Inman Mills; Notice of Authorization for Continued Project Operation, 58120 [2012-23025]

Download as PDF 58120 Federal Register / Vol. 77, No. 182 / Wednesday, September 19, 2012 / Notices DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 4362–000] Combined Notice of Filings #2 Inman Mills; Notice of Authorization for Continued Project Operation Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2172–007; ER10–2172–008; ER10–2179–009; ER10– 2179–011; ER11–2016–002; ER11–2016– 003; ER10–2184–007; ER10–2184–008; ER10–2183–004; ER10–2183–005; ER10– 1048–004; ER10–1048–005; ER10–2176– 008; ER10–2176–009; ER10–2192–007; ER10–2192–008; ER11–2056–001; ER11– 2056–002; ER10–2178–008; ER10–2174– 007; ER10–2174–008; ER11–2014–004; ER11–2014–005; ER11–2013–005; ER11– 2013–004; ER10–3308–006; ER10–3308– 007; ER10–1017–003; ER10–1017–004; ER10–1020–003; ER10–1020–004; ER10– 1145–003; ER10–1145–004; ER10–1144– 002; ER10–1144–003; ER10–1078–003; ER10–1078–004; ER10–1079–003; ER10– 1079–004; ER10–1080–003; ER10–1080– 004; ER11–2010–004; ER11–2010–005; ER10–1081–003; ER10–1081–004; ER10– 2180–007; ER10–2180–008; ER11–2011– 003; ER11–2011–004; ER11–2009–003; ER11–2009–004; ER11–3989–002; ER11– 3989–003; ER10–1734–004; ER10–1734– 005; ER10–2181–009; ER10–2181–011; ER10–1143–003; ER10–1143–004; ER10– 2182–009; ER10–2182–011; ER11–2007– 002; ER11–2007–003; ER12–1223–002; ER12–1223–003; ER11–2005–004; ER11– 2005–005; ER10–2178–007. Applicants: Constellation Energy Commodities Group, Inc., R.E. Ginna Nuclear Power Plant, LLC, PECO Energy Company, Baltimore Gas and Electric Company, Wind Capital Holdings, LLC, CR Clearing, LLC, Exelon New England Power Marketing, LP, Exelon Framingham, LLC, Exelon New Boston, LLC, Exelon West Medway, LLC, Exelon Wyman, LLC, Exelon Generation Company, LLC, Exelon Energy Company, Calvert Cliffs Nuclear Power Plant LLC, CER Generation, LLC, Commonwealth Edison Company, Constellation NewEnergy, Inc., CER Generation II, LLC, Constellation Energy Commodities Group Maine, LLC, Handsome Lake Energy, LLC, Nine Mile Point Nuclear Station, LLC, Constellation Mystic Power, LLC, Cassia Gulch Wind Park, LLC, Michigan Wind 1, LLC, Harvest Windfarm, LLC, Exelon Wind 4, LLC, Criterion Power Partners, LLC, Cow Branch Wind Power, L.L.C., Michigan Wind 2, LLC, MXenergy Electric Inc., Wildcat Wind, LLC, Tuana Springs Energy, LLC, Constellation Paper Source Generation, Inc. The Riverdale Hydroelectric Project No. 4362 is located on the Enoree River, in Spartanburg County, South Carolina. The minor license for Project No. 4362 was issued in September 1982 for a period ending August 31, 2012. The deadline for filing applications for a subsequent license was August 31, 2010. Inman Mills, the licensee for Project No. 4362, did not file an application for a subsequent license.1 On August 31, 2010, Lockhart Power Company filed an application for a subsequent license for the project.2 Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1) (2006), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If, as is the case here, the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c) (2006), and as set forth at 18 CFR 16.21(b), if, as is also the case here, the licensee of such project has not filed an application for a subsequent license, the licensee may be required to continue to operate the project in accordance with the terms and conditions of the license after the minor license expires, until the Commission issues someone else a license for the project or otherwise orders disposition of the project. Notice is hereby given that Inman Mills is authorized to continue operation of the Riverdale Hydroelectric Project, until such time as the Commission issues someone else a license for the project or otherwise orders disposition of the project. Dated: September 12, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–23025 Filed 9–18–12; 8:45 am] tkelley on DSK3SPTVN1PROD with NOTICES BILLING CODE 6717–01–P 1 In 2006, Commission staff approved transfer of the license from Inman Mills to Riverdale Development Venture, LLC. 115 FERC ¶ 62,076 (2006). However, the 2006 order was rescinded in 2008 because the requirements for the transfer were never completed. 122 FERC ¶ 62,204 (2008). 2 The application, docketed Project No. 13590, is pending before the Commission. VerDate Mar<15>2010 19:20 Sep 18, 2012 Jkt 226001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Description: Second Supplement to Notification of Change in Status of Baltimore Gas & Electric Company, et al. Filed Date: 8/1/12. Accession Number: 20120801–5137. Comments Due: 5 p.m. ET 10/2/12. Docket Numbers: ER12–2217–004. Applicants: Power Dave Fund LLC. Description: Compliance Filing 091212 to be effective 9/12/2012. Filed Date: 9/12/12. Accession Number: 20120912–5029. Comments Due: 5 p.m. ET 10/3/12. Docket Numbers: ER12–2314–000. Applicants: Spinning Spur Wind LLC. Description: Supplemental Information of Spinning Spur Wind, LLC. Filed Date: 9/12/12. Accession Number: 20120912–5100. Comments Due: 5 p.m. ET 9/26/12. Docket Numbers: ER12–2442–001. Applicants: PJM Interconnection, L.L.C. Description: Errata to Original Service Agreement No. 3381—Docket No. ER12– 2442–000 to be effective 7/10/2012. Filed Date: 9/12/12. Accession Number: 20120912–5092. Comments Due: 5 p.m. ET 10/3/12. Docket Numbers: ER12–2615–000. Applicants: Midwest Independent Transmission System Operator, Inc., MidAmerican Energy Company. Description: SA 2475 MidAmericanModern Hydro WDS to be effective 6/26/2012. Filed Date: 9/12/12. Accession Number: 20120912–5028. Comments Due: 5 p.m. ET 10/3/12. Docket Numbers: ER12–2616–000. Applicants: PJM Interconnection, L.L.C. Description: Ministerial Clean-Up Filing re OATT Section 230.3 due to Overlapping Filings to be effective 7/18/2012. Filed Date: 9/12/12. Accession Number: 20120912–5046. Comments Due: 5 p.m. ET 10/3/12. Docket Numbers: ER12–2616–001. Applicants: PJM Interconnection, L.L.C. Description: Errata to Transmittal Letter re Ministerial Clean-Up Filing of OATT Sec 230.3 to be effective 7/18/2012. Filed Date: 9/12/12. Accession Number: 20120912–5059. Comments Due: 5 p.m. ET 10/3/12. Docket Numbers: ER12–2617–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: SA 2431 Glacial RidgeGRE G549 GIA to be effective 9/13/2012. Filed Date: 9/12/12. Accession Number: 20120912–5053. E:\FR\FM\19SEN1.SGM 19SEN1

