Federal Highway Administration – Federal Register Recent Federal Regulation Documents

Results 701 - 750 of 2,610
Notice of Final Federal Agency Actions on Proposed Highway in California
Document Number: 2018-06639
Type: Notice
Date: 2018-04-02
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans. The actions relate to a proposed highway project, State Route 132 West Freeway/Expressway Project from post miles 11.0 to 15.0 and 15.7 to 17.5 in the County of Stanislaus in the City of Modesto, State of California. Those actions grant licenses, permits, and approvals for the project.
Environmental Impact Statement: Alexander, Pulaski, and Union Counties, Illinois
Document Number: 2018-06329
Type: Notice
Date: 2018-03-29
Agency: Federal Highway Administration, Department of Transportation
The FHWA is issuing this notice to advise the public that an environmental impact statement will not be prepared for a proposed transportation project in Alexander, Pulaski, and Union Counties, Illinois between the intersection of Illinois Route 3 with Illinois Route 146 and Interstate 57.
Agency Information Collection Activities: Request for Comments for a New Information Collection
Document Number: 2018-05359
Type: Notice
Date: 2018-03-16
Agency: Federal Highway Administration, Department of Transportation
The FHWA has forwarded the information collection request described in this notice to the Office of Management and Budget (OMB) for approval of a new information collection. We published a Federal Register Notice with a 60-day public comment period on this information collection on June 19, 2017. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Notice of Intent To Prepare Environmental Impact Statement, I-495 & I-270 Managed Lanes Study, Montgomery and Prince George's Counties, Maryland and Fairfax County, Virginia
Document Number: 2018-05354
Type: Notice
Date: 2018-03-16
Agency: Federal Highway Administration, Department of Transportation
The FHWA, as the Lead Federal Agency, and MDOT SHA, as the Local Project Sponsor, are issuing this notice to advise the public of our intention to prepare an EIS for the I-495 & I-270 Managed Lanes Study (Study). The Study is the first element of a broader Traffic Relief Plan as announced by Governor Larry Hogan in September 2017, which considers improvements along the entire length of I-495 (Capital Beltway), as well as the entire length of I-270 (Dwight D. Eisenhower Memorial Highway) up to I-70 in Frederick County, Maryland. This EIS will evaluate the potential environmental impacts of alternatives that address congestion within the specific Study scope of I-495 from south of the American Legion Bridge in Fairfax County, Virginia to east of the Woodrow Wilson Bridge and on I-270 from I-495 to I-370, including the east and west I-270 spurs in Montgomery and Prince George's Counties, Maryland. The EIS will be prepared in accordance with regulations implementing the National Environmental Policy Act (NEPA) and provisions of the Fixing America's Surface Transportation (FAST) Act and will include a range of reasonable alternatives, including a ``No Build'' alternative.
Environmental Impact Statement: Little Cottonwood Canyon, Salt Lake County, Utah
Document Number: 2018-04808
Type: Notice
Date: 2018-03-09
Agency: Federal Highway Administration, Department of Transportation
FHWA, on behalf of the Utah Department of Transportation (UDOT), is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for proposed transportation improvements in and near Little Cottonwood Canyon in Salt Lake County, Utah.
Notice of Final Federal Agency Actions on Proposed Highway in Indiana
Document Number: 2018-04067
Type: Notice
Date: 2018-03-02
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by the FHWA and the USFWS that are final pursuant to the statute. The actions relate to the proposed highway project for a 26-mile segment of Interstate 69 (I-69) in the Counties of Morgan, Johnson, and Marion, State of Indiana, and grant licenses, permits, and approvals for the project.
