Nuclear Regulatory Commission 2017 – Federal Register Recent Federal Regulation Documents
Results 551 - 580 of 580
Program-Specific Guidance About Possession Licenses for Production of Radioactive Material Using an Accelerator
On December 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) solicited comments on draft NUREG-1556, Volume 21, Revision 1, ``Consolidated Guidance About Materials Licenses: Program-Specific Guidance About Possession Licenses for Production of Radioactive Material Using an Accelerator.'' The public comment period was originally scheduled to close on January 20, 2017. The NRC has decided to extend the public comment period to allow more time for members of the public to develop and submit their comments.
Category 3 Source Security and Accountability; Correction
The U.S. Nuclear Regulatory Commission (NRC) is correcting a notice that was published in the Federal Register (FR) on January 9, 2017, regarding Category 3 source security and accountability. This action is necessary to delete erroneous text in the paragraph under the heading ``IV. Public Comments Process.''
Duke Energy Progress; Combined License Applications for Shearon Harris Nuclear Plant Units 2 and 3
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to an October 13, 2016, letter from Duke Energy Progress (DEP). On May 2, 2013, DEP requested that the NRC suspend review of its combined license (COL) application until further notice. On October 13, 2016, DEP requested an exemption from certain regulatory requirements which, if granted, would allow them to revise their COL application for Shearon Harris Nuclear Plant (Harris) Units 2 and 3 in order to address enhancements to the Emergency Preparedness (EP) rules by December 31, 2019, rather than by December 31, 2016, as the regulations currently require. The NRC staff reviewed this request and determined that it is appropriate to grant the exemption to the EP update requirements until December 31, 2019, but stipulated that the updates to the Final Safety Analysis Report must be submitted prior to requesting the NRC resume its review of the COL application, or by December 31, 2019, whichever comes first.
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Debris Screen Related Dimensions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 63 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Tennessee Valley Authority; Clinch River Nuclear Site
On May 12, 2016, the Tennessee Valley Authority (TVA) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for an early site permit (ESP) for the Clinch River Nuclear Site located in Oak Ridge, Tennessee. A notice of receipt and availability of this application was published in the Federal Register on June 23, 2016. The TVA also provided supplemental information in support of the application to the NRC.
Rhode Island Atomic Energy Commission
The U.S. Nuclear Regulatory Commission (NRC) has issued a renewal of Facility Operating License No. R-95, held by the Rhode Island Atomic Energy Commission (RINSC or the licensee) for the continued operation of its Rhode Island Nuclear Science Center reactor for an additional 20 years from the date of issuance. The facility is located on the Narragansett Bay Campus of the University of Rhode Island in Narragansett, Rhode Island.
Department of the Army, U.S. Army Research, Development and Engineering Command, Armament Research, Development and Engineering Center, Picatinny Arsenal; Picatinny, New Jersey
The U.S. Nuclear Regulatory Commission (NRC) is considering the issuance to license amendment of SUB-348, issued on July 13, 1961 and held by the Department of the Army, U.S. Army Research, Development and Engineering Command (RDEC), Armament Research, Development and Engineering Center (ARDEC or the licensee), for its facilities located at the Picatinny Arsenal in Morris County, New Jersey.
University of Missouri-Columbia Research Reactor
The U.S. Nuclear Regulatory Commission (NRC) issued a renewal of Facility Operating License No. R-103, held by the Curators of the University of MissouriColumbia (the licensee), for the continued operation of its University of MissouriColumbia Research Reactor (MURR or the reactor) at a maximum steady-state power level of 10 megawatts thermal (MWt) for an additional 20 years from the date of issuance. The MURR facility is located in the University Research Park, adjacent to the main campus of the University of Missouri-Columbia, in Boone County, Columbia, Missouri.