Agencies

[Federal Register Volume 77, Number 182 (Wednesday, September 19, 2012)]
[Notices]
[Page 58120]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23025]



[[Page 58120]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 4362-000]


Inman Mills; Notice of Authorization for Continued Project 
Operation

    The Riverdale Hydroelectric Project No. 4362 is located on the 
Enoree River, in Spartanburg County, South Carolina. The minor license 
for Project No. 4362 was issued in September 1982 for a period ending 
August 31, 2012. The deadline for filing applications for a subsequent 
license was August 31, 2010. Inman Mills, the licensee for Project No. 
4362, did not file an application for a subsequent license.\1\ On 
August 31, 2010, Lockhart Power Company filed an application for a 
subsequent license for the project.\2\
---------------------------------------------------------------------------

    \1\ In 2006, Commission staff approved transfer of the license 
from Inman Mills to Riverdale Development Venture, LLC. 115 FERC ] 
62,076 (2006). However, the 2006 order was rescinded in 2008 because 
the requirements for the transfer were never completed. 122 FERC ] 
62,204 (2008).
    \2\ The application, docketed Project No. 13590, is pending 
before the Commission.
---------------------------------------------------------------------------

    Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1) (2006), requires 
the Commission, at the expiration of a license term, to issue from 
year-to-year an annual license to the then licensee under the terms and 
conditions of the prior license until a new license is issued, or the 
project is otherwise disposed of as provided in section 15 or any other 
applicable section of the FPA. If, as is the case here, the project's 
prior license waived the applicability of section 15 of the FPA, then, 
based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 
558(c) (2006), and as set forth at 18 CFR 16.21(b), if, as is also the 
case here, the licensee of such project has not filed an application 
for a subsequent license, the licensee may be required to continue to 
operate the project in accordance with the terms and conditions of the 
license after the minor license expires, until the Commission issues 
someone else a license for the project or otherwise orders disposition 
of the project.
    Notice is hereby given that Inman Mills is authorized to continue 
operation of the Riverdale Hydroelectric Project, until such time as 
the Commission issues someone else a license for the project or 
otherwise orders disposition of the project.

    Dated: September 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-23025 Filed 9-18-12; 8:45 am]
BILLING CODE 6717-01-P