Agency Information Collection Activities: Request for Comments for a New Information Collection
Document Number: 2018-04064
Type: Notice
Date: 2018-02-28
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Transportation Asset Management Plan Development Processes Certification and Recertification Guidance; Transportation Asset Management Plan Consistency Determination Interim Guidance
Document Number: 2018-03618
Type: Notice
Date: 2018-02-22
Agency: Federal Highway Administration, Department of Transportation
The FHWA is finalizing one guidance document and issuing one interim guidance document: Transportation Asset Management Plan Development Processes Certification and Recertification Guidance, and Transportation Asset Management Plan Consistency Determination Interim Guidance. These documents provide implementation guidance on provisions of the Moving Ahead for Progress in the 21st Century Act (MAP-21) and the Asset Management Final Rule, which requires a State department of transportation (State DOT) to develop and implement a risk-based asset management plan. Under these authorities, FHWA must certify that Transportation Asset Management Plan (TAMP) development processes established by a State DOT meet applicable requirements, and make an annual consistency determination, evaluating whether a State DOT has developed and implemented a State-approved TAMP that meets all applicable requirements. This notice finalizes the Transportation Asset Management Plan Development Processes Certification and Recertification Guidance, issues interim guidance on transportation asset management plan consistency determinations, and summarizes the comments received on the drafts of both guidance documents, FHWA's response to those comments, and any changes that were made to the guidance documents issued with this notice.
Fixing America's Surface Transportation (FAST) Act; Equal Access for Over-the-Road Buses Guidance
Document Number: 2018-03617
Type: Notice
Date: 2018-02-22
Agency: Federal Highway Administration, Department of Transportation
This Notice announces and outlines the final guidance for requirements contained in Section 1411(a) and (b) of the FAST Act regarding the treatment of over-the-road buses (OTRBs).
Environmental Impact Statement; Henry County, Virginia
Document Number: 2018-03597
Type: Notice
Date: 2018-02-22
Agency: Federal Highway Administration, Department of Transportation
The U.S. Department of Transportation, Federal Highway Administration (FHWA), in coordination with the Virginia Department of Transportation (VDOT), is issuing this notice of intent to advise the public, agencies, and stakeholders that an Environmental Impact Statement (EIS) will be prepared to study the effects of a highway project under consideration along the Route 220 corridor in Henry County, Virginia.
Agency Information Collection Activities: Notice of Request for Reinstatement of a Previously Approved Information Collection
Document Number: 2018-03502
Type: Notice
Date: 2018-02-21
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for renewal of an existing information collection that is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Notice of Request for Extension of Currently Approved Information Collection
Document Number: 2018-03501
Type: Notice
Date: 2018-02-21
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for renewal of an existing information collection that is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Notice of Final Federal Agency Actions on Proposed Highway Project in Rhode Island
Document Number: 2018-03139
Type: Notice
Date: 2018-02-15
Agency: Federal Highway Administration, Department of Transportation
This notice corrects information in the January 19, 2018, Notice of Limitation on Claims for Judicial Review of Actions at 83 FR 2867 in reference to deletion of incorrect information regarding FHWA's assumed environmental responsibilities and Executive Order references that are not applicable.
Notice of Final Federal Agency Actions of Proposed Highway/Interchange Improvement in California; Statute of Limitations on Claims
Document Number: 2018-02610
Type: Notice
Date: 2018-02-09
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, that are final. The actions relate to the proposed highway project, Niles Canyon Safety Improvements Project on State Route 84 (SR-84) between the City of Fremont and the town of Sunol in southern Alameda County, State of California. Those actions grant licenses, permits, and approvals for the project.
Environmental Impact Statement: I-80/I-215 Parley's Interchange, Salt Lake County, Utah
Document Number: 2018-02609
Type: Notice
Date: 2018-02-09
Agency: Federal Highway Administration, Department of Transportation
FHWA, on behalf of the Utah Department of Transportation (UDOT), is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for proposed transportation improvements to the I-80/I-215 Parleys Interchange in Salt Lake County, Utah.
Rescinding the Notice of Intent for an Environmental Impact Statement (EIS): 14th Street Bridge Corridor, Arlington County, Virginia and Washington, DC
Document Number: 2018-02605
Type: Notice
Date: 2018-02-09
Agency: Federal Highway Administration, Department of Transportation
The FHWA is issuing this notice to advise the public that the Notice of Intent (NOI) for the preparation of an Environmental Impact Statement to study ways to reduce congestion, enhance safety, and improve traffic operation in the 14th Street Bridge Corridor (Interstate 395) is being rescinded. The NOI was published in the Federal Register on July 18, 2006. A draft EIS was released in January 2012. This rescission is based on a lack of available funding for the full corridor proposals and has led to identification of numerous individual projects of independent utility.
