University of Missouri-Columbia Research Reactor, 3814-3816 [2017-00523]
Download as PDF
3814
Federal Register / Vol. 82, No. 8 / Thursday, January 12, 2017 / Notices
ADAMS
accession No(s).
or Web site
Document title
Information on Cumulative Radiological Health Impacts in Support of the Clinch River Nuclear
Site Early Site Permit Application.
Meteorological Information in Support of the Clinch River Nuclear Site Early Site Permit Application.
Information on Radiation Protection and Accident Consequences in Support of the Clinch River
Nuclear Site Early Site Permit Application.
Information on Alternate Cooling Water Systems in Support of the Clinch River Nuclear Site
Early Site Permit Application.
Information on Terrestrial Ecology in Support of the Clinch River Nuclear Site Early Site Permit
Application.
Information on Stability of Subsurface Materials and Foundation in Support of the Clinch River
Nuclear Site Early Site Permit Application.
Site Selection Information in Support of the Clinch River Nuclear Site Early Site Permit Application.
Aquatic Ecology Information in Support of the Clinch River Nuclear Site Early Site Permit Application.
Environmental Protection Plan Information in Support of the Clinch River Nuclear Site Early
Site Permit Application.
The NRC will post other publically
available materials related to this
application in ADAMS and on the
NRC’s public Web site at https://
www.nrc.gov/reactors/new-reactors/esp/
clinch-river.html.
Dated at Rockville, Maryland, this 5th day
of January 2017.
For The Nuclear Regulatory Commission.
Francis M. Akstulewicz,
Director, Division of New Reactor Licensing,
Office of New Reactors.
[FR Doc. 2017–00529 Filed 1–11–17; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–186; NRC–2013–0090]
University of Missouri—Columbia
Research Reactor
Nuclear Regulatory
Commission.
ACTION: License renewal; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) issued a renewal of
Facility Operating License No. R–103,
held by the Curators of the University of
Missouri—Columbia (the licensee), for
the continued operation of its
University of Missouri—Columbia
Research Reactor (MURR or the reactor)
at a maximum steady-state power level
of 10 megawatts thermal (MWt) for an
additional 20 years from the date of
issuance. The MURR facility is located
in the University Research Park,
adjacent to the main campus of the
University of Missouri-Columbia, in
Boone County, Columbia, Missouri.
DATES: The renewed facility operating
license No. R–103 is effective on
January 4, 2017.
mstockstill on DSK3G9T082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:28 Jan 11, 2017
Jkt 241001
Please refer to Docket ID
NRC–2013–0090 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2013–0090. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it available in
ADAMS) is provided the first time that
a document is referenced. For the
convenience of the reader, the ADAMS
accession numbers are provided in a
table in the ‘‘Availability of Documents’’
section of this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Geoffrey A. Wertz, Office of Nuclear
ADDRESSES:
PO 00000
Frm 00099
Fmt 4703
Sfmt 4703
ML16340A259.
ML16340A256.
ML16340A258.
ML16344A061.
ML16348A552.
ML16350A420.
ML16350A429.
ML16356A485.
ML16363A378.
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
0893; email: Geoffrey.Wertz@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Discussion
The NRC has issued renewed Facility
Operating License No. R–103, held by
the licensee, which authorizes
continued operation of the MURR,
located in the University Research Park,
adjacent to the main campus of the
University of Missouri—Columbia, in
Columbia, Missouri. The MURR is an
open pool-type reactor which is lightwater moderated and cooled. It is
licensed to operate at a maximum
steady state power level of 10 MWt. The
renewed Facility Operating License No.
R–103 will expire 20 years from its date
of issuance.
The renewed facility operating license
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s regulations in chapter I of
title 10 of the Code of Federal
Regulations (10 CFR), and sets forth
those findings in the renewed facility
operating license. The agency afforded
an opportunity for hearing in the Notice
of Opportunity for Hearing published in
the Federal Register on May 20, 2013
(78 FR 29393). The NRC received no
request for a hearing or petition for
leave to intervene following the notice.
