, and AS332L2 helicopters to require cleaning, inspecting, and lubricating each tangential gearbox (gearbox) and adjusting, as necessary, the fuel shut-off control lever. This AD was prompted by the jamming of one of two fuel shut-off control levers because of solidified grease in the gearbox. A companion gearbox had extensive corrosion. In case of an emergency, pilots may need to use the control levers to shut off fuel going into the engine and to shut off the helicopter's electrical power system. The jamming of the levers prevents the shut off of the engine fuel and prevents the parallel- mounted micro switches from switching off the electrical power system. These actions are intended to prevent the jamming of the control levers, which could prevent shut-off of the engine fuel and electrical power system during an emergency shutdown.
National Emission Standards for Hazardous Air Pollutant Emissions: Hard and Decorative Chromium Electroplating and Chromium Anodizing Tanks; and Steel Pickling-HCl Process Facilities and Hydrochloric Acid Regeneration Plants
This action finalizes the residual risk and technology review conducted for the following source categories regulated under two national emission standards for hazardous air pollutants (NESHAP): hard and decorative chromium electroplating and chromium anodizing tanks, and steel picklingHCl process facilities and hydrochloric acid regeneration plants. On October 21, 2010, EPA proposed amendments to these NESHAP under section 112(d)(6) and (f)(2) of the Clean Air Act. On February 8, 2012, EPA published a supplemental proposal with new analyses and results. For hard and decorative chromium electroplating and chromium anodizing tanks these final amendments addressing Clean Air Act (CAA) sections 112(d)(6) and (f)(2) include revisions to the emissions limits for total chromium; addition of housekeeping requirements to minimize fugitive emissions; and a requirement to phase-out the use of perfluorooctane sulfonic acid (PFOS) based fume suppressants. These requirements will provide greater protection for public health and the environment by reducing emissions of hexavalent chromium (a known human carcinogen). In addition, as part of the October 2010 proposal, we proposed certain actions pursuant to CAA section 112(d)(2) and (3) for hard and decorative chromium electroplating and chromium anodizing tanks. For these sources, we are modifying and adding testing and monitoring, recordkeeping, and reporting requirements; and revisions to the regulatory provisions related to emissions during periods of malfunction. For steel pickling hydrochloric acid regeneration plants, we are finalizing our proposal to remove the alternative compliance method because we believe it is inconsistent with the requirements of CAA section 112(d)(2) and (3). This amendment will achieve reductions in chlorine emissions. Additionally, we are adding provisions to the Steel Pickling Facilities NESHAP requiring that the emission limits of the rule apply at all times, including during periods of startup, shutdown and malfunction.