Rescinding the Notice of Intent for an Environmental Impact Statement (EIS): Manassas National Battlefield Park Bypass, Loudon, Fairfax, Fauquier and Prince William Counties, VA
Document Number: 2018-02602
Type: Notice
Date: 2018-02-09
Agency: Federal Highway Administration, Department of Transportation
The FHWA is issuing this notice to advise the public that the Notice of Intent (NOI) for the preparation of an EIS to identify and study alternative means of transportation for traffic currently using the two main public roadways (VA Routes 29 and 234) running through the Manassas National Battlefield Park is being rescinded. The NOI was published in the Federal Register on November 1, 2001. A draft EIS was released in January 2005. This rescission is based on a lack of available funding for the proposed new road alignments proposed by this project as well as lack of funding and planning approval for the Bi- County Parkway.
Agency Information Collection Activities: Notice of Request for Renewal of a Previously Approved Information Collection
Document Number: 2018-02538
Type: Notice
Date: 2018-02-08
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for renewal of a previously approved information collection that is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Notice of Request for Extension of Currently Approved Information Collection
Document Number: 2018-02526
Type: Notice
Date: 2018-02-08
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for renewal of an existing information collection that is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Request for Comments for a New Information Collection
Document Number: 2018-02525
Type: Notice
Date: 2018-02-08
Agency: Federal Highway Administration, Department of Transportation
The FHWA has forwarded the information collection request described in this notice to the Office of Management and Budget (OMB) for approval of a new information collection. We published a Federal Register Notice with a 60-day public comment period on this information collection on June 19, 2017. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Alaska National Interest Lands Conservation Act of 1980 (ANILCA) Title XI Notice of Time Extension for Environmental Impact Statement
Document Number: 2018-02265
Type: Notice
Date: 2018-02-06
Agency: Federal Highway Administration, Department of Transportation
The FHWA has determined it necessary to extend the date by which a final environmental impact statement will be published for the Sterling Highway Milepost 45-60 Project in Alaska, and thereby to extend the timing of decisions of involved Federal agencies regarding the project. Timelines and the process of extending timelines are established in the Alaska National Interest Lands Conservation Act of 1980 (ANILCA) for certain projects. The FHWA is extending the date to accommodate a potential shift in the preferred alternative and to determine with the Department of the Interior how a 2017 commitment to undertake a land exchange in the project area would affect the decision making process. The delay is agreeable to the applicant (Alaska Department of Transportation and Public Facilities) and other involved Federal agencies.
Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: Dane County, Wisconsin
Document Number: 2018-01569
Type: Notice
Date: 2018-01-29
Agency: Federal Highway Administration, Department of Transportation
A Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) was published in the Federal Register Vol. 80, No. 65, April 6, 2015 to advise the public that FHWA and WisDOT would prepare an Environmental Impact Statement (EIS) for a proposed freeway interchange improvement project on Interstate I-39/90 at the I-39/90 and US 12/18 interchange (Beltline Interchange) and adjacent local road systems in the City of Madison, Dane County, Wisconsin. The FHWA is issuing this notice to advise the public that FHWA and WisDOT will no longer prepare an EIS for this interchange improvement project. FHWA and WisDOT will prepare an Environmental Assessment (EA) for a proposed improvement project with reduced scope and impacts.
Notice of Final Federal Agency Actions on Proposed Highway in California
Document Number: 2018-01316
Type: Notice
Date: 2018-01-24
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, and USFWS. The actions relate to a proposed highway project on Interstate 10 (I-10), the I-10/Avenue 50 New Interchange Project, located in the eastern portion of the City of Coachella in the County of Riverside, State of California. The proposed interchange is located approximately 3.4 miles east of the existing I- 10/Dillon Road interchange, and approximately 9.1 miles west of the existing Cactus City Safety Road Rest Area. Those actions grant licenses, permits, and approvals for the project.
Agency Information Collection Activities: Request for Comments for a New Information Collection
Document Number: 2018-01137
Type: Notice
Date: 2018-01-23
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under Supplementary Information. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Notice of Request for Extension of Currently Approved Information Collection
Document Number: 2018-01135
Type: Notice
Date: 2018-01-23
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for renewal of an existing information collection that is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Notice of Final Federal Agency Actions on Proposed Highway Project in Rhode Island
Document Number: 2018-00665
Type: Notice
Date: 2018-01-19
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by the FHWA that are final pursuant to the statute. The actions relate to a proposed highway project, Toll Locations 1 and 2 in the Towns of Hopkinton, Richmond, and Exeter in the State of Rhode Island, FHWA Project Number T0LL002, Rhode Island Department of Transportation (RIDOT) Contract Number 2017- OT-002.