The NRC staff prepared a safety
evaluation report (SER) for the renewal
of Facility Operating License No. R–103
and concluded, based on that
evaluation, that the licensee can
continue to operate the facility without
E:\FR\FM\12JAN1.SGM
12JAN1
Federal Register / Vol. 82, No. 8 / Thursday, January 12, 2017 / Notices
endangering the health and safety of the
public. The NRC staff also prepared an
environmental assessment and finding
of no significant Impact for the renewal
of the facility operating license, noticed
in the Federal Register on November 29,
2016 (81 FR 86024), and concluded that
renewal of the facility operating license
will not have a significant impact on the
quality of the human environment.
II. Availability of Documents
The documents identified in the
following table are available to
interested persons through ADAMS
accession numbers, as indicated. The
SER, prepared by the NRC staff for the
license renewal, is available under
ADAMS Accession No. ML16124A887.
ADAMS accession
No.
mstockstill on DSK3G9T082PROD with NOTICES
Document
Application for License Renewal for the University of Missouri-Columbia Research Reactor as Per 10 CFR 2.109—Cover
Letter, August 31, 2006.
Safety Analysis Report for the University of Missouri-Columbia Application for License Renewal Application—Volume 1 of
2—Redacted, August 31, 2006.
Safety Analysis Report for the University of Missouri-Columbia Application for License Renewal—Chapters 10–18, Volume
2 of 2—Redacted, August 31,2006.
University of Missouri Research Reactor (MURR) Environmental Report for License Renewal, August 31, 2006 ..................
Written Communication as Specified by 10 CFR 50.4 (b)(1) Regarding the Response to the ‘‘University of Missouri at Columbia—Request for Additional Information RE: License Renewal Environmental Report,’’ January 29, 2010.
University of Missouri, Columbia—Response to NRC Request for Additional Information, Redacted, July 16, 2010 ..............
University of Missouri—Columbia Licensee Response to NRC Request for Additional Information—Chapter 10, Related to
Amendment Information Only, Redacted, August 31, 2010.
University of Missouri, Columbia, Response to Request for Additional Information Regarding License Renewal, September
3, 2010.
University of Missouri, Columbia—Response to NRC Request for Additional Information, dated June 1, 2010, (TAC
No.ME1580) Redacted, September 30, 2010.
University of Missouri, Columbia—Response to NRC Request for Additional Information 45-Day Response Questions (TAC
No. ME1580) Redacted, October 29, 2010.
Written Communication as Specified by 10 CFR 50.4 (b)(1) Regarding the Response to the ‘‘University of Missouri at Columbia—Request for Additional Information RE: License Renewal, Safety Analysis Report, Complex Questions,’’ dated
May 6, 2010, October 29, 2010.
University of Missouri, Columbia—Response to NRC Request for Additional Information 45-Day Response Questions (TAC
No. ME1580) Redacted, November 30, 2010.
University of Missouri-Columbia Research Reactor Response to Request for Additional Information Regarding Renewal
Request for Amendment Facility Operating License R–103, March 11, 2011.
University of Missouri-Columbia Research Reactor’s Response to NRC Request for Additional Information Regarding a
Renewal Request for Amended Facility Operating License R–103, September 8, 2011.
University of Missouri—Columbia Research Reactor, Written Communication as Specified by 10 CFR 50.4 (b)(1) Regarding Responses to the University of Missouri at Columbia—Request for Additional Information RE: License Renewal,
Safety Analysis Report, January 6, 2012.
University of Missouri, Columbia—Licensee Response to NRC Request for Additional Information dated May 6, 2010
(Complex Questions) and June 1, 2012 (45-Day Response Questions) RE: License Renewal (TAC No. ME1580) Redacted, June 28, 2012.
Written Communication as Specified by 10 CFR 50.4 (b)(1) Regarding the Response to the University of Missouri at Columbia—Request for Additional Information Regarding the Renewal of Facility Operating License No. R–103 for the University of Missouri, January 28, 2015.
University of Missouri-Columbia—Response to Request for Additional Information Regarding Renewal Request for Amended Facility Operating License, July 31, 2015.
University of Missouri-Columbia, Request for a copy of the Emergency Plan in Support of Renewal of Amended Facility License No. R–103, September 15, 2015.
University of Missouri, Columbia-Responses to NRC Request for Additional Information, Dated April 17, 2015, Regarding
Renewal Request for Amended Facility Operating License, October 1, 2015.
University of Missouri-Columbia—Response to NRC Request for Additional Information Dated December 17, 2015, Regarding Renewal Request for License No. R–103, February 8, 2016.
