Inman Mills; Notice of Authorization for Continued Project Operation, 58120 [2012-23025]
Download as PDF
58120
Federal Register / Vol. 77, No. 182 / Wednesday, September 19, 2012 / Notices
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 4362–000]
Combined Notice of Filings #2
Inman Mills; Notice of Authorization for
Continued Project Operation
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2172–007;
ER10–2172–008; ER10–2179–009; ER10–
2179–011; ER11–2016–002; ER11–2016–
003; ER10–2184–007; ER10–2184–008;
ER10–2183–004; ER10–2183–005; ER10–
1048–004; ER10–1048–005; ER10–2176–
008; ER10–2176–009; ER10–2192–007;
ER10–2192–008; ER11–2056–001; ER11–
2056–002; ER10–2178–008; ER10–2174–
007; ER10–2174–008; ER11–2014–004;
ER11–2014–005; ER11–2013–005; ER11–
2013–004; ER10–3308–006; ER10–3308–
007; ER10–1017–003; ER10–1017–004;
ER10–1020–003; ER10–1020–004; ER10–
1145–003; ER10–1145–004; ER10–1144–
002; ER10–1144–003; ER10–1078–003;
ER10–1078–004; ER10–1079–003; ER10–
1079–004; ER10–1080–003; ER10–1080–
004; ER11–2010–004; ER11–2010–005;
ER10–1081–003; ER10–1081–004; ER10–
2180–007; ER10–2180–008; ER11–2011–
003; ER11–2011–004; ER11–2009–003;
ER11–2009–004; ER11–3989–002; ER11–
3989–003; ER10–1734–004; ER10–1734–
005; ER10–2181–009; ER10–2181–011;
ER10–1143–003; ER10–1143–004; ER10–
2182–009; ER10–2182–011; ER11–2007–
002; ER11–2007–003; ER12–1223–002;
ER12–1223–003; ER11–2005–004; ER11–
2005–005; ER10–2178–007.
Applicants: Constellation Energy
Commodities Group, Inc., R.E. Ginna
Nuclear Power Plant, LLC, PECO Energy
Company, Baltimore Gas and Electric
Company, Wind Capital Holdings, LLC,
CR Clearing, LLC, Exelon New England
Power Marketing, LP, Exelon
Framingham, LLC, Exelon New Boston,
LLC, Exelon West Medway, LLC, Exelon
Wyman, LLC, Exelon Generation
Company, LLC, Exelon Energy
Company, Calvert Cliffs Nuclear Power
Plant LLC, CER Generation, LLC,
Commonwealth Edison Company,
Constellation NewEnergy, Inc., CER
Generation II, LLC, Constellation Energy
Commodities Group Maine, LLC,
Handsome Lake Energy, LLC, Nine Mile
Point Nuclear Station, LLC,
Constellation Mystic Power, LLC, Cassia
Gulch Wind Park, LLC, Michigan Wind
1, LLC, Harvest Windfarm, LLC, Exelon
Wind 4, LLC, Criterion Power Partners,
LLC, Cow Branch Wind Power, L.L.C.,
Michigan Wind 2, LLC, MXenergy
Electric Inc., Wildcat Wind, LLC, Tuana
Springs Energy, LLC, Constellation
Paper Source Generation, Inc.
The Riverdale Hydroelectric Project
No. 4362 is located on the Enoree River,
in Spartanburg County, South Carolina.
The minor license for Project No. 4362
was issued in September 1982 for a
period ending August 31, 2012. The
deadline for filing applications for a
subsequent license was August 31,
2010. Inman Mills, the licensee for
Project No. 4362, did not file an
application for a subsequent license.1
On August 31, 2010, Lockhart Power
Company filed an application for a
subsequent license for the project.2
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1) (2006), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If, as is the case here, the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c) (2006),
and as set forth at 18 CFR 16.21(b), if,
as is also the case here, the licensee of
such project has not filed an application
for a subsequent license, the licensee
may be required to continue to operate
the project in accordance with the terms
and conditions of the license after the
minor license expires, until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
Notice is hereby given that Inman
Mills is authorized to continue
operation of the Riverdale Hydroelectric
Project, until such time as the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
Dated: September 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–23025 Filed 9–18–12; 8:45 am]
tkelley on DSK3SPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
1 In 2006, Commission staff approved transfer of
the license from Inman Mills to Riverdale
Development Venture, LLC. 115 FERC ¶ 62,076
(2006). However, the 2006 order was rescinded in
2008 because the requirements for the transfer were
never completed. 122 FERC ¶ 62,204 (2008).
2 The application, docketed Project No. 13590, is
pending before the Commission.