Environmental Impact Statement: Strafford and Rockingham County, New Hampshire
Document Number: 2018-00785
Type: Notice
Date: 2018-01-18
Agency: Federal Highway Administration, Department of Transportation
The FHWA is issuing this notice to advise the public that a Supplemental Environmental Impact Statement (SEIS) will be prepared to re-evaluate a reasonable range of transportation alternatives associated with the General Sullivan Bridge (GSB) for maintaining access for pedestrians and bicyclists across Little Bay in Newington and Dover, New Hampshire, thereby retaining this regional connectivity in northern coastal New Hampshire.
Automated Driving Systems
Document Number: 2018-00784
Type: Notice
Date: 2018-01-18
Agency: Federal Highway Administration, Department of Transportation
Automated Driving Systems (ADS) are increasingly being tested and introduced onto the public roadways. The FHWA is interested in hearing from the public, including stakeholders (e.g., State and local agencies, vehicle manufacturing industry, road hardware and intelligent transportation systems industry, related associations, transportation advocates, ADS hardware and software platform developers, etc.), on a range of issues related to assessing the infrastructure requirements and standards that may be necessary for enabling safe and efficient operations of ADS.
Notice of Final Federal Agency Actions of Proposed Highway Improvement in California; Statute of Limitations on Claims
Document Number: 2018-00775
Type: Notice
Date: 2018-01-18
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans. The actions relate to the proposed widening project on State Route 138 (SR-138) between 5th Street East and 10th Street East from two lanes to three lanes in each direction, a distance of approximately 0.5 mile. Additionally, the project proposes to widen Sierra Highway from two lanes to three lanes in each direction between Avenue R and a point 500 feet south of Avenue Q, a distance of approximately 0.9 mil, in the City of Palmdale within the County of Los Angeles, State of California. Those actions grant licenses, permits, and approvals for the project.
Buy America Waiver Notification
Document Number: 2017-28150
Type: Notice
Date: 2017-12-28
Agency: Federal Highway Administration, Department of Transportation
This notice provides information regarding FHWA's finding that a Buy America waiver is appropriate for iron and steel components of Georgia Ports Authority (GPA)-procured Rail Mounted Gantry (RMG) cranes that will increase intermodal capacity at the Garden City Terminal in Garden City, Georgia. These iron and steel components are not manufactured (from melting to coating) in the United States in sufficient and reasonably available quantities and of a satisfactory quality. This notice follows FHWA's November 20, 2017, notice finding that a Buy America waiver is appropriate for 33 specific iron and steel components of the GPA Project by adding new items to the list of waived products.
Agency Information Collection Activities: Request for Comments for a New Information Collection
Document Number: 2017-28034
Type: Notice
Date: 2017-12-28
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Tribal Transportation Self-Governance Program; Negotiated Rulemaking Committee Meeting
Document Number: 2017-27439
Type: Proposed Rule
Date: 2017-12-21
Agency: Federal Highway Administration, Department of Transportation
As required by the Negotiated Rulemaking Act, the Secretary of Transportation announces a meeting of the Tribal Transportation Self- Governance (TTSGP) Negotiated Rulemaking Committee. The meeting is open to the public.
Productive and Timely Expenditure of Funds
Document Number: 2017-27270
Type: Notice
Date: 2017-12-19
Agency: Federal Highway Administration, Department of Transportation
This notice announces the FHWA website, ``FAST Act Section 1421Programmatic Approaches to Project Delivery,'' where information and guidance on improving project delivery is consolidated to encourage implementation of approaches, techniques, and best practices to facilitate the productive, effective, and timely expenditure of title 23, United States Code, funds. Consistent implementation of the information and guidance provided on the website will serve to assist Federal-aid recipients in effectively using Federal funds by avoiding unnecessary, costly project delays and minimizing project cost overruns.