University of Missouri at Columbia—Responses to NRC Request for Additional Information dated February 8, 2016 Regarding Renewal Request for Amendment, April 8, 2016.
University of Missouri- Columbia Research Reactor, Response to Request for Additional Information on License Renewal
Amendment Request, April 15, 2016.
University of Missouri-Columbia Research Reactor’s Responses to the NRC Request for Additional Information, Dated October 28, 2015, Regarding Our Renewal Request for Amended Facility Operating License No. R–103, May 31, 2016.
University of Missouri-Columbia Response to Request for Additional Information Regarding the Proposed Technical Specifications for the License Renewal, July 25, 2016.
University of Missouri-Columbia Response to NRC Request for Additional Information Regarding Renewal for Amended
Facility Operating License, August 31, 2016.
University of Missouri-Columbia Response to NRC Request for Additional Information Regarding the Technical Specifications for the Renewal for Amended Facility Operating License, November 7, 2016.
University of Missouri-Columbia Response to NRC Request for Additional Information Regarding the Technical Specifications for the Renewal for Amended Facility Operating License, November 15, 2016.
University of Missouri-Columbia Response to NRC Request for Additional Information Regarding the Security Plan for the
Renewal for Amended Facility Operating License, November 15, 2016.
University of Missouri-Columbia Response to NRC Request for Additional Information Regarding the Renewal for Amended Facility Operating License, December 14, 2016.
University Of Missouri-Columbia Regarding Issuance of Renewed Facility Operating License No. R–103 for The University
Of Missouri—Columbia Research Reactor (TAC No. ME1580) January 4, 2017.
VerDate Sep<11>2014
18:28 Jan 11, 2017
Jkt 241001
PO 00000
Frm 00100
Fmt 4703
3815
Sfmt 4703
E:\FR\FM\12JAN1.SGM
12JAN1
ML062540114.
ML092110573.
ML092110597.
ML062540121.
ML100330073.
ML12354A237.
ML120050315.
ML102500533.
ML12355A019.
ML12355A023.
ML103060018.
ML12355A026.
ML110740249.
ML11255A003.
ML12010A186.
ML12346A004.
ML15034A474.
ML15216A122.
ML15260A439.
ML15275A314.
ML16041A221.
ML16103A536.
ML16110A164.
ML16155A132.
ML16209A236.
ML16246A010.
ML16313A517.
ML16321A485.
ML16321A455.
ML16350A424.
ML16124A885.
3816
Federal Register / Vol. 82, No. 8 / Thursday, January 12, 2017 / Notices
Dated at Rockville, Maryland, this 5th day
of January 2017.
For the Nuclear Regulatory Commission.
Michael Balazik,
Chief (Acting), Research and Test Reactors
Licensing Branch, Division of Policy and
Rulemaking, Office of Nuclear Reactor
Regulation.
[FR Doc. 2017–00523 Filed 1–11–17; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 040–06377; NRC–2014–0041]
Department of the Army, U.S. Army
Research, Development and
Engineering Command, Armament
Research, Development and
Engineering Center, Picatinny Arsenal;
Picatinny, New Jersey
Nuclear Regulatory
Commission.
ACTION: Environmental assessment and
finding of no significant impact;
issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is considering the
issuance to license amendment of SUB–
348, issued on July 13, 1961 and held
by the Department of the Army, U.S.
Army Research, Development and
Engineering Command (RDEC),
Armament Research, Development and
Engineering Center (ARDEC or the
licensee), for its facilities located at the
Picatinny Arsenal in Morris County,
New Jersey.
DATES: The Environmental assessment
and finding of no significant impact
referenced in this document is available
on January 12, 2017.
ADDRESSES: Please refer to Docket ID
NRC–2014–0041 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2014–0041. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
mstockstill on DSK3G9T082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:28 Jan 11, 2017
Jkt 241001
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. For the
convenience of the reader, the ADAMS
accession numbers are provided in a
table in the ‘‘Availability of Documents’’
section of this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Laurie A. Kauffman, Division of Nuclear
Materials Safety, Region I, U.S. Nuclear
Regulatory Commission, King of
Prussia, PA 19406; telephone: 610–337–
5323; email: Laurie.Kauffman@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is considering the issuance
of a license amendment to NRC’s Source
Materials License No. SUB–348 (License
No. SUB–348). The license is held by
the Department of the Army, U.S. Army
Research, Development and Engineering
Command (RDEC), Armament Research,
Development and Engineering Center
(ARDEC or the licensee), for its facilities
located at the Picatinny Arsenal in
Morris County, New Jersey. The ARDEC
submitted to the NRC a license
amendment request and proposed
decommissioning plan for Area 1222.