Licensing Support System Advisory Review Panel
The Licensing Support System Advisory Review Panel was established by the U.S. Nuclear Regulatory Commission (NRC) as a Federal Advisory Committee in 1989. Its purpose was to provide advice on the fundamental issues of design and development of an electronic information management system to be used to store and retrieve documents relating to the licensing of a geologic repository for the disposal of high-level radioactive waste, and on the operation and maintenance of the system. This electronic information management system was known as the Licensing Support System (LSS). In November 1998, the Commission approved amendments to title 10 of the Code of Federal Regulations part 2 that renamed the Licensing Support System Advisory Review Panel as the Licensing Support Network Advisory Review Panel. The Licensing Support Network (LSN) was shut down in 2011 and the document collection was submitted to the Office of the Secretary. The document collection was made publically available in the NRC's ADAMS system in August 2016 and contains over 3.69 million documents associated the proposed high-level waste facility at Yucca Mountain. Membership on the Panel will continue to be drawn from those whose interests that could be affected by the use of the LSN document collection, including the Department of Energy, the NRC, the State of Nevada, the National Congress of American Indians, affected units of local governments in Nevada, the Nevada Nuclear Waste Task Force, and nuclear industry groups. Federal agencies with expertise and experience in electronic information management systems may also participate on the Panel. The NRC has determined that renewal of the charter for the LSNARP until January 5, 2019, is in the public interest in connection with duties imposed on the Commission by law. This action is being taken in accordance with the Federal Advisory Committee Act after consultation with the Committee Management Secretariat, General Services Administration.
Toshiba Corporation, Advanced Boiling-Water Reactor; Design Certification
The U.S. Nuclear Regulatory Commission (NRC) is closing the NRC's docket for the Advanced Boiling-Water Reactor (ABWR) design certification renewal application submitted by Toshiba Corporation. Toshiba Corporation has withdrawn its application to renew the ABWR design certification rule.
Information Collection: NRC Form 327, Special Nuclear Material (SNM) and Source Material (SM) Physical Inventory Summary Report, and NUREG/BR-0096, Instructions and Guidance for Completing Physical Inventory
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ``NRC Form 327, Special Nuclear Material (SNM) and Source Material (SM) Physical Inventory Summary Report, and NUREG/ BR-0096, Instructions and Guidance for Completing Physical Inventory.''
FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station, Unit No. 1
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License No. NPF- 3 for the Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse), as requested by FirstEnergy Nuclear Operating Company (FENOC, the licensee).
Reno Creek In Situ
The U.S. Nuclear Regulatory Commission (NRC) is issuing the Final Supplemental Environmental Impact Statement (SEIS) (NUREG-1910, Supplement 6) for the Reno Creek In Situ Uranium Recovery (ISR) Project. By letter dated October 3, 2012, AUC LLC submitted an application to the NRC for a new source materials license for the proposed Reno Creek ISR Project proposed to be located in Campbell County, Wyoming. The SEIS is Supplement 6 to NUREG-1910, ``Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities.''
Category 3 Source Security and Accountability
On October 18, 2016, the U.S. Nuclear Regulatory Commission (NRC) issued a Staff Requirements Memorandum (SRM) for COMJMB-16-0001 and directed NRC staff to take specific actions to evaluate whether it is necessary to revise NRC regulations or processes governing source protection and accountability. Specifically, the Commission asked the staff to conduct an evaluation of, among other things, the pros and cons of different methods of requiring transferors of Category 3 quantities of radioactive material to verify the validity of a transferee's license prior to transfer, the pros and cons of including Category 3 sources in the National Source Tracking System (NSTS), and the risks posed by aggregation of Category 3 sources into Category 2 quantities. As part of this evaluation, the NRC is seeking input from licensees, Agreement States, and the public to inform the staff's assessment of potential revisions to regulations or processes requiring Category 3 source protection and accountability.
Tribal Policy Statement
The U.S. Nuclear Regulatory Commission (NRC) is issuing this Statement of Policy to set forth principles to be followed by the NRC staff to promote effective government-to-government interactions with American Indian and Alaska Native Tribes, and to encourage and facilitate Tribal involvement in the areas over which the Commission has jurisdiction. It provides agencywide guidelines that achieve consistency, but also encourage custom-tailored approaches to consultation and coordination that reflect the circumstances of each situation and the preference of each Tribal government. It is the NRC's expectation that all program and regional office consultation and coordination practices will be consistent with or adhere to the NRC Tribal Policy Statement.
