American River Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 58125 [2012-23027]
Download as PDF
Federal Register / Vol. 77, No. 182 / Wednesday, September 19, 2012 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14374–000]
tkelley on DSK3SPTVN1PROD with NOTICES
American River Power, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 20, 2012, American River
Power, LLC filed an application for a
preliminary permit under section 4(f) of
the Federal Power Act proposing to
study the feasibility of the Brookville
Hydroelectric Water Power Project No.
14374, to be located at the existing
Brookville Lake Dam on the Whitewater
River, near the town of Brookville in
Franklin County, Indiana. The
Brookville Lake Dam is owned by the
United States government and operated
by the United States Army Corps of
Engineers.
A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) One new 60-foot-long by 30-footwide by 30-foot-high reinforced
concrete powerhouse, containing three
3-megawatt (MW) turbines for a total
capacity of 9 MW; (2) a new 220-footlong by 9-foot-diameter steel penstock;
(3) a new 35-foot-long by 35-foot-wide
substation; (4) a new 400-foot-long, 12.5
to 34.5-kilovolt transmission line; and
(5) appurtenant facilities. The project
would have an estimated annual
generation of 55 gigawatt-hours.
Applicant Contact: Mr. John Henry,
726 Eldridge Avenue, Collingswood, NJ
08107–1708; (856) 240–0707.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, and competing
applications (without notices of intent),
or notices of intent to file competing
applications: 60 days from the issuance
of this notice. Competing applications
and notices of intent must meet the
requirements of 18 CFR 4.36.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
VerDate Mar<15>2010
19:20 Sep 18, 2012
Jkt 226001
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14374) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–23027 Filed 9–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–506–000]
Trunkline Gas Company, L.L.C.; Notice
of Request Under Blanket
Authorization
Take notice that on August 30, 2012,
Trunkline Gas Company, L.L.C.
(Trunkline), P.O. Box 4967, Houston,
Texas, 77210, filed in Docket No. CP12–
506–000, a Prior Notice request
pursuant to sections 157.205 and
157.216 of the Commission’s
Regulations under the Natural Gas Act
for authorization to abandon
Trunkline’s existing compressor unit
located in Jackson County, Texas.
Specifically, Trunkline propose to
abandon, in place, the existing 1,675
horsepower compressor unit and related
auxiliary equipment at the Edna
Compressor Station. Due to the
construction of the Eagle Plant
Interconnect and its delivery pressure,
Trunkline has determined that the
compression at the Edna Compressor
Station will no longer be needed.
Trunkline has not operated the Edna
Compressor Station during the last
twelve months and no service to
existing customers will be impacted, all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
58125
filing may also be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to
Stephen T. Veatch, Senior Director of
Certificates and Tariffs, Trunkline Gas
Company, L.L.C., 5051 Westheimer
Road, Houston, Texas 77056, or call
(713) 989–2024, or fax (713) 989–1176,
or by email: Stephen.veatch@sug.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
E:\FR\FM\19SEN1.SGM
19SEN1
Agencies
[Federal Register Volume 77, Number 182 (Wednesday, September 19, 2012)]
[Notices]
[Page 58125]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23027]
[[Page 58125]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14374-000]
American River Power, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 20, 2012, American River Power, LLC filed an application
for a preliminary permit under section 4(f) of the Federal Power Act
proposing to study the feasibility of the Brookville Hydroelectric
Water Power Project No. 14374, to be located at the existing Brookville
Lake Dam on the Whitewater River, near the town of Brookville in
Franklin County, Indiana. The Brookville Lake Dam is owned by the
United States government and operated by the United States Army Corps
of Engineers.
A preliminary permit does not authorize the permit holder to
perform any land-disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed project would consist of: (1) One new 60-foot-long by
30-foot-wide by 30-foot-high reinforced concrete powerhouse, containing
three 3-megawatt (MW) turbines for a total capacity of 9 MW; (2) a new
220-foot-long by 9-foot-diameter steel penstock; (3) a new 35-foot-long
by 35-foot-wide substation; (4) a new 400-foot-long, 12.5 to 34.5-
kilovolt transmission line; and (5) appurtenant facilities. The project
would have an estimated annual generation of 55 gigawatt-hours.
Applicant Contact: Mr. John Henry, 726 Eldridge Avenue,
Collingswood, NJ 08107-1708; (856) 240-0707.
FERC Contact: Tyrone A. Williams, (202) 502-6331.
Deadline for filing comments, motions to intervene, and competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14374) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-23027 Filed 9-18-12; 8:45 am]