The ARDEC requested authorization to
decontaminate the small remaining
amounts of depleted uranium and
radium in Area 1222, and proposed a
decommissioning plan that included
information describing how Area 1222
would meet the criteria described in
part 20 of title 10 of the Code of Federal
Regulations (CFR), subpart E, ‘‘License
Termination Criteria’’ following
decommissioning. Issuance of the
amendment would authorize the
decontamination of Area 1222. The
ARDEC license would not be otherwise
affected, and the ARDEC will continue
to conduct authorized activities under
this license at other locations on the
Picatinny Arsenal site. The ARDEC
requested this action in a letter dated
July 23, 2013 (ADAMS Accession No.
ML14078A564). The NRC’s
consideration of the license amendment
request for the proposed
decommissioning plan, and notice of an
opportunity to request a hearing was
publicly noticed in Federal Register
notice (79 FR 18934–18936; March 27,
2014) (ADAMS Accession No.
ML14058A702).
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
The NRC has prepared an
environmental assessment (EA) in
support of its review of the proposed
actions in accordance with the
requirements of 10 CFR part 51
‘‘Environmental Protection Regulations
for Domestic Licensing and Related
Regulatory Functions,’’ which
implements the NRC’s environmental
protection program under the National
Environmental Policy Act (NEPA) of
1969, as amended. Based on this EA, the
NRC has concluded that a finding of no
significant impact (FONSI) is
appropriate. The NRC will make a
decision to amend the license following
completion of a safety evaluation report.
II. Environmental Assessment
Description of the Proposed Action
The proposed action is to amend NRC
License No. SUB–348 to authorize the
decontamination of Area 1222 so that
residual radioactivity above background
can be reduced to a level that meets the
criteria in 10 CFR part 20, subpart E,
‘‘License Termination Criteria,’’
specifically, 10 CFR 20.1402,
‘‘Radiological Criteria for Unrestricted
Use.’’ This criteria allows unrestricted
use of a site if the maximum total
effective dose equivalent to an average
member of the critical group is 25
millirem per year (0.25 millisievert
(mSv) per year) and the residual
radioactivity above background has
been reduced to levels that are as low
as is reasonably achievable.
The NRC License No. SUB–348 was
issued on July 13, 1961, pursuant to 10
CFR part 40, and has been amended
periodically since that time. This
license authorizes ARDEC to use
uranium and thorium in any form for
purposes of conducting research and
development activities. The ARDEC
conducts authorized activities under
this license at numerous other locations
on the arsenal, and is not requesting
license termination.
The Picatinny Arsenal is situated on
6,500 acres of land and consists of office
space, laboratories, and specialized
facilities. The Picatinny Arsenal is
located in a mixed residential and
commercial area. Area 1222, which
includes an open detonation pit area
and the adjacent hillside areas, is
located on the arsenal property in the
valley toward the northern end of the
arsenal and lies at the base of the
Copperas Mountain. In the 1970’s, the
ARDEC used Area 1222 for open
detonation of munitions and as a
demilitarization area. NRC-licensed
activities performed in Area 1222 were
restricted to the detonation of a limited
number of mines containing small
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 82, Number 8 (Thursday, January 12, 2017)]
[Notices]
[Pages 3814-3816]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-00523]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-186; NRC-2013-0090]
University of Missouri--Columbia Research Reactor
AGENCY: Nuclear Regulatory Commission.
ACTION: License renewal; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) issued a renewal
of Facility Operating License No. R-103, held by the Curators of the
University of Missouri--Columbia (the licensee), for the continued
operation of its University of Missouri--Columbia Research Reactor
(MURR or the reactor) at a maximum steady-state power level of 10
megawatts thermal (MWt) for an additional 20 years from the date of
issuance. The MURR facility is located in the University Research Park,
adjacent to the main campus of the University of Missouri-Columbia, in
Boone County, Columbia, Missouri.
DATES: The renewed facility operating license No. R-103 is effective on
January 4, 2017.
