Surface Transportation Board – Federal Register Recent Federal Regulation Documents
Results 601 - 650 of 3,664
Railroad Cost Recovery Procedures-Productivity Adjustment
In a decision served on February 6, 2020, the Board proposed to adopt 1.010 (1.0% per year) as the measure of average (geometric mean) change in railroad productivity for the 2014-2018 (five-year) period. This represents an increase of 0.5% from the average for the 2013-2017 period. The Board's February 6, 2020 decision in this proceeding stated that comments may be filed addressing any perceived data and computational errors in the Board's calculation. The decision also stated that, unless a further order is issued postponing the effective date, this decision will take effect on March 1, 2020.
Soo Line Corporation-Control-Central Maine & Quebec Railway, Inc.
The Surface Transportation Board (Board) is accepting for consideration the application filed on December 17, 2019, by Soo Line Corporation (Soo Line Corp.) and Central Maine & Quebec Railway US Inc. (CMQR US) (collectively, Applicants). The application seeks Board approval for Soo Line Corp., an indirect wholly owned holding company subsidiary of Canadian Pacific Railway Company (CP), to acquire control of CMQR US. This proposal is referred to as the Transaction. The Board finds that the application is complete. The Board also makes the preliminary determination, based on the evidence presented in the application, that the Transaction is a minor transaction because it ``clearly will not have any anticompetitive effects'' and that, if any such anticompetitive effects were found to exist, they would ``clearly be outweighed by the [T]ransaction's anticipated contribution to the public interest in meeting significant transportation needs.'' 49 CFR 1180.2. The Board emphasizes that this is not a final determination and may be rebutted by subsequent filings and evidence submitted into the record for this proceeding. The Board will carefully consider any claims that the Transaction would have anticompetitive effects.
Civil Monetary Penalties-2020 Adjustment
The Surface Transportation Board (Board) is issuing a final rule to implement the annual inflationary adjustment to its civil monetary penalties, pursuant to the Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015.
Winthrop Sargent, John Cogliano, and Paul Fuerst-Acquisition of Control-Plymouth and Brockton Street Railway Company, Brush Hill Transportation Company, and McGinn Bus Company, Inc.
On December 6, 2019, Winthrop Sargent (Sargent), John Cogliano (Cogliano), and Paul Fuerst (Fuerst) (collectively, Applicants), all noncarriers, filed an application for authority after-the-fact to acquire control of Plymouth and Brockton Street Railway Company (P&B), Brush Hill Transportation Company (Brush Hill), and McGinn Bus Company, Inc. (McGinn), from George S. Anzuoni and Richard W. Anzuoni (collectively, Sellers). The Board is tentatively approving and granting after-the-fact authorization of the transaction, and, if no opposing comments are timely filed, this notice will be the final Board action. Persons wishing to oppose the application must follow Board regulations.
Quarterly Rail Cost Adjustment Factor
The Board has approved the first quarter 2020 Rail Cost Adjustment Factor (RCAF) and cost index filed by the Association of American Railroads. The first quarter 2020 RCAF (Unadjusted) is 1.043. The first quarter 2020 RCAF (Adjusted) is 0.440. The first quarter 2020 RCAF-5 is 0.414.
Regulatory Agenda; Semiannual Regulatory Agenda
The Chairman of the Surface Transportation Board is publishing the Regulatory Flexibility Agenda for fall 2019.
Seven County Infrastructure Coalition-Rail Construction & Operation-in Utah, Carbon, Duchesne, and Uintah Counties, Utah
The Seven County Infrastructure Coalition (Coalition) intends to seek Board approval to construct and operate an approximately 85- mile rail line between the Uinta Basin in northeastern Utah and an existing rail line near Kyune, Utah. On June 19, 2019, the Board's Office of Environmental Analysis (OEA) issued a Notice of Intent to Prepare an EIS and a Notice of Availability of the Draft Scope of Study (Draft Scope), pursuant to National Environmental Policy Act (NEPA). OEA requested comments on the Draft Scope from federal, state, and local agencies; tribes; other interested stakeholders; and the public during the public scoping period and held six public meetings in the project area. After review and consideration of all comments received, this notice sets forth the Final Scope of Study (Final Scope) of the EIS. The Final Scope reflects additions and changes to the Draft Scope as a result of comments received during the scoping comment period. The Final Scope also summarizes and addresses the principal environmental concerns raised by the comments on the Draft Scope and explains if and how these issues will be addressed in the EIS.