Agency Information Collection Activities: Request for Comments for a New Information Collection
Document Number: 2017-27178
Type: Notice
Date: 2017-12-18
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under Supplementary Information. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Notice of Final Federal Agency Actions on Proposed Highway in California
Document Number: 2017-27046
Type: Notice
Date: 2017-12-18
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans that are final within the meaning of agency law. The actions relate to a proposed highway project, Interstate 15, from post mile 18.3 to post mile 21.0, in the City of Lake Elsinore, in the County of Riverside, State of California. Those actions grant licenses, permits, and approvals for the project.
Notice of Final Federal Agency Actions on Proposed Highway in Idaho
Document Number: 2017-26946
Type: Notice
Date: 2017-12-15
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by the FHWA. The actions relate to a proposed highway project, US 20/26 Corridor Study, Junction I-84 to Eagle Road in Ada and Canyon Counties in the State of Idaho, FHWA Project Number STP-3230(106), Idaho Transportation Department (ITD) Key Number 07826.
Surface Transportation Project Delivery Program; TxDOT Audit #4 Report
Document Number: 2017-26947
Type: Notice
Date: 2017-12-14
Agency: Federal Highway Administration, Department of Transportation
The Surface Transportation Project Delivery Program allows a State to assume FHWA's environmental responsibilities for review, consultation, and compliance for Federal highway projects. When a State assumes these Federal responsibilities, the State becomes solely responsible and liable for carrying out the responsibilities it has assumed, in lieu of FHWA. Prior to the Fixing America's Surface Transportation (FAST) Act of 2015, the Program required semiannual audits during each of the first 2 years of State participation to ensure compliance by each State participating in the Program. This notice announces and solicits comments on the fourth audit report for the Texas Department of Transportation's (TxDOT) participation in accordance with these pre-FAST Act requirements.
Agency Information Collection Activities: Request for Comments for the Renewal of an Information Collection
Document Number: 2017-26266
Type: Notice
Date: 2017-12-06
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request approval from the Office of Management and Budget (OMB) for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Metropolitan Planning Organization Coordination and Planning Area Reform
Document Number: 2017-25762
Type: Rule
Date: 2017-11-29
Agency: Federal Highway Administration, Department of Transportation, Federal Transit Administration
This rulemaking rescinds certain transportation planning regulations pertaining to the establishment of the metropolitan planning area (MPA) boundaries, the designation of metropolitan planning organizations (MPO), and the coordination among MPOs. The amendments contained in this rule carry out the statutory mandate to rescind the final rule published on December 20, 2016, on this topic.
Buy America Waiver Notification
Document Number: 2017-25074
Type: Notice
Date: 2017-11-20
Agency: Federal Highway Administration, Department of Transportation
This notice provides information regarding FHWA's finding that a Buy America waiver is appropriate for 33 iron and steel components of Georgia Ports Authority-procured Rail Mounted Gantry (RMG) cranes that will increase intermodal capacity at the Garden City Terminal in Garden City, Georgia. These iron and steel components are not manufactured (from melting to coating) in the United States in sufficient and reasonably available quantities and of a satisfactory quality.
Notice of Final Federal Agency Action on Proposed Highway in Arizona
Document Number: 2017-25069
Type: Notice
Date: 2017-11-20
Agency: Federal Highway Administration, Department of Transportation
The FHWA is issuing this notice to announce action taken by the USACE that are final within the meaning of the United States Code. The action relates to the construction of the South Mountain Freeway/ Loop 202 Project (Project) in Maricopa County, in the Phoenix Metropolitan Area, in the State of Arizona. The USACE granted a Department of the Army permit, pursuant to Section 404 of the Clean Water Act, as amended, authorizing the Arizona Department of Transportation (AZDOT) to discharge dredged or fill material into Waters of the United States at specified locations related to the Project.
Notice of Final Federal Agency Actions of Proposed Highway/Interchange Improvement in California; Statute of Limitations on Claims
Document Number: 2017-24625
Type: Notice
Date: 2017-11-14
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, that are final. The actions relate to the proposed highway project, Alameda Creek Bridge Replacement Project on State Route 84 (SR-84) between the City of Fremont and the town of Sunol in southern Alameda County, State of California. Those actions grant licenses, permits, and approvals for the project.
