Hardins Manufacturing Company, Hardins Resources Company; Notice of Transfer of Exemption, 58124 [2012-23026]
Download as PDF
58124
Federal Register / Vol. 77, No. 182 / Wednesday, September 19, 2012 / Notices
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP12–496). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: September 11, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–23032 Filed 9–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6492–009]
tkelley on DSK3SPTVN1PROD with NOTICES
Hardins Manufacturing Company,
Hardins Resources Company; Notice
of Transfer of Exemption
1. By email filed April 23, 2012,
Hardins Manufacturing Company
informed the Commission that its
exemption from licensing for the
Hardins Hydro-Power Project No. 6492,
originally issued December 8, 1982,1 has
1 21 FERC ¶ 62,400, Order Granting Exemption
From Licensing of a Small Hydroelectric Project of
5 Megawatts or Less.
VerDate Mar<15>2010
19:20 Sep 18, 2012
Jkt 226001
been transferred to Hardins Resources
Company. The project is located on the
South Fork, Catawba River in Gaston
County, North Carolina. The transfer of
an exemption does not require
Commission approval.
2. Hardins Resources Company,
located at 11800 Henderson Road,
Clifton, VA 20124 is now the exemptee
of the Hardins Hydro-Power Project No.
6492.
Dated: September 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–23026 Filed 9–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER12–2614–000]
Dynamo Power LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding, of
Dynamo Power LLC’s application for
market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is October 3,
2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
PO 00000
Frm 00037
Fmt 4703
Sfmt 9990
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 13, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–23044 Filed 9–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14436–000]
Kaweah River Power Authority; Errata
Notice
On August 22, 2012, the Commission
issued a Notice in the above-referenced
proceeding. Notice of Preliminary
Permit Application Accepted For Filing
And Soliciting Comments, Motions To
Intervene, And Competing Applications,
August 22, 2012. (August 22, 2012). The
county location of the project was
incorrectly identified as Tulare County,
Nevada. The correct county location of
the project is Tulare County, California.
Dated: September 11, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–23021 Filed 9–18–12; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\19SEN1.SGM
19SEN1
Agencies
[Federal Register Volume 77, Number 182 (Wednesday, September 19, 2012)]
[Notices]
[Page 58124]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23026]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6492-009]
Hardins Manufacturing Company, Hardins Resources Company; Notice
of Transfer of Exemption
1. By email filed April 23, 2012, Hardins Manufacturing Company
informed the Commission that its exemption from licensing for the
Hardins Hydro-Power Project No. 6492, originally issued December 8,
1982,\1\ has been transferred to Hardins Resources Company. The project
is located on the South Fork, Catawba River in Gaston County, North
Carolina. The transfer of an exemption does not require Commission
approval.
---------------------------------------------------------------------------
\1\ 21 FERC ] 62,400, Order Granting Exemption From Licensing of
a Small Hydroelectric Project of 5 Megawatts or Less.
---------------------------------------------------------------------------
2. Hardins Resources Company, located at 11800 Henderson Road,
Clifton, VA 20124 is now the exemptee of the Hardins Hydro-Power
Project No. 6492.
Dated: September 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-23026 Filed 9-18-12; 8:45 am]
BILLING CODE 6717-01-P