Exelon Generation Company LLC; Clinton Power Station, Unit 1
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC (Exelon, the licensee), to withdraw its application dated August 11, 2016, for a proposed amendment to Facility Operating License No. NPF-62. The proposed amendment request would have eliminated the on-shift positions not needed for storage of the spent fuel in the spent fuel pool during the initial decommissioning period and the emergency response organization positions not needed to respond to credible events. Additionally the licensee proposed to revise the emergency action levels (EALs) to reflect those conditions applicable when the unit is in a permanently defueled condition.
Exelon Generation Company LLC; Clinton Power Station, Unit 1
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC (Exelon, the licensee), to withdraw its application dated July 28, 2016, for a proposed amendment to Facility Operating License No. NPF-62. The proposed amendment request would have changed the organization, staffing, and training requirements contained in Section 5.0 of the Technical Specifications after the license no longer authorizes operation of the reactor or placement or retention of fuel in the reactor pressure vessel.
Rhode Island Atomic Energy Commission
The U.S. Nuclear Regulatory Commission (NRC) is considering renewal of Facility License No. R-95, held by the Rhode Island Atomic Energy Commission (RIAEC or the licensee), for the continued operation of the Rhode Island Nuclear Science Center Reactor (RINSC reactor or the facility), located in the Narragansett, Washington County, Rhode Island. The NRC is issuing an environmental assessment (EA) and finding of no significant impact (FONSI) associated with the renewal of the license.
Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2
The U.S. Nuclear Regulatory Commission (NRC) received and is considering issuance of an amendment to Facility Operating License No. NPF-96, issued to the Tennessee Valley Authority, for operation of the Watts Bar Nuclear Plant (WBN), Unit 2. The proposed amendment would revise the WBN, Unit 2, Cyber Security Plan (CSP) Implementation Schedule for Milestone 8 and would revise the associated license condition in the Facility Operating License. Because the amendment request contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation.
University of Maryland; Maryland University Training Reactor
The U.S. Nuclear Regulatory Commission (NRC) issued a renewal of Facility Operating License No. R-70, held by the University of Maryland (UMD or the licensee) for the continued operation of its Maryland University Training Reactor (MUTR or the facility) Training, Research, Isotope Production, General Atomics (TRIGA) reactor for an additional 20 years.
Duke Energy Carolinas, LLC; William States Lee III Nuclear Station Units 1 and 2
The U.S. Nuclear Regulatory Commission (NRC) has issued combined licenses (Nos. NPF-101 and NPF-102) to Duke Energy Carolinas, LLC (DEC) William States Lee III Nuclear Station Units 1 and 2. In addition, the NRC has prepared a Summary Record of Decision (ROD) that supports the NRC's decision to issue the above-named combined licenses.
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued, from December 6 to December 19, 2016. The last biweekly notice was published on December 20, 2016.
Duke Energy Carolinas, LLC; William States Lee III Nuclear Station Units 1 and 2
The U.S. Nuclear Regulatory Commission (NRC) is issuing a notice of intent to enter into a modified indemnity agreement with Duke Energy Carolinas, LLC, (DEC) to operate William States Lee III Nuclear Station (WLS) Units 1 and 2. The NRC is required to publish notice of its intent to enter into an indemnity agreement which contains provisions different from the general form found in the NRC's regulations. A modification to the general form is necessary to accommodate the unique timing provisions of a combined license (COL).
Information Collection: NRC Forms 366, 366A, and 366B, “Licensee Event Report”; Correction
The U.S. Nuclear Regulatory Commission (NRC) is correcting a notice that was published in the Federal Register (FR) on November 30, 2016, regarding Notice of submission to the Office of Management and Budget; request for comment. This action is necessary to amend the annual responses and burden hours to include the burden and responses associated cyber security events.
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of one amendment request. The amendment request is for Kewaunee Power Station. For this amendment request, the NRC proposes to determine that it involves no significant hazards consideration. Because the amendment request contains sensitive unclassified non-safeguards information (SUNSI) and safeguards information (SGI), an order imposes procedures to obtain access to SUNSI and SGI for contention preparation.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.