Notice To Rescind Notice of Intent To Prepare an Environmental Impact Statement: Taylorsville Mobility Study, Salt Lake County, State of Utah
Document Number: 2017-24623
Type: Notice
Date: 2017-11-14
Agency: Federal Highway Administration, Department of Transportation
The FHWA is issuing this notice to advise the public that the Notice of Intent (NOI), issued on March 2, 2010, to prepare an EIS is being rescinded for the proposed Taylorsville Mobility Study transportation project. The proposed EIS was to analyze and address the regional transportation connectivity needs on the west side of the Salt Lake Valley in the area bounded by 6200 South, 4700 South; Bangerter Highway and Redwood Road in Salt Lake County, State of Utah. For Further Information, contact: Edward T. Woolford, Environmental Program Manager, Federal Highway Administration, 2520 West 4700 South, Suite 9A, Salt Lake City, Utah 84129, by telephone (801) 955-3524.
National Performance Management Measures; Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement Program
Document Number: 2017-24345
Type: Proposed Rule
Date: 2017-11-08
Agency: Federal Highway Administration, Department of Transportation
The FHWA is extending the comment period for a notice of proposed rulemaking (NPRM) and request for comments, which was published on October 5, 2017. The original comment period is set to close on November 6, 2017. The extension is based on concern expressed by stakeholders that this closing date does not provide sufficient time to review and provide comprehensive comments on the proposal. The FHWA recognizes that others interested in commenting may have similar concerns, but is mindful of commenters who have expressed opposition to a lengthy rulemaking process. Therefore, the closing date for comments is extended, which will provide stakeholders interested in commenting additional time to submit responses to the docket.
Motorcyclist Advisory Council to the Federal Highway Administration
Document Number: 2017-23862
Type: Notice
Date: 2017-11-02
Agency: Federal Highway Administration, Department of Transportation
This notice announces the first meeting of the Motorcycle Advisory Council (MAC) to the FHWA. The purpose of this meeting is to advise the Secretary of Transportation, through the Administrator of the FHWA, on infrastructure issues of concern to motorcyclists, including; barrier design, road design, construction and maintenance practices, and the architecture and implementation of intelligent transportation system technologies, pursuant to Section 1426 of the Fixing America's Surface Transportation (FAST) Act.
Agency Information Collection Activities: Request for Comments for a New Information Collection
Document Number: 2017-23757
Type: Notice
Date: 2017-11-01
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Notice of Request for Extension of Currently Approved Information Collection
Document Number: 2017-23755
Type: Notice
Date: 2017-11-01
Agency: Federal Highway Administration, Department of Transportation
In compliance with the Paperwork Reduction Act (PRA) of 1995, this notice announces that FHWA will submit the collection of information described below to the Office of Management and Budget (OMB) for review and comment. The Federal Register Notice with a 60-day comment period soliciting comments on the following collection of information was published on August 1, 2017. The PRA submission describes the nature of the information collection and its expected cost and burden.
Notice of Final Federal Agency Actions of Proposed Highway/Interchange Improvement in Ohio; Statute of Limitations on Claims
Document Number: 2017-23202
Type: Notice
Date: 2017-10-25
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of ODOT, is issuing this notice to announce actions taken by ODOT that are final. The actions relate to the proposed modification of the existing interchange at Interstate Route 71 (I-71), United States Route 36 (US-36), and State Route 37 (SR-37) in the County of Delaware, State of Ohio. Those actions grant licenses, permits, and approvals for the project.
Proposed Memorandum of Understanding (MOU) Assigning Certain Federal Environmental Responsibilities to the State of Arizona, Including National Environmental Policy Act (NEPA) Authority for Certain Categorical Exclusions (CEs)
Document Number: 2017-23011
Type: Notice
Date: 2017-10-24
Agency: Federal Highway Administration, Department of Transportation
The FHWA and the State of Arizona, acting by and through its Department of Transportation (State), propose participation of the State in the Categorical Exclusion Assignment program. This Program allows FHWA to assign to States its authority and responsibility for determining whether certain designated activities within the geographic boundaries of the State, as specified in the proposed Memorandum of Understanding (MOU), are categorically excluded from preparation of an environmental assessment or an environmental impact statement under the National Environmental Policy Act.
Notice of Final Federal Agency Actions on Proposed Highway in California
Document Number: 2017-22954
Type: Notice
Date: 2017-10-23
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, that are final. The actions relate to a proposed highway project, located on State Route 20 between post miles R18.07/20.25 in the County of Yuba, State of California. Those actions grant licenses, permits, and approvals for the project.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.