ADDRESSES: Please refer to Docket ID NRC-2013-0090 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0090. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if it available in
ADAMS) is provided the first time that a document is referenced. For
the convenience of the reader, the ADAMS accession numbers are provided
in a table in the ``Availability of Documents'' section of this
document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Geoffrey A. Wertz, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-0893; email: Geoffrey.Wertz@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Discussion
The NRC has issued renewed Facility Operating License No. R-103,
held by the licensee, which authorizes continued operation of the MURR,
located in the University Research Park, adjacent to the main campus of
the University of Missouri--Columbia, in Columbia, Missouri. The MURR
is an open pool-type reactor which is light-water moderated and cooled.
It is licensed to operate at a maximum steady state power level of 10
MWt. The renewed Facility Operating License No. R-103 will expire 20
years from its date of issuance.
The renewed facility operating license complies with the standards
and requirements of the Atomic Energy Act of 1954, as amended (the
Act), and the Commission's rules and regulations. The Commission has
made appropriate findings as required by the Act and the Commission's
regulations in chapter I of title 10 of the Code of Federal Regulations
(10 CFR), and sets forth those findings in the renewed facility
operating license. The agency afforded an opportunity for hearing in
the Notice of Opportunity for Hearing published in the Federal Register
on May 20, 2013 (78 FR 29393). The NRC received no request for a
hearing or petition for leave to intervene following the notice.
The NRC staff prepared a safety evaluation report (SER) for the
renewal of Facility Operating License No. R-103 and concluded, based on
that evaluation, that the licensee can continue to operate the facility
without
[[Page 3815]]
endangering the health and safety of the public. The NRC staff also
prepared an environmental assessment and finding of no significant
Impact for the renewal of the facility operating license, noticed in
the Federal Register on November 29, 2016 (81 FR 86024), and concluded
that renewal of the facility operating license will not have a
significant impact on the quality of the human environment.
II. Availability of Documents
The documents identified in the following table are available to
interested persons through ADAMS accession numbers, as indicated. The
SER, prepared by the NRC staff for the license renewal, is available
under ADAMS Accession No. ML16124A887.
------------------------------------------------------------------------
Document ADAMS accession No.
------------------------------------------------------------------------
Application for License Renewal for ML062540114.
the University of Missouri-Columbia
Research Reactor as Per 10 CFR
2.109--Cover Letter, August 31, 2006.
Safety Analysis Report for the ML092110573.
University of Missouri-Columbia
Application for License Renewal
Application--Volume 1 of 2--
Redacted, August 31, 2006.
Safety Analysis Report for the ML092110597.
University of Missouri-Columbia
Application for License Renewal--
Chapters 10-18, Volume 2 of 2--
Redacted, August 31,2006.
University of Missouri Research ML062540121.
Reactor (MURR) Environmental Report
for License Renewal, August 31, 2006.
Written Communication as Specified by ML100330073.
10 CFR 50.4 (b)(1) Regarding the
Response to the ``University of
Missouri at Columbia--Request for
Additional Information RE: License
Renewal Environmental Report,''
January 29, 2010.
University of Missouri, Columbia-- ML12354A237.
Response to NRC Request for
Additional Information, Redacted,
July 16, 2010.
University of Missouri--Columbia ML120050315.
Licensee Response to NRC Request for
Additional Information--Chapter 10,
Related to Amendment Information
Only, Redacted, August 31, 2010.
University of Missouri, Columbia, ML102500533.
Response to Request for Additional
Information Regarding License
Renewal, September 3, 2010.
University of Missouri, Columbia-- ML12355A019.
Response to NRC Request for
Additional Information, dated June
1, 2010, (TAC No.ME1580) Redacted,
September 30, 2010.
University of Missouri, Columbia-- ML12355A023.
Response to NRC Request for
Additional Information 45-Day
Response Questions (TAC No. ME1580)
Redacted, October 29, 2010.
Written Communication as Specified by ML103060018.
10 CFR 50.4 (b)(1) Regarding the
Response to the ``University of
Missouri at Columbia--Request for
Additional Information RE: License
Renewal, Safety Analysis Report,
Complex Questions,'' dated May 6,
2010, October 29, 2010.
University of Missouri, Columbia-- ML12355A026.
Response to NRC Request for
Additional Information 45-Day
Response Questions (TAC No. ME1580)
Redacted, November 30, 2010.