VerDate Mar<15>2010
19:20 Sep 18, 2012
Jkt 226001
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Description: Second Supplement to
Notification of Change in Status of
Baltimore Gas & Electric Company, et al.
Filed Date: 8/1/12.
Accession Number: 20120801–5137.
Comments Due: 5 p.m. ET 10/2/12.
Docket Numbers: ER12–2217–004.
Applicants: Power Dave Fund LLC.
Description: Compliance Filing
091212 to be effective 9/12/2012.
Filed Date: 9/12/12.
Accession Number: 20120912–5029.
Comments Due: 5 p.m. ET 10/3/12.
Docket Numbers: ER12–2314–000.
Applicants: Spinning Spur Wind LLC.
Description: Supplemental
Information of Spinning Spur Wind,
LLC.
Filed Date: 9/12/12.
Accession Number: 20120912–5100.
Comments Due: 5 p.m. ET 9/26/12.
Docket Numbers: ER12–2442–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Errata to Original Service
Agreement No. 3381—Docket No. ER12–
2442–000 to be effective 7/10/2012.
Filed Date: 9/12/12.
Accession Number: 20120912–5092.
Comments Due: 5 p.m. ET 10/3/12.
Docket Numbers: ER12–2615–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.,
MidAmerican Energy Company.
Description: SA 2475 MidAmericanModern Hydro WDS to be effective
6/26/2012.
Filed Date: 9/12/12.
Accession Number: 20120912–5028.
Comments Due: 5 p.m. ET 10/3/12.
Docket Numbers: ER12–2616–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Ministerial Clean-Up
Filing re OATT Section 230.3 due to
Overlapping Filings to be effective
7/18/2012.
Filed Date: 9/12/12.
Accession Number: 20120912–5046.
Comments Due: 5 p.m. ET 10/3/12.
Docket Numbers: ER12–2616–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Errata to Transmittal
Letter re Ministerial Clean-Up Filing of
OATT Sec 230.3 to be effective
7/18/2012.
Filed Date: 9/12/12.
Accession Number: 20120912–5059.
Comments Due: 5 p.m. ET 10/3/12.
Docket Numbers: ER12–2617–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: SA 2431 Glacial RidgeGRE G549 GIA to be effective 9/13/2012.
Filed Date: 9/12/12.
Accession Number: 20120912–5053.
E:\FR\FM\19SEN1.SGM
19SEN1
Agencies
[Federal Register Volume 77, Number 182 (Wednesday, September 19, 2012)]
[Notices]
[Page 58120]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23025]
[[Page 58120]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4362-000]
Inman Mills; Notice of Authorization for Continued Project
Operation
The Riverdale Hydroelectric Project No. 4362 is located on the
Enoree River, in Spartanburg County, South Carolina. The minor license
for Project No. 4362 was issued in September 1982 for a period ending
August 31, 2012. The deadline for filing applications for a subsequent
license was August 31, 2010. Inman Mills, the licensee for Project No.
4362, did not file an application for a subsequent license.\1\ On
August 31, 2010, Lockhart Power Company filed an application for a
subsequent license for the project.\2\
---------------------------------------------------------------------------
\1\ In 2006, Commission staff approved transfer of the license
from Inman Mills to Riverdale Development Venture, LLC. 115 FERC ]
62,076 (2006). However, the 2006 order was rescinded in 2008 because
the requirements for the transfer were never completed. 122 FERC ]
62,204 (2008).
\2\ The application, docketed Project No. 13590, is pending
before the Commission.
---------------------------------------------------------------------------
Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1) (2006), requires
the Commission, at the expiration of a license term, to issue from
year-to-year an annual license to the then licensee under the terms and
conditions of the prior license until a new license is issued, or the
project is otherwise disposed of as provided in section 15 or any other
applicable section of the FPA. If, as is the case here, the project's
prior license waived the applicability of section 15 of the FPA, then,
based on section 9(b) of the Administrative Procedure Act, 5 U.S.C.
558(c) (2006), and as set forth at 18 CFR 16.21(b), if, as is also the
case here, the licensee of such project has not filed an application
for a subsequent license, the licensee may be required to continue to
operate the project in accordance with the terms and conditions of the
license after the minor license expires, until the Commission issues
someone else a license for the project or otherwise orders disposition
of the project.
Notice is hereby given that Inman Mills is authorized to continue
operation of the Riverdale Hydroelectric Project, until such time as
the Commission issues someone else a license for the project or
otherwise orders disposition of the project.
Dated: September 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-23025 Filed 9-18-12; 8:45 am]
BILLING CODE 6717-01-P