60-Day Notice of Intent To Seek Extension of Approval: System Diagram Maps
As required by the Paperwork Reduction Act of 1995 (PRA), the Surface Transportation Board (STB or Board) gives notice of its intent to seek approval from the Office of Management and Budget (OMB) for an extension of the collection of system diagram maps, described below.
60-Day Notice of Intent to Seek Extension of Approval: Rail Depreciation Studies
As required by the Paperwork Reduction Act of 1995 (PRA), the Surface Transportation Board (STB or Board) gives notice of its intent to seek approval from the Office of Management and Budget (OMB) for an extension of the collection of Rail Depreciation Studies, described below.
60-Day Notice of Intent To Seek Extension of Approval: Arbitration “Opt-In” Notices
As required by the Paperwork Reduction Act of 1995 (PRA), the Surface Transportation Board (STB or Board) gives notice of its intent to seek approval from the Office of Management and Budget (OMB) for an extension of the collection of Arbitration ``Opt-in'' Notices, described below.
60-Day Notice of Intent To Seek Extension of Approval: Information Collection Activities-Recordations (Rail and Water Carrier Liens), Water Carrier Tariffs, and Agricultural Contract Summaries
As required by the Paperwork Reduction Act of 1995 (PRA), the Surface Transportation Board (STB or Board) gives notice of its intent to seek approval from the Office of Management and Budget (OMB) for an extension of the collection required by statute for rail or water carrier equipment liens (recordations), water carrier tariffs, and rail agricultural contract summaries, as described in more detail below.
Limiting Extensions of Trail Use Negotiating Periods; Rails-to-Trails Conservancy-Petition for Rulemaking
The Surface Transportation Board (Board or STB) is adopting a final rule amending its regulations related to the National Trails System Act to: (1) Provide that the initial term for Certificates or Notices of Interim Trail Use or Abandonment will be one year (instead of the current 180 days); (2) permit up to three one-year extensions of the initial period if the trail sponsor and the railroad agree; and (3) permit additional one-year extensions if the trail sponsor and the railroad agree and extraordinary circumstances are shown.
Waybill Sample Reporting
The Surface Transportation Board (Board) proposes to amend its regulations with respect to the Waybill Sample data that railroads are required to submit to the Board. The proposed amendments to the Waybill Sample regulations would simplify the sampling rates of non-intermodal carload shipments and specify separate sampling strata and rates for intermodal shipments.
30-Day Notice of Intent To Seek Extension of Approval: Class I Railroad Annual Report
As required by the Paperwork Reduction Act of 1995 (PRA), the Surface Transportation Board (STB or Board) gives notice of its intent to seek approval from the Office of Management and Budget (OMB) for an extension of the collection of Class I Railroad Annual Reports, described below. The Board previously published a notice about this collection in the Federal Register on September 12, 2019. That notice allowed for a 60-day public review and comment period. No comments were received.
Bessemer and Lake Erie Railroad Company-Acquisition and Operation-Certain Rail Lines of CSX Transportation, Inc. in Onondaga, Oswego, Jefferson, Saint Lawrence, and Franklin Counties, NY
The Surface Transportation Board (Board) is accepting for consideration the application filed on October 11, 2019, by Bessemer and Lake Erie Railroad Company (B&LE or Applicant).\1\ The application seeks Board approval for B&LE, an indirect wholly owned rail carrier subsidiary of Canadian National Railway Company (CNR), to acquire from CSX Transportation, Inc. (CSXT), and to operate approximately 236.3 miles of rail line in New York. This proposal is referred to as the Transaction.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.