University of Missouri-Columbia ML110740249.
Research Reactor Response to Request
for Additional Information Regarding
Renewal Request for Amendment
Facility Operating License R-103,
March 11, 2011.
University of Missouri-Columbia ML11255A003.
Research Reactor's Response to NRC
Request for Additional Information
Regarding a Renewal Request for
Amended Facility Operating License R-
103, September 8, 2011.
University of Missouri--Columbia ML12010A186.
Research Reactor, Written
Communication as Specified by 10 CFR
50.4 (b)(1) Regarding Responses to
the University of Missouri at
Columbia--Request for Additional
Information RE: License Renewal,
Safety Analysis Report, January 6,
2012.
University of Missouri, Columbia-- ML12346A004.
Licensee Response to NRC Request for
Additional Information dated May 6,
2010 (Complex Questions) and June 1,
2012 (45-Day Response Questions) RE:
License Renewal (TAC No. ME1580)
Redacted, June 28, 2012.
Written Communication as Specified by ML15034A474.
10 CFR 50.4 (b)(1) Regarding the
Response to the University of
Missouri at Columbia--Request for
Additional Information Regarding the
Renewal of Facility Operating
License No. R-103 for the University
of Missouri, January 28, 2015.
University of Missouri-Columbia-- ML15216A122.
Response to Request for Additional
Information Regarding Renewal
Request for Amended Facility
Operating License, July 31, 2015.
University of Missouri-Columbia, ML15260A439.
Request for a copy of the Emergency
Plan in Support of Renewal of
Amended Facility License No. R-103,
September 15, 2015.
University of Missouri, Columbia- ML15275A314.
Responses to NRC Request for
Additional Information, Dated April
17, 2015, Regarding Renewal Request
for Amended Facility Operating
License, October 1, 2015.
University of Missouri-Columbia-- ML16041A221.
Response to NRC Request for
Additional Information Dated
December 17, 2015, Regarding Renewal
Request for License No. R-103,
February 8, 2016.
University of Missouri at Columbia-- ML16103A536.
Responses to NRC Request for
Additional Information dated
February 8, 2016 Regarding Renewal
Request for Amendment, April 8, 2016.
University of Missouri- Columbia ML16110A164.
Research Reactor, Response to
Request for Additional Information
on License Renewal Amendment
Request, April 15, 2016.
University of Missouri-Columbia ML16155A132.
Research Reactor's Responses to the
NRC Request for Additional
Information, Dated October 28, 2015,
Regarding Our Renewal Request for
Amended Facility Operating License
No. R-103, May 31, 2016.
University of Missouri-Columbia ML16209A236.
Response to Request for Additional
Information Regarding the Proposed
Technical Specifications for the
License Renewal, July 25, 2016.
University of Missouri-Columbia ML16246A010.
Response to NRC Request for
Additional Information Regarding
Renewal for Amended Facility
Operating License, August 31, 2016.
University of Missouri-Columbia ML16313A517.
Response to NRC Request for
Additional Information Regarding the
Technical Specifications for the
Renewal for Amended Facility
Operating License, November 7, 2016.
University of Missouri-Columbia ML16321A485.
Response to NRC Request for
Additional Information Regarding the
Technical Specifications for the
Renewal for Amended Facility
Operating License, November 15, 2016.
University of Missouri-Columbia ML16321A455.
Response to NRC Request for
Additional Information Regarding the
Security Plan for the Renewal for
Amended Facility Operating License,
November 15, 2016.
University of Missouri-Columbia ML16350A424.
Response to NRC Request for
Additional Information Regarding the
Renewal for Amended Facility
Operating License, December 14, 2016.
University Of Missouri-Columbia ML16124A885.
Regarding Issuance of Renewed
Facility Operating License No. R-103
for The University Of Missouri--
Columbia Research Reactor (TAC No.
ME1580) January 4, 2017.
------------------------------------------------------------------------
[[Page 3816]]
Dated at Rockville, Maryland, this 5th day of January 2017.
For the Nuclear Regulatory Commission.
Michael Balazik,
Chief (Acting), Research and Test Reactors Licensing Branch, Division
of Policy and Rulemaking, Office of Nuclear Reactor Regulation.
[FR Doc. 2017-00523 Filed 1-11-17; 8:45 am]
BILLING CODE 7590-01-P